CN209514904U - Assembled architecture frame column grouting teaching training apparatus - Google Patents

Assembled architecture frame column grouting teaching training apparatus Download PDF

Info

Publication number
CN209514904U
CN209514904U CN201821726298.4U CN201821726298U CN209514904U CN 209514904 U CN209514904 U CN 209514904U CN 201821726298 U CN201821726298 U CN 201821726298U CN 209514904 U CN209514904 U CN 209514904U
Authority
CN
China
Prior art keywords
grout
bottom plate
grouting
side panel
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821726298.4U
Other languages
Chinese (zh)
Inventor
龙照华
楼振航
瞿承意
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tai Xue Construction Technology Co., Ltd.
Original Assignee
Zhejiang Taixue Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Taixue Technology Co Ltd filed Critical Zhejiang Taixue Technology Co Ltd
Priority to CN201821726298.4U priority Critical patent/CN209514904U/en
Application granted granted Critical
Publication of CN209514904U publication Critical patent/CN209514904U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to assembled architecture frame column grouting teaching training apparatus, including bottom plate, side panel, top plate, grout sleeve, upper connecting connection parts, lower connecting connection parts, Butterworth Hatch, grout outlet and grouting port;The bottom plate is square structure, and side panel, which encloses to connect by strength adhesive, to be fixed on above bottom plate, and roof plate supporting is connected and fixed in side panel and through strength adhesive;Grout sleeve is equipped between bottom plate and top plate, grout sleeve is fixed on bottom plate by strength adhesive, and laterally plate is evenly arranged grout sleeve;Upper connecting connection parts in grout sleeve are fixed on top plate by helicitic texture.The beneficial effects of the utility model are: being equipped with upper connecting connection parts and lower connecting connection parts in the grout sleeve of the present apparatus, upper connecting connection parts are for simulating the reinforcing bar being embedded in frame column, lower connecting connection parts are for simulating the exposed reinforcing bar in lower layer's frame column capital, the Butterworth Hatch of bottom plate is recycled for grouting material to be discharged convenient for whole device.

Description

Assembled architecture frame column grouting teaching training apparatus
Technical field
The utility model is a kind of teaching training apparatus, and specifically a kind of assembled architecture frame column grouting teaching is real Training apparatus.
Background technique
Assembled architecture has had nearly 40 years development courses, energetically support of the recent years in national policy in China Under, the assembled architecture in China has obtained tremendous development.However college student and building industry worker recognize assembled architecture The cognition known and understand not deep, especially to construct to assembled architecture some details is very not familiar, such as assembled architecture Grouting technique traces it to its cause and is a lack of suitable teaching training apparatus.
Prefabrication is to be connected simultaneously cast in situs by reinforcing bar, connector etc. by precast concrete to connect It connects the concrete in region and forms the building of stress entirety, belong to the scope of building industrialization, architectural industrialization.It is prefabricated assembled The main composition component of building includes precast concrete sandwich heat preservation Side fascia, concrete folding flexural member (composite beam, overlapping Plate), precast concrete lining, precast stair, prefabricated balcony etc..Rebar connecting technology is the key that prefabrication skill One of art, reliable connection are the key that guarantee structural integrity and shock resistance, the company that China's assembled architecture uses at present The mode of connecing has 3 kinds of sleeve connection, slurry anchor connection and mechanical connection, wherein in the majority with sleeve grouting connection type.
Reinforced bar sleeve grouting jointing is made of Ribbed Bar, grout sleeve and dedicated grouting material.Reinforced bar sleeve grouting Catenation principle is the hollow type sleeve through casting, and reinforcing bar is inserted into sleeve inner from both ends open, does not need to overlap or weld, steel The structural grouting material of high-intensitive microdilatancy is filled between muscle and sleeve.It connects mechanism mainly by grouting material by sleeve Effect of contraction enhances the positive acting power between reinforcing bar, sleeve inside, steel in addition grouting material itself has micro-expansion characteristics with this The frictional force that muscle is generated by the positive force and rough surface, to transmit reinforcement stresses.It is different from sleeve connection mode by reinforcing bar, point To be in the milk and being partly in the milk entirely.Full grouting connector is a kind of traditional type of attachment, and the reinforcing bar for connecting sleeve and both ends is all made of filling Slurry mode connects, and half grouting connector is a kind of newer type of attachment, and sleeve is connect with an end bar using grouting connection type, And the other end is connected using mechanical connection manner.
However, introducing data and few, Building class college students and building production to sleeve grouting interconnection technique on the market Industry chemical industry people is also not deep enough to the understanding of sleeve grouting interconnection technique, also has the teacher of many schools or student to go to assembly Formula construction and installation watch sleeve grouting interconnection technique, but assembled architecture construction speed with school teaching process also when It is variant, furthermore, assembled architecture construction profession is the very strong profession of practicality, and many professional skills need to practice operation It can cultivate, such as reinforced bar sleeve grouting interconnection technique, need practice of being largely in the milk, grouting technique could be grasped, if The full grout sleeve or half grout sleeve of one line of direct application project are trained, and do not simply fail to the movement for observing grouting material Process, and cost is very high, and every progress once grouting test, the grout sleeve of test is all consolidated by grouting material, can only It scraps.Therefore, urgent need will develop a kind of assembled architecture grouting teaching training apparatus, learn for architectural speciality student or fill Learn grouting technique with formula building industry worker.
Utility model content
The purpose of the utility model is to overcome deficiencies in the prior art, provide a kind of assembled architecture frame column grouting religion Actual training device is learned, which is formed using high-strength, transparent board making system, and student is facilitated to see grouting material in sleeve Trend, acquires a deep understanding of grouting principle.
This assembled architecture frame column is in the milk teaching training apparatus, including bottom plate, side panel, top plate, grout sleeve, on Connecting connection parts, lower connecting connection parts, Butterworth Hatch, strength adhesive, grout outlet and grouting port;The bottom plate is square knot Structure, side panel, which encloses to connect by strength adhesive, to be fixed on above bottom plate, and roof plate supporting is in side panel and passes through strength adhesive It is connected and fixed;Grout sleeve is equipped between bottom plate and top plate, grout sleeve is fixed on bottom plate by strength adhesive, grouting set Laterally plate is evenly arranged cylinder;Upper connecting connection parts in grout sleeve are fixed on top plate by helicitic texture, grout sleeve Interior lower connecting connection parts are fixed on bottom plate by strength adhesive;Grout sleeve close to side panel side be equipped with grouting port and Grout outlet, grouting port is under, and grout outlet is upper;Bottom plate center is equipped with Butterworth Hatch.
As preferred: the grout sleeve is curled into cylindrical structure using high-strength, transparent plate.
As preferred: all grout sleeves close to the side panel of left and right sides are equipped with grouting port and grout outlet, by nearby The grout sleeve at the middle part of the side panel of rear side is equipped with grouting port and grout outlet.
As preferred: the duct penetration side panel of connection grouting port and grout outlet, grouting port and grout outlet are sealed by piston It is stifled.
As preferred: the side panel is supported on bottom plate, is reserved on side panel for installing grouting port and grout outlet Hole, the grouting port and grout outlet of grout sleeve be mounted in the correspondence hole of side panel and fixed by strength adhesive.
The beneficial effects of the utility model are: being equipped with upper connecting connection parts in the grout sleeve of the present apparatus connects dress with lower part It sets, upper connecting connection parts are for simulating the reinforcing bar being embedded in frame column, and lower connecting connection parts are for simulating lower layer's frame column column Exposed reinforcing bar is pushed up, the Butterworth Hatch of bottom plate is recycled for grouting material to be discharged convenient for whole device.Carried out in education activities This teaching training apparatus can to use professional teachers control by Cheng Zhong as the teaching aid of prefabricated frame trestle grouting construction This teaching training apparatus explains the grouting principle and grouting construction process emphasis of prefabricated frame trestle, is conducive to student and knows profession The grasp of knowledge.
Detailed description of the invention
Fig. 1 is assembled architecture frame column grouting teaching training apparatus ground plan;
Fig. 2 is assembled architecture frame column grouting teaching training apparatus elevation;
Fig. 3 is assembled architecture frame column grouting teaching training apparatus top plane view;
Fig. 4 is assembled architecture frame column grouting teaching training apparatus A-A sectional view;
Fig. 5 is assembled architecture frame column grouting teaching training apparatus B-B sectional view.
Description of symbols: 1. bottom plates;2. side panel;3. top plate;4. grout sleeve;Connecting connection parts on 5.;6. lower part Attachment device;7. Butterworth Hatch;9. piston;10. grout outlet;11. grouting port.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model In scope of protection of the claims.
As shown in Figures 1 to 5, assembled architecture frame column grouting teaching training apparatus, including bottom plate 1, side Plate 2, top plate 3, grout sleeve 4, upper connecting connection parts 5, lower connecting connection parts 6, Butterworth Hatch 7, strength adhesive, grout outlet 10 With grouting port 11.The bottom plate 1 is the supporting part of whole device, carries side panel 2 and grout sleeve 4, and by device Load be effectively transmitted on ground;The side panel 2 is supported on bottom plate 1, according to the size of grout sleeve 4 and installation position Requirement is set, remains for installing the hole of grouting port 11 and grout outlet 10 in advance on side panel 2 in advance, then again grout sleeve 4 Grouting port 11 and grout outlet 10 be inserted into the correspondence hole of side panel 2, and fixed with strength adhesive;The top plate 3 supports On side panel 2, top plate 3 and side panel 2 are fixed together by strength adhesive;The grout sleeve 4 using it is high-strength, Transparent plate is curled into cylindrical structure, and upper connecting connection parts 5 are equipped in grout sleeve 4, and main function is simulation assembled Pre-buried reinforcing bar in building element, lower connecting connection parts 6 are fixed on bottom plate 1, and main function is under simulation assembled architecture Grouting port 11 and grout outlet 10 is arranged close to 2 side of side panel in the exposed reinforcing bar of layer, grout sleeve 4, and grouting port 11 is under, pulp Mouth 10 is in duct penetration side panel 2 that is upper, and will connecting grouting port 11 and grout outlet 10, so as to grouting operation;The top connects Connection device 5 is for simulating the reinforcing bar being embedded in frame column, and the lower connecting connection parts 6 are for simulating outside lower layer's frame column capital The reinforcing bar of dew;The Butterworth Hatch 7 is recycled for grouting material to be discharged convenient for whole device;The strength adhesive must be with Clear sheet has good compatibility to have enough strength and stiffness after the condensation hardening of strength adhesive, and is colourless Pellucidity;The piston 9 is for blocking grouting port 11 and grout outlet 10.
When real training, grouting material is prepared first.For the ease of later period cleaning, grouting material should not be using the material with condensation performance Material, such as cement mortar, preferably use corn juice etc., consistency meets related specification requirement.Then passing through small pressure slip casting machine will Grouting material is injected from grouting port 11, and since whole device is all-transparent, student can be clearly seen that grouting material is set in pressure Under the standby power effect provided, the run trace in grout sleeve 4, to acquire a deep understanding of slip casting principle.Simultaneously by multiple Grouting test is recycled, student is allowed to form the professional skill of slip casting, for example grasps consistency, the slip casting time, slip casting of grouting material comprehensively Pressure etc..When slurries are overflowed from top grout outlet 10, grout outlet 10 is blocked with piston 9, until all grout outlets 10 all seal It is stifled to finish, then stop slip casting, block grouting port 11, at this point, the grouting operation of the pillar is completed.In order to ensure the device has Circulate operation performance is provided with a Butterworth Hatch 7 in the bottom of device, after slip casting operation completion, opens the cleaning of bottom Mouth 7, grouting material flows out under the effect of gravity, and grouting material is recycled, to reuse.

Claims (5)

  1. The teaching training apparatus 1. a kind of assembled architecture frame column is in the milk, it is characterised in that: including bottom plate (1), side panel (2), Top plate (3), grout sleeve (4), upper connecting connection parts (5), lower connecting connection parts (6), Butterworth Hatch (7), strength adhesive, pulp Mouth (10) and grouting port (11);The bottom plate (1) is square structure, and side panel (2) encloses to connect by strength adhesive to be fixed on Above bottom plate (1), top plate (3) is supported in side panel (2) and is connected and fixed by strength adhesive;Bottom plate (1) and top plate (3) Between be equipped with grout sleeve (4), grout sleeve (4) is fixed on bottom plate (1) by strength adhesive, and grout sleeve (4) is along side Panel (2) is evenly arranged;Upper connecting connection parts (5) in grout sleeve (4) are fixed on top plate (3) by helicitic texture, are filled Lower connecting connection parts (6) in slurry sleeve (4) are fixed on bottom plate (1) by strength adhesive;Grout sleeve (4) leans on proximal side Plate (2) side is equipped with grouting port (11) and grout outlet (10), and grouting port (11) is under, and grout outlet (10) is upper;Bottom plate (1) center Equipped with Butterworth Hatch (7).
  2. The teaching training apparatus 2. assembled architecture frame column according to claim 1 is in the milk, it is characterised in that: the grouting Sleeve (4) is curled into cylindrical structure using high-strength, transparent plate.
  3. The teaching training apparatus 3. assembled architecture frame column according to claim 1 is in the milk, it is characterised in that: close to left and right All grout sleeves (4) of the side panel (2) of side are equipped with grouting port (11) and grout outlet (10), the side panel close to front and back side (2) grout sleeve (4) at middle part is equipped with grouting port (11) and grout outlet (10).
  4. The teaching training apparatus 4. assembled architecture frame column according to claim 1 is in the milk, it is characterised in that: connection slip casting The duct penetration side panel (2) of mouth (11) and grout outlet (10), grouting port (11) and grout outlet (10) pass through piston (9) and block.
  5. The teaching training apparatus 5. assembled architecture frame column according to claim 1 is in the milk, it is characterised in that: the side Plate (2) is supported on bottom plate (1), and the hole for installing grouting port (11) and grout outlet (10) is reserved on side panel (2), is filled The grouting port (11) and grout outlet (10) for starching sleeve (4) are mounted in the correspondence hole of side panel (2) and by strength adhesive It is fixed.
CN201821726298.4U 2018-10-24 2018-10-24 Assembled architecture frame column grouting teaching training apparatus Active CN209514904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821726298.4U CN209514904U (en) 2018-10-24 2018-10-24 Assembled architecture frame column grouting teaching training apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821726298.4U CN209514904U (en) 2018-10-24 2018-10-24 Assembled architecture frame column grouting teaching training apparatus

Publications (1)

Publication Number Publication Date
CN209514904U true CN209514904U (en) 2019-10-18

Family

ID=68192667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821726298.4U Active CN209514904U (en) 2018-10-24 2018-10-24 Assembled architecture frame column grouting teaching training apparatus

Country Status (1)

Country Link
CN (1) CN209514904U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110751870A (en) * 2019-11-01 2020-02-04 郭晶玉 Teaching experimental device for assembled building frame column
CN112133183A (en) * 2020-09-24 2020-12-25 浙江太学科技集团有限公司 Assembled building grouting teaching training device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110751870A (en) * 2019-11-01 2020-02-04 郭晶玉 Teaching experimental device for assembled building frame column
CN110751870B (en) * 2019-11-01 2021-08-24 郭晶玉 Teaching experimental device for assembled building frame column
CN112133183A (en) * 2020-09-24 2020-12-25 浙江太学科技集团有限公司 Assembled building grouting teaching training device

Similar Documents

Publication Publication Date Title
CN209514904U (en) Assembled architecture frame column grouting teaching training apparatus
CN209297537U (en) Assembled architecture shear wall grouting teaching training apparatus
CN202694668U (en) Novel entity scale building teaching model
CN102620989B (en) Test device for durability of FRP (Fiber Reinforced Plastic) bar under action of environment/stress and test method
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN105970803B (en) The shearing resistance energy-dissipating device and construction method of assembled bridge pier
CN207765006U (en) Assembled architecture sleeve grouting practice teaching model
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN102749278A (en) Method for testing depth of influence of acid rain on red clay on the basis of pH value test
CN201540683U (en) Simulated construction model for teaching
CN208889184U (en) A kind of assembled architecture comprehensive practical traning model
CN209323688U (en) Prefabricated assembling type reinforced concrete column splices node structure
CN101515416B (en) Simulation building model for teaching use
CN208486235U (en) The sealing component of the changeover portion template of binder assembly in a kind of suitable water
CN208296892U (en) The parallel sleeve grouting detection structure of vertical prefabricated components
CN207718654U (en) Precast shear wall Side fascia teaching training apparatus
CN207920139U (en) A kind of Axial-compression Column of Reinforced Concrete with ruggedized construction
CN207458381U (en) Precast shear wall lining teaching training apparatus
CN209118623U (en) Assembled architecture gluing practice teaching model equipment
CN206075701U (en) Underground engineering experiences area
CN104464500B (en) A kind of training base and its method of construction in high ferro tunnel
CN208848485U (en) Shear wall and raft foundation construction teaching facilities
CN207363378U (en) One kind ties up button tent
CN205894732U (en) Reinforced structure of rowlock wall body
CN206671023U (en) A kind of verifying attachment for reinforced bar sleeve scene grouting quality

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200409

Address after: 322100 nanxitan, Liushi street, Dongyang City, Jinhua City, Zhejiang Province

Patentee after: Zhejiang Tai Xue Construction Technology Co., Ltd.

Address before: 310020, Hangzhou, Zhejiang, Jianggan District triumph Road, No. 343 floor, room B1047

Patentee before: ZHEJIANG TAIXUE TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right