CN115450169B - River course revetment considering sewage interception pipeline layout and construction method thereof - Google Patents

River course revetment considering sewage interception pipeline layout and construction method thereof Download PDF

Info

Publication number
CN115450169B
CN115450169B CN202211122376.0A CN202211122376A CN115450169B CN 115450169 B CN115450169 B CN 115450169B CN 202211122376 A CN202211122376 A CN 202211122376A CN 115450169 B CN115450169 B CN 115450169B
Authority
CN
China
Prior art keywords
steel pipe
concrete
pipe pile
pile
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211122376.0A
Other languages
Chinese (zh)
Other versions
CN115450169A (en
Inventor
曾子
刘侠
陈强
陈磊
周祥森
任慧敏
谭祖勇
蔡庆
江宏
胡锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN202211122376.0A priority Critical patent/CN115450169B/en
Publication of CN115450169A publication Critical patent/CN115450169A/en
Application granted granted Critical
Publication of CN115450169B publication Critical patent/CN115450169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/121Devices for applying linings on banks or the water bottom
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a river bank protection taking sewage interception pipeline layout into consideration and a construction method thereof, wherein the river bank protection comprises an inner steel pipe pile assembly, an outer steel pipe pile assembly, a pile partition wall, a concrete bottom plate and a concrete top plate, the lower end of the steel pipe pile assembly is inserted into a river bank slope, the lower end of the pile partition wall is positioned below a ground line of the river bank slope, and the upper end of the outer steel pipe pile assembly is positioned in the pile partition wall; the concrete bottom plate is arranged below the ground line of the river bank slope, the concrete top plate is arranged above the designed water level of the river, and the sewage interception pipeline is arranged in a pipe ditch formed by the inter-pile wall, the inner side steel pipe pile assembly, the concrete bottom plate and the concrete top plate; the two rows of steel pipe pile components are connected into a whole through the inter-pile wall, the concrete bottom plate and the concrete top plate, the steel pipe pile components are small-sized component combinations, large-sized mechanical vibration or rotary drilling construction is not needed in the implementation process, and the influence on surrounding residents and buildings is small; and the steel pipe pile assembly can be constructed through a small machine, so that the requirement on a construction site is low.

Description

River course revetment considering sewage interception pipeline layout and construction method thereof
Technical Field
The invention relates to the technical field of hydraulic structures, in particular to a river bank protection taking sewage interception pipeline layout into consideration and a construction method thereof.
Background
Plain river network areas, especially developed areas such as bead triangles, long triangles and the like, are densely populated, civil houses face rivers, river channels are narrow, surrounding houses are dense, in-and-out traffic is difficult, and the conventional bank protection type cannot meet the site construction requirements; meanwhile, the situation that residents are close to the river and lodging is caused in the areas due to the outstanding contradiction between land, so that the current situation of the water environment of the river is bad, and a sewage interception and treatment system along the river is also in urgent need of comprehensive treatment; therefore, the conventional river bank protection structure needs to be correspondingly optimized and innovated to adapt to engineering construction under special conditions.
Under the conditions that the population is dense in coastal developed areas and the civil house is constructed in the river, the conventional method adopted by river bank protection engineering is as follows: the method has the advantages that the form of wall-hanging wall bank protection of the rotary-excavation filling pile is adopted, so that the stability and safety of the formed building of the two banks are ensured in the process of river bank slope excavation; and (3) adopting a prefabricated sheet pile shore protection mode, and reinforcing the river bank slope in a permanent-face combination mode.
However, the two methods have the problems of higher requirements on construction sites, larger influence on the periphery during construction and larger unit investment.
Disclosure of Invention
The invention aims to provide the river bank protection taking the arrangement of the sewage interception pipelines into consideration and a construction method thereof, which can ensure the practicability of the comprehensive river treatment project, furthest reduce the influence on the formed buildings in the surrounding dense areas and simultaneously reserve the arrangement space of the sewage interception pipelines and control the investment of the engineering construction.
The invention is realized by the following technical scheme:
in a first aspect, a river bank revetment for considering sewage interception pipeline layout, comprising:
an inner steel pipe pile assembly having a lower end and an upper end, the lower end of the inner steel pipe pile assembly being inserted into a river bank slope;
an outer steel pipe pile assembly having a lower end and an upper end, the lower end of the outer steel pipe pile assembly being inserted into a river bank slope, and the outer steel pipe pile assembly being located on a water surface of the river relative to the inner steel pipe pile assembly, a gap being provided between the outer steel pipe pile assembly and the inner steel pipe pile assembly;
the pile partition wall is provided with a lower end and an upper end, the lower end of the pile partition wall is positioned below the ground line of a river bank slope, and the upper end of the outer steel pipe pile assembly is positioned in the pile partition wall;
the concrete bottom plate is arranged below the ground line of the river bank slope and is connected with the lower end of the pile partition wall, and the inner side steel pipe pile assembly and the outer side steel pipe pile assembly penetrate through the concrete bottom plate and are fixedly connected with the concrete bottom plate;
the concrete top plate is arranged above the designed water level of the river channel and is connected with the upper end of the inter-pile wall, and the inner side steel pipe pile assembly and the outer side steel pipe pile assembly are fixedly connected with the concrete top plate;
the dirt intercepting pipeline is arranged in a pipe ditch formed by the inter-pile wall, the inner side steel pipe pile assembly, the concrete bottom plate and the concrete top plate.
Optionally, the inner steel pipe pile assembly is vertically arranged, and the inner steel pipe pile assembly comprises a plurality of inner steel pipes which are arranged in parallel;
the outer steel pipe pile assembly is vertically arranged and comprises a plurality of outer steel pipes which are arranged in parallel;
the concrete bottom plate is horizontally arranged, and the lower end of the inter-pile wall is fixedly connected with the middle line of the upper side surface of the concrete bottom plate;
the concrete top plate is horizontally arranged, and the upper end of the pile partition wall is fixedly connected with the middle line of the lower side face of the concrete top plate.
Optionally, the concrete bottom plate, the inter-pile wall and the concrete top plate are formed by concrete pouring;
backfill is filled between the pipe ditch and the sewage interception pipeline;
the face of the concrete roof is provided with a vertical river-crossing railing.
Optionally, the concrete bottom plate includes:
a C30 concrete retaining wall bottom plate connected with the inter-pile wall;
a C20 concrete cushion layer arranged below the C30 concrete retaining wall bottom plate and connected with the C30 concrete retaining wall bottom plate;
the dry masonry block stone foot protector is arranged on the water surface of the C30 concrete retaining wall bottom plate;
and the pile wall and the concrete top plate are both cast by C30 concrete.
As an example, the inner steel tube and the outer steel tube are D200 steel tubes, the length is 8m, the distance between two adjacent inner steel tubes/outer steel tubes is 50cm, and the inner steel tubes/outer steel tubes are arranged in a quincuncial shape;
the thickness of the C20 concrete cushion layer is 10cm, and the thickness of the C30 concrete retaining wall bottom plate is 60cm;
the height of the inter-pile wall is 195cm, and the thickness of the inter-pile wall is 60cm;
the thickness of the concrete top plate is 45cm.
In a second aspect, a construction method for constructing a river bank protection with respect to sewage interception pipeline layout, where the construction method is used for constructing a river bank protection with respect to sewage interception pipeline layout as described above, and the construction method includes:
determining the minimum distance between the inner steel pipe pile component and the house boundary;
determining the stable distance between double rows of piles of the outer steel pipe pile assembly and the inner steel pipe pile assembly;
digging a foundation pit according to the determined minimum distance;
pressing the inner side steel pipes and the outer side steel pipes into the foundation pit according to the minimum distance and the stable distance between the double-row piles;
pouring concrete bottom plates and pile walls in sequence;
laying a sewage interception pipe network and filling backfill soil;
and pouring a concrete top plate.
Optionally, before digging the foundation pit, there is also a need:
obtaining the water yield of the sewage interception pipeline and determining the size of a pipe ditch;
judging whether the stable distance between the double-row piles is matched with the size of the pipe ditch, and if not, adjusting the stable distance between the double-row piles;
and if so, excavating the foundation pit according to the determined minimum distance.
Optionally, the minimum distance is determined by a minimum safe construction distance of the foundation pit construction machine and the steel pipe pressing machine.
Optionally, the double row pile stabilizing distance is determined by foundation pit support design specifications.
Optionally, the method for determining the duct size comprises the following steps:
determining the diameter of the pipeline according to the water yield of the sewage interception pipeline;
determining the ultra-high widening size of the sewage interception pipeline;
the whole pipeline diameter and the ultra-high widening size are obtained to obtain the size of the pipe ditch.
Compared with the prior art, the invention has the following advantages and beneficial effects:
according to the invention, two rows of steel pipe pile assemblies are connected into a whole through the inter-pile wall, the concrete bottom plate and the concrete top plate, the steel pipe pile assemblies are small-sized component combinations, and large-sized mechanical vibration or rotary drilling construction is not needed in the implementation process, so that the influence on surrounding residents and buildings is small; the steel pipe pile assembly can be constructed through small machinery, and the requirements on construction sites are low; the double-row steel pipe pile components can provide temporary foundation pit support for construction of the sewage interception pipes along the river, and meanwhile, the position between the two piles can provide a pipe ditch for laying the sewage interception pipes.
The invention adopts smaller structural members, conventional machinery is adopted in the construction process, complex construction process and large construction equipment are not needed, and meanwhile, the finished pipe piles can be utilized as supporting equipment, so that the permanent combination is well realized, the efficiency of the current structural members can be furthest exerted, and the unit investment of river bank protection is reduced.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the principles of the invention.
FIG. 1 is a side view of a river bank revetment with a view to intercepting a pipeline layout according to the present invention.
Fig. 2 is a schematic structural view of a river bank protection taking sewage interception pipeline layout into consideration according to the present invention.
Reference numerals: 1-inner side steel pipe pile components, 2-outer side steel pipe pile components, 3-inter-pile walls, 4-concrete bottom plates, 41-C30 concrete retaining wall bottom plates, 42-C20 concrete cushion layers, 43-dry masonry block stone foot protectors, 5-concrete top plates, 6-dirt intercepting pipelines, 7-backfill soil, 8-house boundaries and 9-river facing guardrails.
Detailed Description
The present invention will be described in further detail with reference to the drawings and embodiments, for the purpose of making the objects, technical solutions and advantages of the present invention more apparent. It is to be understood that the specific embodiments described herein are merely illustrative of the substances, and not restrictive of the invention.
It should be further noted that, for convenience of description, only the portions related to the present invention are shown in the drawings.
In this application, unless specifically stated and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally formed; can be directly connected or indirectly connected through an intermediate medium, and can be communicated with the inside of two elements or the interaction relationship of the two elements. The specific meaning of the terms in this application will be understood by those of ordinary skill in the art as the case may be.
In this application, unless expressly stated or limited otherwise, a first feature "above" or "below" a second feature may include both the first and second features being in direct contact, and may also include the first and second features not being in direct contact but being in contact with each other by way of additional features therebetween. Moreover, a first feature being "above," "over" and "on" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is higher in level than the second feature. The first feature being "under", "below" and "beneath" the second feature includes the first feature being directly under and obliquely below the second feature, or simply means that the first feature is less level than the second feature.
Embodiments of the present invention and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
The terminology of the invention is explained.
River course in intensive house area: coastal areas and developed areas of plain river networks often have dense population, and civil houses face the river, so that the river channels are narrow, surrounding houses are dense, the in-out traffic is difficult, and the conventional construction conditions are basically not provided.
Dirt interception pipeline 6: because the close distribution of the river-facing civil houses often causes serious pollution to the surrounding river network water environment because the sewage along the river residential areas is directly discharged into the river, the above areas often need to be constructed by intercepting the sewage network pipes along the river.
River course shore protection: the river bank protection of the house dense area river channel is solved by optimizing the hydraulic structure, the bank protection type can ensure the stable and safe protection of the surrounding dense building group in the river bank construction process, the river bank protection construction can be effectively carried out, and meanwhile, the laying of the river intercepting sewage pipeline 6 is met.
The existing two technologies are:
the construction method adopts a rotary-digging cast-in-place pile wall-mounted wall-protecting mode, ensures the stability and safety of the construction formed by two sides in the process of river channel bank slope excavation, adopts cast-in-situ large-diameter reinforced concrete cast-in-place piles as a bearing structure for bank slope anti-slip, and adopts a thin-wall reinforced concrete wall-mounted wall arranged outside a waterside pile body as a connecting member for anti-impact retaining, thereby forming an integral inter-pile wall 3-protecting structure.
Adopting a prefabricated sheet pile shore protection mode, wherein the shore protection mode is a closely arranged prefabricated [ V-shaped or U-shaped ] reinforced concrete sheet pile structure, closely driving prefabricated piles into the river bank side through a high-frequency vibrating hammer to form a closely arranged shore protection structure, and pouring a through reinforced concrete crown beam on the pile top after the construction of the closely arranged piles is completed to ensure the structural integrity and strength of the closely arranged piles; the closely-arranged prefabricated sheet pile bank protection structure can ensure that the river bank slope is reinforced in a permanent-face combination mode in the construction process.
The disadvantages of the two prior art techniques described above:
the unit investment is larger: the wall-hanging wall type revetment of the rotary-digging bored concrete pile is required to be advanced by a large-scale rotary-digging drilling machine, and the unit linear meter unit price of the river revetment of the reinforced concrete pile body is 1.5-2.5 ten thousand; when the closely arranged prefabricated sheet piles are adopted for bank protection, large-scale vibration hammering equipment is required, and the high-frequency hammering can be used for entering soil in place, so that the strength of the prefabricated sheet piles is generally higher than that of C60 high-strength concrete, the manufacturing cost is high, and the unit price per linear meter reaches 1.2-1.6 ten thousand.
The construction site is high in requirement: the construction adopting the two shore protection types requires large mechanical equipment to enter and exit the construction passageway, the width of the passageway is 4.5m, and the requirements of the site are high, so that the construction conditions are difficult to meet under the conditions that the population is dense in coastal developed areas and the civil houses are built in the river.
The influence on the periphery is larger in the construction process: the two shore protection types all need large-scale machine implementation in the construction process, and larger vibration exists in the pile body implementation process, so that the influence on the surrounding dense houses is larger and certain irreversible damage is easy to occur.
The attached sewage interception pipeline 6 needs to consider a new arrangement space and an excavation supporting mode.
Example 1
In order to solve the above-mentioned drawbacks, as shown in fig. 1 and 2, the present embodiment provides a river revetment considering the arrangement of the sewage interception pipeline 6, which comprises an inner steel pipe pile assembly 1, an outer steel pipe pile assembly 2, an inter-pile wall 3, a concrete bottom plate 4 and a concrete top plate 5.
For convenience of the following description, the inner steel pipe pile assembly 1 is set to have a lower end and an upper end, the outer steel pipe pile assembly 2 has a lower end and an upper end, and the inter-pile wall 3 has a lower end and an upper end. The side close to the river channel is set to be the water surface.
The lower extreme of inboard steel-pipe pile subassembly 1 inserts to the river course bank slope, and the lower extreme of outside steel-pipe pile subassembly 2 inserts to the river course bank slope, is provided with the clearance between outside steel-pipe pile subassembly 2 and the inboard steel-pipe pile subassembly 1.
The outer steel pipe pile assembly 2 is located on the water surface of the river channel relative to the inner steel pipe pile assembly 1.
The lower end of the inter-pile wall 3 is positioned below the ground line of the river bank slope, and the upper end of the outer steel pipe pile assembly 2 is positioned in the inter-pile wall 3; before construction, the river bank slope needs to be excavated, so that the ground line is the ground of the unexcavated river bank slope.
The concrete bottom plate 4 is arranged below the ground line of the river bank slope, the concrete top plate 5 is arranged above the designed water level of the river, the concrete bottom plate 4 is connected with the lower end of the inter-pile wall 3, the concrete top plate 5 is connected with the upper end of the inter-pile wall 3, and the concrete bottom plate 4, the inter-pile wall 3 and the concrete top plate 5 form an I-shaped structure as shown in figure 1.
In order to fix the outer steel pipe pile assembly 2 and the inner steel pipe pile assembly 1 through the concrete top plate 5, the concrete bottom plate 4 and the inter-pile wall 3, the inner steel pipe pile assembly 1 and the outer steel pipe pile assembly 2 penetrate through the concrete bottom plate 4 and are fixedly connected with the concrete bottom plate 4; the inner steel pipe pile assembly 1 and the outer steel pipe pile assembly 2 are fixedly connected with a concrete roof 5;
in the present embodiment, the outer steel pipe pile assembly 2 is vertically disposed, and the inner steel pipe pile assembly 1 includes a plurality of inner steel pipes disposed in parallel; the outer steel pipe pile assembly 2 is vertically arranged, and the outer steel pipe pile assembly 2 comprises a plurality of outer steel pipes which are arranged in parallel.
The steel pipe pile assembly is formed through the steel pipes which are arranged in parallel, and construction is convenient when construction is performed, because the steel pipes with small diameters are adopted as main stress members, the double-row steel pipe pile assembly is connected through the concrete structure, so that the whole pile assembly is stressed, the structural performance of the pile body is fully exerted, and the pile assembly is used as a stress structure of a revetment of a bank slope.
Because the stress member is a small-diameter steel pipe pile, only small downward pressure is needed in the piling process, large mechanical access is not needed, large vibration is not generated in the construction process, and the influence on the surrounding formed buildings is minimal.
Preferably, in order to increase the stability of the same construction, the concrete bottom plate 4 is set horizontally, and the lower end of the inter-pile wall 3 is fixedly connected with the middle line of the upper side surface of the concrete bottom plate 4; the concrete top plate 5 is horizontally arranged, and the upper end of the inter-pile wall 3 is fixedly connected with the middle line of the lower side surface of the concrete top plate 5.
The sewage interception pipeline 6 is arranged in a pipe ditch formed by the inter-pile wall 3, the inner steel pipe pile assembly 1, the concrete bottom plate 4 and the concrete top plate 5, and backfill 7 is filled between the pipe ditch and the sewage interception pipeline 6.
The space formed by the inter-pile wall 3, the inner side steel pipe pile assembly 1, the concrete bottom plate 4 and the concrete top plate 5 is used as a pipe ditch for laying the sewage interception pipeline 6, so that the double-row steel pipe pile assembly piles can be used as foundation pit supporting piles for laying the sewage interception pipeline 6, the safety of laying the sewage interception pipeline network is ensured, the permanent temporary combination can be well realized, the investment is saved to the greatest extent, the investment is saved by about 30% compared with the investment of the traditional supporting type, and the construction period is saved by about 20%.
For the safety of river bank protection, a vertical river-crossing railing is arranged on the water-crossing surface of the concrete top plate 5.
In order to increase the stability of the concrete structure, the concrete bottom plate 4, the inter-pile wall 3 and the concrete top plate 5 are formed by concrete pouring.
The concrete bottom plate 4 comprises a C30 concrete retaining wall bottom plate 41 connected with the inter-pile wall 3, a C20 concrete cushion layer 42 arranged below the C30 concrete retaining wall bottom plate 41 and connected with the C20 concrete cushion layer, and dry masonry block stone protective feet 43 arranged on the water surface of the C30 concrete retaining wall bottom plate 41; the pile wall 3 and the concrete roof 5 are all cast by C30 concrete.
As a specific example, the structure of each member is defined, the inner steel pipe and the outer steel pipe are D200 steel pipes, the length is 8m, the distance between two adjacent inner steel pipes/outer steel pipes is 50cm, and the inner steel pipes/outer steel pipes are arranged in a quincuncial shape;
the thickness of the C20 concrete cushion layer 42 is 10cm, and the thickness of the C30 concrete retaining wall bottom plate 41 is 60cm; the height of the inter-pile wall 3 is 195cm, and the thickness of the inter-pile wall 3 is 60cm; the thickness of the concrete top plate 5 is 45cm.
The dimensions of the respective members may be adjusted according to actual conditions, and are not particularly limited.
Example two
The present embodiment provides a construction method for river revetment taking into consideration arrangement of a sewage interception pipeline 6, the construction method comprising:
determining the minimum distance between the inner steel pipe pile assembly 1 and the house boundary 8; the minimum distance between the inner steel pipe pile assembly 1 and the house boundary 8 is generally determined by the minimum safe construction distance when the inner steel pipe is pressed in, and if a small excavator is adopted, the influence range of a bucket is considered, and the minimum safe distance is not lower than 1.5m; if geological drilling is adopted for hole guiding and driving, the nearest distance from the house is not less than 0.5m, and the specific value is a value comprehensively formulated according to construction specifications and related experience, especially the characteristic value of mechanical equipment available in the existing machine.
Determining the stable distance between double rows of piles of the outer steel pipe pile assembly 2 and the inner steel pipe pile assembly; the distance between the steel pipe pile components mainly depends on the stability calculation of the double-row piles, and the calculation simplified model can refer to the stability calculation of the double-row piles of the foundation pit support; determining the minimum distance according to the calculation result, wherein the calculation method is a general calculation method for building foundation pit support design specifications; the calculation index has corresponding regulation. Therefore, the calculation in this embodiment is performed based on the specification, and the content of the calculation is also conventional anti-capsizing calculation and integral anti-sliding calculation. After the stability calculation, the minimum value of the stability interval of the double-row piles can be obtained.
Obtaining the water yield of the sewage interception pipeline 6 and determining the size of a pipe ditch;
judging whether the stable distance between the double-row piles is matched with the size of the pipe ditch, and if not, adjusting the stable distance between the double-row piles; and if so, excavating the foundation pit according to the determined minimum distance.
The relevant distance and the height between the pipe ditch and the sewage interception pipeline 6 are determined according to the minimum clearance requirements in the outdoor drainage design specification and the water supply and drainage pipeline construction and acceptance specification.
Pressing the inner side steel pipes and the outer side steel pipes into the foundation pit according to the minimum distance and the stable distance between the double-row piles; for example, a small excavator can be adopted to directly press into a soil layer in a region mainly containing mucky soil, a high-pressure water punching and washing mode can be adopted to match with the small excavator to press into the soil layer in a region mainly containing fine sand or powder clay, and a small-volume geological drill hole can be adopted to assist in conveying a steel pipe into the soil body if the region of a hard block containing gravel and the like is in contact with the part. The method can ensure that the embodiment does not need to use large-scale mechanical equipment in the construction process, has better regional adaptability, and has smaller influence on surrounding residents and buildings.
Pouring a concrete bottom plate 4 and a pile partition wall 3 in sequence;
laying a sewage interception pipe network and filling backfill soil 7; the stress form of the double-row steel pipe pile assembly piles can be used as a permanent stress structure of river bank protection, and can be used as a supporting structure for excavating the sewage interception pipeline 6, so that the laying of the sewage interception pipeline 6 is ensured.
And pouring a concrete top plate 5. The concrete roof 5 is ensured to have enough structural strength, so that the double-row steel pipe pile assemblies form a stressed whole, and meanwhile, the structure can be designed in a cantilever manner according to the actual requirements of a river channel, so as to ensure the passing requirements of the periphery of the river channel.
The stable distance between the double-row piles is determined by foundation pit supporting design specifications.
The minimum distance is determined by the minimum safe construction distance of the foundation pit construction machine and the steel pipe pressing machine.
The method for determining the pipe ditch size comprises the following steps: determining the diameter of the pipeline according to the water yield of the sewage interception pipeline 6; determining the ultra-high widening size of the sewage interception pipeline 6; the whole pipeline diameter and the ultra-high widening size are obtained to obtain the size of the pipe ditch.
Is determined according to the outdoor drainage design standard and the water supply and drainage pipeline construction and acceptance inspection standard.
Combining the first to third embodiments, the present invention has the following advantages:
the influence on surrounding buildings is small: the 3-shaped shore protection structure of the steel pipe pile assembly inter-pile wall is an organic combination of small components, and large-scale mechanical vibration or rotary drilling construction is not needed in the implementation process, so that larger vibration cannot be generated, the influence on surrounding residents and buildings is small, and the method is suitable for river comprehensive treatment engineering of resident gathering areas densely distributed along the coastal river network.
The construction is convenient, the construction period is saved: the main body core component is pressed in by a small-diameter steel pipe, a small-sized digging machine or a geological drilling machine is adopted for pressing in the pressing process, and a high-pressure water gun can be adopted for washing holes in the pressing process so as to facilitate the pressing in of the steel pipe and the emptying of soil in the pipe; the construction of other components such as the concrete roof 5 is conventional concrete pouring without special construction equipment, so that the construction process is conventional, convenient and quick, and the construction period can be saved compared with the conventional shore protection mode.
The method is characterized in that the method is permanently combined with the convenient sewage interception pipe network laying: the implementation of the double-row steel pipe pile assembly piles can provide temporary support for the construction of the sewage interception pipes along the river, and meanwhile, the position between the two piles can provide precious pipe position space for the laying of the sewage interception pipes 6, so that the advantages of the double-row piles are fully utilized.
Has better economical efficiency: the construction method adopts smaller conventional structural members, conventional machinery is adopted in the construction process, complex construction process and large construction equipment are not needed, meanwhile, the completed tubular piles can be utilized as supporting equipment, permanent combination is well realized, the efficiency of the current structural members can be exerted to the greatest extent, and therefore, compared with the conventional revetment structural form, engineering investment can be saved.
In the description of the present specification, reference to the terms "one embodiment/manner," "some embodiments/manner," "example," "specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment/manner or example is included in at least one embodiment/manner or example of the present application. In this specification, the schematic representations of the above terms are not necessarily for the same embodiment/manner or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments/modes or examples. Furthermore, the various embodiments/modes or examples described in this specification and the features of the various embodiments/modes or examples can be combined and combined by persons skilled in the art without contradiction.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the present application, the meaning of "plurality" is at least two, such as two, three, etc., unless explicitly defined otherwise.
It will be appreciated by persons skilled in the art that the above embodiments are provided for clarity of illustration only and are not intended to limit the scope of the invention. Other variations or modifications of the above-described invention will be apparent to those of skill in the art, and are still within the scope of the invention.

Claims (10)

1. River course revetment that dirt pipeline (6) laid is cut in consideration, characterized in that includes:
an inner steel pipe pile assembly (1) having a lower end and an upper end, the lower end of the inner steel pipe pile assembly (1) being inserted into a river bank;
an outer steel pipe pile assembly (2) having a lower end and an upper end, wherein the lower end of the outer steel pipe pile assembly (2) is inserted into a river bank slope, the outer steel pipe pile assembly (2) is positioned on the water surface of the river relative to the inner steel pipe pile assembly (1), and a gap is arranged between the outer steel pipe pile assembly (2) and the inner steel pipe pile assembly (1);
a pile-to-pile wall (3) having a lower end and an upper end, the lower end of the pile-to-pile wall (3) being located below a ground line of a river bank, the upper end of the outer steel pipe pile assembly (2) being located within the pile-to-pile wall (3);
the concrete bottom plate (4) is arranged below the ground line of the river bank slope and is connected with the lower end of the inter-pile wall (3), and the inner side steel pipe pile assembly (1) and the outer side steel pipe pile assembly (2) penetrate through the concrete bottom plate (4) and are fixedly connected with the concrete bottom plate (4);
the concrete top plate (5) is arranged above the designed water level of the river channel and is connected with the upper end of the inter-pile wall (3), and the inner steel pipe pile assembly (1) and the outer steel pipe pile assembly (2) are fixedly connected with the concrete top plate (5);
the dirt intercepting pipeline (6) is arranged in a pipe ditch formed by the inter-pile wall (3), the inner steel pipe pile assembly (1), the concrete bottom plate (4) and the concrete top plate (5).
2. River course revetment with sewage interception pipeline (6) layout in view of claim 1, characterized in that the inner steel pipe pile assembly (1) is arranged vertically and the inner steel pipe pile assembly (1) comprises a plurality of inner steel pipes arranged in parallel;
the outer steel pipe pile assembly (2) is vertically arranged, and the outer steel pipe pile assembly (2) comprises a plurality of outer steel pipes which are arranged in parallel;
the concrete bottom plate (4) is horizontally arranged, and the lower end of the inter-pile wall (3) is fixedly connected with the middle line of the upper side surface of the concrete bottom plate (4);
the concrete top plate (5) is horizontally arranged, and the upper end of the inter-pile wall (3) is fixedly connected with the middle line of the lower side face of the concrete top plate (5).
3. River course revetment with sewage interception pipeline (6) layout in view of claim 2, characterized in that the concrete bottom plate (4), the inter-pile wall (3) and the concrete top plate (5) are cast from concrete;
backfill soil (7) is filled between the pipe ditch and the sewage interception pipeline (6);
the water surface of the concrete top plate (5) is provided with a vertical river-crossing railing.
4. River course revetment that is laid in view of sewage interception pipelines (6) according to claim 2, characterized in that the concrete floor (4) comprises:
a C30 concrete retaining wall bottom plate (41) connected with the pile partition wall (3);
a C20 concrete cushion layer (42) arranged below the C30 concrete retaining wall bottom plate (41) and connected with the C30 concrete retaining wall bottom plate;
a dry masonry block foot protector (43) arranged on the water surface of the C30 concrete retaining wall bottom plate (41);
and the pile wall (3) and the concrete top plate (5) are both cast by C30 concrete.
5. River course revetment with sewage interception pipeline (6) layout in view of claim 4, characterized in that the inner and outer steel pipes are D200 steel pipes, length is 8m, distance between two adjacent inner/outer steel pipes is 50cm, and are arranged in quincuncial shape;
the thickness of the C20 concrete cushion layer is 10cm, and the thickness of the C30 concrete retaining wall bottom plate is 60cm;
the height of the inter-pile wall (3) is 195cm, and the thickness of the inter-pile wall (3) is 60cm;
the thickness of the concrete top plate (5) is 45cm.
6. A construction method for a river course revetment with respect to arrangement of a sewage interception pipeline (6), characterized in that the construction method is used for constructing the river course revetment with respect to arrangement of the sewage interception pipeline (6) according to any one of claims 2 to 4, and comprises the following steps:
determining the minimum distance between the inner steel pipe pile assembly (1) and the house boundary (8);
determining the stable distance between double rows of piles of the outer steel pipe pile assembly (2) and the inner steel pipe pile assembly;
digging a foundation pit according to the determined minimum distance;
pressing the inner side steel pipes and the outer side steel pipes into the foundation pit according to the minimum distance and the stable distance between the double-row piles;
sequentially pouring a concrete bottom plate (4) and a pile wall (3);
laying a sewage interception pipe network and filling backfill soil (7);
and pouring a concrete top plate (5).
7. The construction method of river course revetment considering the layout of the sewage interception pipeline (6) according to claim 6, wherein before digging the foundation pit, the method further comprises the following steps:
obtaining the water yield of the sewage interception pipeline (6) and determining the size of a pipe ditch;
judging whether the stable distance between the double-row piles is matched with the size of the pipe ditch, and if not, adjusting the stable distance between the double-row piles;
and if so, excavating the foundation pit according to the determined minimum distance.
8. A construction method of river course revetment taking into account the layout of the sewage interception pipeline (6) according to claim 6, wherein said minimum distance is determined by the minimum safe construction distance of the foundation pit construction machine and the steel pipe pressing machine.
9. The construction method of river bank protection taking into account the layout of the sewage interception pipelines (6) according to claim 6, wherein the stable distance between the double piles is determined by foundation pit support design specifications.
10. The construction method of river bank protection in consideration of sewage interception pipeline (6) layout according to claim 7, wherein the method for determining the pipe ditch size comprises the following steps:
determining the diameter of the pipeline according to the water yield of the sewage interception pipeline (6);
determining the ultra-high widening size of the sewage interception pipeline (6);
the whole pipeline diameter and the ultra-high widening size are obtained to obtain the size of the pipe ditch.
CN202211122376.0A 2022-09-15 2022-09-15 River course revetment considering sewage interception pipeline layout and construction method thereof Active CN115450169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211122376.0A CN115450169B (en) 2022-09-15 2022-09-15 River course revetment considering sewage interception pipeline layout and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211122376.0A CN115450169B (en) 2022-09-15 2022-09-15 River course revetment considering sewage interception pipeline layout and construction method thereof

Publications (2)

Publication Number Publication Date
CN115450169A CN115450169A (en) 2022-12-09
CN115450169B true CN115450169B (en) 2024-01-23

Family

ID=84305394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211122376.0A Active CN115450169B (en) 2022-09-15 2022-09-15 River course revetment considering sewage interception pipeline layout and construction method thereof

Country Status (1)

Country Link
CN (1) CN115450169B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115787804B (en) * 2023-02-13 2023-04-14 福州市规划设计研究院集团有限公司 Assembled prevents flowing backward river-side and cuts dirty device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248780A (en) * 2009-04-15 2010-11-04 Nippon Steel Corp Water area structure using sea bed ground driving member
CN206457777U (en) * 2017-01-26 2017-09-01 福州市规划设计研究院 Embankment piping lane integral structure
CN206512743U (en) * 2017-03-02 2017-09-22 南京市市政设计研究院有限责任公司 River course soil-baffling structure
JP2018168600A (en) * 2017-03-30 2018-11-01 五洋建設株式会社 Concrete structure and method for constructing the same
CN110593305A (en) * 2019-06-25 2019-12-20 武汉市政工程设计研究院有限责任公司 Utility tunnel who constructs with green way of shore river jointly and do revetment retaining wall concurrently
CN111236260A (en) * 2020-03-12 2020-06-05 广西交通科学研究院有限公司 Variable-rigidity combined type prefabricated double-row pile supporting structure and construction method thereof
CN211497114U (en) * 2019-11-20 2020-09-15 北控技术服务(广东)有限公司 Compound ecological revetment
CN212866028U (en) * 2020-07-23 2021-04-02 广西路建工程集团有限公司 River course limit sewage pipe network combines sheet-like barricade arrangement structure of stake
CN213233297U (en) * 2020-08-07 2021-05-18 中国电建集团成都勘测设计研究院有限公司 Town river levee structure
CN112982296A (en) * 2021-03-29 2021-06-18 黄河勘测规划设计研究院有限公司 Construction method of pile box type retaining wall for slope protection

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248780A (en) * 2009-04-15 2010-11-04 Nippon Steel Corp Water area structure using sea bed ground driving member
CN206457777U (en) * 2017-01-26 2017-09-01 福州市规划设计研究院 Embankment piping lane integral structure
CN206512743U (en) * 2017-03-02 2017-09-22 南京市市政设计研究院有限责任公司 River course soil-baffling structure
JP2018168600A (en) * 2017-03-30 2018-11-01 五洋建設株式会社 Concrete structure and method for constructing the same
CN110593305A (en) * 2019-06-25 2019-12-20 武汉市政工程设计研究院有限责任公司 Utility tunnel who constructs with green way of shore river jointly and do revetment retaining wall concurrently
CN211497114U (en) * 2019-11-20 2020-09-15 北控技术服务(广东)有限公司 Compound ecological revetment
CN111236260A (en) * 2020-03-12 2020-06-05 广西交通科学研究院有限公司 Variable-rigidity combined type prefabricated double-row pile supporting structure and construction method thereof
CN212866028U (en) * 2020-07-23 2021-04-02 广西路建工程集团有限公司 River course limit sewage pipe network combines sheet-like barricade arrangement structure of stake
CN213233297U (en) * 2020-08-07 2021-05-18 中国电建集团成都勘测设计研究院有限公司 Town river levee structure
CN112982296A (en) * 2021-03-29 2021-06-18 黄河勘测规划设计研究院有限公司 Construction method of pile box type retaining wall for slope protection

Also Published As

Publication number Publication date
CN115450169A (en) 2022-12-09

Similar Documents

Publication Publication Date Title
CN113863367B (en) In-situ protection suspension method for existing underground pipeline
CN112064751A (en) Deep groove construction method for drainage pipeline
CN115450169B (en) River course revetment considering sewage interception pipeline layout and construction method thereof
CN105953078A (en) Protection device and protection method of high-pressure gas pipeline
CN115653000A (en) Gravity pipe gallery in-situ protection structure system in foundation pit range and construction method
CN106948757A (en) A kind of underground pipe well-digging construction technology carried out using foundation ditch region
CN113152518A (en) Water-rich stratum foundation pit pile plate wall inter-pile gravel reverse-filtration seepage-proofing structure and construction method
CN111593739A (en) Cement mixing pile enclosure wall-profile steel cantilever type combined support
CN216973425U (en) Inclined prefabricated steel pile foundation pit supporting system capable of being supported and excavated firstly
CN114482014B (en) Construction method for hammering pile sinking of precast pile in deep foundation pit in offshore ultra-thick silt region
CN215715515U (en) Municipal pipe network construction supporting integrated structure under unfavorable geological conditions
CN108951702A (en) A kind of construction method of pipe gallery
CN212506300U (en) Soft clay stratum pipeline laying open cut supporting construction
CN210482328U (en) Retaining unit and retaining structure for landslide
CN113684839A (en) Excavation and support method for deep and narrow pipe trench under complex conditions
CN112376577A (en) Subway station water-rich sand layer deep foundation pit construction supporting structure and construction method
CN217601635U (en) Pipe jacking receiving well structure
CN220099935U (en) Steel pipe pile supporting structure for limited space supporting in sandy pebble area
CN112609706B (en) Construction method of opposite-bracing angle brace concrete horizontal supporting structure of foundation pit in sea reclamation area
CN110258659B (en) Submarine pipeline landing section interval type soil liquefaction resistance improving device and method
CN216894448U (en) Non-excavation of micro-aperture pipeline is pieced together pipe ripple steel welt supporting device
CN210482371U (en) Pipe gallery system that multistage support and major structure combined together
CN220203894U (en) Steel corrugated pipe vertical shaft structure
CN217710783U (en) Occupy full section cofferdam of river course structure and break stream structure not
CN219547819U (en) Existing building protection structure of shallow foundation immediately adjacent to foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant