CN209290386U - A kind of transfer structure of subway station - Google Patents

A kind of transfer structure of subway station Download PDF

Info

Publication number
CN209290386U
CN209290386U CN201821591107.8U CN201821591107U CN209290386U CN 209290386 U CN209290386 U CN 209290386U CN 201821591107 U CN201821591107 U CN 201821591107U CN 209290386 U CN209290386 U CN 209290386U
Authority
CN
China
Prior art keywords
line
subway
platform
route
transfer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821591107.8U
Other languages
Chinese (zh)
Inventor
胡霞
史海鸥
王丹平
有智慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201821591107.8U priority Critical patent/CN209290386U/en
Application granted granted Critical
Publication of CN209290386U publication Critical patent/CN209290386U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of transfer structures of subway station, the transfer structure setting is in the infall of three subway lines, three subway lines are respectively first line, the second route and tertiary circuit, the first line and second route are parallel to each other, and the first line and the tertiary circuit are mutually perpendicular to;The transfer structure includes: the negative one stop platform Room and minus two stops platform, and the tertiary circuit is by the negative one stop platform Room, and the first line and the second route are respectively parallel through minus two stops platform;Two tracks of second route are located between two tracks of the first line, and the side of two tracks of the first line is respectively set there are two the first transferring passage.The transfer structure can significantly improve the interchange efficiency of passenger in different routes, greatly reduce the transfer time of passenger.Moreover, shortening the distance that passenger changes to subway, reduces the stream of people's interference when volume of the flow of passengers is big in subway, significantly improve the operational efficiency of subway.

Description

A kind of transfer structure of subway station
Technical field
The utility model relates to the construction fields of subway more particularly to a kind of subway station to change to structure.
Background technique
Currently, the construction of city underground is more and more, many down towns, which are all built, a plurality of subway line, therefore, meeting There is the case where two lines road intersection or even three-line are intersected.The transfer being arranged when currently, intersecting for a plurality of subway line Several combinations that iron car station is changed to using node transfer, interchange on the same platform, channel transfer, platform to the Room, according to line alignment, route In the position in space and the arrangement form of platform, generally there are the transfer of three line of " river " font, the transfers side such as three line of " F " font transfer Formula.
But presently, there are three line of " river " font transfer platform be arranged in parallel in road or place, need it is wider It supports in place.Removing change on the same stage it is more convenient outer, remaining transfer passenger flow need to from platform to subway concourse again under carry out to another platform Transfer, transfer distance is remote, and disturbs to passenger flow out of the station.The transfer of three line of " F " font shares subway concourse by three lines and changes Multiply, station scale is big, and investment is high, and three-line transfer distance is too long.Therefore, it is necessary to design a kind of transfer is convenient, change to away from From the intersection transfer station that close, passenger flow interferes lesser three subway lines.
Utility model content
In order to overcome the above technical defects, the utility model provides a kind of subway station transfer structure, can be realized three The different subway of the transfer of the passenger of subway line rapidly and efficiently, and transfer distance is close.
To solve the above-mentioned problems, the utility model is achieved by following technical scheme:
A kind of transfer structure of subway station, the transfer structure setting is in the infall of three subway lines, and described three Subway line is respectively first line, the second route and tertiary circuit, and the first line and second route are mutually flat Row, the first line and the tertiary circuit are mutually perpendicular to;
The transfer structure includes: the negative one stop platform Room and minus two stops platform, and the tertiary circuit passes through negative one stop platform The Room, the first line and the second route are respectively parallel through minus two stops platform;Two tracks of second route are located at institute It states between two tracks of first line, the side of two tracks of the first line, which is respectively set to change to there are two first, to be led to Road, first transferring passage realize the transfer of first line and the second route.
Further, the first line and second route are in same level height, and the first line is described The lower section of tertiary circuit.The first line of same level height and the second route to share one layer of platform, and first line is set Transfer can be fast implemented in the lower section of tertiary circuit by setting.
Further, the negative one stop platform Room is provided with the shared subway concourse area of three subway lines, the negative one The second transferring passage is provided between the stop platform Room and the minus two stops platform.Three-line shares a subway concourse area, subtracts significantly Transfer distance is lacked, stream of people's queuing time is substantially reduced by the second transferring passage.
Further, second transferring passage include be connected to the negative one stop platform Room and the minus two stops platform it Between escalator, stand-type elevator and escape truck, the escape truck be located at the escalator superior channel and Between inferior channel.While the transferring passage of various ways ensure that the transfer time is less, the safety of the metro operation of raising Property.
Further, the minus two stops platform is provided with the two-wire boarding station of the first line and second route Platform, the negative one stop platform Room are provided with the single line platform of the tertiary circuit.The two-wire platform is First Line Road and the second line sharing, reduce transfer away from discrete time.
Further, the two-wire platform includes the first load zones, the second load zones, the described first position by bus Between the first line and two tracks of second route, second load zones are located at the first line and institute It states between the two other track of the second route.Different load zones greatly reduce the operation of the time and subway that are lined up by bus Efficiency.
Further, first load zones and second load zones are each provided with 4 escalators and 2 stations are vertical Elevator.
Further, the subway concourse area includes the first subway concourse area and the second subway concourse area, and first subway concourse area is located at institute The side of tertiary circuit is stated, second subway concourse area is located at the other side of the tertiary circuit.Since three-line shares one Negative one waiting hall area is divided into the degree of crowding that two platform subregions can reduce passenger, reduces the transfer time.
Compared with prior art, the utility model has the beneficial effects that
Transfer structure design in station disclosed by the utility model is simple, so that three subway lines of transfer inside configuration are only It is distributed only over underground two layers, the interchange efficiency of passenger in different routes can be significantly improved, greatly reduce the transfer time of passenger. Further, since three subway lines share a negative one stop platform Room, two circuit-lines share a minus two stops platform, because This, substantially reduces the distance that passenger changes to subway, reduces the stream of people's interference when volume of the flow of passengers is big in subway, significantly improves ground The operational efficiency of iron.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is minus two layers of structural schematic diagram in the transfer structure of subway station disclosed in the utility model embodiment;
Fig. 2 is the structural schematic diagram of negative one layer in the transfer structure of subway station disclosed in the utility model embodiment;
Fig. 3 is the partial cross-sectional structural diagram in the transfer structure of subway station disclosed in the utility model embodiment.
In figure:
1- first line;The second route of 2-;The first load zones of 3-;The second load zones of 4-;The first transferring passage of 5-;6- stands Formula elevator;7- escalator;8- tertiary circuit;The first subway concourse of 9- area;The second subway concourse of 10- area;11- escape truck.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
As shown in FIG. 1 to 3, the utility model discloses a kind of transfer structure of subway station, the transfer structure is set It is placed in the infall of three subway lines, three subway lines are respectively first line 1, the second route 2 and tertiary circuit 8, first line 1 and the second route 2 are parallel to each other, and first line 1 and tertiary circuit 8 are mutually perpendicular to;The subway station is changed Multiplying structure includes: the negative one stop platform Room and minus two stops platform, and tertiary circuit 8 passes through the negative one stop platform Room, first line 1 and second Respectively parallel through minus two stops platform, two tracks of the second route 2 are located between two tracks of first line 1 route 2, the The side of two tracks of one route 1 is respectively set there are two the first transferring passage 5, and the first transferring passage 5 realizes first line With the transfer of the second route.Entire transfer structure seems likeness in form " ╪ ", two of them parallel lines indicate two subway lines, separately One vertical line indicates other set subway line.
Transfer structure design in station disclosed by the utility model is simple, so that three subway lines of transfer inside configuration are only It is distributed only over underground two layers, the interchange efficiency of passenger in different routes can be significantly improved, greatly reduce the transfer time of passenger. Further, since three subway lines share a negative one stop platform Room, two circuit-lines share a minus two stops platform, because This, substantially reduces the distance that passenger changes to subway, reduces the stream of people's interference when volume of the flow of passengers is big in subway, significantly improves ground The operational efficiency of iron.
Preferably, first line 1 and the second route 2 are in same level height, and first line 1 is in the lower section of tertiary circuit 8. The first line 1 of same level height and the second route 2 to share one layer of platform, and first line 1 is arranged in tertiary circuit 8 lower section can fast implement transfer.The passenger of first line 1 and the second route 2 transfer is directly completed at minus two layers, First Line The passenger of road 1 and the second route 2 transfer needs the platform Room of negative one floor to complete transfer to tertiary circuit 8.Wherein, the negative one The stop platform Room is provided with the shared subway concourse area of three subway lines, the negative one stop platform Room and the minus two stops platform it Between be provided with the second transferring passage.Three-line shares a subway concourse area, greatly reduces transfer distance, logical by the second transfer Road substantially reduces stream of people's queuing time.
Preferably, second transferring passage includes being connected between the negative one stop platform Room and the minus two stops platform Escalator 7, stand-type elevator 6 and escape truck 11, escape truck 11 is located at the superior channel of escalator 7 and inferior Between channel.While the transferring passage of various ways ensure that the transfer time is less, the safety of the metro operation of raising.Multiply Visitor can select suitable transferring passage according to different needs.
Preferably, the minus two stops platform is provided with the two-wire platform of first line 1 and the second route 2, described negative The one stop platform Room is provided with the single line platform of tertiary circuit 8.The two-wire platform is first line 1 and the second route 2 share, reduce transfer away from discrete time.
Preferably, the two-wire platform includes the first load zones 3 and the second load zones 4, and the first load zones 3 are located at Between first line 1 and two tracks of the second route 2, in addition the second load zones 4 are located at first line 1 and the second route 2 Between two tracks.First load zones 3 and the second load zones 4 are each provided with 4 station vertical lifting of escalator 7 and 2 machines 6. Since three-line shares a negative one waiting hall area, different load zones greatly reduce the time and subway being lined up by bus Efficiency of operation.
Preferably, the subway concourse area includes the first subway concourse area 9 and the second subway concourse area 10, and the first subway concourse area 9 is located at third The side of route 8, the second subway concourse area 10 are located at the other side of tertiary circuit 8.Being divided into two platform subregions can reduce personnel's The degree of crowding reduces the transfer time.
The other structures of the transfer structure of subway station described in the present embodiment are referring to the prior art, and details are not described herein.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, therefore it is all without departing from the content of the technical scheme of the utility model, implement according to the technical essence of the utility model to above Any modification, equivalent variations and modification, are still within the scope of the technical solutions of the present invention made by example.

Claims (7)

1. a kind of transfer structure of subway station, which is characterized in that
For the transfer structure setting in the infall of three subway lines, three articles of subway lines are respectively first line, Two routes and tertiary circuit, the first line and second route are parallel to each other, the first line and the third line Road is mutually perpendicular to;
Include: the negative one stop platform Room and minus two stops platform, the tertiary circuit by the negative one stop platform Room, the first line and Second route is respectively parallel through minus two stops platform;Two tracks of second route are located at two rails of the first line Between road, the side of two tracks of the first line is respectively set there are two the first transferring passage, and first transfer is logical The transfer of road realization first line and the second route.
2. the transfer structure of subway station according to claim 1, which is characterized in that the negative one stop platform Room is provided with The shared subway concourse area of three subway lines, is provided with second between the negative one stop platform Room and the minus two stops platform and changes Multiply channel.
3. the transfer structure of subway station according to claim 2, which is characterized in that second transferring passage includes connecting Escalator, stand-type elevator and the escape truck being connected between the negative one stop platform Room and the minus two stops platform, institute Escape truck is stated to be located between the superior channel and inferior channel of the escalator.
4. the transfer structure of subway station according to claim 1, which is characterized in that the minus two stops platform setting is The two-wire platform of first line and second route is stated, the negative one stop platform Room is provided with the list of the tertiary circuit Line platform.
5. the transfer structure of subway station according to claim 4, which is characterized in that the two-wire platform includes First load zones and the second load zones, first load zones are located at two tracks of the first line and second route Between, second load zones are between the first line and the two other track of second route.
6. the transfer structure of subway station according to claim 5, which is characterized in that first load zones and described Two load zones are each provided with 4 escalators and 2 station vertical lifting machines.
7. the transfer structure of subway station according to claim 2, which is characterized in that the subway concourse area includes first stop Room area and the second subway concourse area, first subway concourse area are located at the side of the tertiary circuit, and second subway concourse area is located at described The other side of tertiary circuit.
CN201821591107.8U 2018-09-28 2018-09-28 A kind of transfer structure of subway station Active CN209290386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821591107.8U CN209290386U (en) 2018-09-28 2018-09-28 A kind of transfer structure of subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821591107.8U CN209290386U (en) 2018-09-28 2018-09-28 A kind of transfer structure of subway station

Publications (1)

Publication Number Publication Date
CN209290386U true CN209290386U (en) 2019-08-23

Family

ID=67653558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821591107.8U Active CN209290386U (en) 2018-09-28 2018-09-28 A kind of transfer structure of subway station

Country Status (1)

Country Link
CN (1) CN209290386U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111688724A (en) * 2020-05-07 2020-09-22 中铁十八局集团有限公司 Subway crossline one-way circulation quick transfer structure
CN112810632A (en) * 2019-11-15 2021-05-18 中铁武汉勘察设计研究院有限公司 Station outbound method based on transfer island
WO2021223571A1 (en) * 2020-05-07 2021-11-11 中铁十八局集团有限公司 One-way circulation rapid transfer structure for intersecting subway lines
CN113668915A (en) * 2021-08-18 2021-11-19 广州地铁设计研究院股份有限公司 Subway transfer station and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112810632A (en) * 2019-11-15 2021-05-18 中铁武汉勘察设计研究院有限公司 Station outbound method based on transfer island
CN111688724A (en) * 2020-05-07 2020-09-22 中铁十八局集团有限公司 Subway crossline one-way circulation quick transfer structure
CN111688724B (en) * 2020-05-07 2021-11-05 中铁十八局集团有限公司 Subway crossline one-way circulation quick transfer structure
WO2021223571A1 (en) * 2020-05-07 2021-11-11 中铁十八局集团有限公司 One-way circulation rapid transfer structure for intersecting subway lines
CN113668915A (en) * 2021-08-18 2021-11-19 广州地铁设计研究院股份有限公司 Subway transfer station and construction method thereof

Similar Documents

Publication Publication Date Title
CN209290386U (en) A kind of transfer structure of subway station
KR101760115B1 (en) Articulated funiculator
KR100969228B1 (en) Urban railway honey comb transit structure of station
CN208006947U (en) A kind of light-duty empty rail traffic delivery system
CN104477170A (en) Standard bridge type elevated station
CN109649412A (en) A kind of light-duty empty rail traffic delivery system
CN110700318A (en) Intercity railway underground station of track area top integration development
CN103072877A (en) Single-well and double-car elevator
CN112441024B (en) Platform door design method based on vehicle type projection distribution and high-speed rail platform door
CN110439341A (en) A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train
CN103661405A (en) Underground all-node transfer station of urban railway system
CN106080611A (en) One platform one direction in August is without intersecting three line transfer stations
CN109826063A (en) A kind of two-way, multilane, multilayer rail freeway facility and its working method
CN207089296U (en) A kind of urban track traffic line section station that comes in and goes out integrates with arrangement
CN107313448B (en) Multi-line transfer subway station
CN214246782U (en) Elevated railway station with traffic valleys
CN205474885U (en) Single track station of way midspan seat formula
CN206189952U (en) Road formula plane movement type stereo garage strides
CN106927337A (en) Skyscraper binary channels straight line worm gear elevator hoistways
CN204296710U (en) A kind of standardization bridge type elevated station
CN207596277U (en) A kind of machine room Three-door elevator structure
CN206599343U (en) Elevator device for moving back desk-top building
CN110106797B (en) Subway station with two in-station access section lines capable of being converted and conversion method
CN206000090U (en) Semi-mounted stair under a kind of plate of subway station
CN107128315A (en) The arrangement of main line and branch line and the track traffic for having the structure integrate with station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Xia

Inventor after: Shi Haiou

Inventor after: Wang Danping

Inventor after: You Zhihui

Inventor before: Hu Xia

Inventor before: Shi Haiou

Inventor before: Wang Danping

Inventor before: You Zhihui