CN110700318A - An Intercity Railway Underground Station Integrated Development Above the Track Area - Google Patents

An Intercity Railway Underground Station Integrated Development Above the Track Area Download PDF

Info

Publication number
CN110700318A
CN110700318A CN201911134246.7A CN201911134246A CN110700318A CN 110700318 A CN110700318 A CN 110700318A CN 201911134246 A CN201911134246 A CN 201911134246A CN 110700318 A CN110700318 A CN 110700318A
Authority
CN
China
Prior art keywords
railway
hall
area
floor
exit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911134246.7A
Other languages
Chinese (zh)
Inventor
张利剑
李锋
方恒堃
张亚琼
鲍凯
贾龙飞
白智强
郎静
朱云飞
高伟君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201911134246.7A priority Critical patent/CN110700318A/en
Publication of CN110700318A publication Critical patent/CN110700318A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明公开了一种轨行区上方一体化开发的城际铁路地下车站,包括铁路功能区和一体化开发区两个区域,铁路功能区由下至上设置的地下三层铁路站台层、地下二层铁路出站厅、地下二层小汽车停车场、地下二层出租车上客区、地下一层铁路候车厅,地下一层铁路商业区以及地上轻型结构共同组成;通过铁路出站厅两侧城市通道以及下沉广场,实现与地铁换乘厅、地铁出站厅便捷进行连通;候车厅的层顶为地上轻型结构,通过地上轻型结构及玻璃幕墙实现将自然光引入候车厅;在铁路出站厅、候车厅设采光中厅将自然光引入站台层。本发明在轨行区正上方的一体化开发,可以利用地下车站既有空间上方土地,减少物业开发新占地面积,提高开发区域的土地利用率。

Figure 201911134246

The invention discloses an intercity railway underground station integratedly developed above the track area, comprising two areas: a railway functional area and an integrated development area. The railway exit hall on the first floor, the car parking lot on the second basement floor, the taxi pick-up area on the second basement floor, the railway waiting hall on the first basement floor, the railway commercial area on the first basement floor and the light structure on the ground are composed together; through the two sides of the railway exit hall The urban passage and the sunken square can be conveniently connected with the subway transfer hall and the subway exit hall; the roof of the waiting hall is an above-ground light structure, and natural light is introduced into the waiting hall through the above-ground light structure and glass curtain wall; when the railway exits the station The hall and waiting hall are equipped with a central hall to introduce natural light into the platform level. The integrated development of the invention directly above the rail area can utilize the land above the existing space of the underground station, reduce the new floor area of property development, and improve the land utilization rate of the development area.

Figure 201911134246

Description

一种轨行区上方一体化开发的城际铁路地下车站An Intercity Railway Underground Station Integrated Development Above the Track Area

技术领域technical field

本发明属于城际铁路技术领域,具体是一种轨行区上方一体化开发的城际铁路地下车站。The invention belongs to the technical field of intercity railways, in particular to an intercity railway underground station integrated above the track area.

背景技术Background technique

伴随着我国都市圈城际铁路的大规模规划建设的背景与土地资源集约化利用的趋势,结合铁路车站建设进行一体化开发已逐渐成为城城际铁路建设关注的热点问题。目前大多数的城际铁路站点范围内的一体化开发通常采用车站、物业开发“平面分离”的模式,造成占地面积较大、功能相对分散、相关设施资源无法共享,同时降低了公共交通运行的效率,因此亟待采用一种更加紧凑、高效、有序的车站一体化开发的组织形式,整合相关功能与资源,以提高土地利用率和改善交通出行环境。With the background of large-scale planning and construction of intercity railways in my country's metropolitan area and the trend of intensive utilization of land resources, integrated development combined with railway station construction has gradually become a hot issue of intercity railway construction. At present, most of the integrated development within the scope of intercity railway stations usually adopts the "plane separation" mode of station and property development, resulting in a large area, relatively scattered functions, and the inability to share related facilities and resources, and at the same time reduces the operation of public transportation. Therefore, it is urgent to adopt a more compact, efficient and orderly organizational form of integrated development of stations, integrating relevant functions and resources, so as to improve land utilization and improve the transportation environment.

发明内容SUMMARY OF THE INVENTION

本发明提供了一种轨行区上方一体化开发的城际铁路地下车站,其目的在于解决现有的城际铁路车站占地面积较大、功能相对分散、相关设施资源无法共享,公共交通运行效率低的问题。The invention provides an intercity railway underground station integrated above the track area, which aims to solve the problem that the existing intercity railway station occupies a large area, has relatively scattered functions, cannot share related facilities and resources, and causes the operation of public transportation. problem of inefficiency.

本发明采用以下技术方案:The present invention adopts following technical scheme:

一种轨行区上方一体化开发的城际铁路地下车站,包括两个区域,分别为铁路功能区和一体化开发区,所述铁路功能区包括依次由下至上设置的地下三层铁路站台层、地下二层铁路出站厅、地下二层小汽车停车场、地下二层出租车上客区、地下一层铁路候车厅,地下一层铁路商业区以及地上轻型结构;所述铁路出站厅两侧设置同层城市通道以及下沉广场,所述铁路出站厅北侧与地铁换乘厅、地铁出站厅相互连通;An intercity railway underground station integratedly developed above a track area, comprising two areas, namely a railway functional area and an integrated development area, wherein the railway functional area includes three underground railway platform layers arranged sequentially from bottom to top , the railway exit hall on the second underground floor, the car parking lot on the second underground floor, the taxi pick-up area on the second underground floor, the railway waiting hall on the first underground floor, the railway commercial area on the first underground floor, and the light structure on the ground; the railway exit hall The same-level urban passage and the sunken square are set on both sides, and the north side of the railway exit hall is connected with the subway transfer hall and the subway exit hall;

所述铁路出站厅设置处采光中厅;所述铁路出站厅、地铁出站厅与所述小汽车停车场、出租车上客区、公交枢纽以及城市用地通过所述下沉广场、城市通廊连通;The railway outbound hall is set in the lighting central hall; the railway outbound hall, the subway outbound hall, the car parking lot, the taxi pick-up area, the bus hub and the urban land pass through the sunken square, the city corridor connection;

所述铁路站台层通过进站楼扶梯与所述铁路候车厅连通,所述铁路站台层通过出站楼扶梯与铁路进站厅连通,所述铁路出站层与所述铁路候车厅及铁路商业平台通过楼扶梯连通,所述地上轻型结构为所述铁路候车厅的屋顶,所述地上轻型结构呈弧形由一侧向另一侧伸出、遮挡所述铁路候车厅和部分所述下沉广场。The railway platform floor is connected with the railway waiting hall through the escalator of the incoming stair, the railway platform floor is communicated with the railway entering hall through the escalator of the exit stair, and the railway outgoing floor is connected with the railway waiting hall and the railway business. The platform is connected by stairs and escalators, the above-ground light structure is the roof of the railway waiting hall, and the above-ground light structure extends from one side to the other in an arc shape, shielding the railway waiting hall and part of the sinking square.

所述一体化开发区通过设置在所述铁路功能区的多根结构柱支撑。The integrated development zone is supported by a plurality of structural columns arranged in the railway functional zone.

所述铁路候车厅通过换乘楼扶梯与所述地铁换乘厅、地铁出站厅连通。The railway waiting hall is connected with the subway transfer hall and the subway exit hall through the transfer stair and escalator.

所述地上轻型结构及玻璃幕墙将自然光引入所述铁路候车厅,所述铁路候车厅、铁路出站厅、所述铁路站台层层顶部设置多个所述采光中厅,自然光可透过所述采光中厅照射在所述铁路出站厅内及所述铁路站台层上。The above-ground light structure and the glass curtain wall introduce natural light into the railway waiting hall. A plurality of the lighting central halls are arranged on the top of the railway waiting hall, the railway exit hall and the railway platform, and the natural light can pass through the The lighting central hall is irradiated in the railway exit hall and on the railway platform layer.

所述城市通廊及所述下沉广场设置所述小汽车停车场、出租车等候区、公交枢纽、P+R停车场与所述铁路出站厅、地铁出站厅以及所述城市用地直接连通。The urban corridor and the sunken square are provided with the car parking lot, taxi waiting area, bus hub, P+R parking lot and the railway exit hall, subway exit hall and the urban land directly. Connected.

本发明的优点如下:The advantages of the present invention are as follows:

(1)在铁路车站轨行区正上方进行一体化开发,车站结构与上部物业开发共用柱网、同期建设实现物业开发与地下结构的有效连通;提高土地资源的利用率,共享停车、设备等设施资源,节约开发工程的总体投资;(1) Carry out integrated development directly above the railway station track area, the station structure and the upper property development share a column network, and the construction in the same period realizes the effective connection between the property development and the underground structure; improves the utilization rate of land resources, and shares parking, equipment, etc. Facility resources, saving overall investment in development projects;

(2)车站候车厅、出站厅立体化设计,使有限的进出站空间更为宽敞且有序,便于大客流组织,避免进出站客流交叉;(2) The three-dimensional design of the station waiting hall and the exit hall makes the limited entry and exit space more spacious and orderly, which facilitates the organization of large passenger flows and avoids the intersection of incoming and outgoing passenger flows;

(3)预留铁路车站与规划地铁车站共用换乘厅,实现双向安检互信、预留铁路与地铁之间的付费区换乘条件;(3) Reserve railway stations and planned subway stations to share transfer halls, realize mutual trust in two-way security inspections, and reserve transfer conditions in paid areas between railways and subways;

(4)铁路地下候车厅地面化设计,取消地面混凝土结构顶板,将自然光引入候车厅,极大改善了候车环境;(4) The ground-based design of the railway underground waiting hall, cancel the roof of the ground concrete structure, and introduce natural light into the waiting hall, which greatly improves the waiting environment;

(5)铁路车站地下站台层及地下出站厅顶板设置6组采光中庭,将阳光引入出站厅及站台,提升整体空间效果及乘客体验;(5) There are 6 sets of lighting atriums on the underground platform level of the railway station and the roof of the underground exit hall to introduce sunlight into the exit hall and platform to improve the overall space effect and passenger experience;

(6)铁路车站地下二层出站层将南、北城市用地以80米城市通廊进行有效连通,实现铁路车站与地铁、有轨电车、公交车、出租车、小汽车的便捷换乘,同时利用车站聚集人流的作用和上方提供舒适便捷的城市生活体验,交通、建筑、城市空间高度融合与协调,实现真正的站城一体化;(6) The second underground floor of the railway station will effectively connect the southern and northern urban land with an urban corridor of 80 meters, so as to realize the convenient transfer between the railway station and the subway, trams, buses, taxis and cars. At the same time, using the function of the station to gather people and provide a comfortable and convenient urban life experience, the traffic, architecture and urban space are highly integrated and coordinated to realize the real integration of the station and the city;

(7)车站造型采用层层退台的设计手法,营造梯田自然风貌,同时车站南侧采用景观下沉广场延续了东、西向城市绿带,与城市景观进行了很好的融合;(7) The station shape adopts the design method of step-by-step retreat to create a natural style of terraced fields. At the same time, the south side of the station adopts a landscaped sunken square to continue the east and west urban green belts, which are well integrated with the urban landscape;

(8)铁路候车厅与铁路出站厅分别通过进站楼扶梯、出站楼扶梯实现与铁路站台层联通,实现进、出站客流分开。(8) The railway waiting hall and the railway exit hall are connected with the railway platform floor through the escalator of the incoming stair and the escalator of the outgoing stair respectively, so as to realize the separation of the incoming and outgoing passenger flow.

附图说明:Description of drawings:

图1为本发明整体结构主视示意图。FIG. 1 is a schematic front view of the overall structure of the present invention.

图2为本发明地下二层平面示意图。Figure 2 is a schematic plan view of the second underground floor of the present invention.

图3为本发明车站候车厅区域剖视示意图。FIG. 3 is a schematic cross-sectional view of the area of the station waiting hall according to the present invention.

图4为本发明车站候车厅区域部分结构剖视示意图。FIG. 4 is a schematic cross-sectional view of a part of the structure of the station waiting hall area of the present invention.

图5为本发明附图2的局部位置放大示意图。FIG. 5 is an enlarged schematic diagram of a partial position of FIG. 2 of the present invention.

图6为本发明地下二层平面放大示意图。FIG. 6 is an enlarged schematic view of the second underground floor of the present invention.

图7为本发明附图6的局部位置放大示意图。FIG. 7 is an enlarged schematic view of a partial position of FIG. 6 of the present invention.

附图标记:Reference number:

1-铁路候车厅,2-铁路出站厅,3-铁路站台层,4-铁路功能区,5-采光中厅,6-铁路商业区,7-一体化开发区,8-出站楼扶梯,9-进站楼扶梯,10-地上轻型结构,11-城市通廊,12-地铁换乘厅,13-地铁候车厅,14-小汽车停车场,15-出租车上客区,16-公交枢纽,17-结构柱,18-下沉广场,19-玻璃幕墙,20-楼扶梯,21-换乘楼扶梯,A-城市用地1-Railway waiting hall, 2-Railway exit hall, 3-Railway platform floor, 4-Railway functional area, 5-Lighting central hall, 6-Railway business area, 7-Integrated development area, 8-Exit escalator , 9- Escalator for entering station, 10- Light structure above ground, 11- City corridor, 12- Subway transfer hall, 13- Subway waiting hall, 14- Car parking lot, 15- Taxi pick-up area, 16- Bus hub, 17-structural column, 18-sunk square, 19-glass curtain wall, 20-stair escalator, 21-transfer stair escalator, A-urban land

具体实施方式:Detailed ways:

下面结合附图对本发明的具体实施方式做进一步说明。The specific embodiments of the present invention will be further described below with reference to the accompanying drawings.

以下实施例仅是为清楚说明本发明所作的举例,而并非对本发明的实施方式的限定。对于所属领域的普通技术人员来说,在下述说明的基础上还可以做出其他不同形式的变化或变动,而这些属于本发明精神所引出的显而易见的变化或变动仍处于本发明的保护范围之中。The following examples are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those of ordinary skill in the art, on the basis of the following description, other changes or changes in different forms can also be made, and these obvious changes or changes which belong to the spirit of the present invention are still within the protection scope of the present invention. middle.

参见附图1,一种轨行区上方一体化开发的城际铁路地下车站,包括两个区域,分别为铁路功能区4和一体化开发区7,所述铁路功能区4包括依次由下至上设置的地下三层铁路站台层3、地下二层铁路出站厅2、地下二层小汽车停车场14、地下二层出租车上客区15、地下一层铁路候车厅1,地下一层铁路商业区6以及地上轻型结构10;所述铁路出站厅2两侧设置同层城市通道11以及下沉广场18,所述铁路出站厅2北侧与地铁换乘厅12、地铁出站厅13相互连通;Referring to FIG. 1, an intercity railway underground station integratedly developed above the track area includes two areas, namely, a railway functional area 4 and an integrated development area 7. The railway functional area 4 includes a sequence from bottom to top. Set up three underground railway platform floor 3, underground second floor railway exit hall 2, underground second floor car parking lot 14, underground second floor taxi pick-up area 15, underground first floor railway waiting hall 1, underground first floor railway The commercial area 6 and the above-ground light structure 10; the same-floor urban passage 11 and the sunken plaza 18 are arranged on both sides of the railway exit hall 2, and the north side of the railway exit hall 2 is connected with the subway transfer hall 12 and the subway exit hall 13 interconnected;

所述铁路出站厅2设置6处采光中厅5;所述铁路出站厅2、地铁出站厅13与所述小汽车停车场14、出租车上客区15、公交枢纽16以及城市用地通过所述下沉广场18、城市通廊11连通,参见附图1、2、3、6、7;The railway exit hall 2 is provided with 6 lighting central halls 5; the railway exit hall 2, the subway exit hall 13, the car parking lot 14, the taxi pick-up area 15, the bus hub 16 and the urban land Connected through the sunken square 18 and the city corridor 11, see Figures 1, 2, 3, 6, and 7;

所述铁路站台层3通过进站楼扶梯9与所述铁路候车厅1连通,所述铁路站台层3通过出站楼扶梯8与铁路进站厅2连通,所述铁路出站层2与所述铁路候车厅1及铁路商业平台6通过楼扶梯20连通,所述地上轻型结构10为所述铁路候车厅1的屋顶,所述地上轻型结构10呈弧形由一侧向另一侧伸出、遮挡所述铁路候车厅1和部分所述下沉广场18,参见附图1、3、4。The railway platform floor 3 is connected with the railway waiting hall 1 through the incoming stair escalator 9, the railway platform floor 3 is communicated with the railway entering hall 2 through the outgoing escalator 8, and the railway outgoing floor 2 is connected with the railway station. The railway waiting hall 1 and the railway commercial platform 6 are communicated through stairs 20, the above-ground light structure 10 is the roof of the railway waiting hall 1, and the above-ground light structure 10 extends from one side to the other in an arc shape. , Block the railway waiting hall 1 and part of the sunken plaza 18, see Figures 1, 3, and 4.

所述一体化开发区7通过设置在所述铁路功能区4的多根结构柱17支撑,参见附图1。The integrated development zone 7 is supported by a plurality of structural columns 17 arranged in the railway functional zone 4 , see FIG. 1 .

所述铁路候车厅1通过换乘楼扶梯21与所述地铁换乘厅12、地铁出站厅13连通,参见附图3。The railway waiting hall 1 is connected with the subway transfer hall 12 and the subway exit hall 13 through the transfer stair escalator 21 , see FIG. 3 .

所述地上轻型结构10及玻璃幕墙19将自然光引入所述铁路候车厅1,所述铁路候车厅1、铁路出站厅2、所述铁路站台层3层顶部设置多个所述采光中厅5,自然光可透过所述采光中厅5照射在所述铁路出站厅2内及所述铁路站台层3上,参见附图3。The above-ground light structure 10 and the glass curtain wall 19 introduce natural light into the railway waiting hall 1 , and a plurality of the central lighting halls 5 are arranged on the top of the railway waiting hall 1 , the railway exit hall 2 and the third floor of the railway platform. , the natural light can be irradiated in the railway exit hall 2 and on the railway platform layer 3 through the lighting central hall 5 , see FIG. 3 .

所述城市通廊11及所述下沉广场18设置所述小汽车停车场14、出租车等候区15、公交枢纽16、P+R停车场17与所述铁路出站厅2、地铁出站厅13以及所述城市用地直接连通,参见附图2、5、6、7。The city corridor 11 and the sunken plaza 18 are provided with the car parking lot 14, taxi waiting area 15, bus hub 16, P+R parking lot 17, and the railway exit hall 2 and the subway exit. The hall 13 and the urban land are directly connected, see Figures 2, 5, 6, and 7.

本发明根据实际项目实际需求、以及对传统铁路领域的站房设计方法的新思考,提供了一种新型的车站形式:根据城市规划及发展需求,将传统铁路车站由地面站改为地下站,同时充分利用铁路车站轨行区正上方土地空间进行一体化开发,铁路功能区4车站结构与一体化开发区7的上部物业开发共用柱网、同期建设实现物业开发与地下结构的有效连通;提高土地资源的利用率,共享停车、设备等设施资源,节约开发工程的总体投资。The present invention provides a new type of station form according to the actual needs of the actual project and the new thinking on the station building design method in the traditional railway field: according to the urban planning and development needs, the traditional railway station is changed from the ground station to the underground station, At the same time, make full use of the land space directly above the railway station track area for integrated development, the station structure of the railway functional area 4 and the upper property development of the integrated development area 7 share the column network, and the construction in the same period realizes the effective connection between the property development and the underground structure; The utilization rate of land resources, the sharing of facilities resources such as parking and equipment, and the overall investment in development projects are saved.

本发明通过将地下车站顶盖打开,以轻型结构替代,并结合玻璃幕墙、候车厅及出站厅开洞等设计手法,使将自然阳光引入候车厅及站台层,极大的改善了车站环境,提高旅客舒适度。By opening the roof of the underground station and replacing it with a light-weight structure, the invention combines the design techniques of glass curtain wall, openings in the waiting hall and exit hall, etc., so that natural sunlight can be introduced into the waiting hall and platform layer, which greatly improves the station environment. , to improve passenger comfort.

本发明结合城市需要,在地下二层设置城市通廊11、下沉广场18,将实现铁路车站与地铁、有轨电车、公交车、出租车、小汽车的便捷换乘,同时利用车站聚集人流的作用和上方提供舒适便捷的城市生活体验,交通、建筑、城市空间高度融合与协调,实现真正的站城一体化。In the present invention, the urban corridor 11 and the sunken plaza 18 are arranged on the second underground floor in consideration of the needs of the city, which will realize the convenient transfer between railway stations and subways, trams, buses, taxis and cars, and at the same time use the stations to gather people. It provides a comfortable and convenient urban life experience, and the transportation, architecture and urban space are highly integrated and coordinated to realize the real integration of station and city.

以下将结合具体实施方式对本发明做进一步说明:The present invention will be further described below in conjunction with specific embodiments:

此工程为城际铁路的一座地下车站,预设置于道路南侧80m宽规划绿地内。车站南、北侧均规划为城市用地,规划有城市通廊穿越车站,连接南北城市用地,区位的重要性决定了车站的土地价值和功能价值,利用车站的正上方有限的土地进行一体化开发,给城市提供便利的服务设施。车站因地制宜的利用车站建设的机会打通南北城市主轴线,满足城市交通需求,使得城市人流,各个交通设施之间的人流在该枢纽自由高效换乘,同时将阳光引入候车大厅,改善人们出行环境,并利用仅有的车站上方土地配置便利的商业服务功能,一体化开发区7的地上物业开发与铁路功能区的地下车站作为一个框架结构体系建设,实现资源的高度整合,最终实现一种紧凑、高效、有序的新型车站+物业立体化开发的城际铁路车站形式。This project is an underground station of the intercity railway, which is preset to be placed in the planned green space with a width of 80m on the south side of the road. Both the south and north sides of the station are planned as urban land, and urban corridors are planned to cross the station and connect the north and south urban land. The importance of the location determines the land value and functional value of the station, and the limited land directly above the station is used for integrated development. , to provide convenient service facilities to the city. According to local conditions, the station takes advantage of the opportunity of station construction to open up the main axis of the north and south cities to meet the needs of urban traffic, so that the flow of people in the city and the flow of people between various transportation facilities can be transferred freely and efficiently at the hub, and at the same time, sunlight is introduced into the waiting hall to improve people's travel environment. And using the only land above the station to configure convenient commercial service functions, the above-ground property development of the integrated development zone 7 and the underground station of the railway functional zone are constructed as a frame structure system to achieve a high degree of integration of resources, and finally realize a compact, Efficient and orderly new station + intercity railway station with three-dimensional property development.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.

Claims (5)

1.一种轨行区上方一体化开发的城际铁路地下车站,其特征在于:包括两个区域,分别为铁路功能区(4)和一体化开发区(7),所述铁路功能区(4)包括依次由下至上设置的地下三层铁路站台层(3)、地下二层铁路出站厅(2)、地下二层小汽车停车场(14)、地下二层出租车上客区(15)、地下一层铁路候车厅(1),地下一层铁路商业区(6)以及地上轻型结构(10);所述铁路出站厅(2)两侧设置同层城市通道(11)以及下沉广场(18),所述铁路出站厅(2)北侧与地铁换乘厅(12)、地铁出站厅(13)相互连通;1. An intercity railway underground station integratedly developed above the track area is characterized in that: comprising two areas, respectively a railway functional area (4) and an integrated development area (7), the railway functional area ( 4) Including the three-story underground railway platform layer (3), the second-floor railway exit hall (2), the second-floor car parking lot (14), and the second-floor taxi pick-up area ( 15), a railway waiting hall (1) on the ground floor, a railway commercial area (6) on the ground floor and a light structure on the ground (10); the railway exit hall (2) is provided with urban passages on the same floor (11) and The sunken square (18), the north side of the railway exit hall (2) is connected with the subway transfer hall (12) and the subway exit hall (13); 所述铁路出站厅(2)设置6处采光中厅(5);所述铁路出站厅(2)、地铁出站厅(13)与所述小汽车停车场(14)、出租车上客区(15)、公交枢纽(16)以及城市用地通过所述下沉广场(18)、城市通廊(11)连通;The railway exit hall (2) is provided with 6 central lighting halls (5); the railway exit hall (2), the subway exit hall (13), the car parking lot (14), the taxi The passenger area (15), the public transport hub (16) and the urban land are connected through the sunken square (18) and the urban corridor (11); 所述铁路站台层(3)通过进站楼扶梯(9)与所述铁路候车厅(1)连通,所述铁路站台层(3)通过出站楼扶梯(8)与铁路进站厅(2)连通,所述铁路出站层(2)与所述铁路候车厅(1)及铁路商业平台(6)通过楼扶梯(20)连通,所述地上轻型结构(10)为所述铁路候车厅(1)的屋顶,所述地上轻型结构(10)呈弧形由一侧向另一侧伸出、遮挡所述铁路候车厅(1)和部分所述下沉广场(18)。The railway platform floor (3) is communicated with the railway waiting hall (1) through the incoming stair escalator (9), and the railway platform floor (3) is connected to the railway entering hall (2) through the outgoing escalator (8) ) is connected, the railway outbound floor (2) is connected with the railway waiting hall (1) and the railway commercial platform (6) through the stairs (20), and the above-ground light structure (10) is the railway waiting hall The roof of (1), the above-ground light structure (10) protrudes from one side to the other in an arc shape, covering the railway waiting hall (1) and part of the sunken square (18). 2.如权利要求1所述的一种轨行区上方一体化开发的城际铁路地下车站,其特征在于,所述一体化开发区(7)通过设置在所述铁路功能区(4)的多根结构柱(17)支撑。2 . The intercity railway underground station integratedly developed above the track area according to claim 1 , wherein the integrated development area ( 7 ) passes through a A plurality of structural columns (17) are supported. 3.如权利要求1所述的一种轨行区上方一体化开发的城际铁路地下车站,其特征在于,所述铁路候车厅(1)通过换乘楼扶梯(21)与所述地铁换乘厅(12)、地铁出站厅(13)连通。3. The intercity railway underground station integratedly developed above the track area according to claim 1, wherein the railway waiting hall (1) is exchanged with the subway through a transfer stair escalator (21). The passenger hall (12) and the subway exit hall (13) are connected. 4.如权利要求1所述的一种轨行区上方一体化开发的城际铁路地下车站,其特征在于,所述地上轻型结构(10)及玻璃幕墙(19)将自然光引入所述铁路候车厅(1),所述铁路候车厅(1)、铁路出站厅(2)、所述铁路站台层(3)层顶部设置多个所述采光中厅(5),自然光可透过所述采光中厅(5)照射在所述铁路出站厅(2)内及所述铁路站台层(3)上。4. The intercity railway underground station integrated above the track area according to claim 1, wherein the above-ground light structure (10) and the glass curtain wall (19) introduce natural light into the railway waiting Hall (1), the railway waiting hall (1), the railway exit hall (2), and the top of the railway platform layer (3) are provided with a plurality of said lighting central halls (5), and natural light can pass through the The lighting central hall (5) is illuminated in the railway exit hall (2) and on the railway platform layer (3). 5.如权利要求1所述的一种轨行区上方一体化开发的城际铁路地下车站,其特征在于,所述城市通廊(11)及所述下沉广场(18)设置所述小汽车停车场(14)、出租车等候区(15)、公交枢纽(16)、P+R停车场(17)与所述铁路出站厅(2)、地铁出站厅(13)以及所述城市用地直接连通。5. The intercity railway underground station integratedly developed above the track area according to claim 1, characterized in that said urban corridor (11) and said sunken square (18) are provided with said small Car parking lot (14), taxi waiting area (15), bus hub (16), P+R parking lot (17) and the railway exit hall (2), subway exit hall (13) and the The urban land is directly connected.
CN201911134246.7A 2019-11-19 2019-11-19 An Intercity Railway Underground Station Integrated Development Above the Track Area Pending CN110700318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911134246.7A CN110700318A (en) 2019-11-19 2019-11-19 An Intercity Railway Underground Station Integrated Development Above the Track Area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911134246.7A CN110700318A (en) 2019-11-19 2019-11-19 An Intercity Railway Underground Station Integrated Development Above the Track Area

Publications (1)

Publication Number Publication Date
CN110700318A true CN110700318A (en) 2020-01-17

Family

ID=69207359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911134246.7A Pending CN110700318A (en) 2019-11-19 2019-11-19 An Intercity Railway Underground Station Integrated Development Above the Track Area

Country Status (1)

Country Link
CN (1) CN110700318A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112096131A (en) * 2020-08-20 2020-12-18 中国建筑科学研究院有限公司 Transportation hub complex personnel evacuation facility
CN113036651A (en) * 2021-04-15 2021-06-25 中铁第四勘察设计院集团有限公司 110kV underground traction substation structure arranged above rail-mounted area
CN113136894A (en) * 2021-05-13 2021-07-20 北京市市政工程设计研究总院有限公司 Underground station suitable for hydrogen energy tramcar
CN113802917A (en) * 2021-09-27 2021-12-17 杭州中联筑境建筑设计有限公司 Three-dimensional composite building structure in front of railway passenger station
CN115323848A (en) * 2022-08-12 2022-11-11 广州市城市规划设计有限公司 Three-dimensional traffic nuclear system of rail yard station complex
CN113026812B (en) * 2021-03-18 2024-02-06 中铁第四勘察设计院集团有限公司 Subway station capable of being built together with property development
CN119062385A (en) * 2024-09-09 2024-12-03 中国铁路设计集团有限公司 A subway section flood escape passage

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090117159A (en) * 2008-05-08 2009-11-12 한국철도기술연구원 Urban railway honeycomb historical structure
CN103661405A (en) * 2013-12-18 2014-03-26 中建一局集团第五建筑有限公司 Underground full-node transfer station for urban rail transit
CN211395746U (en) * 2019-11-19 2020-09-01 北京市市政工程设计研究总院有限公司 Intercity railway underground station of track area top integration development

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090117159A (en) * 2008-05-08 2009-11-12 한국철도기술연구원 Urban railway honeycomb historical structure
CN103661405A (en) * 2013-12-18 2014-03-26 中建一局集团第五建筑有限公司 Underground full-node transfer station for urban rail transit
CN211395746U (en) * 2019-11-19 2020-09-01 北京市市政工程设计研究总院有限公司 Intercity railway underground station of track area top integration development

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
宋冰晶;: "地铁车站和广场及商业一体化立体开发模式", 都市快轨交通, no. 06, 18 December 2011 (2011-12-18), pages 59 - 64 *
宗传苓,谭国威,张晓春: "基于城市发展战略的深圳高铁枢纽规划研究 —以深圳北站和福田站为例", 规划师论坛, vol. 27, no. 10, 31 December 2011 (2011-12-31), pages 23 - 29 *
殷峻,甘宁,刘峻屹:: "贵安站综合交通枢纽地下空间开发的研究与探讨", 高速铁路技术, no. 1, 15 December 2018 (2018-12-15), pages 84 - 89 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112096131A (en) * 2020-08-20 2020-12-18 中国建筑科学研究院有限公司 Transportation hub complex personnel evacuation facility
CN112096131B (en) * 2020-08-20 2022-03-25 中国建筑科学研究院有限公司 Transportation hub complex personnel evacuation facility
CN113026812B (en) * 2021-03-18 2024-02-06 中铁第四勘察设计院集团有限公司 Subway station capable of being built together with property development
CN113036651A (en) * 2021-04-15 2021-06-25 中铁第四勘察设计院集团有限公司 110kV underground traction substation structure arranged above rail-mounted area
CN113136894A (en) * 2021-05-13 2021-07-20 北京市市政工程设计研究总院有限公司 Underground station suitable for hydrogen energy tramcar
CN113802917A (en) * 2021-09-27 2021-12-17 杭州中联筑境建筑设计有限公司 Three-dimensional composite building structure in front of railway passenger station
CN113802917B (en) * 2021-09-27 2023-03-10 杭州中联筑境建筑设计有限公司 Three-dimensional composite building structure in front of railway passenger station
CN115323848A (en) * 2022-08-12 2022-11-11 广州市城市规划设计有限公司 Three-dimensional traffic nuclear system of rail yard station complex
CN115323848B (en) * 2022-08-12 2024-08-16 广州市城市规划设计有限公司 Rail station complex three-dimensional traffic nuclear system
CN119062385A (en) * 2024-09-09 2024-12-03 中国铁路设计集团有限公司 A subway section flood escape passage
CN119062385B (en) * 2024-09-09 2025-10-28 中国铁路设计集团有限公司 A subway section flood escape passage

Similar Documents

Publication Publication Date Title
Rogov et al. Quality management of the megacities transport hubs development, design and construction
CN211395746U (en) Intercity railway underground station of track area top integration development
CN101134464A (en) A/B/C Combined Route Network and Rail Transit
CN111691249A (en) Underground transportation system and method for transporting objects
CN106638193A (en) Modularized city
Chen et al. Elements of the core area transport system oriented to station–city integration
CN112096131A (en) Transportation hub complex personnel evacuation facility
CN107545529A (en) Urban rail station full-space traffic conversion method
CN113802917B (en) Three-dimensional composite building structure in front of railway passenger station
Shaimardanova et al. The emergence and development of transport hubs in Russia
CN112922437A (en) Portable medium-sized railway passenger station arrangement structure
CN104878670B (en) A kind of underground bus rapid transit roadnet suitable for intersection
CN115323848B (en) Rail station complex three-dimensional traffic nuclear system
CN107059521B (en) Underground four-layer three-dimensional overlapping type transportation junction structure
CN216007958U (en) Three-dimensional composite building structure in front of railway passenger station
CN206692967U (en) A kind of three-dimensional overlapping type transport hub construction in four layers of underground
CN205035706U (en) Three -dimensional stack transportation junction of festival ground type
CN210707371U (en) Suspension type monorail transit direction type system
CN111950779A (en) A pedestrian flow optimization method for underground commercial space in subway stations
Jia et al. Underground space development in comprehensive transport hubs in China
CN110667603A (en) Suspension type monorail transit direction type system
WO2021129269A1 (en) Method for guaranteeing on-demand passage
Agieieva et al. Transformation of pedestrian route schemes in the parking–air terminal zones in the course of airport reconstruction
Zheng et al. The configuration of transfer facilities in integrated passenger transport hubs
Zhang et al. Experience and reference of implementing public transport priority strategy dominated by urban rail transit in Tokyo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200117

RJ01 Rejection of invention patent application after publication