CN208577909U - A kind of Route for pedestrians structure - Google Patents
A kind of Route for pedestrians structure Download PDFInfo
- Publication number
- CN208577909U CN208577909U CN201820902349.8U CN201820902349U CN208577909U CN 208577909 U CN208577909 U CN 208577909U CN 201820902349 U CN201820902349 U CN 201820902349U CN 208577909 U CN208577909 U CN 208577909U
- Authority
- CN
- China
- Prior art keywords
- ground
- layer
- diversion trench
- drain port
- metalling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011449 brick Substances 0.000 claims abstract description 32
- 239000004576 sand Substances 0.000 claims abstract description 17
- 238000004140 cleaning Methods 0.000 claims description 29
- 239000012535 impurity Substances 0.000 claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 13
- 239000007787 solid Substances 0.000 claims description 3
- 230000000903 blocking Effects 0.000 claims description 2
- 238000009825 accumulation Methods 0.000 abstract description 7
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 9
- 238000009434 installation Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 1
- 101700005059 bed-3 Proteins 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 230000002209 hydrophobic Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Abstract
The utility model relates to road technology fields, in particular to a kind of Route for pedestrians structure, it include the ground layer set gradually from bottom to up, metalling, fine sand layer, brick layer and diversion trench, the side wall of diversion trench offers the first drain port, and first drain port be located at the intersection of metalling and ground layer, be provided with the first filter plate at the first drain port;Diversion trench closely offers the second drain port at brick layer, and the second filter plate is provided at the second drain port.Rain when, part rainwater from ground brick layer Shangdi turn between gap under seep, rainwater sequentially passes through fine sand layer and metalling, finally along ground laminar flow, enters in diversion trench from the first drain port;Part rainwater enters in diversion trench from the second drain port along floor tile laminar flow, reduces the accumulation of rainwater in ground brick layer;When rainwater is more, rainwater enters metalling from the first drain port, and rainwater is stored temporarily in metalling, reduces the accumulation of rainwater in ground brick layer.
Description
Technical field
The utility model relates to road technology field, in particular to a kind of Route for pedestrians structure.
Background technique
With the quickening of urbanization process, construction land area constantly expands, and Permeable stratum area is caused to be significantly increased, and causes phase
With under condition of raining, runoff coefficient increases, and flood peak shifts to an earlier date, and magnanimity increases, and constitutes to municipal drainage prevention waterlogging and river course flood huge
Pressure, also threaten the safety in city.
The a large amount of hard in city is mated formation, and such as asphalt road, cement pavement, water permeability is bad when rainfall, it is not easy to infiltrate, lead
Cause forms the ponding of this road section surface.
Utility model content
The purpose of this utility model is to provide a kind of Route for pedestrians structure, have the advantages that reduce surface gathered water.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of Route for pedestrians knot
Structure, including ground layer, metalling, fine sand layer, brick layer and diversion trench, the top of ground layer is arranged in the metalling, described
Fine sand layer is arranged in the top of metalling, and described ground brick layer is laid on the top of fine sand layer, the side wall of the diversion trench with ground
Base, metalling, fine sand layer and ground brick layer are touched, and the ground layer is obliquely installed, and inclined lower end is touched with diversion trench,
The side wall of the diversion trench offers the first drain port, and the first drain port is located at the intersection of metalling and ground layer, described
The first filter plate that the rubble for reducing in metalling enters diversion trench is provided at first drain port;
Brick layer is arranged above Ground for the one end of the diversion trench far from ground layer, and described ground brick layer is obliquely installed, and inclined
Lower end is arranged towards diversion trench, offers on the diversion trench hydrophobic for second for the water inflow diversion trench in ground brick layer
Mouthful, the second filter plate for entering diversion trench for reducing impurity is provided at second drain port.
Implement above-mentioned technical proposal, rain when, part rainwater from ground brick layer Shangdi turn between gap under seep, rainwater is successively
Across fine sand layer and metalling, finally along ground laminar flow, enter in diversion trench from the first drain port;Part rainwater is along floor tile
Laminar flow enters in diversion trench from the second drain port, reduces the accumulation of rainwater in ground brick layer;When rainwater is more, rainwater is from
Enter metalling at one drain port, rainwater is stored temporarily in metalling, reduces the accumulation of rainwater in ground brick layer;First filtering
The setting of plate reduces rubble and is entered in diversion trench by the first drain port, reduces the phenomenon that diversion trench blocks;Second
The phenomenon that setting of filter plate reduces the impurity such as fallen leaves and is entered in diversion trench by the second drain port, reduces diversion trench blocking
Occur.
Further, the slot for plugging the second filter plate is offered on the upper edge of the diversion trench.
Implement above-mentioned technical proposal, when installing the second filter plate, operator can be complete by the second filter plate insertion slot
At installation, it is larger that the second filter plate contact a possibility that leading to the damage of the second filter plate with the external world for a long time, the setting of slot so that
The replacement of second filter plate and installation process are simple and convenient.
Further, the cleaning piece that the second filter plate is blocked for reducing impurity is provided at second filter plate, it is described
Cleaning piece includes shaft and cleaning plate, and the cleaning plate is in netted setting, and one end of the cleaning plate is connect with shaft, and described turn
The side wall of axis and the second drain port is rotatablely connected and is arranged perpendicular to ground, and the shaft is close to the second drain port perpendicular to ground
Side wall setting.
Implement above-mentioned technical proposal, when accumulating impurity at the second filter plate, rotating shaft clears up plate rotation at this time, miscellaneous
Matter is cleaned plate and stirs, so that impurity is no longer blocked at the second filter plate;When the section ponding, operator's rotating shaft
Second drain port can be dredged, dredging mode is simple and convenient.
Further, through-hole is offered on the upper edge of the diversion trench, one end of the shaft is accommodated in through-hole, described
Shaft is accommodated in the first turn trough that one end in through-hole offers polygon.
Implement above-mentioned technical proposal, cooperated when rotating shaft using tool and the first turn trough, turning tool is i.e. rotatably turn
Axis;The setting of first turn trough and through-hole reduces the generation of the phenomenon that irrelevant personnel rotating shaft.
Further, the leakage hole for water delivery is offered on the side wall of first turn trough.
Implement above-mentioned technical proposal, the setting of leakage hole reduces the phenomenon that rainwater is assembled at first rotating shaft.
Further, the shaft is provided with link block along its axis direction, opened up on the link block it is fluted, it is described recessed
Slot is arranged in link block and is parallel on the side wall of the second drain port, and the convex block with groove grafting, institute are provided on the cleaning plate
It states link block fluted and far from ground one end is set and be hinged with fixed link, the link block setting is fluted and close to ground
One end be provided with block, the location hole for fixing fixed link position is offered in the fixed link and block, it is described fixed
Position is provided with locking piece at hole.
Implement above-mentioned technical proposal, when plate is cleared up in installation, cooperates convex block and groove, rotation fixed link makes fixed link pressure
Plate is firmly cleared up, after fixed link is touched with block, the peace of cleaning plate can be completed using the fixed current fixed link position of locking piece
Dress, cleaning plate detachably make cleaning plate replaceable when damaging, reduce the replacement cost of cleaning piece.
Further, the locking piece is set as threaded rod, and the threaded rod is threadedly coupled with location hole, on the threaded rod
It is provided with the tabletting for being fixed bar.
Implement above-mentioned technical proposal, rotation threaded rod, which makes tabletting be fixed bar, to consolidate the position of fixed link
Fixed, the fixed form of fixed link is simple and convenient.
Further, one end of threaded rod is arranged in the tabletting, and one end that the threaded rod is provided with tabletting offers more
Second turn trough of side shape.
Implement above-mentioned technical proposal, the setting of the second turn trough reduces irrelevant personnel rotation threaded rod, reduces tabletting not
The phenomenon that being fixed bar generation.
In conclusion the utility model having the beneficial effect that in contrast to the prior art
One, when rainwater is more, rainwater enters metalling from the first drain port, and rainwater is stored temporarily in metalling,
Reduce the accumulation of rainwater in ground brick layer;
Two, the setting of the second filter plate reduces the impurity such as fallen leaves and is entered in diversion trench by the second drain port, reduces
The phenomenon that diversion trench blocks;
Three, the setting of slot is so that the replacement of the second filter plate and installation process are simple and convenient.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the section of the utility model embodiment;
Fig. 2 is second filter plate of the utility model embodiment and the structural schematic diagram of cleaning piece;
Fig. 3 is the portion the A enlarged drawing in Fig. 2;
Fig. 4 is the portion the B enlarged drawing in Fig. 2.
Appended drawing reference: 1, ground layer;2, metalling;3, fine sand layer;4, brick layer;5, diversion trench;51, the first drain port;
52, the first filter plate;53, the second drain port;54, the second filter plate;55, slot;56, through-hole;6, cleaning piece;61, shaft;
611, the first turn trough;612, leakage hole;62, plate is cleared up;621, convex block;63, link block;631, groove;632, block;64, solid
Fixed pole;65, location hole;66, locking piece;661, threaded rod;662, tabletting;663, the second turn trough.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Embodiment:
As shown in Figure 1, a kind of Route for pedestrians structure, including ground layer 1, metalling 2, fine sand layer 3, brick layer 4 and water conservancy diversion
The top of ground layer 1 is arranged in slot 5, metalling 2, and the top of metalling 2 is arranged in fine sand layer 3, and ground brick layer 4 is laid on fine sand layer
3 top, the side wall of diversion trench 5 are touched with ground layer 1, metalling 2, fine sand layer 3 and ground brick layer 4, and the inclination of ground layer 1 is set
It sets, and inclined lower end is touched with diversion trench 5, the side wall of diversion trench 5 offers the first drain port 51, and the first drain port 51
Positioned at the intersection of metalling 2 and ground layer 1, it is provided at the first drain port 51 and enters for reducing the rubble in metalling 2
First filter plate 52 of diversion trench 5.
As shown in Figure 1, 2, brick layer 4 is arranged above Ground for the one end of diversion trench 5 far from ground layer 1, and ground brick layer 4 is obliquely installed,
And inclined lower end is arranged towards diversion trench 5, is offered on diversion trench 5 for flowing into diversion trench 5 for the water in ground brick layer 4
Second drain port 53 is provided with the second filter plate 54 for entering diversion trench 5 for reducing impurity, diversion trench at second drain port 53
The slot 55 for plugging the second filter plate 54 is offered on 5 upper edge.
The water conservancy diversion process of rainwater: a part of rainwater from 4 Shangdi of ground brick layer turn between gap under seep, rainwater sequentially passes through carefully
Sand bed 3 and metalling 2 finally flow along ground layer 1, enter in diversion trench 5 from the first drain port 51.Another part rainwater edge
The flowing of ground brick layer 4 enters in diversion trench 5 from the second drain port 53, reduces the accumulation of rainwater in ground brick layer 4.When rainwater is more
When, rainwater enters metalling 2 from the first drain port 51, and rainwater is stored temporarily in metalling 2, reduces rain in ground brick layer 4
The accumulation of water.
The setting of first filter plate 52 reduces rubble and is entered in diversion trench 5 by the first drain port 51, reduces water conservancy diversion
The phenomenon that slot 5 blocks;The setting of second filter plate 54 reduces the impurity such as fallen leaves and enters water conservancy diversion by the second drain port 53
In slot 5, reduce the phenomenon that diversion trench 5 blocks.
When installing the second filter plate 54, installation is can be completed in the second filter plate 54 insertion slot 55 by operator, and second
Filter plate 54 for a long time with the external world contact cause the second filter plate 54 damage a possibility that it is larger, the setting of slot 55 is so that the second mistake
The replacement of filter plate 54 and installation process are simple and convenient.
As shown in Figure 2,3, the cleaning piece that the second filter plate 54 is blocked for reducing impurity is provided at the second filter plate 54
6, cleaning piece 6 includes shaft 61 and cleaning plate 62, and cleaning plate 62 is in netted setting, and one end of cleaning plate 62 is connect with shaft 61.
The side wall of shaft 61 and the second drain port 53 is rotatablely connected and is arranged perpendicular to ground, and shaft 61 is vertical close to the second drain port 53
Side wall in ground is arranged.Through-hole 56 is offered on the upper edge of diversion trench 5, one end of shaft 61 is accommodated in through-hole 56, is turned
One end that axis 61 is accommodated in through-hole 56 offers the first turn trough 611 of polygon.It is opened up on the side wall of first turn trough 611 useful
In the leakage hole 612 of water delivery.
It clears up at the second drain port 53 and accumulates the process of impurity: clearing up plate 62 under normal conditions and fit with the second filter plate 54,
When impurity is deposited at the second drain port 53, operator is inserted into rotating shaft 61 in the first turn trough 611 using tool, at this time
It clears up plate 62 to rotate, impurity is cleaned plate 62 and stirs, so that impurity is no longer blocked at the second drain port 53.
Operator's rotating shaft 61 can dredge the second drain port 53, and dredging mode is simple and convenient.First turn
The phenomenon that setting of slot 611 and through-hole 56 reduces irrelevant personnel rotating shaft 61 generation.
The setting of leakage hole 612 reduces the phenomenon that rainwater is assembled at first rotating shaft 61.
As shown in Figure 2,4, shaft 61 is provided with link block 63 along its axis direction, and fluted 631 are opened up on link block 63,
Groove 631 is arranged in link block 63 and is parallel on the side wall of the second drain port 53, clears up on plate 62 and is provided with and 631 grafting of groove
Convex block 621, link block 63 is arranged fluted 631 and is hinged with fixed link 64 far from the one end on ground, and link block 63 is provided with
The one end on groove 631 and close ground is provided with block 632, is offered in fixed link 64 and block 632 for fixed
The location hole 65 of 64 position of bar is provided with locking piece 66 at location hole 65.Locking piece 66 is set as threaded rod 661, threaded rod 661
It is threadedly coupled with location hole 65, the tabletting 662 for being fixed bar 64 is provided on threaded rod 661, tabletting 662 is arranged in spiral shell
One end of rasp bar 661, one end that threaded rod 661 is provided with tabletting 662 offer the second turn trough 663 of polygon.
The process of installation cleaning plate 62: cooperating convex block 621 and groove 631, and rotation fixed link 64 pushes down fixed link 64
Plate 62 is cleared up, after fixed link 64 is touched with block 632, rotation threaded rod 661 makes tabletting 662 be fixed bar 64 can be to solid
The position of fixed pole 64 is fixed.
Cleaning plate 62 detachably makes cleaning plate 62 replaceable when damaging, and reduces the replacement cost of cleaning piece 6.Second turn
The phenomenon that setting of slot 663 reduces irrelevant personnel rotation threaded rod 661, reduces 662 malcompression fixed link 64 of tabletting generation.
Polygon is set as regular hexagon in the present embodiment, and tool is set as the rotating bar of six prismatics.
The above is only the exemplary embodiment of the utility model, the protection model rather than limited the present invention
It encloses, the protection scope of the utility model is determined by the attached claims.
Claims (8)
1. a kind of Route for pedestrians structure, which is characterized in that including ground layer (1), metalling (2), fine sand layer (3), brick layer (4)
With diversion trench (5), in the top of ground layer (1), the fine sand layer (3) is arranged in metalling (2) for metalling (2) setting
Top, described ground brick layer (4) are laid on the top of fine sand layer (3), the side wall of the diversion trench (5) with ground layer (1), rubble
Layer (2), fine sand layer (3) and ground brick layer (4) are touched, and the ground layer (1) is obliquely installed, and inclined lower end and diversion trench
(5) it touches, the side wall of the diversion trench (5) offers the first drain port (51), and the first drain port (51) is located at metalling (2)
With the intersection of ground layer (1), it is provided at first drain port (51) to enter for reducing the rubble in metalling (2) and leads
The first filter plate (52) of chute (5);
Brick layer (4) is arranged above Ground for the one end of the diversion trench (5) far from ground layer (1), and described ground brick layer (4) is obliquely installed,
And inclined lower end is arranged towards diversion trench (5), offers on the diversion trench (5) for for the water flow on ground brick layer (4)
Enter the second drain port (53) of diversion trench (5), is provided at second drain port (53) and enters diversion trench for reducing impurity
(5) the second filter plate (54).
2. a kind of Route for pedestrians structure according to claim 1, which is characterized in that on the upper edge of the diversion trench (5)
Offer the slot (55) for plugging the second filter plate (54).
3. a kind of Route for pedestrians structure according to claim 1, which is characterized in that be arranged at second filter plate (54)
There is the cleaning piece (6) for reducing impurity blocking the second filter plate (54), the cleaning piece (6) includes shaft (61) and cleaning plate
(62), the cleaning plate (62) is in netted setting, and one end of cleaning plate (62) is connect with shaft (61), the shaft (61)
It is rotatablely connected with the side wall of the second drain port (53) and is arranged perpendicular to ground, the shaft (61) is close to the second drain port (53)
Perpendicular to the side wall setting on ground.
4. a kind of Route for pedestrians structure according to claim 3, which is characterized in that on the upper edge of the diversion trench (5)
It offers through-hole (56), one end of the shaft (61) is accommodated in through-hole (56), and the shaft (61) is accommodated in through-hole (56)
Interior one end offers the first turn trough (611) of polygon.
5. a kind of Route for pedestrians structure according to claim 4, which is characterized in that the side wall of first turn trough (611)
On offer leakage hole (612) for water delivery.
6. a kind of Route for pedestrians structure according to claim 3, which is characterized in that the shaft (61) is along its axis direction
It is provided with link block (63), is opened up fluted (631) on the link block (63), the groove (631) is arranged in link block
(63) it is parallel on the side wall of the second drain port (53), is provided on cleaning plate (62) and the convex block of groove (631) grafting
(621), fluted (631) are arranged in the link block (63) and one end far from ground is hinged with fixed link (64), the connection
Block (63) is arranged fluted (631) and is provided with block (632) close to the one end on ground, the fixed link (64) and block
(632) location hole (65) for fixing fixed link (64) position is offered on, is provided with locking at the location hole (65)
Part (66).
7. a kind of Route for pedestrians structure according to claim 6, which is characterized in that the locking piece (66) is set as screw thread
Bar (661), the threaded rod (661) are threadedly coupled with location hole (65), are provided on the threaded rod (661) solid for compressing
The tabletting (662) of fixed pole (64).
8. a kind of Route for pedestrians structure according to claim 7, which is characterized in that the tabletting (662) is arranged in screw thread
One end of bar (661), one end that the threaded rod (661) is provided with tabletting (662) offer the second turn trough of polygon
(663)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820902349.8U CN208577909U (en) | 2018-06-11 | 2018-06-11 | A kind of Route for pedestrians structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820902349.8U CN208577909U (en) | 2018-06-11 | 2018-06-11 | A kind of Route for pedestrians structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208577909U true CN208577909U (en) | 2019-03-05 |
Family
ID=65507085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820902349.8U Active CN208577909U (en) | 2018-06-11 | 2018-06-11 | A kind of Route for pedestrians structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208577909U (en) |
-
2018
- 2018-06-11 CN CN201820902349.8U patent/CN208577909U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108060623B (en) | Sponge urban construction road rain water processing system | |
CN109577132A (en) | Road sinks formula greenbelt and construction method | |
CN109024146A (en) | Expressway slope discharge structure | |
CN203487428U (en) | Multifunctional roadside pipeline | |
CN106638919B (en) | A kind of urban road rainwater recycling system and construction method | |
CN105297645B (en) | A kind of stagnant storage of sponge urban rainwater oozes uses heat-extraction system pipe fitting and its construction method only | |
CN208251291U (en) | Rain-water accumulating under artificial rain system based on LID facility arranges well | |
CN208430430U (en) | A kind of highway bridge road surface drainage device | |
CN110106957A (en) | A kind of sponge type Rain Garden overflow mechanism | |
CN207727378U (en) | A kind of sponge city pavement | |
CN206971366U (en) | A kind of combination biology is detained with the catch-basin set | |
CN208577909U (en) | A kind of Route for pedestrians structure | |
CN206815479U (en) | Landscape eddy flow arranges seepage well | |
CN108374477A (en) | A kind of device collected for road initial rainwater with processing | |
CN212316594U (en) | Road surface structure device for filtering and draining water | |
CN210507029U (en) | Road drainage structure | |
CN210031499U (en) | Bridge drainage system | |
CN2856127Y (en) | Roadside rain collection system | |
CN208121939U (en) | The device with processing is collected for road initial rainwater | |
CN207672365U (en) | A kind of grass planting trench system based on sponge city | |
CN206173824U (en) | Road bed buries water tube unit | |
CN207109831U (en) | A kind of hill path draining slope protection system | |
CN207760928U (en) | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING sponge gardens rainwater-collecting circulatory system | |
CN206635602U (en) | A kind of kerbstone with permeable filtering function | |
CN208415472U (en) | A kind of town road drainage arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 10-2, No. 551, Dongqianhu Avenue, Dongqianhu tourist resort, Ningbo, 315000, Zhejiang Province (pilot area) Patentee after: NINGBO LANDSCAPE ARCHITECTURE DESIGN RESEARCH INSTITUTE Co.,Ltd. Address before: 315000 188 Park Road, Haishu District, Ningbo, Zhejiang Patentee before: NINGBO LANDSCAPE ARCHITECTURE DESIGN RESEARCH INSTITUTE Co.,Ltd. |