CN206512743U - River course soil-baffling structure - Google Patents

River course soil-baffling structure Download PDF

Info

Publication number
CN206512743U
CN206512743U CN201720200067.9U CN201720200067U CN206512743U CN 206512743 U CN206512743 U CN 206512743U CN 201720200067 U CN201720200067 U CN 201720200067U CN 206512743 U CN206512743 U CN 206512743U
Authority
CN
China
Prior art keywords
river course
soil
retaining wall
layer
baffling structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720200067.9U
Other languages
Chinese (zh)
Inventor
石哲然
周晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201720200067.9U priority Critical patent/CN206512743U/en
Application granted granted Critical
Publication of CN206512743U publication Critical patent/CN206512743U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of river course soil-baffling structure, including the retaining wall positioned at river course side, the upper surface of the retaining wall is provided with mounting groove along its length, it is provided with the mounting groove and cuts dirty drainpipe, one end of described section of dirty drainpipe extends in river course and communicated with river course, its drip irrigation device is will to cut a dirty drainpipe to be arranged in retaining wall, so as to reduce the influence in the section to circulation of being supplied water in river course, reaches that effectively reducing river course blocks water the effect in section.

Description

River course soil-baffling structure
Technical field
The utility model is related to river course technical field of buildings, more specifically, it relates to a kind of river course soil-baffling structure.
Background technology
River course is typically made up with soil-baffling structure of concrete, for resisting washing away for water body in river course, it is to avoid river course both sides The loss of water and soil.
Existing Authorization Notice No. provides a kind of urban river ecological Afforestation Landscape for CN204475262U Chinese patent Shore protection, it includes retaining wall, and retaining wall is fitted with the water in river course, and side of the retaining wall away from river course is disposed with ecological block Brick, toughness plank road and shield river greenbelt.All have in current river course and cut dirty drainpipe, cut dirty drainpipe and be arranged on one with retaining wall Rise, after rubbish precipitation in urban water, then be emitted in river course, it is to avoid the cleannes reduction of water quality in river course.
But, the diameter dimension for cutting dirty drainpipe is generally large, so that the section reduction circulated that causes to supply water in river course, i.e., Increase the section that blocks water, change the flowing water section in former design river course, summer rainfall than it is larger when, easily cause in river course The spilling of water, reduces the speed of urban rainwater dispatch.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model be provide one kind effectively reduce river course block water cut The river course soil-baffling structure in face.
To achieve the above object, the utility model provides following technical scheme:
Grown along it a kind of river course soil-baffling structure, including the retaining wall positioned at river course side, the upper surface of the retaining wall Degree direction, which is provided with mounting groove, the mounting groove to be provided with, cuts dirty drainpipe, and one end of described section of dirty drainpipe extends to river Communicated in road and with river course.
By using above-mentioned technical proposal, dirty drainpipe will be cut and be arranged in retaining wall, so as to reduce to being supplied water in river course The influence in the section of circulation, reaches that effectively reducing river course blocks water the effect in section.It is located in addition, cutting dirty drainpipe in mounting groove, The immersion of river is prevented effectively from, extension cuts the service life of dirty drainpipe.
Further, soil is provided with the mounting groove and tamps layer, described section of dirty drainpipe tamps layer positioned at soil It is internal.
By using above-mentioned technical proposal, soil tamps layer and fitted with cutting the tube wall of dirty drainpipe, effectively improves and cuts dirty row The intensity of water pipe.Weaken to produce when cutting dirty drainpipe draining and rock.In addition, it is to avoid personnel are fallen in mounting groove.
Further, madial wall of the mounting groove close to river course direction, which is upwardly extended, is provided with erosion control brush board.
It by using above-mentioned technical proposal, can effectively prevent rainwater from overflowing across retaining wall, reduce farsighted soil and tamp rushing for layer Brush.
Further, the retaining wall is provided with dry rock layer positioned at the side in river course, and the dry rock layer is less than erosion control Brush board.
By using above-mentioned technical proposal, dry rock layer is formed by the accumulation of drystone block, so that with to close gear in river course The effect of the water flow speed reduction of cob wall side-walls, reduction is washed away to retaining wall.
Further, the soil, which is tamped, is provided with green plants on layer.
By using above-mentioned technical proposal, green plants, which tamp layer to soil, has the effect reinforced, it is possible to reduce rainwater Layer is tamped to soil to wash away.Trampled in addition, reduction personnel tamp layer to soil.And avoid personnel's soil of jumping over from tamping Layer, danger of the reduction close to river course.
Further, side of the retaining wall away from river course is provided with security protection wall, and the security protection wall is higher than Retaining wall.
By using above-mentioned technical proposal, when rainy season, rainwater can be avoided to overflow to road surface.
Further, it is provided with sandstone between the security protection wall and retaining wall and tamps layer.
By using above-mentioned technical proposal, sandstone tamps layer and formed by sandstone accumulation, so as to for audience's walking.This Outside, when rainwater overflows across erosion control brush board, rainwater can be penetrated down into time, it is to avoid soil, which is tamped, gathers rainwater on layer.
Further, the sandstone tamps and water service pipe is provided with layer, and the water service pipe extends and and river to river course direction Road is communicated.
By using above-mentioned technical proposal, sandstone can be made to tamp the water in layer and timely imported in river course.Furthermore it is possible to Ensure that river course and sandstone tamp the water level balance between layer, the pressure balance of retaining wall both sides.
Further, the quantity of the water service pipe is two, and two water service pipes are located at respectively to be cut above and below dirty drainpipe Both sides.
By using above-mentioned technical proposal, after one of drainpipe is blocked, another drainpipe can continue to lead to Water, so as to ensure that sandstone tamps the balance between layer and river course both sides water level.
In summary, the utility model has the advantages that:
1st, dirty drainpipe will be cut to be arranged in retaining wall, and will reduce the influence to the section for circulation of being supplied water in river course, reaching has Effect reduces river course and blocked water the effect in section;
2nd, do rock layer to be formed by the accumulation of drystone block, so that with to the water flow speed reduction in river course close to retaining wall side-walls Effect, reduction retaining wall is washed away.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment.
In figure:1st, retaining wall;11st, erosion control brush board;12nd, mounting groove;121st, soil tamps layer;1211st, green plants;2nd, cut Dirty drainpipe;3rd, rock layer is done;4th, security protection wall;5th, sandstone tamps layer;51st, water service pipe;6th, river course.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.
Embodiment:
A kind of river course soil-baffling structure, reference picture 1, it includes the retaining wall 1 positioned at the side of river course 6, and retaining wall 1 is by reinforcing bar Concrete is made, to avoid the both sides soil erosion of river course 6.The upper surface of retaining wall 1 is provided with mounting groove 12 along its length, It is provided with mounting groove 12 and cuts dirty drainpipe 2, the one end for cutting dirty drainpipe 2 is extended in river course 6, and is communicated with river course 6, cuts dirt The other end of drainpipe 2 and the gully of municipal highway(Not shown in figure)Communicate;When rainy, the rainwater on highway is through draining Well stream is to cutting in dirty drainpipe 2, and rainwater flows in section dirty drainpipe 2, through cutting the filtering of dirt drainpipe 2, flows into river course 6 Water is more clean.Dirty drainpipe 2 will be cut to be arranged in retaining wall 1, the section without taking circulation of supplying water in river course 6, from And effectively reduce the section that blocks water in river course 6.
Soil is provided with reference picture 1, mounting groove 12 and tamps layer 121, is cut dirty drainpipe 2 and is tamped layer 121 positioned at soil It is internal.The soil filled by soft soil tamps layer 121 and can fully fitted with cutting the tube wall of dirty drainpipe 2, is cut so as to improve The intensity of dirty drainpipe 2.
Reference picture 1, madial wall of the mounting groove 12 close to the direction of river course 6, which is upwardly extended, is provided with erosion control brush board 11, protection against erosion Plate 11 is molded with the formed by integrally casting of retaining wall 1, so as to avoid the water in river course 6 from overflowing across retaining wall 1.Soil is tamped and set on layer 121 There are green plants 1211, green plants 1211 are flower calamus, Lythrum salicaria, cattail or taxodium ascendens etc., trample soil to prevent audience and fill out Real layer 121, and stop audience soil of jumping over can be played tamp the thing of layer 121 and close to the danger in river course 6.
Reference picture 1, the side that retaining wall 1 is located at river course 6 is provided with dry rock layer 3, dry rock layer 3 accumulated by drystone block and Into with gap between adjacent drystone block;When flowing water speed in river course 6, flowing water rushing to retaining wall 1 is reduced Brush, does rock layer 3 and is less than erosion control brush board 11.
Reference picture 1, side of the retaining wall 1 away from river course 6 is provided with security protection wall 4, and security protection wall 4 is higher than retaining wall 1, preferred security protecting wall 4 is higher than retaining wall 10.6M-1M, to avoid the water in rainy season river course 6 from overflowing.Security protection wall 4 Sandstone is provided between retaining wall 1 and tamps layer 5, sandstone tamps layer 5 and formed by the accumulation of sand grains and rubble.In season short of rain, It can be walked for audience and experience the Nature close to river course 6.
Sandstone tamps and water service pipe 51 is provided with layer 5, and water service pipe 51 is pvc pipe, and water service pipe 51 extends to the direction of river course 6, And communicated with river course 6, the quantity of water service pipe 51 is two, and two water service pipes 51 are located at twice both sides for cutting dirty drainpipe 2 respectively, After heavy rain, the rainwater that sandstone is tamped in layer 5 is imported in river course 6 through water service pipe 51, and aqueduct can make the both sides of retaining wall 1 Water level balance, so that the uniform force of the both sides of retaining wall 1.

Claims (9)

1. a kind of river course soil-baffling structure, including the retaining wall (1) positioned at river course (6) side, it is characterised in that:The retaining wall (1) upper surface is provided with mounting groove (12), the mounting groove (12) to be provided with along its length cuts dirty drainpipe (2), One end of described section of dirty drainpipe (2) extends in river course (6) and communicated with river course (6).
2. river course soil-baffling structure according to claim 1, it is characterised in that:Soil is provided with the mounting groove (12) Layer (121) is tamped, described section of dirty drainpipe (2) is located at the inside that soil tamps layer (121).
3. river course soil-baffling structure according to claim 2, it is characterised in that:The mounting groove (12) is close to river course (6) The madial wall in direction, which is upwardly extended, is provided with erosion control brush board (11).
4. river course soil-baffling structure according to claim 3, it is characterised in that:The retaining wall (1) is located at river course (6) Side is provided with dry rock layer (3), and the dry rock layer (3) is less than erosion control brush board (11).
5. river course soil-baffling structure according to claim 2, it is characterised in that:The soil is tamped and set on layer (121) There are green plants (1211).
6. river course soil-baffling structure according to claim 1, it is characterised in that:The remote river course (6) of the retaining wall (1) Side is provided with security protection wall (4), and the security protection wall (4) is higher than retaining wall (1).
7. river course soil-baffling structure according to claim 6, it is characterised in that:The security protection wall (4) and retaining wall (1) sandstone is provided between and tamps layer (5).
8. river course soil-baffling structure according to claim 7, it is characterised in that:The sandstone is tamped to be provided with layer (5) Water service pipe (51), the water service pipe (51) extends to river course (6) direction and communicated with river course (6).
9. river course soil-baffling structure according to claim 8, it is characterised in that:The quantity of the water service pipe (51) is two Individual, two water service pipes (51) are located at respectively cuts dirty drainpipe (2) both sides up and down.
CN201720200067.9U 2017-03-02 2017-03-02 River course soil-baffling structure Expired - Fee Related CN206512743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720200067.9U CN206512743U (en) 2017-03-02 2017-03-02 River course soil-baffling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720200067.9U CN206512743U (en) 2017-03-02 2017-03-02 River course soil-baffling structure

Publications (1)

Publication Number Publication Date
CN206512743U true CN206512743U (en) 2017-09-22

Family

ID=59869123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720200067.9U Expired - Fee Related CN206512743U (en) 2017-03-02 2017-03-02 River course soil-baffling structure

Country Status (1)

Country Link
CN (1) CN206512743U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450169A (en) * 2022-09-15 2022-12-09 中国电建集团成都勘测设计研究院有限公司 River bank protection considering sewage intercepting pipeline arrangement and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450169A (en) * 2022-09-15 2022-12-09 中国电建集团成都勘测设计研究院有限公司 River bank protection considering sewage intercepting pipeline arrangement and construction method thereof
CN115450169B (en) * 2022-09-15 2024-01-23 中国电建集团成都勘测设计研究院有限公司 River course revetment considering sewage interception pipeline layout and construction method thereof

Similar Documents

Publication Publication Date Title
CN207362631U (en) A kind of road rain water recovery system of sponge urban construction
CN207567889U (en) Residential quarters Rainwater collection system
CN207512545U (en) A kind of road surface drainage structure
CN108729326A (en) Self-purification drainage system for the strand highway construction of sponge city
CN106192665A (en) A kind of sponge urban road rain infiltration system and construction method thereof
CN206433417U (en) Sponge urban ecology grass planting ditch
CN103174079B (en) A kind of roadway rainwater collection system for preventing surface gathered water
CN108271656A (en) A kind of water circulation system and construction method for Slope greening
CN203782519U (en) Shallow grass ditch
CN207776053U (en) It is a kind of for sponge urban construction without catch-basin drainage system
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN206512743U (en) River course soil-baffling structure
CN206521728U (en) A kind of hydraulic engineering ecological protection slope
CN206308584U (en) Urban road drainage system
CN209636585U (en) A kind of pavement grass planting ditch
CN208701842U (en) Greenery patches buffer strip system
CN207243686U (en) A kind of overpass rain processing system
CN106894491A (en) A kind of sponge city concave herbaceous field
CN206245443U (en) A kind of novel grass-planting trench system
CN206616661U (en) A kind of sponge city concave herbaceous field
CN205775706U (en) A kind of novel without closed median strip drainage system
CN211972951U (en) Municipal works road laying structure
CN107401205A (en) A kind of karst depression rainfall utilizes system
CN207537964U (en) A kind of hydraulic engineering ecological protection slope
CN206635806U (en) A kind of retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

CF01 Termination of patent right due to non-payment of annual fee