CN113823137A - Emergency rescue training facility - Google Patents

Emergency rescue training facility Download PDF

Info

Publication number
CN113823137A
CN113823137A CN202110914977.4A CN202110914977A CN113823137A CN 113823137 A CN113823137 A CN 113823137A CN 202110914977 A CN202110914977 A CN 202110914977A CN 113823137 A CN113823137 A CN 113823137A
Authority
CN
China
Prior art keywords
steel construction
steel structure
steel
balcony
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110914977.4A
Other languages
Chinese (zh)
Inventor
刘术军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wodik Beijing Industrial Technology Co ltd
Original Assignee
Wodik Beijing Industrial Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wodik Beijing Industrial Technology Co ltd filed Critical Wodik Beijing Industrial Technology Co ltd
Priority to CN202110914977.4A priority Critical patent/CN113823137A/en
Publication of CN113823137A publication Critical patent/CN113823137A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Ladders (AREA)

Abstract

The invention provides an emergency rescue training facility, which relates to the technical field of training facilities and comprises a first steel structure, a second steel structure and a third steel structure, wherein the second steel structure is positioned above the first steel structure, the third steel structure is positioned above the second steel structure, and the top ends of the first steel structure and the second steel structure are respectively provided with a positioning hole and an assembling groove. According to the invention, through arranging the first steel structure, the second steel structure and the third steel structure, the training equipment for assembling the steel bars can be completely assembled into three semi-finished products, so that the steel bars can be conveniently assembled, through arranging the positioning holes and the positioning rods, the positioning can be carried out in the process of assembling the first steel structure, the second steel structure and the third steel structure, through arranging the assembling grooves and the assembling plates, the first steel structure, the second steel structure and the third steel structure can be preliminarily assembled, further, the training field can be replaced without integral disassembly, and a user can train in various training environments.

Description

Emergency rescue training facility
Technical Field
The invention relates to the technical field of training facilities, in particular to an emergency rescue training facility.
Background
Emergency rescue training is extremely important as a training mode of dealing with emergency rescue, and the existing emergency rescue training equipment mostly adopts a plurality of groups of reinforcing steel bars and bolts to assemble into an integrated building as a training facility, but the assembly and disassembly of the assembly mode are very complicated, so that once the building is successful, the training site needs to be disassembled integrally to replace the training site when needing to be replaced, and the user can only train in a single environment.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides an emergency rescue training facility.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides an emergency rescue training facility, includes a steel construction, No. two steel constructions and No. three steel constructions, No. two steel constructions are located the top of a steel construction, No. three steel constructions are located the top of No. two steel constructions, locating hole and equipment groove have not been seted up equally to the top of a steel construction and No. two steel constructions, the bottom of No. two steel constructions and No. three steel constructions is equallyd divide and is do not adorned equipment board and locating lever admittedly, the inner wall in equipment groove and the surface of equipment board are provided with reinforced structure, the surface of No. two steel constructions is provided with the climbing rescue simulation subassembly, the surface of No. two steel constructions and No. three steel constructions is provided with hoist cable fast fall subassembly.
In order to bring convenience to the user to the interior of the No. three steel structure for carrying out the rapid descent training, the rapid descent training device is improved by further comprising a lifter, supporting legs, a ceiling, a reinforcing frame and a foot standing plate, wherein the lifter is installed in the interior of the No. one steel structure, the top ends of the supporting legs are fixedly installed at the bottom end of the No. one steel structure, the ceiling is fixedly installed at the top end of the No. three steel structure through the reinforcing frame, and the foot standing plate is fixedly installed on the inner walls of the No. one steel structure, the No. two steel structure and the No. three steel structure respectively.
In order to reinforce the assembled first steel structure, second steel structure and third steel structure, the invention is improved in that the reinforcing structure comprises reinforcing holes and threaded holes, the reinforcing holes are formed in the inner wall of the assembling groove, and the threaded holes are formed in the outer surface of the assembling plate.
In order to facilitate the positioning in the process of assembling the first steel structure, the second steel structure and the third steel structure, the invention has the improvement that the outer surface of the positioning rod is in sliding connection with the inner wall of the positioning hole, and the outer surface of the assembling plate is in sliding connection with the inner wall of the assembling groove.
In order to protect the safety of a user in climbing, the climbing rescue simulation assembly is improved to include a balcony I, a guardrail I, reinforcing blocks, a ladder stand, an anti-falling fence and reinforcing rods, wherein the balcony I is fixedly arranged on two sides of the outer surface of a steel structure II, the bottom end of the guardrail I is fixedly arranged on the upper surface of the balcony I, the reinforcing blocks are fixedly arranged on the lower surface of the balcony I, the ladder stand is fixedly arranged on two sides of the outer surface of the balcony I, two ends of the anti-falling fence are fixedly arranged on two sides of the outer surface of the ladder stand respectively, and the reinforcing rods are fixedly arranged on the outer surface of the anti-falling fence.
In order to improve the stability of the balcony I, the invention has the improvement that one end of the reinforcing block, which is far away from the ladder stand, is fixedly arranged on the side wall of the steel structure II, and the anti-falling rail and the reinforcing rod are made of aluminum alloy.
In order to carry out quick descent training on a user, the sling quick descent component comprises an auxiliary fence, a stabilizing ring, a second balcony, a second guardrail, a through groove, a reinforcing plate, a fixing frame, a mounting plate and a fixed pulley, wherein the bottom end of the auxiliary fence is fixedly arranged at the top end of the first guardrail, two ends of the stabilizing ring are fixedly arranged at two sides of the outer surface of the auxiliary fence respectively, the second balcony is fixedly arranged at two sides of the outer surface of a third steel structure respectively, the bottom end of the second guardrail is fixedly arranged at the upper surface of the second balcony, the through groove is formed in the upper surface of the second balcony, the reinforcing plate is fixedly arranged at two sides of the through groove inner wall respectively, the fixing frame is fixedly arranged at two sides of the outer surface of the third steel structure respectively, the top end of the mounting plate is fixedly arranged at the lower surface of a ceiling, and the fixed pulley is rotatably connected to the bottom end of the mounting plate.
In order to improve the comfort of the user during exercise, the side wall of the auxiliary fence is fixedly arranged on the side wall of the second steel structure, and the stabilizing ring is made of rubber.
Compared with the prior art, the invention has the advantages and positive effects that,
1. according to the invention, through the arrangement of the first steel structure, the second steel structure and the third steel structure, the training equipment for assembling the steel bars can be completely assembled into three semi-finished products, the steel bars can be conveniently assembled, through the arrangement of the positioning holes and the positioning rods, the steel bars can be positioned in the process of assembling the first steel structure, the second steel structure and the third steel structure, through the arrangement of the assembling grooves and the assembling plates, the first steel structure, the second steel structure and the third steel structure can be preliminarily assembled, further, the training field can be changed without integral disassembly, a user can train in various training environments, and through the arrangement of the reinforcing structure, the joint of the first steel structure, the second steel structure and the third steel structure can be reinforced through bolts.
2. According to the anti-falling fence, the climbing rescue simulation assembly is arranged, so that a user can perform climbing training, the reinforcing rod for reinforcing is additionally arranged outside the traditional anti-falling fence, the situation that the anti-falling fence is extruded and deformed due to overweight of the user is effectively avoided, and the safety of the user in the using process is further improved.
3. According to the invention, the sling quick-descending component is arranged, so that a rope or an iron chain can be freely selected for carrying out quick-descending training, and the auxiliary quick-descending can be carried out by means of the auxiliary fence made of rubber materials in the using process of a user.
Drawings
Fig. 1 is a schematic perspective view of an emergency rescue training facility according to the present invention;
FIG. 2 is a schematic sectional view of a partial three-dimensional structure of an emergency rescue training facility according to the present invention;
FIG. 3 is an enlarged view taken at A of FIG. 2 in accordance with the present invention;
FIG. 4 is a schematic perspective view of a first steel structure of an emergency rescue training facility according to the present invention;
FIG. 5 is a schematic perspective view of a second steel structure of an emergency rescue training facility according to the present invention;
FIG. 6 is a schematic perspective view of a climbing rescue simulation assembly of an emergency rescue training facility according to the present invention;
fig. 7 is a three-dimensional schematic view of a third steel structure of an emergency rescue training facility provided by the invention.
Illustration of the drawings:
1. a first steel structure; 2. a second steel structure; 3. a third steel structure; 4. an elevator; 5. supporting legs; 6. a ceiling; 7. a reinforcing frame; 8. positioning holes; 9. an assembly groove; 10. reinforcing holes; 11. assembling a plate; 12. a threaded hole; 13. positioning a rod; 14. a first balcony; 15. a first guardrail; 16. a reinforcing block; 17. climbing a ladder; 18. The anti-falling fence; 19. a reinforcing rod; 20. a foot standing plate; 21. an auxiliary column; 22. a stabilizing ring; 23. a second balcony; 24. a second guardrail; 25. passing through the slot; 26. a reinforcing plate; 27. a fixed mount; 28. mounting a plate; 29. And a fixed pulley.
Detailed Description
In order that the above objects, features and advantages of the present invention can be more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and thus the present invention is not limited to the specific embodiments of the present disclosure.
Referring to fig. 1-7, the present invention provides a technical solution: the utility model provides an emergency rescue training facility, including a steel construction 1, No. 2 steel construction and No. 3 steel construction, No. 2 steel construction is located the top of a steel construction 1, No. 3 steel construction is located the top of No. 2 steel construction, No. 1 steel construction and No. 2 steel construction's top is equallyd divide and is seted up locating hole 8 and equipment groove 9 respectively, No. 2 steel construction and No. 3 steel construction's bottom is equallyd divide and is equipped with equipment board 11 and locating lever 13 respectively admittedly, still include lift 4, supporting leg 5, ceiling 6, reinforcing frame 7 and footing board 20, lift 4 installs in the inside of a steel construction 1, the top of supporting leg 5 is adorned admittedly in the bottom of a steel construction 1, ceiling 6 is adorned admittedly on the top of No. 3 steel construction through reinforcing frame 7, footing board 20 is adorned admittedly respectively at the inner wall of a steel construction 1, No. 2 steel construction and No. 3 steel construction, through setting up No. 1 steel construction, The steel structure 2 II and the steel structure 3 III can be assembled into three semi-finished products by changing the training equipment for assembling the steel bars into a whole, the assembly is convenient, the steel structure 1I, the steel structure 2 II and the steel structure 3 III can be positioned in the process of assembling the steel structures 1, 2 and 3 by arranging the positioning holes 8 and the positioning rods 13, the steel structure 1I, the steel structure 2 II and the steel structure 3 III can be preliminarily assembled by arranging the assembling grooves 9 and the assembling plates 11, the training field can be replaced without disassembling the whole body, a user can train in various training environments, when the surrounding training environment needs to be replaced, the steel structure 3 III is hoisted by using a crane, the steel structure 2 II is hoisted, the steel structure 1I is hoisted and moved to the ground needing to be placed, and then the positioning rods 13 are aligned to the positioning holes 8, place No. two steel construction 2 on the top of a steel construction 1, until the inside of equipment board 11 embedding equipment groove 9, it can to install No. three steel construction 3 on the top of No. two steel construction 2 to repeat above operation afterwards.
The inner wall of equipment groove 9 and the surface of equipment board 11 are provided with reinforced structure, reinforced structure is including reinforcing hole 10 and screw hole 12, reinforcing hole 10 sets up the inner wall at equipment groove 9, screw hole 12 sets up the surface at equipment board 11, through setting up reinforcing hole 10 and screw hole 12, can be through the bolt to steel construction 1, No. 2 steel construction and No. 3 steel construction's junction is consolidated, at steel construction 1, No. 2 steel construction and No. 3 steel construction complete backs, twist behind reinforcing hole 10 with the bolt and fix at the inside of screw hole 12 to equipment board 11.
The climbing rescue simulation assembly is arranged on the outer surface of the second steel structure 2, and comprises a first balcony 14, a first guardrail 15, a reinforcing block 16, a ladder stand 17, an anti-falling rail 18 and reinforcing rods 19, wherein the first balcony 14 is fixedly arranged on two sides of the outer surface of the second steel structure 2 respectively, the bottom end of the first guardrail 15 is fixedly arranged on the upper surface of the first balcony 14, the reinforcing block 16 is fixedly arranged on the lower surface of the first balcony 14, the ladder stand 17 is fixedly arranged on two sides of the outer surface of the first balcony 14, two ends of the anti-falling rail 18 are fixedly arranged on two sides of the outer surface of the ladder stand 17 respectively, the reinforcing rods 19 are fixedly arranged on the outer surface of the anti-falling rail 18, climbing training can be carried out by a user through the climbing rescue simulation assembly, the reinforcing rods 19 for reinforcing are additionally arranged outside the traditional anti-falling rail 18, and the situation that the anti-falling rail 18 is extruded and deformed due to overweight of the user is effectively avoided, the safety of the user in the use process is further improved, when the user needs to climb for rescue, the user can be trained through the ladder stand 17, and the anti-falling rail 18 and the reinforcing rod 19 can effectively prevent the user from falling off from the ladder stand 17.
The outer surfaces of the second steel structure 2 and the third steel structure 3 are provided with a sling quick-descending assembly, the sling quick-descending assembly comprises an auxiliary fence 21, a stabilizing ring 22, a second balcony 23, a second guardrail 24, a passing groove 25, a reinforcing plate 26, a fixing frame 27, a mounting plate 28 and a fixed pulley 29, the bottom end of the auxiliary fence 21 is fixedly arranged at the top end of the first guardrail 15, two ends of the stabilizing ring 22 are fixedly arranged at two sides of the outer surface of the auxiliary fence 21 respectively, the second balcony 23 is fixedly arranged at two sides of the outer surface of the third steel structure 3 respectively, the bottom end of the second guardrail 24 is fixedly arranged at the upper surface of the second balcony 23, the passing groove 25 is arranged on the upper surface of the second balcony 23, the reinforcing plate 26 is fixedly arranged at two sides of the inner wall passing groove 25 respectively, the fixing frame 27 is fixedly arranged at two sides of the outer surface of the third steel structure 3 respectively, the top end of the mounting plate 28 is fixedly arranged at the lower surface of the ceiling 6, the fixed pulley 29 is rotatably connected at the bottom end of the mounting plate 28, the side wall of the auxiliary fence 21 is fixedly arranged on the side wall of the steel structure 2 II, the stabilizing ring 22 is made of rubber, a sling quick-falling component is arranged, ropes or iron chains can be freely selected to perform quick-falling training, in addition, the auxiliary fence 21 made of rubber can be used for assisting quick falling during the use process of a user, a fixing frame 27 is arranged, the ropes can be pulled when the user uses the ropes for quick falling, the fixed pulley 29 is arranged, the iron ropes can be pulled when the user uses the iron ropes for quick falling, when the user needs to use the ropes for quick falling, one end of each rope is fixed on the fixing frame 27, then the ropes are quickly fallen onto the balcony 14I from the through groove 25 on the balcony 23 II, when the user needs to use the iron ropes for quick falling, the iron ropes are passed through the fixed pulley 29, and then a quick-falling tool is matched with the iron ropes for quick falling training, the rubber stabilization ring 22 provides security to the user when the user falls.
The surface of locating lever 13 and the inner wall sliding connection of locating hole 8, the surface of equipment board 11 and the inner wall sliding connection of equipment groove 9, the one end that reinforcing block 16 kept away from cat ladder 17 is adorned admittedly at the lateral wall of No. two steel construction 2, prevent weighing down fence 18 and reinforcing rod 19's material and be the aluminum alloy, locating lever 13 and locating hole 8 mutually support, can be at equipment steel construction 1, No. two steel construction 2 and No. three steel construction 3's in-process carry out assistance-localization real-time, the mutually supporting of equipment board 11 and equipment groove 9, can be at equipment steel construction 1, No. two steel construction 2 and No. three steel construction 3's in-process are pegged graft fixedly, the setting of reinforcing block 16 can promote the stability of No. one balcony 14, the anti-falling fence 18 and the reinforcing rod 19 of aluminum alloy material, it is comparatively light and firm.
The working principle is as follows: when the surrounding training environment needs to be changed, a crane is used for hoisting a steel structure 3, then a steel structure 2 is hoisted, finally a steel structure 1 is hoisted to move to the ground to be placed, then a positioning rod 13 is aligned to a positioning hole 8, then the steel structure 2 is placed at the top end of the steel structure 1 until an assembling plate 11 is embedded into an assembling groove 9, the operation is repeated to install the steel structure 3 at the top end of the steel structure 2, after the steel structure 1, the steel structure 2 and the steel structure 3 are completely assembled, a bolt is threaded through a reinforcing hole 10 and then screwed into the threaded hole 12 to fix the assembling plate 11, when a user needs to climb and rescue, the ladder stand 17 is used for training, the anti-falling fence 18 and the reinforcing rod 19 can effectively prevent the user from falling off the ladder stand 17, when the user needs to use a rope for fast falling, one end of the rope is fixed on the fixing frame 27, then the rope quickly descends to the first balcony 14 from the second balcony 23 through the groove 25, when a user needs to use the rope for quickly descending, the rope passes through the fixed pulley 29, then a quick descending tool is used for being matched with the rope for quickly descending training, and the stabilizing ring 22 made of rubber can provide guarantee for the safety of the user when the user falls.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an emergency rescue training facility, includes a steel construction (1), No. two steel construction (2) and No. three steel construction (3), its characterized in that: no. two steel construction (2) are located the top of a steel construction (1), No. three steel construction (3) are located the top of No. two steel construction (2), locating hole (8) and equipment groove (9) have not been equallyd divide on the top of a steel construction (1) and No. two steel construction (2), the bottom of No. two steel construction (2) and No. three steel construction (3) is equallyd divide and is do not adorned equipment board (11) and locating lever (13) admittedly, the inner wall of equipment groove (9) and the surface of equipment board (11) are provided with reinforced structure, the surface of No. two steel construction (2) is provided with the climbing rescue simulation subassembly, the surface of No. two steel construction (2) and No. three steel construction (3) is provided with the hoist cable speed and falls the subassembly.
2. An emergency rescue training facility as claimed in claim 1, wherein: still include lift (4), supporting leg (5), ceiling (6), reinforcement frame (7) and footing board (20), install the inside at a steel construction (1) in lift (4), the bottom at a steel construction (1) is adorned admittedly on the top of supporting leg (5), the top at No. three steel construction (3) is adorned admittedly through reinforcement frame (7) in ceiling (6), footing board (20) are adorned admittedly respectively at the inner wall of a steel construction (1), No. two steel construction (2) and No. three steel construction (3).
3. An emergency rescue training facility as claimed in claim 1, wherein: the reinforcing structure comprises reinforcing holes (10) and threaded holes (12), wherein the reinforcing holes (10) are formed in the inner wall of the assembling groove (9), and the threaded holes (12) are formed in the outer surface of the assembling plate (11).
4. An emergency rescue training facility as claimed in claim 1, wherein: the outer surface of the positioning rod (13) is in sliding connection with the inner wall of the positioning hole (8), and the outer surface of the assembling plate (11) is in sliding connection with the inner wall of the assembling groove (9).
5. An emergency rescue training facility as claimed in claim 1, wherein: climbing rescue simulation subassembly includes balcony (14), guardrail (15), reinforcing block (16), cat ladder (17), prevents weighing down fence (18) and anchor strut (19), balcony (14) adorns admittedly respectively in the both sides of No. two steel construction (2) surfaces, the upper surface at balcony (14) is adorned admittedly to the bottom of guardrail (15), the lower surface at balcony (14) is adorned admittedly in reinforcing block (16), cat ladder (17) adorns admittedly in the both sides of balcony (14) surface, prevent weighing down the both ends of fence (18) and adorn admittedly in the both sides of cat ladder (17) surface respectively, anchor strut (19) are adorned admittedly in the surface of preventing weighing down fence (18).
6. An emergency rescue training facility as claimed in claim 4, wherein: one end, far away from the crawling ladder (17), of the reinforcing block (16) is fixedly arranged on the side wall of the second steel structure (2), and the anti-falling rail (18) and the reinforcing rod (19) are made of aluminum alloy.
7. An emergency rescue training facility as claimed in claim 5, wherein: the sling fast descending assembly comprises an auxiliary fence (21), a stabilizing ring (22), a second balcony (23), a second guardrail (24), a through groove (25), a reinforcing plate (26), a fixing frame (27), a mounting plate (28) and a fixed pulley (29), wherein the bottom end of the auxiliary fence (21) is fixedly arranged at the top end of a first guardrail (15), the two ends of the stabilizing ring (22) are fixedly arranged at the two sides of the outer surface of the auxiliary fence (21) respectively, the second balcony (23) is fixedly arranged at the two sides of the outer surface of a third steel structure (3) respectively, the bottom end of the second guardrail (24) is fixedly arranged at the upper surface of the second balcony (23), the through groove (25) is arranged at the upper surface of the second balcony (23), the reinforcing plate (26) is fixedly arranged at the two sides of the inner wall of the through groove (25) respectively, and the fixing frame (27) is fixedly arranged at the two sides of the outer surface of the third steel structure (3) respectively, the top end of the mounting plate (28) is fixedly arranged on the lower surface of the ceiling (6), and the fixed pulley (29) is rotatably connected to the bottom end of the mounting plate (28).
8. An emergency rescue training facility as claimed in claim 7, wherein: the side wall of the auxiliary fence (21) is fixedly arranged on the side wall of the second steel structure (2), and the stabilizing ring (22) is made of rubber.
CN202110914977.4A 2021-08-10 2021-08-10 Emergency rescue training facility Pending CN113823137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110914977.4A CN113823137A (en) 2021-08-10 2021-08-10 Emergency rescue training facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110914977.4A CN113823137A (en) 2021-08-10 2021-08-10 Emergency rescue training facility

Publications (1)

Publication Number Publication Date
CN113823137A true CN113823137A (en) 2021-12-21

Family

ID=78922826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110914977.4A Pending CN113823137A (en) 2021-08-10 2021-08-10 Emergency rescue training facility

Country Status (1)

Country Link
CN (1) CN113823137A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735076A (en) * 2016-04-14 2016-07-06 北京九州有道交通科技有限公司 Pillow beam type precast concrete structure layer and assembling method thereof
CN107489296A (en) * 2017-09-30 2017-12-19 沈阳建筑大学 The energy-dissipating and shock-absorbing attachment structure and assembly method of assembly concrete coupling beam
CN209538643U (en) * 2018-09-27 2019-10-25 广东博智林机器人有限公司 A kind of lifting platform
CN110700645A (en) * 2019-10-17 2020-01-17 山东省地震局 Earthquake emergency rescue multifunctional comprehensive training building
CN211181176U (en) * 2019-11-27 2020-08-04 亮剑开拓科技发展(北京)有限公司 Comprehensive training equipment for security education training
CN211294444U (en) * 2019-12-31 2020-08-18 龚薇 Training equipment and mobile emergency rescue system
CN111816047A (en) * 2020-08-07 2020-10-23 沃迪克(北京)工业技术有限公司 Comprehensive emergency rescue training facility
CN112618974A (en) * 2020-12-23 2021-04-09 淮阴工学院 External foldable high-rise building fire emergency escape device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735076A (en) * 2016-04-14 2016-07-06 北京九州有道交通科技有限公司 Pillow beam type precast concrete structure layer and assembling method thereof
CN107489296A (en) * 2017-09-30 2017-12-19 沈阳建筑大学 The energy-dissipating and shock-absorbing attachment structure and assembly method of assembly concrete coupling beam
CN209538643U (en) * 2018-09-27 2019-10-25 广东博智林机器人有限公司 A kind of lifting platform
CN110700645A (en) * 2019-10-17 2020-01-17 山东省地震局 Earthquake emergency rescue multifunctional comprehensive training building
CN211181176U (en) * 2019-11-27 2020-08-04 亮剑开拓科技发展(北京)有限公司 Comprehensive training equipment for security education training
CN211294444U (en) * 2019-12-31 2020-08-18 龚薇 Training equipment and mobile emergency rescue system
CN111816047A (en) * 2020-08-07 2020-10-23 沃迪克(北京)工业技术有限公司 Comprehensive emergency rescue training facility
CN112618974A (en) * 2020-12-23 2021-04-09 淮阴工学院 External foldable high-rise building fire emergency escape device

Similar Documents

Publication Publication Date Title
CN102155089B (en) Self-jacking construction platform integrating vertical transportation equipment and mold base
CN106088565A (en) The method of tiltedly climbing of attachment type raise scaffold and attachment type raise scaffold
CN201714054U (en) Climbing platform system for construction of elevator shaft of high-rise building
EP0335311A3 (en) Hydraulic scaffold
CN110593548A (en) Inclined type lifting climbing frame with triple anti-falling mechanisms and adjustable angle and lifting method thereof
CN103806645B (en) Light intelligent hydraulic climbing formwork device with good wind-resistant and fireproof performances
CN208792758U (en) A kind of huge column climbing apparatus
CN114412158A (en) Aluminum alloy-steel combined attached lifting scaffold and mounting method thereof
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN113823137A (en) Emergency rescue training facility
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN108824803B (en) Giant column climbing formwork device
CN214003869U (en) Attached lifting tower crane runway
CN209179478U (en) Jumping formwork truss
CN209761328U (en) A self-adaptation ladder that is used for super high-rise outer frame steel beam to be under construction
KR200256398Y1 (en) Builder's workbench
CN214615362U (en) A collapsible flexible intelligence is climbed for heterotypic outer contour line building
CN116181041B (en) Building machine of multilayer quick construction
NL2028914B1 (en) Suspended system for supporting a person and method for using same, e.g. in confined spaces
CN116335398B (en) Multilayer rapid construction method
CN219157419U (en) Bridge pier construction encloses cage
CN219952606U (en) Safety platform for beam slab prefabricated field
CN112922306B (en) Independent column operation platform for building
CN211769918U (en) Safe hoisting device of wireless inclinometer while drilling
CN215254394U (en) Intelligent steel structure maintenance platform with adjusting function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211221

RJ01 Rejection of invention patent application after publication