CN211181176U - Comprehensive training equipment for security education training - Google Patents

Comprehensive training equipment for security education training Download PDF

Info

Publication number
CN211181176U
CN211181176U CN201922073932.XU CN201922073932U CN211181176U CN 211181176 U CN211181176 U CN 211181176U CN 201922073932 U CN201922073932 U CN 201922073932U CN 211181176 U CN211181176 U CN 211181176U
Authority
CN
China
Prior art keywords
portal frame
wall
training
fixed
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922073932.XU
Other languages
Chinese (zh)
Inventor
张春亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liangjian Development Of Science And Technology Development Beijing Co ltd
Original Assignee
Liangjian Development Of Science And Technology Development Beijing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liangjian Development Of Science And Technology Development Beijing Co ltd filed Critical Liangjian Development Of Science And Technology Development Beijing Co ltd
Priority to CN201922073932.XU priority Critical patent/CN211181176U/en
Application granted granted Critical
Publication of CN211181176U publication Critical patent/CN211181176U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

A security protection education training comprehensive training device relates to the technical field of safety training devices; the front wall is a fixed point training wall, a first portal frame is fixed above the fixed point training wall, first safety guardrails are respectively arranged on two sides of the first portal frame, and the first portal frame is connected with a first rope through a fixed pulley; a window of a building of the simulation building is arranged on the wall on the right side surface, a second portal frame is arranged at the upper end of the wall, second safety guardrails are respectively arranged on two sides of the second portal frame, a second rope is connected to the second portal frame through a fixed pulley, and a first door is arranged on one side of the bottom of the wall; the left side wall is a rock climbing wall, and a third safety guardrail is fixed at the upper end of the rock climbing wall; the upper end of the back wall is fixed with a soft rope rapid-descent portal frame and a pipeline rapid-descent portal frame, and the outer sides of the soft rope rapid-descent portal frame and the pipeline rapid-descent portal frame are respectively fixed with a fourth safety guardrail. The utility model discloses almost included the main disaster prevention and reduction safety training content project in the present society, exert its maximum effect.

Description

Comprehensive training equipment for security education training
Technical Field
The utility model relates to a safety training equipment technical field, concretely relates to security protection education training comprehensive training equipment.
Background
In recent years, natural disasters have entered a frequent period, which causes irreparable losses to the society and people, and causes a shadow that is hard to forget to the people. In a new era, the importance of disaster prevention and reduction safety education is increasingly realized from parties and national governments, and for this reason, the specialized expenditure of all levels of governments is paid, and schools and society are required to generally develop disaster prevention and reduction safety education training. However, most of the current safety training popular in the society is lecture type training, the form is single, and the effect is poor; secondly, the old concept for many years leads to the social neglect of disaster prevention and reduction safety education; thirdly, the existing domestic equipment for disaster prevention and reduction safety education and training is extremely lack, and most training equipment is single, has few functions and poor effect. The effect and quality of the national disaster prevention and reduction education are greatly influenced. Therefore, a multifunctional comprehensive training device for disaster prevention and reduction safety is provided. The utility model integrates the safety training of 12 functions into a whole through integrating resources, scientific design and reasonable arrangement, saves a large amount of resources, saves space and the cost of a user, not only ensures the effect and quality of training, but also is convenient to push in all training camps and bases all over the country-a good foundation is laid for promoting the development of domestic disaster prevention and reduction education to standardization and healthiness.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure, reasonable in design, convenient to use's security protection education training comprehensive training equipment to prior art's defect and not enough.
In order to achieve the above object, the utility model adopts the following technical scheme: the device comprises a fixed-point training wall, a first safety guardrail, a first portal frame, a first rope, a second safety guardrail, a second portal frame, a second rope, a building window of a simulation building, a first door, a third safety guardrail, a rock climbing wall, a fourth safety guardrail, a soft rope fast-descending portal frame, a pipeline fast-descending portal frame, a second door, an up-down spiral ladder channel, a deep well rescue and a crack rescue; the four walls are connected end to end and are in a cube shape, the front wall is a fixed point training wall, a first portal frame is fixed above the fixed point training wall, first safety guardrails are respectively arranged on two sides of the first portal frame, and the first portal frame is connected with a first rope through a fixed pulley; a window of a building of the simulation building is arranged on the wall on the right side surface, a second portal frame is arranged at the upper end of the wall, second safety guardrails are respectively arranged on two sides of the second portal frame, a second rope is connected to the second portal frame through a fixed pulley, and a first door is arranged on one side of the bottom of the wall; the left side wall is a rock climbing wall, and a third safety guardrail is fixed at the upper end of the rock climbing wall; a soft rope rapid-descent portal frame and a pipeline rapid-descent portal frame are fixed at the upper end of the back wall, fourth safety guardrails are respectively fixed on the outer sides of the soft rope rapid-descent portal frame and the pipeline rapid-descent portal frame, and a second door is arranged at the bottom of the climbing wall; the inner sides of the left side wall and the back wall are provided with an upper spiral ladder channel and a lower spiral ladder channel, one side of the upper spiral ladder channel and one side of the lower spiral ladder channel are provided with deep well rescue, and one side of the deep well rescue is provided with crack rescue.
Furthermore, the first portal frame is connected with a third portal frame through a sliding rope, and the third portal frame is connected with a pull rope.
Furthermore, air defense warning sound playing devices are arranged on the inner sides of the right side wall and the back wall.
Furthermore, the inner sides of the fixed point training wall and the left side wall are provided with a light and fire smoke training device and a fire alarm and sounding device.
After the structure is adopted, the utility model discloses the beneficial effect who produces does: a security protection education training comprehensive training equipment, through designing a disaster prevention and reduction safety education training comprehensive training equipment, to some training items of present single use and setting, form as an organic whole through the integration, compensatied the blank of internal disaster prevention and reduction comprehensive training equipment, both saved a large amount of resources, saved installation and training activity occupation space again, also saved a large amount of purchase installation funds of use unit simultaneously. The utility model has the advantages of can accomplish on same equipment that high-rise fast fall flees, high-rise fast fall rescue, wounded's lift rescue, high-rise building climbing flees and rescue, high-rise building soft rope is climbed rescue and is fleed with the gliding, high-rise building pipeline is climbed rescue and is fleed with the gliding, air defense warning people's air defense, smog way is fleed, shaft rescue, wall body crack rescue, rock climbing, high-rise building sideslip and swim 12 project training such as flee under the crossline, almost included the main disaster prevention in the present society and subtracted disaster safety training content project, exert its maximum effect, the utility model has the advantages of simple structure, set up reasonable, the cost of manufacture low grade.
Drawings
FIG. 1 is a block diagram of the present invention;
FIG. 2 is a view of section A-A of FIG. 1;
FIG. 3 is a block diagram of section B-B of FIG. 1;
FIG. 4 is a schematic view of section C-C of FIG. 1;
FIG. 5 is a schematic view of section D-D of FIG. 1;
FIG. 6 is a view of section E-E of FIG. 3;
FIG. 7 is a structural diagram of the present invention for high-rise building horizontal sliding ferry escaping training;
fig. 8 is a top view of fig. 7.
Description of reference numerals:
the device comprises a fixed point training wall 1, a first safety guardrail 2, a first portal frame 3, a first rope 4, a second safety guardrail 5, a second portal frame 6, a second rope 7, a simulation building window 8, a first door 9, a third safety guardrail 10, a rock climbing wall 11, a fourth safety guardrail 12, a soft rope fast-descending portal frame 13, a pipeline fast-descending portal frame 14, a second door 15, a spiral ladder up-and-down channel 16, a deep well rescue 17, a crack rescue 18, a third portal frame 19, a sliding rope 20 and a pull rope 21.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Referring to fig. 1 to 6, the following technical solutions are adopted in the present embodiment: the device comprises a fixed-point training wall 1, a first safety guardrail 2, a first portal frame 3, a first rope 4, a second safety guardrail 5, a second portal frame 6, a second rope 7, a window 8 of a simulation building, a first door 9, a third safety guardrail 10, a rock climbing wall 11, a fourth safety guardrail 12, a soft rope fast descending portal frame 13, a pipeline fast descending portal frame 14, a second door 15, a spiral ladder up-down channel 16, a deep well rescue 17 and a crack rescue 18; the four walls are connected end to end and are in a cube shape, the front wall is a fixed point training wall 1, a first portal frame 3 is fixed above the fixed point training wall 1, first safety guardrails 2 are respectively arranged on two sides of the first portal frame 3, and a first rope 4 is connected to the first portal frame 3 through a fixed pulley; a window 8 of a building of the simulation building is arranged on the wall on the right side, a second portal frame 6 is arranged on the wall, second safety guardrails 5 are respectively arranged on two sides of the second portal frame 6, a second rope 7 is connected to the second portal frame 6 through a fixed pulley, and a first door 9 is arranged on one side of the bottom of the wall; the left side wall is a rock climbing wall 11, and a third safety guardrail 10 is fixed at the upper end of the rock climbing wall 11; the upper end of the back wall is fixed with a soft rope fast-descending portal frame 13 and a pipeline fast-descending portal frame 14, the outer sides of the soft rope fast-descending portal frame 13 and the pipeline fast-descending portal frame 14 are respectively fixed with a fourth safety guardrail 12, and the bottom of the rock climbing wall 11 is provided with a second door 15.
Referring to fig. 7-8, the first portal frame 3 is connected with a third portal frame 19 through a slide rope 20, the third portal frame 19 is connected with a pull rope 21, 2 groups of solid hook rings are respectively arranged on a quick-descending frame beam on the upper part in front of the equipment, a special steel lock for users and an outdoor special power rope with the diameter of 12mm are connected, the other end of the rope is connected with a fixed ring which is arranged at a position 30000mm away from the front straight line of the equipment and is 2500mm high and 5000mm wide and is arranged on the upper beam of the portal frame, the portal frame is formed by welding national standard 140mm steel pipes, and the fixed rings on the surfaces of embedded parts are connected to form a large right triangle for the cross-sliding swinging escape training of high-rise buildings.
1500mm above the front wall is a safety guardrail, and the safety guardrail is formed by welding 30mm steel pipes; two groups of 2000mm high 1200mm wide gantry quick descending support frames are arranged, the gantry is formed by welding national standard 140 steel pipes, a structure surface with the lower part of 8500mm 6000mm is welded into an integral plane by a national standard checkered plate with the thickness of 2.5mm, the area of the integral plane is 8500mm 6000mm, six 8 circles which are drawn in a double-row bow shape are arranged on the integral plane, the diameter of the six circles is 500mm, and the six circles are used for fixed point quick descending rescue training above a high-rise building; meanwhile, an outdoor fixed pulley is arranged above the lifting device and connected with an outdoor power rope with the diameter of 12mm, and the outdoor fixed pulley is connected with a movable pulley on a safety belt for fixing the wounded below the lifting device, so that the lifting device can be applied to lifting rescue training of the wounded on the ground of the high-rise building.
1500mm above the right side wall is a safety guardrail frame formed by welding 30mm steel pipes; two groups of 1200 x 2000mm portal frames are arranged, the portal frames are formed by welding national standard 140mm steel pipes, the lower 8500 x 6000mm structural surface is welded into an integral plane by a national standard checkered plate with the thickness of 2.5mm, the area is 6000 x 8500mm, and six simulated building windows which are arranged in a left-right double mode are arranged on the integral plane and are used for the high-rise building to enter the house rescue training from the upper quick descending window.
1500mm above the left side wall is a safety guardrail frame which is formed by welding 30mm steel pipes; the structure surface of 8500mm 6000mm below is welded into an integral plane by using a national standard checkered plate with the thickness of 2.5mm, the area is 6000mm 8500mm, and a plurality of irregular rock points are arranged on the integral plane according to 3 rock points per square meter and are used for training climbing rescue and training the speed climbing of common adults and children.
1500mm above the back wall is a safety guardrail frame which is formed by welding 30mm steel pipes; wherein, two groups of 1200mm 2000mm portal frames are arranged, the portal frames are formed by welding national standard 140mm steel pipes, and the lower part is 8500mm 6000mm steel structure space; a rope with the diameter of 30mm is hung to the position 500mm above the central position of the left portal frame beam, and is used for escape training of emergency soft rope gliding of the high-rise building; a steel tube with the diameter of 90mm is connected and hung at the center of the portal frame beam on the right side above the steel lock to the position with the diameter of about 500mm above the ground, and the steel tube is used for escape training of high-rise buildings by means of downward sliding of the pipeline.
The left side wall and the inner side of the back wall are provided with an upper spiral ladder channel 16 and a lower spiral ladder channel 16, one side of the upper spiral ladder channel 16 and the lower spiral ladder channel is provided with a deep well rescue 17, one side of the deep well rescue 17 is provided with a crack rescue 18, the circumference enclosed by four surfaces of the equipment is 6000 to 6000mm, the left back side position is provided with a spiral ladder, a 220mm national standard steel pipe of a ladder column and a 30mm steel pipe handrail are led to a passage opening with the diameter of 2000mm above the top of the equipment from the ground, the periphery of the. A vertical shaft with the height of 8500mm and the diameter of 1100mm is arranged at the position of 1000mm on the right side of the spiral ladder in a space with the perimeter of 6000 mm-6000 mm surrounded by four sides of the equipment, and the vertical shaft is formed by welding 30mm steel pipes. The lower part of the vertical shaft falls to the ground, and a small door with the width of 600mm and the height of 1500mm is arranged at the position of falling to the ground. A safety sinking type well cover is arranged at the joint of the upper part of the vertical shaft and the platform, the well cover and the upper plane of the equipment are in the same level, and the periphery of the well body is welded and wrapped by a honeycomb-shaped iron sheet and used for rescue training of the vertical shaft. In the space surrounded by four sides of the equipment and with the circumference of 6000X 6000, the edge of the vertical shaft extends forwards by 1000mm, a rectangular vertical shaft with the height of 8500mm, the length of 2000mm and the width of 600mm is arranged, and the vertical shaft is formed by welding 30mm steel pipes. The lower part of the rectangular vertical shaft falls to the ground, and a small door with the width of 600mm and the height of 1500mm is arranged at the position of falling to the ground. A safety sinking type well cover is arranged above the rectangular vertical shaft, the well cover is horizontal to the upper plane of the equipment, and the periphery of the square well body is welded and wrapped by honeycomb iron sheets and is used for rescue training between floors of high-rise buildings and between wall body cracks.
The right side wall and the back wall inboard be provided with air defense warning sound play device, the girth that encloses at the four sides of equipment is 6000 mm's space ground, lean on the 3000mm of right rear side on, set up a height 1500mm 1800mm 3000 mm's short room space, short room uses the square distance pipe as the support, the iron sheet welds into the room wall, the room wall leans on the middle 1000mm wicket that establishes of 1500mm width in the middle of the rear side, short room left side wall establishes 2 600mm small windows with the 800mm high department on ground, fill with steel bar welding net in the middle of the window, establish an air defense warning sound play device in the small room for air defense warning is sounded the air defense and is fleed the training.
The inner sides of the fixed point training wall 1 and the left side wall are provided with a lighting and fire smoke training device and a fire alarm and sounding device, the front 3000mm position is close to the space with the perimeter of 6000mm by 6000mm surrounded by four sides of the equipment until the space extends to the left and right inner side edges of the equipment, a cabin with height 2200mm, width 3000mm and length 2000mm is arranged on the left side of the area with 3000mm 6000mm, a square pipe is used as a support for the cabin, an iron sheet is welded into a room wall, a small door with height 2000mm and width 1000mm is arranged on the space between the spiral ladder and the vertical shaft on the back side, the small door can be pulled open and closed outwards, a channel port with height 2200mm, width 1500mm is arranged on the right side of the right front part in the cabin, the channel extends towards the right side in an arched shape, a passage outlet with the height of 2200mm and the width of 1000mm is arranged below the right side surface, an outward-opening pull steel structure door is arranged, when the door is closed, the surface of the door and the wall of the high-rise building entering the house rescue training surface from the upper quick-descending window form a plane. The channel is internally provided with a light, a fire-fighting smoke training device and a fire alarm sounding device and is used for fire smoke escape training.
The basic principles and main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. The utility model provides a training equipment is synthesized in security protection education training which characterized in that: the device comprises a fixed-point training wall, a first safety guardrail, a first portal frame, a first rope, a second safety guardrail, a second portal frame, a second rope, a building window of a simulation building, a first door, a third safety guardrail, a rock climbing wall, a fourth safety guardrail, a soft rope fast-descending portal frame, a pipeline fast-descending portal frame, a second door, an up-down spiral ladder channel, a deep well rescue and a crack rescue; the four walls are connected end to end and are in a cube shape, the front wall is a fixed point training wall, a first portal frame is fixed above the fixed point training wall, first safety guardrails are respectively arranged on two sides of the first portal frame, and the first portal frame is connected with a first rope through a fixed pulley; a window of a building of the simulation building is arranged on the wall on the right side surface, a second portal frame is arranged at the upper end of the wall, second safety guardrails are respectively arranged on two sides of the second portal frame, a second rope is connected to the second portal frame through a fixed pulley, and a first door is arranged on one side of the bottom of the wall; the left side wall is a rock climbing wall, and a third safety guardrail is fixed at the upper end of the rock climbing wall; a soft rope rapid-descent portal frame and a pipeline rapid-descent portal frame are fixed at the upper end of the back wall, fourth safety guardrails are respectively fixed on the outer sides of the soft rope rapid-descent portal frame and the pipeline rapid-descent portal frame, and a second door is arranged at the bottom of the climbing wall; the inner sides of the left side wall and the back wall are provided with an upper spiral ladder channel and a lower spiral ladder channel, one side of the upper spiral ladder channel and one side of the lower spiral ladder channel are provided with deep well rescue, and one side of the deep well rescue is provided with crack rescue.
2. The comprehensive training equipment for security education training of claim 1, wherein: the first portal frame is connected with a third portal frame through a sliding rope, and the third portal frame is connected with a pull rope.
3. The comprehensive training equipment for security education training of claim 1, wherein: and air defense alarm sound playing devices are arranged on the inner sides of the right side wall and the back wall.
4. The comprehensive training equipment for security education training of claim 1, wherein: the inner sides of the fixed point training wall and the left side wall are provided with a lighting and fire smoke training device and a fire alarm and sounding device.
CN201922073932.XU 2019-11-27 2019-11-27 Comprehensive training equipment for security education training Active CN211181176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922073932.XU CN211181176U (en) 2019-11-27 2019-11-27 Comprehensive training equipment for security education training

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922073932.XU CN211181176U (en) 2019-11-27 2019-11-27 Comprehensive training equipment for security education training

Publications (1)

Publication Number Publication Date
CN211181176U true CN211181176U (en) 2020-08-04

Family

ID=71823288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922073932.XU Active CN211181176U (en) 2019-11-27 2019-11-27 Comprehensive training equipment for security education training

Country Status (1)

Country Link
CN (1) CN211181176U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111816047A (en) * 2020-08-07 2020-10-23 沃迪克(北京)工业技术有限公司 Comprehensive emergency rescue training facility
CN113823137A (en) * 2021-08-10 2021-12-21 沃迪克(北京)工业技术有限公司 Emergency rescue training facility

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111816047A (en) * 2020-08-07 2020-10-23 沃迪克(北京)工业技术有限公司 Comprehensive emergency rescue training facility
CN113823137A (en) * 2021-08-10 2021-12-21 沃迪克(北京)工业技术有限公司 Emergency rescue training facility

Similar Documents

Publication Publication Date Title
CN211181176U (en) Comprehensive training equipment for security education training
JP5750608B2 (en) Tsunami evacuation equipment
JP2005264721A (en) Evacuation apparatus to be used in the case of emergency such as tsunami and flood
CN101041103B (en) Pipe for escaping from high building on fire
CN104143287A (en) Earthquake simulation and rescue training system
GB1396844A (en) Emergency escape device
CN206928624U (en) A kind of heavy ladder cage for high-altitude building
CN207115792U (en) A kind of safe construction experiences equipment
CN204029268U (en) Earthquake simulation and rescue training system
CN206950466U (en) A kind of high-rise multi-buffer passway for escaping
CN206730449U (en) Rock-climbing training station
CN102031859A (en) Fire-fighting exhaust safety channel system of house building
CN108744329A (en) A kind of skyscraper technique equipped with safe escape spiral slide
CN206646869U (en) Steel construction theater with fire-fighting function
CN104975559A (en) Corridor bridge apparatus
CN206385499U (en) High-strength prestressed ecological sheet pile hommization escape ladder stand
JP6547094B2 (en) Building with evacuation room for tsunami, flood and storm surge
JP6402296B1 (en) Buildings with evacuation rooms for tsunami, flood and storm surge countermeasures
CN207348787U (en) One kind maintenance cat ladder platform
JP6368892B1 (en) Buildings with evacuation rooms for tsunami, flood and storm surge countermeasures
CN205988499U (en) Fire-fighting equipment is moved in construction site
CN206636153U (en) Indoor individual layer scaffold
CN205850156U (en) Fire-fighting life-saving, rock-climbing integrated training platform
CN205935756U (en) Novel public security sentry box
CN217054525U (en) Tour assembled road bridge construction safety of construction experience shop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant