CN210342607U - Stair section decoration operation platform - Google Patents

Stair section decoration operation platform Download PDF

Info

Publication number
CN210342607U
CN210342607U CN201920372449.9U CN201920372449U CN210342607U CN 210342607 U CN210342607 U CN 210342607U CN 201920372449 U CN201920372449 U CN 201920372449U CN 210342607 U CN210342607 U CN 210342607U
Authority
CN
China
Prior art keywords
frame
rod
operation platform
stair section
portal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920372449.9U
Other languages
Chinese (zh)
Inventor
张胜利
李久安
焦洋
姚鑫
胡志韩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201920372449.9U priority Critical patent/CN210342607U/en
Application granted granted Critical
Publication of CN210342607U publication Critical patent/CN210342607U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a stair section decoration operation platform, which comprises a portal frame, a protective frame and a construction platform, the protective frame is fixedly arranged at the upper end of the door frames through bolts, two door frames are arranged, the two door frames are connected through a telescopic first pull rod, a plurality of reserved pin holes are uniformly arranged at the bottom ends of the two door frames at intervals, the bottom end of the portal frame is connected with a height adjusting rod through a first pin hole, one side of the height adjusting rod is uniformly provided with a plurality of second pin holes at intervals, the upper end of the portal frame is fixedly provided with a supporting cross bar, both ends of the construction platform are hung on the two supporting cross bars through iron claws, the construction platform comprises a supporting frame at the bottom end and a pedal arranged at the upper end of the supporting frame, the protection frame is arranged on the outer side of the construction platform, and one side of the protection frame is connected through a telescopic second pull rod.

Description

Stair section decoration operation platform
Technical Field
The utility model relates to a construction fitment technical field, in particular to stair section decoration operation platform.
Background
At present, the staircase incline section is because inconvenient construction, and operation platform is mostly the simple and easy steel pipe scaffold that the job site set up by oneself, and the pattern is confetti eight doors, and factor of safety is low, removes inconveniently, and the ann tears time consuming, hard open.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a stair section decoration operation platform can effectively solve the problem among the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a stair section decoration operation platform comprises two portal frames, two protective frames and a construction platform, wherein the protective frames are fixedly arranged at the upper ends of the portal frames through bolts, the two door frames are connected through a telescopic first pull rod, a plurality of reserved first pin holes are uniformly arranged at the bottom ends of the two door frames at intervals, the bottom end of the portal frame is connected with a height adjusting rod through a first pin hole, one side of the height adjusting rod is uniformly provided with a plurality of second pin holes at intervals, the upper end of the portal frame is fixedly provided with a supporting cross bar, both ends of the construction platform are hung on the two supporting cross bars through iron claws, the construction platform comprises a supporting frame at the bottom end and a pedal arranged at the upper end of the supporting frame, the protection frame is arranged on the outer side of the construction platform, and one side of the protection frame is connected through a telescopic second pull rod.
As an optimized technical scheme of the utility model, all be provided with a plurality of fixed orifices on first pull rod and the second pull rod.
As a preferred technical scheme of the utility model, altitude mixture control pole's bottom is provided with the slipmat, first cotter hole and second cotter hole match each other.
As an optimized technical scheme of the utility model, the lower extreme that lies in the support horizontal pole on the portal is provided with the footboard.
As an optimal technical scheme of the utility model, the inboard of portal is provided with pole setting stiffener and horizontal pole stiffener respectively.
As an optimized technical proposal of the utility model, the pedal is a wood board with the thickness of 20 cm.
As an optimal technical scheme of the utility model, altitude mixture control pole, first pull rod, second pull rod, portal and protection frame all adopt stainless steel material to make and form.
Compared with the prior art, the utility model discloses following beneficial effect has: according to the stair section decoration operation platform, the portal frame is matched with the protection frame and the construction platform, the portal frame can be formed by increasing pin holes on a common portal frame on site in a transformation mode, the assembly is simple and rapid, the turnover can be conducted infinitely, the safety protection effect on operators during construction is good, the height adjustment is convenient, the maximum adjustment height reaches 700cm, the stair section operation platform can be widely applied to decoration construction of stair section inclined planes with different floor heights, the labor intensity of the operators can be effectively reduced, and the working efficiency is improved; the construction platform is manufactured by field processing and can be adjusted according to the angle of the staircase on the spot; the two pull rods are connected by spring pins, the length adjustment is convenient, and the maximum adjustment range is 2 meters.
Drawings
Fig. 1 is the utility model relates to a stair section decorations operation platform's overall structure schematic diagram.
Fig. 2 is the utility model relates to a structural schematic diagram of stair section decoration and fitment operation platform portal.
Fig. 3 is the utility model relates to a stair section decoration operation platform construction platform's schematic structure.
Fig. 4 is the utility model relates to a flexible district trompil picture of first pull rod of stair section decoration operation platform.
Fig. 5 is the utility model relates to a stair section decoration operation platform altitude mixture control board's schematic structure.
In the figure: 1. a gantry; 2. a protective frame; 3. a construction platform; 4. a bolt; 5. a first pull rod; 6. a first pin hole; 7. a height adjustment lever; 8. a second pin hole; 9. a support rail; 10. an iron claw; 11. a support frame; 12. treading a pedal; 13. a second pull rod; 14. a pedal; 15. a vertical rod reinforcing rod; 16. a crossbar stiffener.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-5, a stair section decoration operation platform comprises a portal frame 1, two protection frames 2 and a construction platform 3, wherein the protection frames 2 are fixedly arranged at the upper end of the portal frame 1 through bolts 4, the portal frame 1 is provided with two portal frames 1, the two portal frames 1 are connected through a telescopic first pull rod 5, the bottom ends of the two portal frames 1 are uniformly provided with a plurality of reserved first pin holes 6 at intervals, the bottom end of the portal frame 1 is connected with a height adjusting rod 7 through the first pin holes 6, one side of the height adjusting rod 7 is uniformly provided with a plurality of second pin holes 8 at intervals, the upper end of the portal frame 1 is fixedly provided with a supporting cross rod 9, two ends of the construction platform 3 are respectively hung on the two supporting cross rods 9 through iron claws 10, the construction platform 3 comprises a supporting frame 11 at the bottom end and a treading plate 12 arranged at the upper end of the supporting frame 11, protection frame 2 sets up in the outside of construction platform 3, just one side of protection frame 2 is connected through telescopic second pull rod 13.
In this embodiment, preferably, a plurality of fixing holes are disposed on each of the first pull rod 5 and the second pull rod 13.
In this embodiment, preferably, the bottom end of the height adjusting rod 7 is provided with a non-slip pad, and the first pin hole 6 and the second pin hole 8 are matched with each other.
In this embodiment, preferably, a pedal 14 is disposed on the gantry 1 at the lower end of the support beam 9.
In this embodiment, it is preferable that the inner sides of the gantry 1 are respectively provided with a vertical rod reinforcing rod 15 and a cross rod reinforcing rod 16.
In this embodiment, the pedal 12 is preferably a 20cm thick wooden board.
In this embodiment, preferably, the height adjustment rod 7, the first pull rod 5, the second pull rod 13, the gantry 1 and the protection frame 2 are all made of stainless steel materials.
It should be noted that the utility model relates to a stair section decoration operation platform, when using, insert height adjusting rod 7 in the bottom of portal 1, then according to the inclination of stair, adjust height adjusting rod 7 of both ends portal 1 bottom, make the inclination of both ends portal 1 always with the inclination of stair, then utilize the pin to fix height adjusting rod 7, hang construction platform 3 on the support horizontal pole 9 at portal 1 both ends with iron claw 10, then utilize bolt 4 to fix protection frame 2 in the upper end of portal 1, after the fixing is accomplished, constructor holds up the pole setting or pole setting stiffener 15 on portal 1, step on pedal 14 and step on construction platform 3 to carry out the operation; the construction platform 3 is manufactured by field processing and can be adjusted according to the angle of the stairs on the spot.
According to the stair section decoration operation platform, the portal frame is matched with the protection frame and the construction platform, the portal frame can be formed by increasing pin holes on a common portal frame on site in a transformation mode, the assembly is simple and rapid, the turnover can be conducted infinitely, the safety protection effect on operators during construction is good, the height adjustment is convenient, the maximum adjustment height reaches 700cm, the stair section operation platform can be widely applied to decoration construction of stair section inclined planes with different floor heights, the labor intensity of the operators can be effectively reduced, and the working efficiency is improved; the construction platform is manufactured by field processing and can be adjusted according to the angle of the staircase on the spot; the two pull rods are connected by spring pins, the length adjustment is convenient, and the maximum adjustment range is 2 meters.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A stair section decoration operation platform comprises a portal frame (1), two protection frames (2) and a construction platform (3), and is characterized in that the protection frames (2) are fixedly arranged at the upper end of the portal frame (1) through bolts (4), the portal frame (1) is provided with two portal frames (1) which are connected through a telescopic first pull rod (5), the bottom ends of the two portal frames (1) are uniformly provided with a plurality of reserved first pin holes (6) at intervals, the bottom end of the portal frame (1) is connected with a height adjusting rod (7) through the first pin holes (6), one side of the height adjusting rod (7) is uniformly provided with a plurality of second pin holes (8) at intervals, the upper end of the portal frame (1) is fixedly provided with a supporting cross rod (9), the two ends of the construction platform (3) are hung on the two supporting cross rods (9) through iron claws (10), the construction platform (3) comprises a supporting frame (11) at the bottom end and a pedal (12) arranged at the upper end of the supporting frame (11), the protection frame (2) is arranged on the outer side of the construction platform (3), and one side of the protection frame (2) is connected through a telescopic second pull rod (13).
2. The stair section finishing operation platform of claim 1, wherein: and a plurality of fixing holes are formed in the first pull rod (5) and the second pull rod (13).
3. The stair section finishing operation platform of claim 1, wherein: the bottom end of the height adjusting rod (7) is provided with an anti-slip pad, and the first pin hole (6) and the second pin hole (8) are matched with each other.
4. The stair section finishing operation platform of claim 1, wherein: a pedal (14) is arranged at the lower end of the supporting cross rod (9) on the door frame (1).
5. The stair section finishing operation platform of claim 1, wherein: the inner side of the portal frame (1) is provided with a vertical rod reinforcing rod (15) and a cross rod reinforcing rod (16) respectively.
6. The stair section finishing operation platform of claim 1, wherein: the pedal (12) is a wood board with the thickness of 20 cm.
7. The stair section finishing operation platform of claim 1, wherein: the height adjusting rod (7), the first pull rod (5), the second pull rod (13), the portal frame (1) and the protection frame (2) are all made of stainless steel materials.
CN201920372449.9U 2019-03-22 2019-03-22 Stair section decoration operation platform Active CN210342607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920372449.9U CN210342607U (en) 2019-03-22 2019-03-22 Stair section decoration operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920372449.9U CN210342607U (en) 2019-03-22 2019-03-22 Stair section decoration operation platform

Publications (1)

Publication Number Publication Date
CN210342607U true CN210342607U (en) 2020-04-17

Family

ID=70173802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920372449.9U Active CN210342607U (en) 2019-03-22 2019-03-22 Stair section decoration operation platform

Country Status (1)

Country Link
CN (1) CN210342607U (en)

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN103806645A (en) Light intelligent hydraulic formwork climbing device with good wind and fire resistant performance
CN210342607U (en) Stair section decoration operation platform
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN205777428U (en) Elevator is from climbing platforms
CN210563298U (en) Interior decoration is with multi-level high decoration and fitment operation platform
CN204676865U (en) A kind of building scaffold
CN209568688U (en) A kind of elevating construction platform
CN215484747U (en) A safety protection operation platform for prefabricated stair construction
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN215167897U (en) Net piece fixed knot of frame is climbed in lightweight constructs
CN205822812U (en) A kind of floor bar mesh sheet is anti-tramples device
CN211058272U (en) Flower basket type overhanging scaffold
CN211143689U (en) Scaffold
CN210598244U (en) Movable operation and protection platform for assembled building stairwell
CN211173068U (en) Elevator shaft formwork support platform system
CN210117915U (en) Single-floor climbing frame and climbing system
CN210127618U (en) Adjustable movable steel pipe scaffold
CN209040527U (en) A kind of scaffold cradle structure
CN219931561U (en) Integral lifting type elevator shaft operation platform
CN216866122U (en) Assembled building elevator well is with interim safety stair
CN216405142U (en) Along with hanging gliding continuous web's of basket fitment platform structure
CN217480759U (en) Scaffold convenient for outdoor construction
CN210002825U (en) attached lifting aluminum alloy scaffold
CN213115437U (en) Wall-attached type operation platform module under overhanging roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant