jack group
tunnel
scale model
main frame
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822071159.9U
Other languages
Chinese (zh)
Inventor
高旭
訾杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201822071159.9U priority Critical patent/CN209167017U/en
Application granted granted Critical
Publication of CN209167017U publication Critical patent/CN209167017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of tunnel butterfly destruction area similarity simulation experiment platform, including main frame, four pressing plates and four groups of jack;It include the jack of several equidistant arrangements in four groups of jack, several jack are using unified or difference control mode;Scale model center offers the prefabricated hole for simulating tunnel, and prefabricated hole is formed by mold.Experimental method are as follows: build experimental bench and complete scale model preparation;To scale model application vertical load for simulating tunnel maximum or minimum principal stress, horizontal load is applied for simulating tunnel minimum or maximum principal stress to scale model;The ratio of maximum principal stress and minimum principal stress is adjusted, destruction area shape around prefabricated hole is observed;By changing maximum or minimum principal stress direction, destruction area shape around prefabricated hole can be made to rotate.Before preparing scale model, a small size sample is prepared in advance, obtains its uniaxial compressive strength, be used as when similarity simulation experiment with reference to safety limit.

Description

A kind of tunnel butterfly destruction area similarity simulation experiment platform
Technical field
The utility model belongs to physical simulation experimental technique field, more particularly to a kind of tunnel butterfly destruction area phase Like simulated experiment platform.
Background technique
Tunnel plays a crucial role for coal mine, studies the failure mode of roadway surrounding rock destruction area and right Reasonable supporting measure is taken to have great importance in tunnel.It is studied by physical simulation experiment, analog scene Rock property, initial field stress state and the boundary condition in tunnel make lane by simulation in-situ stresses environment and application stress Road surrouding rock deformation, the broken ring-shaped of observable roadway surrounding rock destruction area.
For the damage -form problem of roadway surrounding rock, it is then the elastic-plastic problem of roadway surrounding rock on mechanical essence, leads to The distribution of circular tunnel surrouding rock stress and elastoplasticity form can be often solved using the plane strain model of circular hole in plastoelasticity, And there are maximum principal stresses, minimum principal stress in laneway stress field, and defining η is that maximum principal stress suffered by tunnel is answered with minimum master Power ratio.
By consulting existing literature it is found that under different stress conditions, there are three types of basic for circular tunnel Determining Failure Zone of Surrounding Rock tool Form, i.e., round, ellipse and butterfly.As η=1, destruction area is rounded form;When η is increased by 1, on confining pressure direction Determining Failure Zone of Surrounding Rock extends, and roadway surrounding rock destruction area is gradually evolved into oval configuration by rounded form;It is further with η Increase, and after reaching certain value, destruction area can then show disk shape, even if hereafter η continues to increase, the shape of destruction area Shape also no longer changes, and only the size of butterfly will continue to increase.
Physical simulation experiment has been widely used in the engineering practice of some industries, and is used for physical simulation The equipment of experiment is mainly three-dimensional geological mechanical test platform, can satisfy roadway surrounding rock by three-dimensional geological mechanical test platform and destroys Research.But there are still some shortcomings for three-dimensional geological mechanical test platform, and since the size of testing stand is larger, behaviour when causing to test It makes comparisons difficulty, and testing stand can not move easily, cause the flexibility of testing stand very poor, and the size of scale model It is larger, cause the usage amount of analog material more, while three-dimensional geological mechanical test platform need it is longer build the time, Er Qiexiang It is also longer like curing time of the model in testing stand, cause experimental period longer.
Utility model content
In view of the problems of the existing technology, the utility model provides a kind of tunnel butterfly destruction area similarity simulation experiment Platform, have size it is small, experiment when it is easy to operate, easy to remove, build the time is short, scale model size is small, scale model solidification The feature that time is short, experimental period is short.
To achieve the goals above, the utility model adopts the following technical solution: a kind of similar mould of tunnel butterfly destruction area Draft experiment platform, including main frame, top platen, bottom platen, left side pressing plate, right side pressing plate, top jack group, bottom are very heavy Top group, left side jack group and right side jack group;The main frame uses hollow structure, front side and rear side in main frame It is provided with organic glass baffle, scale model is located inside main frame;The top jack group is vertically arranged in main frame Top beam on, the top platen be connected in top jack group piston rod end, the upper table of top platen and scale model Face abuts against contact;The bottom jack group is vertically arranged on the bottom beam of main frame, and the bottom platen is connected in bottom thousand The piston rod end of jin top group, bottom platen are abutted against with the lower surface of scale model and are contacted;The left side jack group level is set Set on the left side vertical beam of main frame, the left side pressing plate be connected in left side jack group piston rod end, left side pressing plate with The left-hand face of scale model abuts against contact;The right side jack group is horizontally set on the right side vertical beam of main frame, described Right side pressing plate is connected in the piston rod end of right side jack group, and right side pressing plate is abutted against with the right lateral surface of scale model and contacted; The main frame is fixed on ground by several stabilizer blades.
If including in the top jack group, bottom jack group, left side jack group and right side jack group The dry identical jack of model, and several jack equidistant arrangements.
Prefabricated hole is offered at the center of the scale model, the prefabricated hole is for simulating tunnel.
The radius of the prefabricated hole is set as R, and the scale model is square structure, and the side length of scale model is set as L, It is necessary to meet following condition: 5R≤(L/2-R).
The prefabricated hole is formed by mold, and number of molds is several, and the section configuration of several molds is different.
A kind of tunnel butterfly destruction area similar simulation experimental method, using the tunnel butterfly destruction area analog simulation Experimental bench includes the following steps:
Step 1: building experimental bench, is completed at the same time the preparation of scale model;
Step 2: vertical load is applied to scale model by top jack group and the cooperation of bottom jack group, is used for Simulate tunnel maximum principal stress or minimum principal stress;Meanwhile by left side jack group and the cooperation of right side jack group to similar Model applies horizontal load, for simulating tunnel minimum principal stress or maximum principal stress;
Step 3: the ratio of adjustment maximum principal stress and minimum principal stress is observed destruction area shape around prefabricated hole, is led to Destruction area shape around prefabricated hole is crossed to judge the destruction area shape of practical roadway surrounding rock.
Before formally preparing scale model, needs that analog material is utilized to prepare a small size sample in advance, pass through single shaft Crush test carries out load test to small size sample, to obtain the uniaxial compressive strength of small size sample, is carrying out similar mould Reference safety limit when draft experiment, when the uniaxial compressive strength is as application maximum principal stress and minimum principal stress.
The top jack group, bottom jack group, left side jack group and right side jack group when applying load, Several jack in it are using the mode that is uniformly controlled or difference control mode.
When jack is using control mode respectively, by applying different loading forces to each jack, so that master answers The direction of power changes, and then destruction area shape around prefabricated hole is made to rotate.
The utility model has the beneficial effects that
The tunnel butterfly destruction area similarity simulation experiment platform of the utility model, it is easy to operate, just when there is small size, experiment In movement, build the feature that the time is short, scale model size is small, scale model curing time is short, experimental period is short.
The utility model can be used for studying Determining Failure Zone of Surrounding Rock and the destruction area shape of coal mine roadway, select to close to tunnel The supporting measure of reason is of great significance.
The utility model can not only set the size of tunnel maximum principal stress and minimum principal stress, and adjustable lane The direction of road maximum principal stress and minimum principal stress, the applicability of the experimental bench of raising.
The utility model can be such that roadway surrounding rock destroys by the ratio of setting tunnel maximum principal stress and minimum principal stress Area's shape changes, and plays directive function to engineering practice.
The utility model prepares the prefabricated hole for simulating circular tunnel using mold on scale model, compared to biography The excavation drilling mode of system can generate destruction to avoid to scale model main body, to improve experimental precision.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of tunnel butterfly destruction area similarity simulation experiment platform of the utility model;
In figure, 1-main frame, 2-top platens, 3-bottom platens, 4-left side pressing plates, 5-right side pressing plates, 6-tops Portion's jack group, 7-bottom jack groups, 8-left side jack groups, 9-right side jack groups, 10-scale models, 11- Stabilizer blade, 12-ground, 13-prefabricated holes.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
As shown in Figure 1, a kind of tunnel butterfly destruction area similarity simulation experiment platform, including main frame 1, top platen 2, bottom Pressing plate 3, left side pressing plate 4, right side pressing plate 5, top jack group 6, bottom jack group 7, left side jack group 8 and right side are very heavy Top group 9;The main frame 1 uses hollow structure, is provided with organic glass baffle, phase in the front side of main frame 1 and rear side It is located inside main frame 1 like model 10;The top jack group 6 is vertically arranged on the top beam of main frame 1, the top pressure Plate 2 is connected in the piston rod end of top jack group 6, and top platen 2 is abutted against with the upper surface of scale model 10 and contacted;It is described Bottom jack group 7 is vertically arranged on the bottom beam of main frame 1, and the bottom platen 3 is connected in the piston of bottom jack group 7 Boom end, bottom platen 3 are abutted against with the lower surface of scale model 10 and are contacted;The left side jack group 8 is horizontally set on main frame On the left side vertical beam of frame 1, the left side pressing plate 4 is connected in the piston rod end of left side jack group 8, left side pressing plate 4 to it is similar The left-hand face of model 10 abuts against contact;The right side jack group 9 is horizontally set on the right side vertical beam of main frame 1, described Right side pressing plate 5 is connected in the piston rod end of right side jack group 9, and right side pressing plate 5 and the right lateral surface of scale model 10 abut against Contact;The main frame 1 is fixed on ground 12 by several stabilizer blades 11.
Include in the top jack group 6, bottom jack group 7, left side jack group 8 and right side jack group 9 There are the identical jack of several models, and several jack equidistant arrangements.
Prefabricated hole 13 is offered at the center of the scale model 10, the prefabricated hole 13 is for simulating tunnel.
The radius of the prefabricated hole 13 is set as R, and the scale model 10 is square structure, the side length of scale model 10 It is set as L, it is necessary to meet following condition: 5R≤(L/2-R).
The prefabricated hole 13 is formed by mold, and number of molds is several, each not phase of the section configuration of several molds Together, circle, ellipse etc. be can be.After scale model 10 solidifies, mold is taken out directly from scale model 10, Form prefabricated hole 13.
A kind of tunnel butterfly destruction area similar simulation experimental method, using the tunnel butterfly destruction area analog simulation Experimental bench includes the following steps:
Step 1: building experimental bench, is completed at the same time the preparation of scale model 10;
Step 2: applying vertical load to scale model 10 by top jack group 6 and the cooperation of bottom jack group 7, For simulating tunnel maximum principal stress;Meanwhile by left side jack group 8 and the cooperation of right side jack group 9 to scale model 10 Apply horizontal load, for simulating tunnel minimum principal stress;
Step 3: the ratio of adjustment maximum principal stress and minimum principal stress observes 13 surrounding destruction area shape of prefabricated hole, The destruction area shape of practical roadway surrounding rock is judged by 13 surrounding destruction area shape of prefabricated hole.
Before formally preparing scale model 10, needs that analog material is utilized to prepare a small size sample in advance, pass through list Axis crush test carries out load test to small size sample, similar in progress to obtain the uniaxial compressive strength of small size sample Reference safety limit when simulated experiment, when the uniaxial compressive strength is as application maximum principal stress and minimum principal stress.If It is more than to refer to safety limit when applying maximum principal stress and minimum principal stress, then illustrates that loading force is excessive, probably leads at this time Experimental bench is caused to be damaged.
The top jack group 6, bottom jack group 7, left side jack group 8 and right side jack group 9 are applying load When lotus, in several jack using be uniformly controlled mode or respectively control mode.
When jack is using control mode respectively, by applying different loading forces to each jack, so that master answers The direction of power changes, and then 13 surrounding destruction area shape of prefabricated hole is made to rotate.It so can effectively improve experiment The adaptability of platform.
Scheme in embodiment is not the scope of patent protection to limit the utility model, all without departing from the utility model Carried out by equivalence enforcement or change, be both contained in the scope of the patents of this case.

Claims (5)

1. a kind of tunnel butterfly destruction area similarity simulation experiment platform, it is characterised in that: including main frame, top platen, bottom pressure Plate, left side pressing plate, right side pressing plate, top jack group, bottom jack group, left side jack group and right side jack group;Institute Main frame is stated using hollow structure, is provided with organic glass baffle in the front side of main frame and rear side, scale model is located at Inside main frame;The top jack group is vertically arranged on the top beam of main frame, and the top platen is connected in top thousand The piston rod end of jin top group, top platen are abutted against with the upper surface of scale model and are contacted;The bottom jack group is set vertically Set on the bottom beam of main frame, the bottom platen is connected in the piston rod end of bottom jack group, bottom platen to it is similar The lower surface of model abuts against contact;The left side jack group is horizontally set on the left side vertical beam of main frame, the left side pressure Plate is connected in the piston rod end of left side jack group, and left side pressing plate is abutted against with the left-hand face of scale model and contacted;The right side Side jack group is horizontally set on the right side vertical beam of main frame, and the right side pressing plate is connected in the piston rod of right side jack group End, right side pressing plate are abutted against with the right lateral surface of scale model and are contacted;The main frame is fixed at ground by several stabilizer blades On face.
2. a kind of tunnel butterfly destruction area similarity simulation experiment platform according to claim 1, it is characterised in that: the top It include several models identical thousand in jack group, bottom jack group, left side jack group and right side jack group Jin top, and several jack equidistant arrangements.
3. a kind of tunnel butterfly destruction area similarity simulation experiment platform according to claim 1, it is characterised in that: in the phase Prefabricated circular hole is offered like the center of model, the prefabricated circular hole is for simulating tunnel.
4. a kind of tunnel butterfly destruction area similarity simulation experiment platform according to claim 3, it is characterised in that: described prefabricated The radius of circular hole is set as R, and the scale model is square structure, and the side length of scale model is set as L, needs to meet following item Part: 5R≤(L/2-R).
5. a kind of tunnel butterfly destruction area similarity simulation experiment platform according to claim 3, it is characterised in that: described prefabricated Circular hole is formed by mold, and number of molds is several, and the section configuration of several molds is different.
CN201822071159.9U 2018-12-11 2018-12-11 A kind of tunnel butterfly destruction area similarity simulation experiment platform Active CN209167017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822071159.9U CN209167017U (en) 2018-12-11 2018-12-11 A kind of tunnel butterfly destruction area similarity simulation experiment platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822071159.9U CN209167017U (en) 2018-12-11 2018-12-11 A kind of tunnel butterfly destruction area similarity simulation experiment platform

Publications (1)

Publication Number Publication Date
CN209167017U true CN209167017U (en) 2019-07-26

Family

ID=67343143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822071159.9U Active CN209167017U (en) 2018-12-11 2018-12-11 A kind of tunnel butterfly destruction area similarity simulation experiment platform

Country Status (1)

Country Link
CN (1) CN209167017U (en)

Similar Documents

Publication Publication Date Title
CN107328898B (en) Crossing fault tunnel excavation simulation experiment device
WO2018050079A1 (en) Device and method for testing fractured rock mass collapse chipping and fracture water bursting
CN102222126B (en) Method for simulating numerical value of graded crushed stone tri-axial test
CN102564855B (en) Numerical method for graded crushed stone dynamic triaxial test
CN103616287A (en) Laboratory model testing device for tunnel excavation
CN107727424B (en) Geomechanical model experimental device and method for stability of bedding rock slope
CN108760370B (en) Multi-angle inclined rock stratum roadway support similarity simulation test device and test method
CN110736821B (en) Model test device for landslide area pipeline safety based on gravity loading material
CN104007246A (en) Three-dimensional-coupling slip surface-controllable slope stability similar testing system
CN203443862U (en) Bituminous pavement acceleration loading testing machine
CN109406281A (en) A kind of tunnel butterfly destruction area similarity simulation experiment platform and experimental method
CN104198233B (en) Three axle remoulded sample forming method and devices thereof
CN104215506A (en) Gradient confining pressure loading method
CN202793921U (en) Pavement material shearing intensity and shearing fatigue tester based on 8-shaped test piece
CN110736820B (en) Model test device of landslide area pipeline security
CN209167017U (en) A kind of tunnel butterfly destruction area similarity simulation experiment platform
CN109406290A (en) A kind of three-dimensional similar simulation experiment method of servo loading flexible force transmission
CN211603171U (en) Test device for simulating movable fault to research on tunnel damage mechanism
CN206038342U (en) Quantification research tunnel country rock comes to nothing and malactic power test device
CN207066755U (en) The experimental rig of tunnel bottom structure accumulated damage under a kind of cyclic load
CN109187212B (en) Straight wall semicircular arch roadway loading device and loading method for testing mechanical effect of roadway surface guniting body
CN106706437A (en) Two-dimensional model testing system and method for instability process and mechanism of block-fractured rock mass
CN203881663U (en) Experimental device for lateral compaction analog simulation
CN104634661B (en) Three-dimensional model apparatus for testing rock masses in deep tunnel and using method of testing apparatus
CN203772860U (en) Heavy compaction test apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant