CN109205935A CN201811135824.4A CN201811135824A CN109205935A CN 109205935 A CN109205935 A CN 109205935A CN 201811135824 A CN201811135824 A CN 201811135824A CN 109205935 A CN109205935 A CN 109205935A
Authority
CN
China
Prior art keywords
shut
shuts
discharge outlet
filter
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811135824.4A
Other languages
Chinese (zh)
Other versions
CN109205935B (en
Inventor
徐勇
张志兰
王苏艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ze Environmental Protection Technology Co Ltd
Original Assignee
Shanghai Ze Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ze Environmental Protection Technology Co Ltd filed Critical Shanghai Ze Environmental Protection Technology Co Ltd
Priority to CN201811135824.4A priority Critical patent/CN109205935B/en
Publication of CN109205935A publication Critical patent/CN109205935A/en
Application granted granted Critical
Publication of CN109205935B publication Critical patent/CN109205935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/281Treatment of water, waste water, or sewage by sorption using inorganic sorbents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/283Treatment of water, waste water, or sewage by sorption using coal, charred products, or inorganic mixtures containing them
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/105Phosphorus compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/16Nitrogen compounds, e.g. ammonia
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/30Organic compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2203/00Apparatus and plants for the biological treatment of water, waste water or sewage
    • C02F2203/006Apparatus and plants for the biological treatment of water, waste water or sewage details of construction, e.g. specially adapted seals, modules, connections
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2203/00Apparatus and plants for the biological treatment of water, waste water or sewage
    • C02F2203/008Mobile apparatus and plants, e.g. mounted on a vehicle
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/08Chemical Oxygen Demand [COD]; Biological Oxygen Demand [BOD]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/10Solids, e.g. total solids [TS], total suspended solids [TSS] or volatile solids [VS]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/14NH3-N
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/30Aerobic and anaerobic processes
    • C02F3/308Biological phosphorus removal
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/34Biological treatment of water, waste water, or sewage characterised by the microorganisms used

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Biological Treatment Of Waste Water (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

Shut off the artificial swamp of processing the present invention relates to a kind of river discharge outlet sewage, rack is filtered and the revolving door that shuts off including shutting off, shut off and filters rack and shut off revolving door and riverbank is enclosed sewage and shuts off inter-process space and revolving door and the riverbank discharge outlet face of shutting off, shut off filter rack be inside and outside double layer grid structure and periphery by filtering screen covering, shut off and filters inside rack filled with filter packing, planting aquatic plants on filter packing, sewage shut off inter-process space water body in be equipped with several bio-film colonization fillers, several slow release carbon source supplement pipes and several oxygenation lock phosphorus supplement pipe.The present invention can be realized the high-efficient purification processing to contaminants in drainage, the content of wherein nitrogen phosphorus organic pollutant be effectively reduced, while guaranteeing the flood carrying capacity of river discharge outlet.

Description

River discharge outlet sewage shuts off the artificial swamp of processing
Technical field
The invention belongs to the technical field of artificial swamp water purification, shut off processing more particularly to a kind of river discharge outlet sewage Artificial swamp.
Background technique
As the important carrier of urban surface water resource, urban water-body not only plays the natural function of substance and energy transport Can, but also have the function of water supply, flood passage, water drainage, irrigation, shipping, landscape, tourism etc..Due to long-term high speed economic society Development, many urban water-bodies in China all suffer from serious oxygen-rich oxide even black smelly problem.Currently, with Ecological Civilization Construction Gradually deeply, the improvement of city black-odor riverway is gradually brought into schedule.Many cities establish " the long system in river " to city black and odorous water Carry out restoration of the ecosystem.Practice have shown that in the case where sewage draining exit intercepts completely, using physics, chemistry, biology comprehensive means It is effective for carrying out the restoration of the ecosystem of city black and odorous water.By restoration of the ecosystem, many city black and odorous waters have obtained effectively controlling Reason, city Ecology, water environment and water landscape have obtained effective recovery.
Pipeline blowdown and face source blowdown of the pollution sources of city black and odorous water mainly from city centralization, just so-called city The reason of black and odorous water, substantially belongs to " in water, root is on the coast for pollution ".Therefore administrative department has carried out bank on river periphery While demolishing squatter buildings, pipeline cuts the measures such as dirt.It has no need for reticence, these measures are effectively, to greatly facilitate and reduce into urban water-body Pollutant.But the background of reality is the black smelly and rich battalion of some urban water-bodies even if cutting after dirty and bank demolishes squatter buildings completing pipeline Feedingization phenomenon is there is no obviously slowing down, even if this urban water-body, using various ecological reestablishments, water ecosystem is still difficult To be restored to the level for being better than V class water, some rivers for carrying out restoration of the ecosystem still will appear the indigo plant of large area in high temperature season Green alga outburst or even black and odorous water phenomenon.
The mainly many urban water-bodies of the reason of being found according to a large amount of engineering practice, causing this phenomenon are difficult to realize true The pipe of receiving of positive meaning cuts dirt, and water pollutant mainly passes through storm sewer and enters river.Enter urban water-body by storm sewer Pollution, only the restoration of the ecosystem means in the river are difficult to maintain the steady in a long-term of river water quality.Therefore, it is right in river to realize Effective interception of inlet for stom water blowdown makes detergent power of the amount of pollutants in river corridor restoration for entering water body by inlet for stom water In range, while the flood carrying capacity of inlet for stom water is not influenced, be the important prerequisite for realizing black and odorous water restoration of the ecosystem.
Drowned flow artificial wet land is highly effective to the smelly water remediation of urban black as a kind of ecological water treatment technology of low cost, Circular treatment is carried out to water body by building bypass drowned flow artificial wet land on bank when some black and odorous waters are repaired, effectively promotion water Matter.Artificial swamp is reached by wetland plant, medium filter bed and microorganism by the synergistic effect of physics, chemistry and biology Except the purpose of water pollutant.
Summary of the invention
Shut off the artificial swamp of processing technical problem to be solved by the invention is to provide a kind of river discharge outlet sewage, it is real Now the high-efficient purification of contaminants in drainage is handled, while guaranteeing the flood carrying capacity of river discharge outlet.
The technical solution adopted by the present invention to solve the technical problems is to provide a kind of river discharge outlet sewage and shuts off processing Artificial swamp, including shut off and filter rack and shut off revolving door, it is described shut off filter rack and the revolving door that shuts off is enclosed with riverbank Conjunction forms sewage and shuts off inter-process space and shut off revolving door and the riverbank discharge outlet face, it is described shut off filter rack and be Inside and outside double layer grid structure and periphery is covered by filtering screen, it is described shut off to filter filter packing, institute are filled with inside rack State planting aquatic plants on filter packing, the sewage shut off inter-process space water body in be equipped with several bio-film colonizations and fill out Material, several slow release carbon sources supplement pipe and several oxygenation lock phosphorus supplement pipe.
The sewage shut off inter-process space water body in be equipped with artificial floating island, the bio-film colonization filler, sustained release carbon Source supplement pipe and oxygenation lock phosphorus supplement pipe are lifted on artificial floating island lower part.
The artificial floating island includes floating frame and resistant floating plant, and the resistant floating plant plantation is on floating frame.
The slow release carbon source supplement pipe and oxygenation lock phosphorus supplement pipe are respectively the loading pipe of tube wall aperture and are hung by hanging buckle The lower section of artificial floating island is hung over, the slow release carbon source filled inside the slow release carbon source supplement pipe is that poly-succinic fourth diester is degradable Plastics, the sustained release oxygenation lock phosphorus agent that the oxygenation lock phosphorus supplement pipe inside is filled are the calper calcium peroxide of 90% or more purity.
The width of the artificial floating island is less than the width for the revolving door that shuts off.
Shut off that if to filter rack include double-layer structural general frame, metal mesh and dry corrosion sacrificial anode described, it is described Metal mesh is installed on the side of general frame, it is described shut off filter rack and corrosion sacrificial anode is conductively connected.
It is described shut off filter that rack passes through setscrew respectively and wirerope is fixed on riverbank.
When the revolving door that shuts off shuts off self weight close sewage shut off inter-process space, flood discharge when under water flow impact pressure It flips outward and opens sewage and shut off inter-process space.
The revolving door that shuts off includes door-plate, shaft and bearing, and the shaft is set to the top of door-plate and both ends and distinguishes It is rotatably installed on to shut off by bearing and filter on rack.
By filler basket, successively hierarchical layered is arranged as one to the filter packing that filters inside rack of shutting off from bottom to top Grade filter packing, secondary filtration filler, three-stage filtration filler and level Four filter packing, the packing material size of the by-pass filtration filler For 30~50mm, the packing material size of the secondary filtration filler is 10~30mm, and the packing material size of the three-stage filtration filler is 5 ~10mm, the packing material size of the level Four filter packing are 5~8mm.
Beneficial effect
First, it filters rack, filtering screen and filter packing by shutting off sewage is shut off and absorbed and filter, then tie Aerobic bio-contact oxidation, bottom anaerobic organism denitrification, oxygenation lock phosphorus and the mode of water plant absorption are closed to water body In the organic pollutants such as nitrogen, phosphorus be combined the processing of formula high-efficient purification, solid in the water body for be discharged into river can be significantly reduced The content of suspended matter, particulate matter and organic pollutant is conducive to river training pollution situation.
Second, on riverbank the displacement of discharge outlet under normal circumstances, the water body that shuts off by filtration mode and overflow manner outside It discharges into river;When displacement exceeds certain limit, the revolving door that shuts off flips outward automatic opening under water flow impact pressure, protects Demonstrate,prove normal flood carrying capacity.
Artificial floating island removal periodically can be carried out cleaning and material supplements work, enhanced Nitrogen/Phosphorus Removal, be convenient for by third The shut off deposit of inter-process space bottom of sewage is cleared up, facility maintenance is facilitated.
4th, structures are sheltered by artificial floating island and water plant, good beautification of landscape effect can be played Fruit.
Detailed description of the invention
Fig. 1 is overlooking structure diagram of the invention.
Fig. 2 shuts off for the present invention filters the schematic perspective view of rack.
Fig. 3 is the structural schematic diagram of artificial floating island of the present invention.
Fig. 4 is the hierarchical layered blank map of filter packing of the present invention.
Fig. 5 is the structural schematic diagram of the revolving door of the invention that shuts off.
Fig. 6 is the structural schematic diagram that slow release carbon source of the present invention supplements pipe.
Fig. 7 is the structural schematic diagram that oxygenation of the present invention locks that phosphorus supplements pipe.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
A kind of river discharge outlet sewage as shown in Figure 1 shuts off the artificial swamp of processing, including shuts off and filter rack 1, cuts Flow revolving door 2 and artificial floating island 11.Shut off and filters rack 1 and shut off revolving door 2 and riverbank 4 is enclosed sewage and shuts off inside Space is managed, and shut off revolving door 2 and 5 face of riverbank discharge outlet, the shut off size in inter-process space of sewage is 9.6m2。 Artificial floating island 11 be set to sewage shut off inter-process space water body in.
Rack 1 is filtered as shown in Fig. 2, shutting off as inside and outside double layer grid structure, including double-layer structural general frame 1-1, If ferrous metal net 1-2 and dry corrosion sacrificial anode 1-3.General frame 1-1 is made of the coating steel pipe of D=5cm, metal mesh 1-2 is the wire netting of mesh diameter D=5mm, is installed on the side of general frame 1-1.Corrosion sacrificial anode 1-3 is aluminium alloy Block, by the metal mesh 1-2 connection of copper conductor and irony, wire netting of the protection as cathode, alleviates corrosion in water.Shut off filter The periphery for crossing rack 1 is covered by filtering screen 3, and filtering screen 3 is the nylon wire of mesh diameter D=2~4mm.Shut off filtration 1 bottom submerged of rack, offshore end is by multiple expansive rivets 12 and is fixed on the concrete revetment on riverbank 4, and passes through Wirerope and riverbank 4 are fixed.
Shut off and filter inside rack 1 filled with filter packing 6, as shown in figure 4, filter packing 6 is by filler basket from lower On successively hierarchical layered be arranged as by-pass filtration filler 6-1, secondary filtration filler 6-2, three-stage filtration filler 6-3 and level Four filtering Filler 6-4.By-pass filtration filler 6-1 is the useless brick of 30~50mm partial size, and secondary filtration filler 6-2 is 10~30mm partial size Gravel filling, three-stage filtration filler 6-3 are the active carbon filler of 5~10mm partial size, and level Four filter packing 6-4 is 5~8mm partial size Zeolite filler.To be easy to disassemble, filter packing 6 filters the matched grid packing basket of 1 size of rack on the coast using with shutting off It directly sinks to shut off after filling and filter in rack 1.7 calamus of top planting aquatic plants of filter packing 6, by 10~20 plants/m2 Plantation.
As shown in figure 5, the revolving door 2 that shuts off includes door-plate 2-1, shaft 2-2 and bearing 2-3.Shaft 2-2 is fixed by rivet In the top of door-plate 2-1, the both ends of shaft 2-2, which pass through bearing 2-3 respectively and are rotatably installed on to shut off, to be filtered on rack 1.It cuts Revolving door 2 is flowed when shutting off, sewage is closed by self weight and shuts off inter-process space, and when flood discharge is turned-out under water flow impact pressure Turn, automatically opens sewage and shut off inter-process space.Shut off revolving door 2 width be 2.3m.
As shown in figure 3, artificial floating island 11 includes floating frame 11-1 and resistant floating plant 11-2.Floating frame 11-1 is that length and width are The square structure of 2.1m encloses area 4.4m2, it is made of the pvc pipe of D=15cm, sealing joint, keeps enough floating Power, floating frame 11-1 are fixed on the concrete revetment on riverbank 4 by nylon rope, avoid it from being impacted by mass-flow impaired.Floating frame 11- Floating plant 11-2 watermifoil is cultivated in 1, planting density is 30 plants/m2.The width design of artificial floating island 11 is less than rotation of shutting off The width of door 2, it is convenient to the removal of artificial floating island 11 is subjected to cleaning and material supplements work, convenient for shutting off inside to sewage The deposit of reason space bottom is cleared up.
The lower section of artificial floating island 11 is lifted with multiple bio-film colonization fillers 8, slow release carbon source supplement pipe 9 and oxygenation lock phosphorus supplement Pipe 10.Bio-film colonization filler 8 can be constructed using biological rope, artificial aquatic weed, baton round, plastic sheet etc., and bottom is not fixed, Ability of voluntarily sinking is required, biological contact oxidation pond is constituted.As shown in Figure 6 and Figure 7, slow release carbon source supplement pipe 9 and oxygenation The loading pipe that phosphorus supplement pipe 10 is respectively tube wall aperture is locked, is hung by hanging buckle in the lower section of artificial floating island 11.Slow release carbon source is mended Fill inside pipe 9 filling poly-succinic fourth diester (PBS) degradation plastic, oxygenation lock inside phosphorus supplement pipe 10 filling purity 90% with On calper calcium peroxide as sustained release oxygenation lock phosphorus agent.
The river discharge outlet sewage shut off processing artificial swamp operation are as follows:
In non-rainfall or smaller rainfall runoff, discharge outlet 5 water flow in riverbank is smaller, and the revolving door 2 that shuts off of face is by self weight Sink to closing, the sewage being discharged from riverbank discharge outlet 5 come together in through the effect of shutting off sewage shut off carry out in inter-process space it is net Outlet after change processing.Treatment process are as follows: the biology that the sewage being discharged from riverbank discharge outlet 5 first passes around 11 lower part of artificial floating island connects Phosphorus is consolidated in touching oxidation processes and the denitrification denitrogenation of bottom and the oxygenation on top, strengthens and removes nitrogen phosphorus therein, reduces therein Organic concentration;Then, further across the filtering of filtering screen 3 and filter packing 6, remove bulky grain solid object therein and Suspended matter;The finally outlet after the absorption of wetland plant and chinampa plant processing.Draining is by wet land filler filtration and wetland The mode overflowed at the top of filler is discharged.
When rainfall runoff is larger, discharge outlet 5 water yield in riverbank increases, and water flow impact pressure increases, and the revolving door 2 that shuts off is in water flow It is dug upwards automatically under percussion, rainwater is expelled directly out into river, does not influence the flood discharge in rainy season.
In the present embodiment, repeatedly tested according to the Inlet and outlet water after stable operation three months, influent COD cr, ammonia nitrogen, The mean concentration of TP, SS are respectively 200mg/L, 15mg/L, 2mg/L, 250mg/L, the water outlet of These parameters be respectively 50mg/L, 3mg/L,0.35mg/L,25mg/L.The artificial swamp is estimated to need annual removal artificial floating island 11, and internal volume carries out primary Dredging processing.

Claims (10)

  1. The artificial swamp of processing 1. a kind of river discharge outlet sewage shuts off, it is characterised in that: including shut off filter rack (1) and cut Flow revolving door (2), it is described shut off to filter rack (1) and the revolving door that shuts off (2) and riverbank (4) and be enclosed sewage shut off inside Manage space and the revolving door that shuts off (2) and riverbank discharge outlet (5) face, it is described to shut off that filter rack (1) be inside and outside Double-level Reticulated Frame structure and periphery is covered by filtering screen (3), it is described shut off filter filled with filter packing (6) inside rack (1), it is described Planting aquatic plants (7) on filter packing (6), the sewage shut off inter-process space water body in be equipped with several bio-film colonizations Filler (8), several slow release carbon sources supplement pipe (9) and several oxygenation lock phosphorus supplement pipe (10).
  2. The artificial swamp of processing 2. a kind of river discharge outlet sewage according to claim 1 shuts off, it is characterised in that: described Sewage shut off inter-process space water body in be equipped with artificial floating island (11), the bio-film colonization filler (8), slow release carbon source supplement Pipe (9) and oxygenation lock phosphorus supplement pipe (10) are lifted on artificial floating island (11) lower part.
  3. The artificial swamp of processing 3. a kind of river discharge outlet sewage according to claim 2 shuts off, it is characterised in that: described Artificial floating island (11) includes floating frame (11-1) and resistant floating plant (11-2), and resistant floating plant (11-2) plantation is in floating On frame (11-1).
  4. The artificial swamp of processing 4. a kind of river discharge outlet sewage according to claim 2 shuts off, it is characterised in that: described Slow release carbon source supplement pipe (9) and oxygenation lock phosphorus supplement pipe (10) are respectively the loading pipe of tube wall aperture and are hung by hanging buckle in people The lower section on work chinampa (11), the internal slow release carbon source filled of slow release carbon source supplement pipe (9) is that poly-succinic fourth diester can drop Plastics are solved, the sustained release oxygenation lock phosphorus agent filled inside the oxygenation lock phosphorus supplement pipe (10) is the peroxidating of 90% or more purity Calcium.
  5. The artificial swamp of processing 5. a kind of river discharge outlet sewage according to claim 2 shuts off, it is characterised in that: described The width of artificial floating island (11) is less than the width for revolving door (2) of shutting off.
  6. The artificial swamp of processing 6. a kind of river discharge outlet sewage according to claim 1 shuts off, it is characterised in that: described Shutting off, to filter rack (1) include double-layer structural general frame (1-1), metal mesh (1-2) and if dry corrosion sacrificial anode (1- 3), the metal mesh (1-2) is installed on the side of general frame (1-1), it is described shut off filter rack (1) and corrosion sacrificial anode (1-3) is conductively connected.
  7. The artificial swamp of processing 7. a kind of river discharge outlet sewage according to claim 1 or 6 shuts off, it is characterised in that: It is described shut off filter rack (1) and be fixed on riverbank (4) by setscrew (12) and wirerope respectively.
  8. The artificial swamp of processing 8. a kind of river discharge outlet sewage according to claim 1 shuts off, it is characterised in that: described When the revolving door (2) that shuts off shuts off self weight close sewage shut off inter-process space, flood discharge when flipped outward under water flow impact pressure Sewage is opened to shut off inter-process space.
  9. The artificial swamp of processing 9. a kind of river discharge outlet sewage according to claim 8 shuts off, it is characterised in that: described The revolving door (2) that shuts off includes door-plate (2-1), shaft (2-2) and bearing (2-3), and the shaft (2-2) is set to door-plate (2-1) Top and both ends pass through bearing (2-3) respectively and be rotatably installed on to shut off and filter on rack (1).
  10. The artificial swamp of processing 10. a kind of river discharge outlet sewage according to claim 1 shuts off, it is characterised in that: institute It states to shut off and filters the internal filter packing (6) of rack (1) successively hierarchical layered is arranged as level-one mistake from bottom to top by filler basket Filter filler (6-1), secondary filtration filler (6-2), three-stage filtration filler (6-3) and level Four filter packing (6-4), the level-one mistake The packing material size for filtering filler (6-1) is 30~50mm, and the packing material size of the secondary filtration filler (6-2) is 10~30mm, institute The packing material size for stating three-stage filtration filler (6-3) is 5~10mm, the packing material size of the level Four filter packing (6-4) is 5~ 8mm。
CN201811135824.4A 2018-09-28 2018-09-28 Artificial wetland for river drainage outlet sewage interception treatment Active CN109205935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811135824.4A CN109205935B (en) 2018-09-28 2018-09-28 Artificial wetland for river drainage outlet sewage interception treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811135824.4A CN109205935B (en) 2018-09-28 2018-09-28 Artificial wetland for river drainage outlet sewage interception treatment

Publications (2)

Publication Number Publication Date
CN109205935A true CN109205935A (en) 2019-01-15
CN109205935B CN109205935B (en) 2021-08-20

Family

ID=64981993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811135824.4A Active CN109205935B (en) 2018-09-28 2018-09-28 Artificial wetland for river drainage outlet sewage interception treatment

Country Status (1)

Country Link
CN (1) CN109205935B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110156148A (en) * 2019-07-02 2019-08-23 南京大学 It is a kind of to strengthen pollution cutting device for the electrolysis for entering river pollution
CN111005345A (en) * 2019-12-03 2020-04-14 福建省水利水电勘测设计研究院 Ecological water system restoration construction method
CN113697876A (en) * 2021-09-15 2021-11-26 同济大学 In-situ rain overflow pollution reduction device and method based on slow-release material
CN115010262A (en) * 2022-05-07 2022-09-06 南京古洛环保工程有限公司 Rainwater drainage port reduction and filtration ecological floating island system

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005118489A1 (en) * 2004-06-03 2005-12-15 Kazuaki Akai Advanced purification system utilizing closed water area by “void of water area”
CN101580333A (en) * 2009-06-29 2009-11-18 杭州富春环保工程有限公司 Domestic sewage disposal device and treatment method thereof
US8021551B2 (en) * 2008-03-27 2011-09-20 Mark Harrison Eco-treatment system
CN102351317A (en) * 2011-09-09 2012-02-15 杨欣 Sewage treatment artificial wetland system
CN202499786U (en) * 2012-02-14 2012-10-24 河海大学 Floating bed filter screen type biological grid
KR20130019902A (en) * 2011-08-18 2013-02-27 한국파라마운트 주식회사 Reactive mat and admixed soil and waterproofing and covering method using them
US8475658B2 (en) * 2003-01-29 2013-07-02 Molycorp Minerals, Llc Water purification device for arsenic removal
CN103821218A (en) * 2014-02-17 2014-05-28 广州市市政工程设计研究院 Initial rainwater and mixed rain-sewage overflow water impounding sewage facility
CN203755425U (en) * 2014-02-17 2014-08-06 广州市市政工程设计研究院 Initial rainwater and rainwater and pollutant mixed overflow water retaining and seepage facility
US20140270960A1 (en) * 2011-03-15 2014-09-18 Gary Breitenbeck Device for coastal restoration
FR3015468A1 (en) * 2013-12-24 2015-06-26 Veolia Water Solutions & Tech WATER TREATMENT DEVICE COMPRISING A BIOLOGICAL TREATMENT TANK AND A STORAGE TANK FORMING A COMPACT ASSEMBLY
US20150299013A1 (en) * 2014-04-17 2015-10-22 Farouk Dakhil Solar desalination and power generation plant
CN105217798A (en) * 2015-11-06 2016-01-06 山东钢铁股份有限公司 The quick self-purifying method of a kind of urban river channel rainwater
CN105439289A (en) * 2015-12-22 2016-03-30 郑州大学 Ecological restoration apparatus for slightly-polluted river water body
CN106007173A (en) * 2016-05-30 2016-10-12 大连民族大学 Scattered household sewage and river water environment purifying system
CN106745765A (en) * 2016-12-01 2017-05-31 黄鑫 A kind of artificial swamp of polluted river water and oxygen-enriched biological treatment combine d bioremediation system
CN206680942U (en) * 2017-03-24 2017-11-28 苏州天瑞环境科技有限公司 The two level wet land treating system in river course
CN107574802A (en) * 2017-09-12 2018-01-12 出惠玲 River surface governing system
CN206971165U (en) * 2017-06-07 2018-02-06 蔡金来 A kind of water conservancy municipal administration river closure works system blocks pond facility
CN108503035A (en) * 2018-05-31 2018-09-07 中国水产科学研究院东海水产研究所 A kind of staged composite ecological floating island for micropollutant water processing

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8475658B2 (en) * 2003-01-29 2013-07-02 Molycorp Minerals, Llc Water purification device for arsenic removal
WO2005118489A1 (en) * 2004-06-03 2005-12-15 Kazuaki Akai Advanced purification system utilizing closed water area by “void of water area”
US8021551B2 (en) * 2008-03-27 2011-09-20 Mark Harrison Eco-treatment system
CN101580333A (en) * 2009-06-29 2009-11-18 杭州富春环保工程有限公司 Domestic sewage disposal device and treatment method thereof
US20140270960A1 (en) * 2011-03-15 2014-09-18 Gary Breitenbeck Device for coastal restoration
KR20130019902A (en) * 2011-08-18 2013-02-27 한국파라마운트 주식회사 Reactive mat and admixed soil and waterproofing and covering method using them
CN102351317A (en) * 2011-09-09 2012-02-15 杨欣 Sewage treatment artificial wetland system
CN202499786U (en) * 2012-02-14 2012-10-24 河海大学 Floating bed filter screen type biological grid
FR3015468A1 (en) * 2013-12-24 2015-06-26 Veolia Water Solutions & Tech WATER TREATMENT DEVICE COMPRISING A BIOLOGICAL TREATMENT TANK AND A STORAGE TANK FORMING A COMPACT ASSEMBLY
CN203755425U (en) * 2014-02-17 2014-08-06 广州市市政工程设计研究院 Initial rainwater and rainwater and pollutant mixed overflow water retaining and seepage facility
CN103821218A (en) * 2014-02-17 2014-05-28 广州市市政工程设计研究院 Initial rainwater and mixed rain-sewage overflow water impounding sewage facility
US20150299013A1 (en) * 2014-04-17 2015-10-22 Farouk Dakhil Solar desalination and power generation plant
CN105217798A (en) * 2015-11-06 2016-01-06 山东钢铁股份有限公司 The quick self-purifying method of a kind of urban river channel rainwater
CN105439289A (en) * 2015-12-22 2016-03-30 郑州大学 Ecological restoration apparatus for slightly-polluted river water body
CN106007173A (en) * 2016-05-30 2016-10-12 大连民族大学 Scattered household sewage and river water environment purifying system
CN106745765A (en) * 2016-12-01 2017-05-31 黄鑫 A kind of artificial swamp of polluted river water and oxygen-enriched biological treatment combine d bioremediation system
CN206680942U (en) * 2017-03-24 2017-11-28 苏州天瑞环境科技有限公司 The two level wet land treating system in river course
CN206971165U (en) * 2017-06-07 2018-02-06 蔡金来 A kind of water conservancy municipal administration river closure works system blocks pond facility
CN107574802A (en) * 2017-09-12 2018-01-12 出惠玲 River surface governing system
CN108503035A (en) * 2018-05-31 2018-09-07 中国水产科学研究院东海水产研究所 A kind of staged composite ecological floating island for micropollutant water processing

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
M.S. FOUNTOULAKIS: "Pilot-scale comparison of constructed wetlands operated under high hydraulic", 《SCIENCE OF THE TOTAL ENVIRONMENT》 *
梁建军等: "复合潜流人工湿地强化处理低温地区生活污水", 《中国给水排水》 *
田景宏: "人工湿地处理永定河微污染河水试验研究", 《水处理技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110156148A (en) * 2019-07-02 2019-08-23 南京大学 It is a kind of to strengthen pollution cutting device for the electrolysis for entering river pollution
CN111005345A (en) * 2019-12-03 2020-04-14 福建省水利水电勘测设计研究院 Ecological water system restoration construction method
CN113697876A (en) * 2021-09-15 2021-11-26 同济大学 In-situ rain overflow pollution reduction device and method based on slow-release material
CN115010262A (en) * 2022-05-07 2022-09-06 南京古洛环保工程有限公司 Rainwater drainage port reduction and filtration ecological floating island system

Also Published As

Publication number Publication date
CN109205935B (en) 2021-08-20

Similar Documents

Publication Publication Date Title
CN104926032B (en) A kind of tidal waterway, coastal cities multistage composite intensified purification method
CN109205935A (en) River discharge outlet sewage shuts off the artificial swamp of processing
CN207294351U (en) A kind of Polluted Urban inland lake purification of water quality and Water Ecological Recovery system
CN104230100A (en) Three-dimensional ecological corridor system and method for in-situ restoration of river water body
CN106365389B (en) A kind of Constructed Wetland For Purifying processing system suitable for cities and towns black-odor riverway
CN203729430U (en) Rainwater bioretention filtering device
CN105502828A (en) Oligodynamic in-situ ecological restoration method of urban beheaded river
CN204185336U (en) For the stereo ecological gallery system of river water body in-situ immobilization
US20150101981A1 (en) Assemblies and methods for treating wastewater
CN104692597B (en) The unsettled sewage draining exit domestic sewage ecological in small-sized distributing river course purifies integrating device
CN107739098A (en) A kind of Polluted Urban inland lake purification of water quality and Water Ecological Recovery method
CN112158958B (en) Artificial rainwater wetland system for sponge city construction for removing pollutants in strengthening manner
CN202063793U (en) Biological response system used for multi-stage sewage treatment
CN207294336U (en) Floating type interim purified in situ device for Drain contamination for river channel mouth
CN108951545A (en) Porous box water purifying revetment system
CN102351317B (en) Sewage treatment artificial wetland system
CN111139784A (en) Point source pollution enhanced retention and purification artificial wetland system at lake inlet and lake outlet
CN217498848U (en) Urban high-density built-up area lake and pond wetland system based on split system
CN105693016A (en) Rain/sewage-mixed-flow-state river course distributed treatment technique
KR20200035535A (en) Reduction of pollution load and Blocking system using Waterfront space
CN205773956U (en) Sewage percolation purification system
CN213572245U (en) Mining area rainwater purifies row and holds system based on LID technique
KR20140043103A (en) Eco-friendly construction system that removes the pollutants and contaminants contained in the stream or rainwater from the point source and the nonpoint source and cleans it with clean water
CN113136762A (en) Road rainwater recycling system for sponge city construction
CN205382008U (en) Use biological water cellar purifier of module that strains slowly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant