CN209243861U - A kind of road rain water processing system - Google Patents

A kind of road rain water processing system Download PDF

Info

Publication number
CN209243861U
CN209243861U CN201822053041.3U CN201822053041U CN209243861U CN 209243861 U CN209243861 U CN 209243861U CN 201822053041 U CN201822053041 U CN 201822053041U CN 209243861 U CN209243861 U CN 209243861U
Authority
CN
China
Prior art keywords
status
inlet
water
stom water
stom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822053041.3U
Other languages
Chinese (zh)
Inventor
段明雷
苏娟
高清波
王亮
姚丹
孟杰
蒋磊
候亚萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822053041.3U priority Critical patent/CN209243861U/en
Application granted granted Critical
Publication of CN209243861U publication Critical patent/CN209243861U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of road rain water processing system, including seepage pipe, drainpipe creates inlet for stom water, overflow pipe, status inlet for stom water, status rainwater connecting tube, status storm sewer, status rainwater inspection well and heavy mud inspection shaft;The seepage pipe wears several seepage holes, and the seepage pipe is layed in below pavement, and the newly-built inlet for stom water and the status inlet for stom water are set to running surface, and the newly-built inlet for stom water is located at status inlet for stom water upstream, and the status inlet for stom water is blocked by cover board.The utility model road rain water processing system dramatically improves the drainability of driveway while increasing pavement control outlet capacity, also can avoid water channel and is silted up by silt.

Description

A kind of road rain water processing system
Technical field
The utility model relates to urban operating mechanism technical fields, more particularly, to a kind of road rain water processing system.
Background technique
With economic continuous development, more and more high buildings and large mansions are built in city, asphalt road, city square, are stood Bridge, parking lot etc. are handed over, the bare land in urban district is fewer and fewer, once raining, rainwater is difficult to permeate the ground.It encounters big Rain, heavy rain, rainwater have little time to flow away by sewer, just form runoff, remittance product is at ponding, the topography especially in urban district Relatively low area.Although there is the row for comparing modernization in present many modern cities, many cities created including China Water and sewer pipeline system, but encounter rainfall it is excessive when, still can drain not as good as ponding is formed, same situation is external The city of many modernizations is also difficult to avoid that.Formation for city ponding, sewer pipe, which silts up, is also important inducement, part Pavement garbage silt is excessive, line clogging when leading to precipitation, impeded drainage.
Utility model content
In view of this, the purpose of this utility model is in view of the deficiencies of the prior art, to provide a kind of road rain water processing system System dramatically improves the drainability of driveway, also can avoid water channel quilt while increasing pavement control outlet capacity Silt silts up.
In order to achieve the above objectives, the utility model uses a kind of following technical scheme: road rain water processing system, including seeps Pipe, drainpipe create inlet for stom water, overflow pipe, status inlet for stom water, status rainwater connecting tube, status storm sewer, the inspection of status rainwater Look into well and heavy mud inspection shaft;
The seepage pipe wears several seepage holes, and the seepage pipe is layed in below pavement, the newly-built inlet for stom water and described existing Shape inlet for stom water is set to running surface, and the newly-built inlet for stom water is located at status inlet for stom water upstream, the status inlet for stom water It is blocked by cover board;The drainpipe is arranged in the water channel bottom of the newly-built inlet for stom water, and the drainpipe connects the seepage pipe, described The heavy mud inspection shaft is arranged in drainpipe and the seepage pipe junction;Described in the water channel middle part of sliding channel setting of the newly-built inlet for stom water Overflow pipe, the overflow pipe are connected to the water channel middle part of sliding channel of the status inlet for stom water;The water channel bottom of the status inlet for stom water is set The status rainwater connecting tube is set, the status rainwater connecting tube is connect with the status storm sewer;The status rainwater connects The status rainwater inspection well is arranged with status storm sewer junction in adapter tube;The seepage pipe and the status storm sewer It is connected to municipal drainage system.
Further, the pavement is water permeable sidewalk, the running surface asphalt cover, the pavement Apparent height is higher than the running surface;Kerbstone is set between the pavement and the driveway.
Further, the cover board upper surface of the status inlet for stom water covers asphalt overlay.
Further, setting cuts dirty basket immediately below the newly-built inlet for stom water.
Further, the newly-built inlet for stom water is inclined ditch formula list comb inlet for stom water or the double comb inlets for stom water of inclined ditch formula.
The beneficial effects of the utility model are:
The utility model road rain water processing system be arranged pavement be water permeable sidewalk, rainwater directly thoroughly to pavement with Under, prevent pavement ponding wet and slippery.The utility model road rain water processing system is while increasing pavement control outlet capacity, pole The drainability for improving to big degree driveway also can avoid water channel and be silted up by silt.The processing of the utility model road rain water System blocks status inlet for stom water, and a newly-built inlet for stom water is arranged in upstream, is laid with seepage pipe under pavement, amount of rainfall it is few when It waits and rain-water drainage and the work of spoil disposal sand only can be completed by drainpipe and seepage pipe;Amount of rainfall is big or seepage pipe water full load, It can still be drained by the road rain water processing system, rainwater is drained into existing by overflow pipe in the water channel of newly-built inlet for stom water In shape inlet for stom water water channel, then pass through status rainwater connecting tube and the discharge of status storm sewer;Since overflow pipe height is higher, silt It is trapped to newly-built inlet for stom water water channel, will not enter in the water channel of status inlet for stom water, avoid causing pipeline silt silting.This reality Status rainwater inspection well and heavy mud inspection shaft are set with new road rain processing system, convenient for inspecting periodically rainwater mud, clear Clean and dredging or down-hole operation.
Detailed description of the invention
Attached drawing 1 is the utility model road rain water processing system overall structure diagram;
Attached drawing 2 is the visual angle A partial structural diagram in attached drawing 1;
Attached drawing 3 is the visual angle B partial structural diagram in attached drawing 1.
Specific embodiment
It is specific embodiment of the utility model below, the technical solution of the utility model is further described, but The utility model is not limited to these examples.
Embodiment 1
A kind of road rain water processing system, including seepage pipe 1, drainpipe 3 create inlet for stom water 4, overflow pipe 5, status inlet for stom water 6, status rainwater connecting tube 7, status storm sewer 8, status rainwater inspection well 9 and heavy mud inspection shaft 10.If the seepage pipe 1 is worn Dry seepage hole 2, the seepage pipe 1 are layed in 11 lower section of pavement, and the newly-built inlet for stom water 4 and the status inlet for stom water 6 are set to vehicle 13 surface of trade, the newly-built inlet for stom water 4 are located at 6 upstream of status inlet for stom water, and the status inlet for stom water 6 is blocked by cover board; The drainpipe 3 is arranged in the water channel bottom of the newly-built inlet for stom water 4, and the drainpipe 3 connects the seepage pipe 1, the drainpipe 3 The heavy mud inspection shaft 10 is set with 1 junction of seepage pipe;The water channel middle part of sliding channel setting of the newly-built inlet for stom water 4 is described to overflow Flow tube 5, the overflow pipe 5 are connected to the water channel middle part of sliding channel of the status inlet for stom water 6;The water channel bottom of the status inlet for stom water 6 The status rainwater connecting tube 7 is set, and the status rainwater connecting tube 7 is connect with the status storm sewer 8;The status rain The status rainwater inspection well 9 is arranged in water connecting tube 7 and 8 junction of status storm sewer;The seepage pipe 1 and the status Storm sewer 8 is connected to municipal drainage system, effectively shares municipal drainage pressure.
Embodiment 2
The present embodiment difference from example 1 is that: the pavement 11 be water permeable sidewalk, the driveway 13 Surface asphalt cover, 11 apparent height of pavement are higher than 13 surface of driveway;The pavement 11 with it is described Kerbstone 12 is set between driveway 13.
Embodiment 3
The present embodiment and embodiment 2 the difference is that: the cover board upper surface of the status inlet for stom water 6 covers pitch cover Face, it is ensured that block, while being consistent with road surface appearance completely.
Embodiment 4
The present embodiment difference from example 1 is that: setting cuts a dirty basket 14 immediately below the newly-built inlet for stom water 4, keeps away The bulk dirt for exempting to carry secretly in rainwater is fallen into the water channel of newly-built inlet for stom water.
Embodiment 5
The present embodiment difference from example 1 is that: the newly-built inlet for stom water 4 be inclined ditch formula list comb inlet for stom water or The inclined double comb inlets for stom water of ditch formula.
The course of work: when rainfall, rainwater a part is thoroughly to 11 or less pavement;Another part falls into newly-built inlet for stom water 4, warp Sundries is filtered by cutting dirty basket 14, is fallen into the water channel of newly-built inlet for stom water 4 later, then passes through the water channel bottom of newly-built inlet for stom water 4 Drainpipe 3 flow into heavy mud inspection shaft 10 and seepage pipe 1, oozed out by seepage pipe 1 or municipal drainage system drained.Drainpipe 3 Heavy mud can be discharged together, silt is prevented to silt the water channel of newly-built inlet for stom water 4 up.
When storing full water in seepage pipe 1 or when larger rainwater intensity, exceeded rainwater via newly-built inlet for stom water 4 water channel medial side The overflow pipe 5 of wall flows into 6 water channel of status inlet for stom water, then passes through the status rainwater connecting tube 7 of 6 water channel bottom of status inlet for stom water It is flowed into status rainwater inspection well 9 and status storm sewer 8, then drained by municipal drainage system.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, this field Other modifications or equivalent replacement that those of ordinary skill makes the technical solution of the utility model, it is practical without departing from this The spirit and scope of new technique scheme should all cover in the scope of the claims of the utility model.

Claims (5)

1. a kind of road rain water processing system, it is characterised in that: including seepage pipe, drainpipe creates inlet for stom water, overflow pipe, status Inlet for stom water, status rainwater connecting tube, status storm sewer, status rainwater inspection well and heavy mud inspection shaft;
The seepage pipe wears several seepage holes, and the seepage pipe is layed in below pavement, the newly-built inlet for stom water and the status rain The mouth of a river is set to running surface, and the newly-built inlet for stom water is located at status inlet for stom water upstream, and the status inlet for stom water is covered Plate blocks;The drainpipe is arranged in the water channel bottom of the newly-built inlet for stom water, and the drainpipe connects the seepage pipe, the draining The heavy mud inspection shaft is arranged with the seepage pipe junction in pipe;The overflow is arranged in the water channel middle part of sliding channel of the newly-built inlet for stom water Pipe, the overflow pipe are connected to the water channel middle part of sliding channel of the status inlet for stom water;Institute is arranged in the water channel bottom of the status inlet for stom water Status rainwater connecting tube is stated, the status rainwater connecting tube is connect with the status storm sewer;The status rainwater connecting tube The status rainwater inspection well is set with status storm sewer junction;The seepage pipe and the status storm sewer with Municipal drainage system connection.
2. road rain water processing system according to claim 1, it is characterised in that: the pavement is water permeable sidewalk, The running surface asphalt cover, the pavement surface height are higher than the running surface;The pavement with Kerbstone is set between the driveway.
3. road rain water processing system according to claim 1 or 2, it is characterised in that: the cover board of the status inlet for stom water Upper surface covers asphalt overlay.
4. road rain water processing system according to claim 1 or 2, it is characterised in that: immediately below the newly-built inlet for stom water Setting cuts dirty basket.
5. road rain water processing system according to claim 1 or 2, it is characterised in that: the newly-built inlet for stom water is inclined ditch Formula list comb inlet for stom water or the double comb inlets for stom water of inclined ditch formula.
CN201822053041.3U 2018-12-07 2018-12-07 A kind of road rain water processing system Expired - Fee Related CN209243861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822053041.3U CN209243861U (en) 2018-12-07 2018-12-07 A kind of road rain water processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822053041.3U CN209243861U (en) 2018-12-07 2018-12-07 A kind of road rain water processing system

Publications (1)

Publication Number Publication Date
CN209243861U true CN209243861U (en) 2019-08-13

Family

ID=67531989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822053041.3U Expired - Fee Related CN209243861U (en) 2018-12-07 2018-12-07 A kind of road rain water processing system

Country Status (1)

Country Link
CN (1) CN209243861U (en)

Similar Documents

Publication Publication Date Title
KR100684923B1 (en) Sanitary pipe storm water inflow for sewage water
CN106835971B (en) A kind of viaduct system for reclaiming rainwater and its installation method
CN109577132A (en) Road sinks formula greenbelt and construction method
CN109457789A (en) Primary rainwater closure well
CN107905331A (en) Stagnant system is oozed in a kind of self-cleaning of sponge city
CN207537844U (en) Town road discharge structure
CN101812865A (en) Integrative environmentally-friendly gutter inlet
CN207419647U (en) Stagnant system is oozed in a kind of self-cleaning of sponge city
CN211793411U (en) Water collecting and supplying system for mine refuse dump
CN210797803U (en) Anti-blocking drain pipe
CN209243861U (en) A kind of road rain water processing system
CN208430430U (en) A kind of highway bridge road surface drainage device
KR100846029B1 (en) Rainwater treatment system for building gutter connection
CN215977570U (en) Urban road drainage system
CN204825633U (en) Structure that precast beam bay formula overpass expansion joint percolating water was dredged in an organized way
CN210031499U (en) Bridge drainage system
CN108532711B (en) Building system based on sponge city construction
CN208649829U (en) A kind of level land grass planting ditch
CN208395832U (en) A kind of ecological revetment brick band with rhone
CN106049651A (en) Urban water-logging prevention and control method
CN207295943U (en) A kind of road drainage system
KR20040048556A (en) Method for drainage of road
CN206554217U (en) A kind of distributing rain water drainage system
CN217175145U (en) Double-layer rainwater hopper system for municipal roads
CN208577909U (en) A kind of Route for pedestrians structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190813

Termination date: 20201207

CF01 Termination of patent right due to non-payment of annual fee