CN209676955U - All steel bracket sun glasshouse greenhouse - Google Patents

All steel bracket sun glasshouse greenhouse Download PDF

Info

Publication number
CN209676955U
CN209676955U CN201920033892.3U CN201920033892U CN209676955U CN 209676955 U CN209676955 U CN 209676955U CN 201920033892 U CN201920033892 U CN 201920033892U CN 209676955 U CN209676955 U CN 209676955U
Authority
CN
China
Prior art keywords
brace
cross
row
column
greenhouse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920033892.3U
Other languages
Chinese (zh)
Inventor
董敏
李颖
孙翔
李雪光
武艳凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shouguang Vegetable Industry Group Greenhouse Technology Co Ltd
Original Assignee
Shandong Shouguang Vegetable Industry Group Greenhouse Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shouguang Vegetable Industry Group Greenhouse Technology Co Ltd filed Critical Shandong Shouguang Vegetable Industry Group Greenhouse Technology Co Ltd
Priority to CN201920033892.3U priority Critical patent/CN209676955U/en
Application granted granted Critical
Publication of CN209676955U publication Critical patent/CN209676955U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Greenhouses (AREA)

Abstract

The utility model relates to greenhouse technical fields, provide a kind of all steel bracket sun glasshouse greenhouse, and row's main brace column, the cross-brace being equipped with including ground in canopy are arranged;Main brace column is equipped with horizontal strut;Cross-brace row is with corresponding main brace column with row;And crossbeam concatenation is all made of with the main brace column of row and horizontal strut and cross-brace;The south on ground, north two sides respectively plug row's earth anchor respectively in canopy;Main brace column, cross-brace bottom be all connected with earth anchor;Earth anchor with row is all made of serises connecting tube concatenation;Several bow beams are overlapped on crossbeam;Covering and heat insulating layer on bow beam;The height on ground is not less than the outer ground of canopy in canopy.Whereby, the utility model is built by earth anchorage ground base, canopy body support frame using main brace column, cross-brace and bow beam.It solves in excessive rainfall, muddy water mixing, the area that do not dry for a long time, it is difficult to the problem of building greenhouse.

Description

All steel bracket sun glasshouse greenhouse
Technical field
The utility model relates to greenhouse technical field more particularly to a kind of all steel bracket sun glasshouse greenhouses.
Background technique
The green house of vegetables of the northern area of China is mainly constructed thicker cob wall canopy body using lower digging formula, then is pacified on canopy body Steel loading pipe holder simultaneously covers film and insulation quilt on it and builds.But the south of the lower reaches of the Yangtze River rainwater is more, rich groundwater, Soil is soft.If building lower digging formula greenhouse, difficulty of construction is big, and the time is long, and the duration cannot be guaranteed, can not even apply when serious Work.
In summary, the existing technology has inconveniences and defects in actual use, so it is necessary to be improved.
Utility model content
For above-mentioned defect, the purpose of this utility model is to provide a kind of all steel bracket sun glasshouse greenhouses, pass through Ground base earth anchorage, canopy body support frame is built using main brace column, cross-brace and bow beam, and main brace column, cross-brace are equal Using earth anchorage, instead of cob wall.Back panel insulation quilt, film, non-woven fabrics add cement throwing jet to be made into insulating layer heat preservation;Sunny side Area covers film, and upper berth keeps the temperature insulation.It solves in excessive rainfall, muddy water mixing, the area that do not dry for a long time, it is difficult to take The problem of building greenhouse.
To achieve the goals above, the utility model provides a kind of all steel bracket sun glasshouse greenhouse, including ground in canopy; Ground is equipped with the east-west main brace column of a row in the canopy;The spacing of two neighboring main brace column is 3~4 meters;The main brace The southern side of column is sunny side area, and north side is back panel;
East, the west two sides of the greenhouse are equipped with the cross-brace row of south-north direction;The cross-brace ranking is in the sunny side In area, including the first cross-brace, the second cross-brace, third cross-brace and the 4th diagonal brace being arranged successively from high to low by north orientation south Column;The cross-brace is arranged with the corresponding main brace column with row, and the height of first cross-brace is less than the main brace column;Institute State the horizontal strut for being also connected on main brace column and stretching to the back panel;East, west two sides cross-brace row be two groups, and it is same The spacing of the two groups of cross-braces in side row is not more than 1 meter;
East and West direction is the same as the main brace column of row and horizontal strut and the first cross-brace, the second cross-brace, third cross-brace Crossbeam concatenation is all made of with the end of the 4th cross-brace;Brace is connected between the main brace column and crossbeam;
The south on ground, north two sides respectively plug row's earth anchor respectively in the canopy;The spacing of adjacent two earth anchor is not more than 2 meters; The main brace column, the first cross-brace, the second cross-brace, third cross-brace and the 4th cross-brace bottom be all connected with earth anchor;With row Earth anchor be all made of serises connecting tube concatenation;
Several bow beams are overlapped on the crossbeam from east to west;It is corresponding that the both ends of the bow beam are separately connected south and north flanks The earth anchor;The spacing of adjacent two bow beam is not more than 1 meter;
The sunny side area side of the bow beam covers film, and the insulation quilt of rollable is covered on the film;The arch The back panel side of beam covers back insulating layer;
The film of sunny side area side is equipped with upper air outlet and lower air outlet;At the upper air outlet and lower air outlet Equipped with 60 mesh fly nets;The height on ground is not less than the outer ground of canopy in the canopy.
All steel bracket according to the present utility model sun glasshouse greenhouse, the south, north two sides earth anchor spacing be 1.8 Rice;The spacing of the two neighboring main brace column is 3.6 meters;The spacing of the two neighboring bow beam is 0.9 meter.
All steel bracket according to the present utility model sun glasshouse greenhouse, the main brace column, horizontal strut, the first cross-brace, Second cross-brace, third cross-brace and the 4th cross-brace are square tube;The crossbeam 2 is square tube or round tube.
All steel bracket according to the present utility model sun glasshouse greenhouse, the square tube and round tube are hot dip galvanizing pipe.
All steel bracket according to the present utility model sun glasshouse greenhouse connects described oblique between the main brace column and bow beam Pull rod.
All steel bracket according to the present utility model sun glasshouse greenhouse, the serises connecting tube are angle bar.
All steel bracket according to the present utility model sun glasshouse greenhouse, the earth anchor are screw pile.
All steel bracket according to the present utility model sun glasshouse greenhouse, the back insulating layer includes insulation quilt;The guarantor The equal cover layer in the two sides of warm quilt, the outside of film layer cover nonwoven layer again;The nonwoven layer of side connects the arch The nonwoven layer of beam, the other side covers cement jet pulp layer.
All steel bracket according to the present utility model sun glasshouse greenhouse, ground is higher than outer 5~10 lis of the ground of canopy in the canopy Rice.
All steel bracket according to the present utility model sun glasshouse greenhouse, the maximum height of the greenhouse are 5 meters;The width of greenhouse Degree is 12 meters.
The utility model is taken by ground base earth anchorage, canopy body support frame using main brace column, cross-brace and bow beam It builds, and main brace column, cross-brace are all made of earth anchorage, instead of cob wall.Back panel insulation quilt, film, non-woven fabrics add cement Whitewashing is made into insulating layer heat preservation;Sunny side area covers film, and upper berth keeps the temperature insulation.It solves in excessive rainfall, muddy water mixing, length The area that time is not dried, it is difficult to the problem of building greenhouse.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the East and West direction section of the utility model;
Fig. 2 is the structural schematic diagram of the side wall of the utility model;
Fig. 3 is the structural schematic diagram of a-quadrant in Fig. 1;
Fig. 4 be in Fig. 1 D to structural schematic diagram;
Fig. 5 is the structural schematic diagram of the indoor plane of the utility model;
Fig. 6 is the flat distribution map of the main brace column of the utility model, cross-brace, earth anchor;
Fig. 7 is the flat distribution map of the crossbeam of the utility model, bow beam and earth anchor;
Fig. 8 is the structural schematic diagram of the staircase of the utility model;
Fig. 9 is the structural schematic diagram of the western facade of cabin of the utility model;
Figure 10 is the structural schematic diagram of the cabin east elevation of the utility model;
Figure 11 is the structural schematic diagram of the cabin south elevation of the utility model;
1- main brace column in the figure, 11- brace, 12- horizontal strut, 13- cabin beam;2- crossbeam, 3- sunny side area, 31- bow Ellbeam, 32- insulation quilt, 33- shutter, 34- manual film-coiling device;
The back panel 4-, the aisle 41-, 42- back insulating layer;5- earth anchor, 51- serises connecting tube;Ground in 6- canopy, 61- rhone, 62- cabin, 63- external door, 64- inside door, 65- sunlight board, the pond 66-;
The first cross-brace of 71-, the second cross-brace of 72-, 73- third cross-brace, the 4th cross-brace of 74-;8- staircase, 81- are helped Hand, 82- antiskid pedal, 83- built-in fitting;B area-goes up air outlet, the region C-lower air outlet.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
Referring to Fig. 1, the utility model provides a kind of all steel bracket sun glasshouse greenhouse, including ground 6 in canopy;The canopy Interior ground 6 is equipped with the east-west main brace column 1 of a row;The spacing of two neighboring main brace column 1 is 3~4 meters;The main brace column 1 Southern side be sunny side area 3, north side be back panel 4;
Referring to fig. 2, the east of the greenhouse, west two sides are equipped with the cross-brace row of south-north direction;Cross-brace ranking in In the sunny side area 3, the first cross-brace 71, the second cross-brace 72, third including being arranged successively from high to low by north orientation south are oblique Dagger 73 and the 4th cross-brace 74;
In conjunction with Fig. 6, the cross-brace is arranged and corresponding 1 row, and the height of first cross-brace 71 together of main brace column Degree is less than the main brace column 1;In conjunction with Fig. 1, the horizontal strut 12 for stretching to the back panel 4 is also connected on the main brace column 1;
In conjunction with Fig. 1, Fig. 2 and Fig. 3, East and West direction with row the main brace column 1 and horizontal strut 12 and the first cross-brace 71, The end of second cross-brace 72, third cross-brace 73 and the 4th cross-brace 74 is all made of the concatenation of crossbeam 2;
Referring to Fig. 1, Fig. 2 and Fig. 7, the south on ground 6, north two sides plug row's earth anchor 5 respectively in the canopy;Adjacent two places The spacing of anchor 5 is not more than 2 meters;The main brace column 1, the first cross-brace 71, the second cross-brace 72, third cross-brace 73 and the 4th are tiltedly The bottom of dagger 74 is all connected with earth anchor 5;In conjunction with Fig. 6, the earth anchor 5 with row is all made of the concatenation of serises connecting tube 51;All earth anchors 5 are serially connected in Together, reinforcement effect is played.Referring to Fig. 1, several bow beams 31 are overlapped on the crossbeam 2 from east to west;The bow beam 31 Both ends are separately connected the corresponding earth anchor 5 of south and north flanks;The spacing of adjacent two bow beam 31 is not more than 1 meter, so that ceiling has enough Intensity.
Referring to Fig. 1,3 side of sunny side area of the bow beam 31 covers film, and the heat preservation of rollable is covered on the film By 32.The insulation quilt 32 is rolled or is put down using shutter 33.
4 side of back panel of the bow beam 31 covers back insulating layer 42;Since the back side is lower towards north side temperature, because This is preferably, and the back insulating layer 42 includes insulation quilt 32;The equal cover layer in two sides of the insulation quilt 32, film layer Outside cover nonwoven layer again;The nonwoven layer of side connects the bow beam 31, covers on the outside of the nonwoven layer of the other side Lid cement throwing jet;
Referring to Fig. 1, the film of 3 side of sunny side area is equipped with upper air outlet and lower air outlet;The upper air outlet and 60 mesh fly nets are equipped at lower air outlet;The width of the upper air outlet and lower air outlet is 1 meter, the length phase of length and greenhouse Together.Ceiling lower part is additionally provided with manual film-coiling device 34, facilitates and film is rolled.
Referring to fig. 4, to increase support strength, brace 11 is connected between the main brace column 1 and crossbeam 2.
Referring to Fig. 1, preferably, brace 11 is also connected between the main brace column 1 and bow beam 31;Increase sunny side area 3 one The support strength of the ceiling of side.
Preferably, the intensity to guarantee canopy body.East, west two sides cross-brace row be two groups, and ipsilateral two groups of cross-braces The spacing of row is not more than 1 meter, preferably 0.9 meter of the utility model.
The serises connecting tube 51 of the utility model can be angle bar, square tube, I-steel etc., the preferred angle bar of the utility model.
Preferably, the earth anchor 5 of the utility model is screw pile;
For convenience of the overlap joint of bow beam 31, the south of the utility model, the spacing of the earth anchor 5 of north two sides are 1.8 meters;Phase The spacing of adjacent two main brace columns 1 is 3.6 meters;The spacing of adjacent two bow beam 31 is 0.9 meter.
Preferably, the main brace column 1 of the utility model, horizontal strut 12, the first cross-brace 71, the second cross-brace 72, third cross-brace 7 and the 4th cross-brace 74 are square tube;The crossbeam 2 is square tube or round tube;The bow beam 31 is round tube folding It is curved to form.
For the service life for improving greenhouse body support frame, the square tube and round tube are hot dip galvanizing pipe.
The height of the main brace column 1 is 4.8 meters, in addition crossbeam and insulation quilt 32, the maximum height of entire greenhouse is up to 5 Rice.Main brace column 1 and the first cross-brace 71, the second cross-brace 72, third cross-brace 7 and the 4th cross-brace 74 spacing up to 2 Rice or so, therefore the width of this greenhouse, up to 12 meters, wherein the width in sunny side area 3 can be more than 10 meters.The length of greenhouse is 50 ~100 meters.
Referring to Fig. 5, aisle 41 is equipped in the back panel 4;41 west side of aisle is equipped with cabin 62;Referring to Fig. 9, figure 10, Figure 11, the cabin 62 are equipped with external door 63 and inside door 64;The roof and side wall of cabin rely on main brace column 1, bow beam 31, the One cross-brace 71 and cabin beam 13 are built.Wall in the south uses sunlight board 65.
External door 63 is connected to outside room, and inside door 64 uses indoors, therefore preferably, and the external door 63 is that stainless steel is antitheft Door, inside door 64 are aluminium alloy door.
Pond 66 is additionally provided with beside cabin 62.
Referring to fig. 2, staircase 8 is additionally provided on the outside of the back panel 4;The staircase 8 include two parallel handrails 81 and The antiskid pedal 82 connected between two handrails 81;The bottom of the handrail 81 connects built-in fitting 83;Increase peace when staircase 8 uses Quan Xing.
Referring to Fig. 1, the outside of the greenhouse is also provided with rhone 61;For convenience of canopy internal drainage, in canopy, the height on ground 6 is not Lower than ground outside canopy.Ground 6 is higher than outer 5~10 centimetres of the ground of canopy in the preferred canopy of the utility model.
Preferably, to improve heat insulation effect, the insulation quilt 32 of the utility model is pearl cotton insulation quilt.
In conclusion the utility model is by ground base earth anchorage, canopy body support frame using main brace column, cross-brace and Bow beam is built, and main brace column, cross-brace are all made of earth anchorage, instead of cob wall.Back panel insulation quilt, film, nonwoven Cloth adds cement throwing jet to be made into insulating layer heat preservation;Sunny side area covers film, and upper berth keeps the temperature insulation.It solves in excessive rainfall, mud Water mixing, the area that do not dry for a long time, it is difficult to the problem of building greenhouse.
Certainly, the utility model can also have other various embodiments, without departing substantially from the spirit of the present invention and its essence In the case of, those skilled in the art work as can make various corresponding changes and modifications, but these according to the utility model Corresponding changes and modifications all should belong to the protection scope of the utility model the attached claims.

Claims (10)

1. a kind of all steel bracket sun glasshouse greenhouse, which is characterized in that including ground in canopy;Ground is equipped with a row in the canopy East-west main brace column;The spacing of two neighboring main brace column is 3~4 meters;The southern side of the main brace column is sunny side area, and north side is Back panel;
East, the west two sides of the greenhouse are equipped with the cross-brace row of south-north direction;Cross-brace ranking in the sunny side area, Including the first cross-brace, the second cross-brace, third cross-brace and the 4th cross-brace being arranged successively from high to low by north orientation south;Institute Cross-brace row is stated with the corresponding main brace column with row, and the height of first cross-brace is less than the main brace column;The master The horizontal strut for stretching to the back panel is also connected on dagger;East, west two sides cross-brace row be two groups, and ipsilateral two The spacing of group cross-brace row is not more than 1 meter;
East and West direction is the same as the main brace column and horizontal strut and the first cross-brace of row, the second cross-brace, third cross-brace and the The end of four cross-braces is all made of crossbeam concatenation;Brace is connected between the main brace column and crossbeam;
The south on ground, north two sides respectively plug row's earth anchor respectively in the canopy;The spacing of adjacent two earth anchor is not more than 2 meters;It is described Main brace column, the first cross-brace, the second cross-brace, third cross-brace and the 4th cross-brace bottom be all connected with earth anchor;With the ground of row Anchor is all made of serises connecting tube concatenation;
Several bow beams are overlapped on the crossbeam from east to west;The both ends of the bow beam are separately connected the corresponding institute of south and north flanks State earth anchor;The spacing of adjacent two bow beam is not more than 1 meter;
The sunny side area side of the bow beam covers film, and the insulation quilt of rollable is covered on the film;The bow beam Back panel side covers back insulating layer;
The film of sunny side area side is equipped with upper air outlet and lower air outlet;It is equipped at the upper air outlet and lower air outlet 60 mesh fly nets;The height on ground is not less than the outer ground of canopy in the canopy.
2. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that the south, north two sides earth anchor Spacing be 1.8 meters;The spacing of the two neighboring main brace column is 3.6 meters;The spacing of the two neighboring bow beam is 0.9 Rice.
3. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that the main brace column, horizontal strut, First cross-brace, the second cross-brace, third cross-brace and the 4th cross-brace are square tube;The crossbeam (2) is square tube or round tube.
4. all steel bracket according to claim 3 sun glasshouse greenhouse, which is characterized in that the square tube and round tube are heat Galvanized pipe.
5. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that the main brace column and bow beam it Between connect the brace.
6. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that the serises connecting tube is angle bar.
7. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that the earth anchor is screw pile.
8. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that the back insulating layer includes protecting Warm quilt;The equal cover layer in the two sides of the insulation quilt, the outside of film layer cover nonwoven layer again;The nonwoven layer of side connects The bow beam is connect, the nonwoven layer of the other side covers cement jet pulp layer.
9. all steel bracket according to claim 1 sun glasshouse greenhouse, which is characterized in that ground is higher than outside canopy in the canopy 5~10 centimetres of ground.
10. all steel bracket sun glasshouse greenhouse described in any one according to claim 1~9, which is characterized in that the greenhouse Maximum height be 5 meters;The width of greenhouse is 12 meters.
CN201920033892.3U 2019-01-09 2019-01-09 All steel bracket sun glasshouse greenhouse Expired - Fee Related CN209676955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920033892.3U CN209676955U (en) 2019-01-09 2019-01-09 All steel bracket sun glasshouse greenhouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920033892.3U CN209676955U (en) 2019-01-09 2019-01-09 All steel bracket sun glasshouse greenhouse

Publications (1)

Publication Number Publication Date
CN209676955U true CN209676955U (en) 2019-11-26

Family

ID=68598353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920033892.3U Expired - Fee Related CN209676955U (en) 2019-01-09 2019-01-09 All steel bracket sun glasshouse greenhouse

Country Status (1)

Country Link
CN (1) CN209676955U (en)

Similar Documents

Publication Publication Date Title
Konya Design primer for hot climates
US20040261953A1 (en) Sail shaped awnings
CN204031947U (en) A kind of novel double-layer roofing greenhouse by solar heat
CN201649392U (en) Roof building integrating virescence, energy conservation and water collection
CN103960086A (en) Multifunctional solar greenhouse
CN106962067A (en) A kind of company's Donges luminous energy greenhouse for Yangtze river basin whole year production
CN110185292A (en) A kind of energy-saving and environmental protection, the Trinitarian industrial premises venue of ecology and its key node design and building method
CN106034833A (en) Intelligent glass greenhouse
CN201474087U (en) Improved arched house structure capable of repeatedly producing for nomadic people
CN203514599U (en) Outdoor wood house
CN108391539B (en) Super-span stacked high-energy greenhouse and construction method thereof
CN209676955U (en) All steel bracket sun glasshouse greenhouse
CN206024654U (en) Glasshouse big -arch shelter
CN205596732U (en) Photovoltaic power generation warmhouse booth
CN202059807U (en) Sunlight greenhouse with light-increasing and temperature-increasing functions
CN104805965A (en) Waterproof, fireproof, heat-preserving and heat-insulating stone cloth
CN202232343U (en) Steel structured air wall greenhouse
CN206299206U (en) A kind of double-contracting Mongolia pack arrangement
CN206641092U (en) New extremely frigid zones ecology sun glasshouse
DE2853975A1 (en) House facade solar energy collector panel - has protective curtain movable between inner and outer transparent sheets
CN219586889U (en) Dome type double-layer transparent low-energy consumption climate-control house suitable for cold areas
CN216752935U (en) Sunlight greenhouse big-arch shelter
CN213127291U (en) Gobi agricultural heat preservation windproof greenhouse
CN219344233U (en) Bath tent
CN202285692U (en) Post-on-wall cable-stayed greenhouse

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191126

CF01 Termination of patent right due to non-payment of annual fee