CN209118623U - Assembled architecture gluing practice teaching model equipment - Google Patents

Assembled architecture gluing practice teaching model equipment Download PDF

Info

Publication number
CN209118623U
CN209118623U CN201821728530.8U CN201821728530U CN209118623U CN 209118623 U CN209118623 U CN 209118623U CN 201821728530 U CN201821728530 U CN 201821728530U CN 209118623 U CN209118623 U CN 209118623U
Authority
CN
China
Prior art keywords
exterior wall
gluing
socket
column
wall cladding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821728530.8U
Other languages
Chinese (zh)
Inventor
李玉甫
张瑞友
缪诗祥
秦继英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Taixue Technology Group Co., Ltd
Original Assignee
Zhejiang Taixue Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Taixue Technology Co Ltd filed Critical Zhejiang Taixue Technology Co Ltd
Priority to CN201821728530.8U priority Critical patent/CN209118623U/en
Application granted granted Critical
Publication of CN209118623U publication Critical patent/CN209118623U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to assembled architecture gluing practice teaching model equipments, including exterior wall cladding, weather proofing sealant, column, bottom plate, spacing adjustable spigot-and-socket slot, bolt, socket component, exterior wall frame board, transparent isolation item and postive stop baffle;The bottom plate is equipped with the hole of installation column, and bore hole size is matched with the insertion portion of column;The exterior wall frame board is bolted on column;Socket component is bolted on the exterior wall cladding, the corresponding position of exterior wall frame board has been bolted spacing adjustable spigot-and-socket slot, and exterior wall cladding is fixed in the spacing adjustable spigot-and-socket slot of exterior wall frame board by socket component;The transparent isolation item is mounted in the gap for needing gluing between exterior wall cladding.The beneficial effects of the utility model are: the spacing adjustable spigot-and-socket slot of the present apparatus is an elongated groove profile socket joint device in the longitudinal direction, the exterior wall cladding of applicable various specifications is hung, to allow the gap (gluing width) between exterior wall cladding to have various different sizes.

Description

Assembled architecture gluing practice teaching model equipment
Technical field
The utility model is a kind of teaching training apparatus, specifically a kind of assembled architecture gluing practice teaching model Device.
Background technique
Assembled architecture has had nearly 40 years development courses, energetically support of the recent years in national policy in China Under, the assembled architecture in China has obtained tremendous development.However college student and building industry worker recognize assembled architecture The cognition known and understand not deep, especially to construct to assembled architecture some details is very not familiar, such as assembled architecture Gluing construction technology traces it to its cause and is a lack of suitable teaching training apparatus.
Prefabrication is to be connected simultaneously cast in situs by reinforcing bar, connector etc. by precast concrete to connect It connects the concrete in region and forms the building of stress entirety, belong to the scope of building industrialization, architectural industrialization.It is prefabricated assembled The main composition component of building includes precast concrete sandwich heat preservation Side fascia, concrete folding flexural member (composite beam, overlapping Plate), precast concrete lining, precast stair, prefabricated balcony etc..Gluing technology is connected between prefabrication Side fascia The main water-proofing treatment technology at position is squeezed into weather proofing sealant outside precast shear wall by press device by gluing technology In gap between wallboard or precast frame cladding panel, play the role of sealing waterproof, prevents rainwater along installation gap penetration Inside to wall or even Indoor environment, the safety of structure and the comfort of indoor environment are influenced.
Due to various reasons, the assembled architecture in China just really moved towards the right path, especially 2016 year since 2010 Country implements the development for vigorously advocating assembled architecture, assembled architecture spring up like bamboo shoots after a spring rain as rise sheer from level ground throughout the country and It rises.Assembled architecture in the market to the demand of professional also voraciously.However, the development due to the technology does not plan a successor, Relevant resources material is considerably less, and exterior wall gluing technology is even more fewer and fewer, and relevant teaching training apparatus there is no, nothing Method meets building university to the culture demand of the assembled talent, therefore, Building class college students and architectural industrialization worker couple The understanding of assembled architecture gluing waterproof technique is not deep enough, also has the teacher of many schools or student to go to assembled architecture Assembled architecture outer wall gluing waterproof technique is viewed and emulated in erecting bed, but the progress of assembled architecture construction with school teaching into Often there is the time difference in degree, furthermore, building trade is also the bigger industry of risk, can not accommodate all architectural universities Raw visiting and learning demand;In addition, the construction of assembled architecture gluing is the very strong technical profession of practicality, need by long-term Practice operation can cultivate professional skill, gluing technology could be grasped, become high-end in assembled architecture industry field Skilled talents.
Certainly, many scholars also suggest that the gluing place for directlying adopt one line of engineering is trained, on the one hand, study does not have There is construction of the sufficiently large place for gluing device;On the other hand, all using real thing, it is professional that student contacts comparison Training can not just carry out relevant operation again, all gluing equipment is all disposable after gelling to be sealed knot hardening , it wastes very serious.Therefore, urgent need will develop a kind of assembled architecture gluing teaching training apparatus, for architectural speciality Raw study or assembled architecture industrial worker learn assembled architecture gluing technology.
Utility model content
The purpose of the utility model is to overcome deficiencies in the prior art, provide a kind of assembled architecture gluing practice teaching Model equipment, the device are formed using durable, high-strength board making system.
This assembled architecture gluing practice teaching model equipment, including exterior wall cladding, weather proofing sealant, column, bottom plate, Spacing adjustable spigot-and-socket slot, bolt, socket component, exterior wall frame board, transparent isolation item and postive stop baffle;The bottom plate is equipped with installation The hole of column, bore hole size are matched with the insertion portion of column;The exterior wall frame board is bolted on column; Socket component is bolted on the exterior wall cladding, it is adjustable that the corresponding position of exterior wall frame board has been bolted spacing Socket joint slot, exterior wall cladding are fixed in the spacing adjustable spigot-and-socket slot of exterior wall frame board by socket component;The transparent isolation item peace In the gap for needing gluing between exterior wall cladding.
As preferred: spacing adjustable spigot-and-socket slot is an elongated slot, and spacing adjustable spigot-and-socket slot both ends are equipped with postive stop baffle.
As preferred: the socket component is adjustable on plate thickness direction.
The beneficial effects of the utility model are:
1, the entire hanging plate of the present apparatus is made of light material, convenient for disassembly and assembly when convenient for real training.
2, the spacing adjustable spigot-and-socket slot of the present apparatus is an elongated groove profile socket joint device in the longitudinal direction, applicable each The exterior wall cladding suspension of kind specification meets different to allow the gap (gluing width) between exterior wall cladding to have various different sizes The gluing real training of work post.
3, the socket component of the present apparatus is a kind of socket joint pendant adjustable on plate thickness direction, by adjusting pendant and exterior wall knot Distance between structure plate, so that it may realize that the depth in the gap between exterior wall cladding is different, to meet the gluing demand of different-thickness.
4, the transparent isolation item of the present apparatus is mounted in the gap for needing gluing, by glue and exterior wall cladding and exterior wall skeleton Plate is completely isolated, in this way, after gluing operates, it is only necessary to clear up transparent isolation item, effectively prevent glue pollution from beating Glue teaching training apparatus.
It 5, can be by this teaching training apparatus as precast shear wall Side fascia gluing during education activities are carried out Construction teaching aid comes using professional teachers compare the gluing principle of present apparatus explanation precast shear wall Side fascia and gluing is constructed Technique emphasis is conducive to grasp of the student to professional knowledge.This teaching training apparatus is also used as precast shear wall Side fascia The actual training device of gluing construction carries out assembled architecture outer wall plate gluing real training under the guidance of real training teacher.
Detailed description of the invention
Fig. 1 is assembled architecture gluing teaching training apparatus overall structure diagram;
Fig. 2 is assembled architecture gluing teaching training apparatus exterior wall frame board schematic diagram;
Fig. 3 is assembled architecture gluing teaching training apparatus exterior wall cladding schematic diagram;
Fig. 4 is assembled architecture gluing teaching training apparatus socket joint slot schematic diagram;
Fig. 5 is assembled architecture gluing teaching training apparatus socket component schematic diagram.
Description of symbols: 01 exterior wall cladding, 02 weather proofing sealant, 03 column, 04 bottom plate, 05 spacing adjustable spigot-and-socket slot; 06 bolt, 07 socket component, 08 exterior wall frame board, 09 transparent isolation item, 10 postive stop baffles.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model In scope of protection of the claims.
The assembled architecture gluing practice teaching model equipment, including exterior wall cladding 01, weather proofing sealant 02, column 03, bottom plate 04, spacing adjustable spigot-and-socket slot 05, bolt 06, socket component 07, exterior wall frame board 08, transparent isolation item 09 and limiting block Plate 10.The bottom plate 04 is the supporting part of whole device, and bottom plate 04 is equipped with the hole of installation column 03, bore hole size and vertical The insertion portion of column 03 matches, and bottom plate 04 bears the whole load that column 03 transmits.The exterior wall frame board 08 passes through bolt 06 is fixed on column 03, guarantees the safety and stability of whole device.Socket joint is fixed with by bolt 06 on the exterior wall cladding 01 Part 07, the corresponding position of exterior wall frame board 08 are equipped with spacing adjustable spigot-and-socket slot 05, and exterior wall cladding 01 is fixed on by socket component 07 In the spacing adjustable spigot-and-socket slot 05 of exterior wall frame board 08.Spacing adjustable spigot-and-socket slot 05 is an elongated slot, applicable various specifications Exterior wall cladding 01 hang, to allow the gap (gluing width) between exterior wall cladding 01 to have various different sizes, meet different works The gluing real training of kind.In view of the safety of entire actual training device, 05 both ends of spacing adjustable spigot-and-socket slot are equipped with postive stop baffle 10, It prevents socket component 07 from skidding off spacing adjustable spigot-and-socket slot 05, effectively avoids exterior wall cladding 01 from sliding and damage and safety even occur Accident.The socket component 07 is a kind of socket joint pendant adjustable on plate thickness direction, by adjusting between pendant and external wall structure plate Distance, so that it may realize that the depth in the gap between adjacent exterior wall cladding 01 is different, to meet the gluing demand of different-thickness.Institute Color and the degree of roughness for stating 01 outer surface of exterior wall cladding are completely the same with precast concrete, between adjacent exterior wall cladding 01 The gap of suitable spacing is formed, provides working face, the degree of roughness and precast concrete of gluing working face for gluing real training It is completely the same, it is ensured that the validity of the true construction scene of the simulation of actual training device.Entire hanging plate is made of light material, just It is convenient for disassembly and assembly when real training.Transparent isolation item 09 is mounted in the gap for needing gluing, by glue and exterior wall cladding 01 and exterior wall Frame board 08 is completely isolated, in this way, only need to clear up transparent isolation item 09 after gluing operates, effectively prevent glue Pollute gluing teaching training apparatus.
When real training, bottom plate 04 is placed on the suitable position in real training place first, column 03 is then inserted into bottom plate 04 In reserved hole, it is desirable that column 03 is connected firmly with bottom plate 04, is then fixed on exterior wall frame board 08 by bolt 06 vertical On column 03, spacing adjustable spigot-and-socket slot 05 is fixed on exterior wall frame board 08 by bolt 06, and in time by spacing adjustable spigot-and-socket slot 10 fixation of postive stop baffle at 05 both ends, notices that bolt 06 will be tightened, it is ensured that entire actual training device is safe and reliable;Then it will hold Plug-in unit 07 is fixed on spacing adjustable spigot-and-socket slot 05, can thus be hung over exterior wall cladding 01 on exterior wall frame board 08, the two Load is transmitted by socket component 07, noticing that the socket component 07 on every piece of exterior wall cladding 01 must be entirely insertable corresponding spacing can It adjusts in socket joint slot 05, gap (gluing working face) width between adjacent exterior wall cladding 01 can be held by socket component 07 spacing is adjustable The position difference of slot 05 is adjusted, fixed after meeting teaching and requiring with real training.Then transparent isolation item 09 is pacified On gluing working face, to prevent glue polluting device.After assembled architecture gluing device is completed, formation width is uniform Gluing gap, and the sundries in gap is cleaned out.Then gluing material is prepared.For the ease of later period cleaning, gluing material must Energy must be had a certain degree of cohesiveness, the position for needing gluing can be reliably bonded in, helps student to complete gluing real training, with this Meanwhile the material can not quickly solidify again, form intensity, general setting time is not less than 8 hours, after gluing operation Cleaning, this material must also have performance free from environmental pollution, suitable consistency is modulated into according to workability.To After gluing material mixing is good, glue indentation is provided on the gluing working face of transparent isolation item 09 by dedicated gluing equipment, Notice that gluing firmly should uniformly, the sealing joint strip of formation is that the concordant wall in both sides is cashed, and centre is slightly recessed, in favor of draining.Through After the assay was approved, transparent isolation item 09 (is not solidified) integral demounting together with sealing joint strip to get off, recycles glue, clean septum pellucidum From item 09, to repeat training operation.

Claims (3)

1. a kind of assembled architecture gluing practice teaching model equipment, it is characterised in that: including exterior wall cladding (01), weather-proof sealing Glue (02), column (03), bottom plate (04), spacing adjustable spigot-and-socket slot (05), bolt (06), socket component (07), exterior wall frame board (08), transparent isolation item (09) and postive stop baffle (10);The bottom plate (04) is equipped with the hole of installation column (03), hole ruler The very little insertion portion with column (03) matches;The exterior wall frame board (08) is fixed on column (03) by bolt (06); It is fixed with socket component (07) on the exterior wall cladding (01) by bolt (06), the corresponding position of exterior wall frame board (08) passes through spiral shell Bolt (06) is fixed with spacing adjustable spigot-and-socket slot (05), and exterior wall cladding (01) is fixed on exterior wall frame board (08) by socket component (07) Spacing adjustable spigot-and-socket slot (05) in;The transparent isolation item (09) is mounted on the gap that gluing is needed between exterior wall cladding (01) It is interior.
2. assembled architecture gluing practice teaching model equipment according to claim 1, it is characterised in that: spacing is adjustable to hold Slot (05) is an elongated slot, and spacing adjustable spigot-and-socket slot (05) both ends are equipped with postive stop baffle (10).
3. assembled architecture gluing practice teaching model equipment according to claim 1, it is characterised in that: the socket component (07) adjustable on plate thickness direction.
CN201821728530.8U 2018-10-24 2018-10-24 Assembled architecture gluing practice teaching model equipment Active CN209118623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821728530.8U CN209118623U (en) 2018-10-24 2018-10-24 Assembled architecture gluing practice teaching model equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821728530.8U CN209118623U (en) 2018-10-24 2018-10-24 Assembled architecture gluing practice teaching model equipment

Publications (1)

Publication Number Publication Date
CN209118623U true CN209118623U (en) 2019-07-16

Family

ID=67202064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821728530.8U Active CN209118623U (en) 2018-10-24 2018-10-24 Assembled architecture gluing practice teaching model equipment

Country Status (1)

Country Link
CN (1) CN209118623U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411951A (en) * 2020-12-01 2021-02-26 浙江太学科技集团有限公司 Real device of instructing that outer wall was glued

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411951A (en) * 2020-12-01 2021-02-26 浙江太学科技集团有限公司 Real device of instructing that outer wall was glued
CN112411951B (en) * 2020-12-01 2022-02-01 浙江太学科技集团有限公司 Real device of instructing that outer wall was glued
CN114530089A (en) * 2020-12-01 2022-05-24 浙江太学科技集团有限公司 Gap depth adjustable assembly type building outer wall gluing practical training device
CN114530090A (en) * 2020-12-01 2022-05-24 浙江太学科技集团有限公司 Can confirm to beat assembly type structure outer wall of gluing closely knit degree and glue real standard device
CN114530088A (en) * 2020-12-01 2022-05-24 浙江太学科技集团有限公司 Gap width adjustable assembly type building outer wall gluing practical training device
CN114530090B (en) * 2020-12-01 2023-12-22 浙江太学科技集团有限公司 Building outer wall gluing training device capable of determining gluing compactness
CN114530089B (en) * 2020-12-01 2024-03-15 浙江太学科技集团有限公司 Gap depth-adjustable fabricated building outer wall gluing training device

Similar Documents

Publication Publication Date Title
CN209118623U (en) Assembled architecture gluing practice teaching model equipment
CN209443580U (en) A kind of building construction antidetonation movable plank house
CN206941898U (en) Corner type drag-line glass curtain wall system
CN209674587U (en) Assembled architecture lifts device for training skill
CN209514904U (en) Assembled architecture frame column grouting teaching training apparatus
CN209297537U (en) Assembled architecture shear wall grouting teaching training apparatus
CN207553360U (en) A kind of lightweight aerated concrete integrated wall plate with window
CN203982676U (en) A kind of combined type mine ventilation model
CN101515416A (en) Simulation building model for teaching use
CN202416637U (en) Corner connecting piece of unit curtain wall and unit curtain wall
CN113502927B (en) Green steel construction building
CN107989172A (en) Corner fittings connects light body plate structure house
CN211257482U (en) Thin calcium silicate board dry-hanging system
CN201359787Y (en) Practice training device of generic cabling of network engineering
CN208363713U (en) A kind of field quick-assembling room
CN204960132U (en) Roof main couple
CN209082780U (en) Margin knot point structure is received in a kind of glass curtain wall and concrete corner
CN207714496U (en) Full prefabricated balcony teaching training apparatus
CN207003844U (en) A kind of movable plank house waterproof construction
CN203769070U (en) Purely manually disassembled and assembled convenient modular fire prevention heat insulating portable house
CN207993340U (en) Dismantled and assembled single storey industry workshop teaching mode
CN206128853U (en) Unit module pin -connected panel enclosure
CN211087708U (en) Angle steel connected node model combined demonstration teaching aid
CN204510930U (en) Be convenient to the preassembled transformer station assembled
CN110541510A (en) Thin calcium silicate board dry-hanging system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310020, Hangzhou, Zhejiang, Jianggan District triumph Road, No. 343 floor, room B1047

Patentee after: Zhejiang Taixue Technology Group Co., Ltd

Address before: 310020, Hangzhou, Zhejiang, Jianggan District triumph Road, No. 343 floor, room B1047

Patentee before: ZHEJIANG TAIXUE TECHNOLOGY Co.,Ltd.