CN209703433U - A kind of ecological protection permeable dike - Google Patents

A kind of ecological protection permeable dike Download PDF

Info

Publication number
CN209703433U
CN209703433U CN201822214599.5U CN201822214599U CN209703433U CN 209703433 U CN209703433 U CN 209703433U CN 201822214599 U CN201822214599 U CN 201822214599U CN 209703433 U CN209703433 U CN 209703433U
Authority
CN
China
Prior art keywords
fixedly installed
coagulation band
band
coagulation
dirty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822214599.5U
Other languages
Chinese (zh)
Inventor
刘飞
牟振波
陈方灿
刘海平
王且鲁
潘瑛子
曾本和
扎西拉姆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Qianjiangshui Ecological Technology Co ltd
Institute of Animal Husbandry and Veterinary Medicine of Tibet Academy of Agriculture and Animal Husbandry Sciences
Original Assignee
Guangzhou Qianjiangshui Ecological Technology Co ltd
Institute of Animal Husbandry and Veterinary Medicine of Tibet Academy of Agriculture and Animal Husbandry Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Qianjiangshui Ecological Technology Co ltd, Institute of Animal Husbandry and Veterinary Medicine of Tibet Academy of Agriculture and Animal Husbandry Sciences filed Critical Guangzhou Qianjiangshui Ecological Technology Co ltd
Priority to CN201822214599.5U priority Critical patent/CN209703433U/en
Application granted granted Critical
Publication of CN209703433U publication Critical patent/CN209703433U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of ecological protection permeable dikes, including earth formations, the side of the earth formations is fixedly installed with dirty coagulation band, the other side of the earth formations is fixedly installed with upper coagulation band, across the earth formations, dirty coagulation band and upper coagulation band are fixedly installed with concrete duct, the dirty coagulation band is fixedly connected by linking coagulation band with upper coagulation band, the outer surface of the upstream coagulation band is fixedly installed with fixed ring, the upper surface of the upstream coagulation band is fixedly installed with isolation strip, the upper surface kind of the earth formations is implanted with herbosa, the lower surface of the dirty coagulation band and upper coagulation band is fixedly installed with fixed pedestal.A kind of ecological protection permeable dike described in the utility model, can have preferable protectiveness, enhance its service life used, and can easy cleaning fall internal sundries, prevent from blocking, and the sundries of floating can be isolated, prevent from floaing into downstream contamination environment.

Description

A kind of ecological protection permeable dike
Technical field
The utility model relates to permeable dike field, in particular to a kind of ecological protection permeable dike.
Background technique
Ecological permeable dam is that one is use gravel and rubbles etc., and body of building a dam manually is built in contaminated river, by soil The composition such as rock stratum and dirty coagulation band, configuration has the plant of catharsis to water quality on dam body, in conjunction with quick diafiltration principle and Artificial swamp principle carries out certain purification to sewage, and ecological permeable dam is applied to processing Rural Plane Source Pollution, in hydraulic slope Plains region small, the network of waterways is intensive builds ecological permeable dam in reservoir, lake, river, forms a buffer area, In in upstream Buffer area, by extending hydraulic detention time, the sedimentation of silt and nutritive salt in promotion water, while utilization aquatic macrophyte, Further absorption and sorption, interception nutritive salt inhibit algae excessive propagation, slow down richness algae etc. to reduce the content of nutritive salt Nutrient laden process improves water quality, has preferable protection effect, and building cost is low, be widely used in every field;However thoroughly The dam lithosphere permeable when coming into operation is because loose, it is easy to and collapsing is fallen because hydraulic pressure is excessive, shortens its service life, And the water of upstream has the pollutant of precipitating for a long time, so that cannot appear water flow blocking from lithosphere to downstream, in addition exists It is easy some suspended matters when water covers dam from above as water flow is brought into downstream, so that influencing the ecological environment in downstream.
Utility model content
The main purpose of the utility model is to provide a kind of ecological protection permeable dikes, can effectively solve background technique In hydraulic pressure it is excessive be easy to cause lithosphere fall collapsing, pollutant blocking cannot ecological environment that is permeable and influencing downstream ask Topic.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of ecological protection permeable dike, including earth formations, the side of the earth formations are fixedly installed with to flow down and mix Solidifying band, the other side of the earth formations are fixedly installed with upper coagulation band, pass through the earth formations, flow down coagulation band and on Stream coagulation band is fixedly installed with concrete duct, and the dirty coagulation band is fixedly connected by linking coagulation band with upper coagulation band, The outer surface of the upstream coagulation band is fixedly installed with fixed ring, and the upper surface of the upstream coagulation band is fixedly installed with isolation Band, the upper surface kind of the earth formations are implanted with herbosa, and the lower surface of the dirty coagulation band and upper coagulation band is solid Dingan County is equipped with fixed pedestal.
Preferably, the steel mesh that flows down is fixedly mounted in the inside of the dirty coagulation band, and the inside of the upstream coagulation band is solid Dingan County is equipped with upper steel mesh.
Preferably, the inside of the concrete duct is filled with rock band, and the both ends of concrete duct are fixedly installed with steel Silk screen.
Preferably, the inside of the linking coagulation band is fixedly installed with linking steel mesh, and is connected the both ends point of steel mesh It is not fixedly connected with dirty steel mesh and upper steel mesh.
Preferably, drive rod is movably installed in the middle part of the fixed ring, the lower end of the drive rod is fixedly installed with Buddhist nun Dragon brush, the upper end of the drive rod is fixedly installed with pull ring.
Preferably, the both side surface of the isolation strip is fixedly installed with spud pile, the fixed peace in the lower end of the spud pile Equipped with pre-embedded block, separation net is embedded in the middle part of the isolation strip, the lower surface of the separation net is fixedly installed with connecting block.
Preferably, the surface of the spud pile is equipped with fixing threaded hole, and it is four groups that the quantity of fixing threaded hole, which has altogether,
Compared with prior art, the utility model has the following beneficial effects:
In the utility model, by the concrete duct of setting, concrete duct cooperates steel wire can will be loose in use Rock band fix, can prevent from when hydraulic pressure is larger falling and leading to avalanche rock band impact, have preferable steady Solidity, by the nylon bruss of setting, nylon bruss, can be by the dust of bottom sediment and some under the force of drive rod and pull ring Domestic refuse takes surface layer to water flow and cleans up, so as to prevent the blocking of iron wire network interface so that have compared with Good cleaning effect, by the isolation strip of setting, some floating materials that isolation strip can in use impact upstream are kept off Firmly, and by staff it clears up, prevents from entering downstream impacting to ecology, make to play preferable environmental protection With.
Detailed description of the invention
Fig. 1 is a kind of overall structure plan view of ecological protection permeable dike of the utility model;
Fig. 2 is a kind of partial plan view of ecological protection permeable dike of the utility model;
Fig. 3 is a kind of partial cutaway view of ecological protection permeable dike of the utility model;
Fig. 4 is a kind of isolation strip view of ecological protection permeable dike of the utility model.
In figure: 1, earth formations;2, flow down coagulation band;201, flow down steel mesh;3, upper coagulation band;301, upper reinforcing bar Net;4, concrete duct;401, rock band;402, steel wire;5, it is connected coagulation band;501, it is connected steel mesh;6, fixed ring;601, Drive rod;602, nylon bruss;603, pull ring;7, isolation strip;701, spud pile;702, pre-embedded block;703, separation net;704, it is connected Block;8, herbosa;9, fixed pedestal.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
As shown in Figs 1-4, the side of a kind of ecological protection permeable dike, including earth formations 1, the earth formations 1 is solid Dingan County is equipped with the coagulation band 2 that flows down, and the other side of the earth formations 1 is fixedly installed with upper coagulation band 3, passes through the soil rock Layer 1, dirty coagulation band 2 and upper coagulation band 3 are fixedly installed with concrete duct 4, and the dirty coagulation band 2 passes through linking coagulation band 5 are fixedly connected with upper coagulation band 3, and the outer surface of the upstream coagulation band 3 is fixedly installed with fixed ring 6, the upstream coagulation Upper surface with 3 is fixedly installed with isolation strip 7, and the upper surface kind of the earth formations 1 is implanted with herbosa 8, and described flow down is mixed The lower surface of solidifying band 2 and upper coagulation band 3 is fixedly installed with fixed pedestal 9;
The steel mesh 201 that flows down is fixedly mounted in the inside of dirty coagulation band 2, and the inside of the upstream coagulation band 3 is fixedly mounted There is upper steel mesh 301;The inside of concrete duct 4 is filled with rock band 401, and the both ends of concrete duct 4 are fixedly installed with Steel wire 402;The inside of linking coagulation band 5 is fixedly installed with linking steel mesh 501, and is connected the both ends difference of steel mesh 501 It is fixedly connected with dirty steel mesh 201 and upper steel mesh 301;The middle part of fixed ring 6 is movably installed with drive rod 601, described The lower end of drive rod 601 is fixedly installed with nylon bruss 602, and the upper end of the drive rod 601 is fixedly installed with pull ring 603;Isolation Both side surface with 7 is fixedly installed with spud pile 701, and the lower end of the spud pile 701 is fixedly installed with pre-embedded block 702, institute The middle part for stating isolation strip 7 is embedded with separation net 703, and the lower surface of the separation net 703 is fixedly installed with connecting block 704;It is fixed The surface of stake 701 is equipped with fixing threaded hole, and it is four groups that the quantity of fixing threaded hole, which has altogether,.
It should be noted that the utility model is a kind of ecological protection permeable dike, when coming into operation, upstream water flow will It is attached to the surface of upper coagulation band 3, while water will be immersed in rock band 401 by steel wire 402, water will be along rock at this time Stone band 401 submerges always inside entire concrete duct 4, finally oozes out, is flowed into down from dirty 2 side steel wire 402 of coagulation band Trip, if the season more in rainwater, water flow will cover the top of permeable dike, flowing water will trickle from upper surface to downstream at this time, And the isolation strip 7 being arranged some floating materials present in water can be isolated when water flow is larger by separation net 703, And cleared up by special staff, the environment in downstream is ensured that so not by the pollution of sundries, wherein in advance Block 702 is buried for being embedded in cement for fixing, spud pile 701 can be used for supporting, and connecting block 704 can be held in the mouth with dam It connects, prevents sundries from floaing from low side, so that playing the development of protecting ecology, in addition the use long-term in view of dam, leads to It crosses the linking coagulation band 5 of setting and is connected 501 structure of steel mesh for upper coagulation band 3 and upper 301 structure of steel mesh and flows down Coagulation band 2 and 201 structure of dirty steel mesh are mutually permanently connected, so that protecting the earth formations 1 of inside not fallen by impact, together The tree root of Shi Liyong herbosa 8 is solid so that more firm, and in order to utilize the unimpeded of water flow, staff can pull pull ring 603 move up drive rod 601, so that nylon bruss 602 is driven to slide on steel wire 402, it in this way can be by bottom end steel Sundries removal on silk screen 402, and some large-scale substances are drawn to the water surface and are cleaned up, to play the role of preferable cleaning, have Conducive to the water penetration of dam.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (7)

1. a kind of ecological protection permeable dike, it is characterised in that: including earth formations (1), the side of the earth formations (1) is solid Dingan County, which is equipped with, to flow down coagulation band (2), and the other side of the earth formations (1) is fixedly installed with upper coagulation band (3), passes through described Earth formations (1), dirty coagulation band (2) and upper coagulation band (3) are fixedly installed with concrete duct (4), the dirty coagulation band (2) it is fixedly connected by linking coagulation band (5) with upper coagulation band (3), the outer surface of the upstream coagulation band (3) is fixedly mounted Have fixed ring (6), it is described upstream coagulation band (3) upper surface be fixedly installed with isolation strip (7), the earth formations (1) it is upper Surface kind is implanted with herbosa (8), and the lower surface of the dirty coagulation band (2) and upper coagulation band (3) is fixedly installed with Determine pedestal (9).
2. a kind of ecological protection permeable dike according to claim 1, it is characterised in that: the dirty coagulation band (2) Inside, which is fixedly mounted, to flow down steel mesh (201), and the inside of the upstream coagulation band (3) is fixedly installed with upper steel mesh (301).
3. a kind of ecological protection permeable dike according to claim 1, it is characterised in that: the concrete duct (4) it is interior Portion is filled with rock band (401), and the both ends of concrete duct (4) are fixedly installed with steel wire (402).
4. a kind of ecological protection permeable dike according to claim 2, it is characterised in that: linking coagulation band (5) Inside be fixedly installed with linking steel mesh (501), and be connected steel mesh (501) both ends respectively with dirty steel mesh (201) and Upper steel mesh (301) is fixedly connected.
5. a kind of ecological protection permeable dike according to claim 1, it is characterised in that: the middle part of the fixed ring (6) It is movably installed with drive rod (601), the lower end of the drive rod (601) is fixedly installed with nylon bruss (602), the drive rod (601) upper end is fixedly installed with pull ring (603).
6. a kind of ecological protection permeable dike according to claim 1, it is characterised in that: the two sides of the isolation strip (7) Surface is fixedly installed with spud pile (701), and the lower end of the spud pile (701) is fixedly installed with pre-embedded block (702), it is described every From being embedded with separation net (703) in the middle part of band (7), the lower surface of the separation net (703) is fixedly installed with connecting block (704).
7. a kind of ecological protection permeable dike according to claim 6, it is characterised in that: the table of the spud pile (701) Face is equipped with fixing threaded hole, and it is four groups that the quantity of fixing threaded hole, which has altogether,.
CN201822214599.5U 2018-12-27 2018-12-27 A kind of ecological protection permeable dike Expired - Fee Related CN209703433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822214599.5U CN209703433U (en) 2018-12-27 2018-12-27 A kind of ecological protection permeable dike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822214599.5U CN209703433U (en) 2018-12-27 2018-12-27 A kind of ecological protection permeable dike

Publications (1)

Publication Number Publication Date
CN209703433U true CN209703433U (en) 2019-11-29

Family

ID=68638436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822214599.5U Expired - Fee Related CN209703433U (en) 2018-12-27 2018-12-27 A kind of ecological protection permeable dike

Country Status (1)

Country Link
CN (1) CN209703433U (en)

Similar Documents

Publication Publication Date Title
CN106567360B (en) A kind of habitat diversity ecological restoring method in urban hard river
CN110396979A (en) A kind of ecological restoring method of city river
CN108729326A (en) Self-purification drainage system for the strand highway construction of sponge city
CN207567889U (en) Residential quarters Rainwater collection system
CN211080099U (en) Ecological river bank protection
CN102139961A (en) Multilayer vegetation zone water quality in situ purification method for highly polluted tributary inlet
CN207193879U (en) A kind of embedding careless brick revetment structure of novel ecological
CN109205935A (en) River discharge outlet sewage shuts off the artificial swamp of processing
CN108951545A (en) Porous box water purifying revetment system
CN209703433U (en) A kind of ecological protection permeable dike
CN207645999U (en) A kind of resident living area initial rainwater runoff intercepts, purification equipment
CN109912036B (en) River course floating garbage collection and water purification system
CN208413993U (en) A kind of water purification system for the relatively slow river of water flow
CN209025043U (en) A kind of water conservancy ecosystem wall
CN201981511U (en) Long-term multi-function riverway ecological restoration retaining dam
CN206625181U (en) River course soil layer safeguard structure
CN106115922B (en) A kind of construction method of the clean water treatment for Landscape Park
CN208830258U (en) Porous box water purifying revetment system
CN210562551U (en) Farmland ecological pond for reducing agricultural non-point source pollution
CN207243686U (en) A kind of overpass rain processing system
CN209703421U (en) A kind of ecology bank slope
CN209442665U (en) River area source pollutants governing system
CN209128937U (en) A kind of ecological straw screen or mat prosthetic device for cities and towns hard revetment band
CN209101111U (en) A kind of embedding floor-lamp structure in sponge city
CN206512743U (en) River course soil-baffling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

Termination date: 20211227