CN213233297U - Town river levee structure - Google Patents

Town river levee structure Download PDF

Info

Publication number
CN213233297U
CN213233297U CN202021638926.0U CN202021638926U CN213233297U CN 213233297 U CN213233297 U CN 213233297U CN 202021638926 U CN202021638926 U CN 202021638926U CN 213233297 U CN213233297 U CN 213233297U
Authority
CN
China
Prior art keywords
soil
foot
river
planting
foot fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021638926.0U
Other languages
Chinese (zh)
Inventor
刘彦琦
杨威
刘颖莲
陈贤
李艺
王瑞瑶
冯红春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN202021638926.0U priority Critical patent/CN213233297U/en
Application granted granted Critical
Publication of CN213233297U publication Critical patent/CN213233297U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to the technical field of river regulation engineering, in particular to an urban river bank structure; the adopted technical scheme is as follows: a town river levee structure comprises a plurality of foot fixing planting sections, wherein each foot fixing planting section comprises a soil blocking body and a foot fixing body, the lower end of each soil blocking body is fixedly connected with the foot fixing body, a soil interception pipe is arranged in each foot fixing body, and soil filling cavities are formed in one side of each soil blocking body and the upper end of each foot fixing body. The utility model is laid along the length direction of the prior retaining wall of the river channel, so as to play the role of stabilizing the prior retaining wall of the river channel; the sewage interception pipe is embedded in the fixing foot so as to meet the layout requirement of the sewage interception pipe; the planting soil is filled in the soil filling cavity, so that aquatic plants can be planted conveniently, ecological and attractive effects are achieved, ecological and natural revetments can be built, and the landscape submitting effect is good. Therefore the utility model discloses can satisfy the functional demand that the river course cut dirty, revetment banket foot simultaneously to combine with view, ecology, the construction is simple, the cost design greatly reduced that singly.

Description

Town river levee structure
Technical Field
The utility model relates to a river regulation engineering technical field, concretely relates to town river levee structure.
Background
In order to restrain the urban water environment deterioration trend and accelerate urban ecological civilized construction, a large number of urban riverways need to be treated by water environment engineering. Particularly, for the river channels in old urban areas, the requirements of sewage interception reconstruction, sediment desilting, ecological restoration, landscape lifting, structural reinforcement and the like can be met basically at the same time.
The river course in the urban area is built with houses on two sides facing the river, the river bank adopts hard concrete or stone masonry retaining wall, and sewage on two sides of the river course is directly discharged into the river. In this case, the following requirements need to be considered for the river channel reconstruction:
1) intercepting sewage and improving requirements:
the sewage on the two sides of the river channel is directly discharged into the river, and the water quality of the river channel is seriously influenced. In order to reduce the pollution of sewage to the water body, a sewage intercepting main pipe needs to be laid along the river.
2) And (3) structural reinforcement:
the retaining walls on the original two banks and the river banks are built for a long time and are damaged to a certain extent, and meanwhile most of the original retaining walls are built on the base surface with shallow burial depth and cannot meet the requirement of river channel impact resistance. Especially, when the dredging depth is deeper and is lower than the foundation of the retaining wall, a foot fixing measure is also needed to prevent the retaining wall from sliding, overturning and the like.
3) Ecological restoration and landscape improvement:
most of the vertical mortar-laid or concrete hard revetments are stiff and straight in river-facing layout, lack of aesthetic feeling, and poor in ecological and landscape properties.
SUMMERY OF THE UTILITY MODEL
To the technical problem that above-mentioned needs are reformed transform to current town river course, the utility model provides a town river bank structure can be used for reforming transform current town river course to satisfy simultaneously that the town river course cuts dirty, consolidate, ecological and pleasing to the eye demand.
The utility model discloses a following technical scheme realizes:
a town river levee structure comprises a plurality of foot fixing planting sections, wherein each foot fixing planting section comprises a soil blocking body and a foot fixing body, the lower end of each soil blocking body is fixedly connected with the foot fixing body, a soil interception pipe is arranged in each foot fixing body, and soil filling cavities are formed in one side of each soil blocking body and the upper end of each foot fixing body.
When the utility model is implemented, the foot fixing bodies are laid along the length direction of the prior retaining wall of the river channel, so as to play a role in stabilizing the prior retaining wall of the river channel; and will cut dirty pipe and bury underground in solid foot is internal to play the demand of laying that satisfies the dirt intercepting pipe, because the both sides building leads to the construction site to be restricted, lay in the river course and cut dirty pipe comparatively simple economy.
Simultaneously, keep off soil body lower extreme and solid foot body fixed connection and keep off soil body one side and solid foot body upper end and be equipped with the chamber of filling out soil to fill planting soil at the intracavity of filling out soil, the aquatic plant's of being convenient for planting, and then play ecological and pleasing to the eye effect, can build ecological natural revetment, the view submits effectually.
Therefore the utility model discloses can satisfy the functional demand that the river course cut dirty, revetment banket foot simultaneously to combine with view, ecology, the construction is simple, the cost design greatly reduced that singly.
Furthermore, a broken stone cushion layer is arranged below the foot fixing body to support the foot fixing body, so that the influence of uneven settlement on a sewage intercepting pipe in the foot fixing body is prevented.
Furthermore, a tamping layer is arranged below the broken stone cushion layer, namely, the foundation of the foot fixing body is tamped, so that the influence of uneven settlement on a sewage interception pipe in the foot fixing body is further prevented.
Furthermore, the soil filling device also comprises planting soil, and the planting soil is filled in the soil filling cavity.
As a specific embodiment of the soil retaining body, the soil retaining body is a concrete wood-like pile or pebble to further enhance the ornamental value of the river levee.
Particularly, a hydrophilic viewing platform is arranged between two adjacent foot fixing planting sections, and the hydrophilic viewing platform is provided with an inspection well.
Preferably, one side that hydrophilic sightseeing platform is close to the river course is equipped with the guardrail, prevents that the pedestrian accident from falling into water.
Preferably, the top of the hydrophilic viewing platform is paved with a decorative layer, so that the ornamental value of the hydrophilic viewing platform is improved, and the anti-skid effect is achieved.
Preferably, the top of the hydrophilic viewing platform is provided with a step used for being connected with a retaining wall.
In order to combine with the river bank retaining wall, the hydrophilic viewing platform is of a rectangular structure (according to the river situation, a fan-shaped hydrophilic viewing platform can be adopted at the bending section of the river channel). The finished manhole cover of the inspection well adopts a pressure manhole cover, is provided with a ventilating pipe to an embankment top, is sealed and waterproof, and prevents sewage from overflowing into a river channel and polluting water quality due to the occurrence of overproof flood.
The utility model has the advantages that:
1. simultaneously, the functional requirements of river channel sewage interception and revetment foot fixation are met, and the ecological landscape-revetment ecological-fixing structure is combined with landscape and ecology, is simple to construct, and has the advantages of lower cost and more single design.
2. When in operation period, the water channel retaining wall does not need to be crossed during maintenance, water is directly drained through the hydrophilic viewing platform, and the operation is convenient.
3. Can make ecological natural revetment, the view promotes effectually.
4. The inspection well is used as a hydrophilic viewing platform, and the ornamental performance and the hydrophilic performance of the river channel are ensured while the requirement for arrangement of the inspection well is met.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
fig. 1 is a schematic top view of the present invention;
FIG. 2 is a schematic structural view of an embodiment of the foot fixing planting section of the present invention;
FIG. 3 is a schematic structural view of another embodiment of the foot fixing planting section of the present invention;
fig. 4 is a schematic structural view of the hydrophilic viewing platform of the present invention.
Reference numbers and corresponding part names in the drawings:
1-a foot fixing planting section, 2-a soil retaining body, 3-a foot fixing body, 4-a sewage interception pipe, 5-a soil filling cavity, 6-planting soil, 8-a tamping layer, 9-a gravel cushion layer, 10-a hydrophilic viewing platform, 11-an inspection well, 12-a flow groove, 13-a concrete cushion layer, 14-a river channel retaining wall, 15-a guardrail, 16-a decorative layer and 17-a step.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the following examples and drawings, and the exemplary embodiments and descriptions thereof of the present invention are only used for explaining the present invention, and are not intended as limitations of the present invention.
Examples
The town river levee structure comprises a plurality of fixed foot planting sections 1, wherein each fixed foot planting section 1 comprises a soil retaining body 2 and a fixed foot body 3, and the lower end of the soil retaining body 2 is fixedly connected with the fixed foot bodies 3. A sewage intercepting pipe 4 is arranged in the foot fixing body 3 and is connected with a town sewage pipeline through the sewage intercepting pipe 4, so that the town sewage can be conveniently and intensively treated. Soil filling cavities 5 are formed in one side of the soil retaining body 2 and the upper end of the foot fixing body 3, planting soil 6 is filled in the soil filling cavities 5, and the planting soil 6 is used for planting aquatic plants.
During construction, the sewage intercepting pipe 4 is laid along the original vertical grout or concrete retaining wall of the revetment, and the sewage intercepting pipe 4 is wrapped by concrete to form the fixing foot body 3. The solid foot bodies 3 meet the design requirements of pipelines of the sewage interception pipes 4, meanwhile, the impact resistance of the river channel needs to be considered, the scouring depth is calculated by parameters such as water flow speed, and the like, and the foundation bed elevation meets the condition that the foundation bed elevation is arranged below the calculated maximum scouring depth by 0.5-1.0 m, so that the solid foot bodies 3 can be ensured to play a role in stabilizing the existing river channel retaining wall 14.
In order to prevent the sewage interception pipe 4 from being affected by uneven settlement, the structural foundation bottom needs to be tamped firstly, and a 15-20 cm gravel cushion layer 9 is arranged, namely the gravel cushion layer 9 is arranged below the foot fixing body 3 to support the foot fixing body 3. Meanwhile, a tamping layer 8 is arranged below the broken stone cushion layer 9 so as to further prevent the influence of uneven settlement on a sewage interception pipe in the foot fixing body.
It can be understood that, when the structure of the embodiment is built, the foundation is firstly tamped to form the tamped layer 8, and then the gravel cushion layer 9 is laid on the tamped layer 8; after the gravel cushion layer 9 is laid, the sewage intercepting pipe 4 is erected on the gravel cushion layer 9 so as to lay a pipeline; after the pipeline is laid, concrete is coated to form the solid legs 3. Therefore, the fixing foot body 3 is not only concrete wrapped outside the pipe network, but also is a part of the design of the pipe network of the sewage interception pipe 4, and the structure of the fixing foot body also meets the relevant requirements of the relevant regulation and specification of outdoor drainage.
The soil retaining body 2 is a concrete wood-like pile or pebble to further enhance the ornamental value of the river levee, and in the embodiment, the soil retaining body 2 is a concrete pine-like pile. Specifically, the concrete pine-like pile is pre-buried in the foot fixing body 3, and is integrally fixed and formed when the foot fixing body 3 is poured; the diameter of the concrete imitation pine board is 10-15 cm, the pile top elevation is higher than the perennial water level by 50-70 cm, and the burial depth in the foot fixing body 3 is determined through structural calculation.
The planting soil 6 is provided above the leg body 3, and is held between the soil retaining body 2 and the river retaining wall 14 by the soil retaining body 2. In order to ensure the growth of plants, the thickness of the 6 soil layers of the planting soil is more than or equal to 40 cm. The aquatic plant can be selected from herba Oenanthes Javanicae, herba Alii Fistulosi, etc.
A hydrophilic viewing platform 10 is arranged between two adjacent foot fixing planting sections 1, and the hydrophilic viewing platform 10 is provided with inspection wells 11 so as to meet the requirement that the inspection wells need to be arranged at intervals along the pipeline of the sewage intercepting pipe 4. In the present embodiment, the inspection well 10 is combined with the hydrophilic viewing platform 10 to achieve the functionality and the landscape. The inspection well 11 generally has three forms of a circle, a rectangle and a sector, and is combined with a river bank retaining wall, and the inspection well adopts a rectangular structure in the embodiment; of course, the inspection well with a fan-shaped structure can also be adopted at the bent section of the river channel according to the river situation.
The inspection well 11 in this embodiment has the same structure as an existing inspection well, and the hydrophilic observation platform 10 is composed of a concrete pad 13, a chute 12, an inspection well body made of reinforced concrete, a reinforced concrete cover plate, a well cover support, a finished well cover, and an inspection ladder. The concrete cover plate is composed of plain soil backfill, a broken stone cushion layer 9 and a decorative layer 16 paved on the platform. The decorative layer 16 can be made of slate, anticorrosive wood and the like, and is good in ornamental value and anti-skid. The top elevation of the hydrophilic landscape platform 10 is flush with the perennial flood level (2-5 years), the top end of the hydrophilic landscape platform is connected with the top elevation of the river retaining wall 14 through a step 17, and a guardrail 15 is arranged on the hydrophilic platform to prevent pedestrians from falling into water. The finished manhole cover of the inspection well adopts a sealed and waterproof pressure manhole cover, and a ventilating pipe is arranged on the top of the dike, so that overproof flood is prevented from occurring, sewage overflows into a river channel, and water quality is polluted. Meanwhile, the bottom in the inspection well 11 is provided with a flow groove 12 to flow through the flow groove 12, namely, the flow groove 12 is connected with the sewage intercepting pipes 4 on two sides of the inspection well 11.
In addition, it should be noted that, since this embodiment encroaches on the original flood section of the river channel, it is necessary to ensure that this embodiment is used on the premise of meeting the flood requirement of the river channel.
The above-mentioned embodiments, further detailed description of the objects, technical solutions and advantages of the present invention, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (9)

1. The town river levee structure is characterized by comprising a plurality of fixed foot planting sections (1), wherein each fixed foot planting section (1) comprises a soil blocking body (2) and a fixed foot body (3), the lower end of the soil blocking body (2) is fixedly connected with the fixed foot bodies (3), a sewage intercepting pipe (4) is arranged in each fixed foot body (3), and soil filling cavities (5) are formed in one side of the soil blocking body (2) and the upper ends of the fixed foot bodies (3).
2. The town river levee structure according to claim 1, wherein a gravel cushion (9) is provided under the leg-fixing body (3).
3. The town river levee structure according to claim 2, characterized in that below the gravel cushion (9) is a rammed layer (8).
4. The town river levee structure according to claim 1, further comprising planting soil (6), wherein the planting soil (6) is filled in the soil filling cavity (5).
5. The town river levee structure according to any one of claims 1-4, characterized in that the retaining body (2) is a concrete wood-like pile or pebble.
6. The town river levee structure according to claim 1, characterized in that a hydrophilic landscape platform (10) is provided between two adjacent foot-fixing planting sections (1), said hydrophilic landscape platform (10) being provided with an inspection well (11).
7. The town river bank structure according to claim 6, wherein the hydrophilic landscape platform (10) is provided with a guardrail (15) on the side near the river.
8. The town river levee structure according to claim 6, characterised in that a decorative layer (16) is laid on top of the hydrophilic viewing platform (10).
9. The town river levee structure according to claim 6, wherein the top of the hydrophilic viewing platform (10) is provided with a step (17) for engaging with a retaining wall.
CN202021638926.0U 2020-08-07 2020-08-07 Town river levee structure Active CN213233297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021638926.0U CN213233297U (en) 2020-08-07 2020-08-07 Town river levee structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021638926.0U CN213233297U (en) 2020-08-07 2020-08-07 Town river levee structure

Publications (1)

Publication Number Publication Date
CN213233297U true CN213233297U (en) 2021-05-18

Family

ID=75894106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021638926.0U Active CN213233297U (en) 2020-08-07 2020-08-07 Town river levee structure

Country Status (1)

Country Link
CN (1) CN213233297U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450169A (en) * 2022-09-15 2022-12-09 中国电建集团成都勘测设计研究院有限公司 River bank protection considering sewage intercepting pipeline arrangement and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450169A (en) * 2022-09-15 2022-12-09 中国电建集团成都勘测设计研究院有限公司 River bank protection considering sewage intercepting pipeline arrangement and construction method thereof
CN115450169B (en) * 2022-09-15 2024-01-23 中国电建集团成都勘测设计研究院有限公司 River course revetment considering sewage interception pipeline layout and construction method thereof

Similar Documents

Publication Publication Date Title
CN111335100A (en) Embankment structure suitable for coastal region and construction method thereof
CN111535357A (en) Water intake pipeline structure penetrating through soft foundation dike below flood level and construction method
CN213233297U (en) Town river levee structure
CN111270698A (en) Protective structure for exposed diseases of bridge pile foundation in sand-mining river channel in mountainous area and construction method of protective structure
CN214783609U (en) Domatic seepage prevention structure of retaining type road bed that soaks
US11802389B2 (en) Ecological seawall water close side embankment slope drainage structure and construction method thereof
CN210507006U (en) High-strength steel wire mesh reinforced material filling structure of road embankment
CN209854656U (en) Dyke
CN112726638A (en) Expansive soil cutting slope protection structure and construction method
CN216108324U (en) Coastal ecological bank protection structure
CN213143094U (en) Ecological geogrid reinforced soil slope device
CN212223936U (en) A protective structure that is used for mountain area to adopt sand river course inner bridge pile foundation to expose disease
CN210658236U (en) Slag stacking structure
CN112227307A (en) Steep bank bi dao embankment structure
CN219315623U (en) Rigid-flexible combined river ecological retaining wall structure
CN218911504U (en) Frame structure for reinforcing soft soil foundation revetment adjacent to building and serving as road
RU74646U1 (en) DEVICE FOR PROTECTING INDUSTRIAL SITES FROM FLOODING
CN205296365U (en) Eco -drainage ditch
CN112554127B (en) Bank-keeping member for changing vertical bank line of urban river and construction method thereof
RU2614072C1 (en) Combined drainage of earthworks
CN212052161U (en) Dyke structure suitable for coastal region
CN216446029U (en) Retaining wall device for hydraulic engineering
CN220704433U (en) Bank protection structure
CN220117110U (en) City river section structure
CN219732069U (en) Reinforced slurry masonry retaining wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant