CN207765006U - Assembled architecture sleeve grouting practice teaching model - Google Patents

Assembled architecture sleeve grouting practice teaching model Download PDF

Info

Publication number
CN207765006U
CN207765006U CN201721363006.0U CN201721363006U CN207765006U CN 207765006 U CN207765006 U CN 207765006U CN 201721363006 U CN201721363006 U CN 201721363006U CN 207765006 U CN207765006 U CN 207765006U
Authority
CN
China
Prior art keywords
sleeve
cylinder
axially extending
extending bore
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721363006.0U
Other languages
Chinese (zh)
Inventor
张田心
张福栋
韩笑
肖明和
王安
董恩义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Bai Chu Education & Technology Co Ltd
Original Assignee
Shandong Bai Chu Education & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Bai Chu Education & Technology Co Ltd filed Critical Shandong Bai Chu Education & Technology Co Ltd
Priority to CN201721363006.0U priority Critical patent/CN207765006U/en
Application granted granted Critical
Publication of CN207765006U publication Critical patent/CN207765006U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses assembled architecture sleeve grouting practice teaching models, including sleeve, the sleeve is the cylinder equipped with axially extending bore, the sleeve is equipped with the discharge pipe being distributed up and down and Grouting Pipe, the Grouting Pipe is arranged with discharge pipe in the side of sleeve, and the Grouting Pipe, discharge pipe is communicated with the axially extending bore of sleeve respectively, the sleeve is made of transparent polymer material, the axially extending bore lower end of the sleeve is sleeved on the first cylinder, the axially extending bore upper end of the sleeve is internally provided with the second cylinder, the utility model can make student intuitively observe the internal structure of sleeve, and it is observed that mobility status of the slurry in sleeve.

Description

Assembled architecture sleeve grouting practice teaching model
Technical field
The utility model is related to a kind of realias, and in particular to assembled architecture sleeve grouting practice teaching model.
Background technology
Existing assembled architecture professional knowledge, technical ability teaching and training process in, need student and worker to understand The connection of precast concrete how is realized with study.In Practical Project, the connection of reinforcing bar grout sleeve is that various assembleds are mixed The important type of attachment of Xtah Crude Clay structure, i.e., the cement injection based sizing in metal sleeve realize reinforcing bar in precast concrete Docking connection, grout sleeve interconnection technique be assembled architecture construction key technology.
But due to the concealment of grout sleeve connection construction effect, and the Practical training equipment that existing enterprise, school use is equal Practical operation real training, Xue Yuanbi are carried out for special purpose model made of armored concrete, or the directly true precast concrete of use Cutting ability observable is carried out to Practical training equipment after grouting material solidification must be waited for, can not intuitively observe grouting material operating the when of carrying out In grout sleeve internal flow and the case where be gradually filled with entire grout sleeve, and then grout sleeve connection can not be visually known Realization effect, increase the difficulty of teaching, training, while also reducing the quality of teaching, training.
Utility model content
The utility model in view of the above-mentioned problems, provide assembled architecture sleeve grouting practice teaching model, can make Member intuitively observes the internal structure of sleeve, and is observed that mobility status of the slurry in sleeve.
The utility model solve technical problem technical solution be:Assembled architecture sleeve grouting practice teaching model, packet Sleeve is included, the sleeve is the cylinder equipped with axially extending bore, and the sleeve is equipped with the discharge pipe being distributed up and down and Grouting Pipe, The Grouting Pipe and discharge pipe are arranged in the side of sleeve, and the Grouting Pipe, discharge pipe respectively with the axially extending bore phase of sleeve Logical, the sleeve is made of transparent polymer material, and the axially extending bore lower end of the sleeve is sleeved on the first cylinder, the set The axially extending bore upper end of cylinder is internally provided with the second cylinder.
Further, the upper end of the axially extending bore is equipped with internal thread, and the lower end of second cylinder is equipped with external screw thread, institute The second cylinder is stated to be connected through a screw thread with sleeve.
Further, the diameter of second cylinder is less than the diameter of axially extending bore, and the second cylinder is socketed on axis Into through-hole.
Further, the lower end of first cylinder is fixed with a pedestal, and the pedestal is horizontally disposed.
The effect provided in invention content is only the effect of embodiment, rather than invents all whole effects, above-mentioned A technical solution in technical solution has the following advantages that or advantageous effect:
1. by making sleeve using transparent polymer material, it can intuitively observe the internal structure of sleeve, match The first cylinder and the second cylinder are closed, it is observed that two cylinders pour process together, slip casting in sleeve by slip casting Pipe is under, and upper, the slurry poured into overflows after filling up gap from top discharge pipe discharge pipe, can observe slurry in sleeve Mobility status, be conducive to student observe and learn.
2. the second cylinder is set to using screw thread and the two different modes of socket in sleeve, can respectively be simulated to student Half connection type be in the milk and be in the milk entirely.
3. pedestal is arranged in the lower end of the first cylinder, the first cylinder can not only be made to stand on to facilitate in plane and demonstrated, but also The preferably simulation shows connection type of embedded bar and pedestal.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model sleeve;
Fig. 2 is the structural schematic diagram of the first embodiment of the utility model;
Fig. 3 is the structural schematic diagram of second of embodiment of the utility model;
In figure, 1, sleeve, 11, axially extending bore, 2, Grouting Pipe, 3, discharge pipe, the 4, first cylinder, 41, pedestal, the 5, second column Body, 6, grouting gun.
Specific implementation mode
In order to clearly illustrate the technical characterstic of this programme, below by specific implementation mode, and its attached drawing is combined, to this Invention is described in detail.Following disclosure provides many different embodiments or example is used for realizing the different knots of the present invention Structure.In order to simplify disclosure of the invention, hereinafter the component of specific examples and setting are described.In addition, the present invention can be with Repeat reference numerals and/or letter in different examples.This repetition is that for purposes of simplicity and clarity, itself is not indicated Relationship between various embodiments and/or setting is discussed.It should be noted that illustrated component is not necessarily to scale in the accompanying drawings It draws.Present invention omits the descriptions to known assemblies and treatment technology and process to avoid the present invention is unnecessarily limiting.
As shown in Figure 1 to Figure 3, assembled architecture sleeve grouting practice teaching model, including sleeve 1, the sleeve 1 are to set Have a cylinder of axially extending bore 11, the sleeve 1 is equipped with the discharge pipe 3 being distributed up and down and Grouting Pipe 2, the Grouting Pipe 2 with Discharge pipe 3 is arranged in the side of sleeve 1, and the Grouting Pipe 2, discharge pipe 3 are communicated with the axially extending bore of sleeve 1 respectively, described Sleeve 1 be made of transparent polymer material, 11 lower end of axially extending bore of the sleeve 1 is sleeved on the first cylinder 4, the sleeve 1 11 upper end of axially extending bore is internally provided with the second cylinder 5.By the way that sleeve is made using transparent polymer material, Ke Yizhi The internal structure for observing sleeve seen coordinates the first cylinder and the second cylinder, it is observed that two cylinders lead in sleeve It crosses slip casting and pours process together, Grouting Pipe is under, and discharge pipe is upper, and the slurry poured into is after filling up gap from top plasma discharge Pipe overflows, and can observe mobility status of the slurry in sleeve, is conducive to student and observes and learn.
It is illustrated in figure 2 the first embodiment of the utility model, the upper end of the axially extending bore 11 is equipped with internal thread, institute The lower end for stating the second cylinder 5 is equipped with external screw thread, and second cylinder 5 is connected through a screw thread with sleeve 1, fully simulates building and apply Half grouting connection type of half grout sleeve and reinforcing bar in work.
The lower end of first cylinder 4 is fixed with a pedestal 41, and the pedestal 41 is horizontally disposed, can both make the first column Body stands on to facilitate in plane and be demonstrated, and the preferably simulation shows connection type of embedded bar and pedestal.
It is illustrated in figure 3 the first embodiment of the utility model, the diameter of second cylinder 5 is less than axial lead to The diameter in hole 11, and the second cylinder 5 is socketed in axially extending bore 11, fully simulates full grout sleeve and steel in construction The full grouting connection type of muscle, by carrying out pair the teaching mode of the first embodiment and the teaching mode of second of embodiment Than making student that the difference of half grout sleeve and full grout sleeve be more clearly understood.
The specific teaching of the utility model uses process:
The first teaching demonstration:Student can pick up the sleeve 1 of transparent polymer material making, through transparent polymer material Material can examine the internal structure of sleeve;
Second of teaching demonstration:The pedestal 41 of first cylinder, 4 lower end is placed on, sleeve 1 is placed on the first column On body 4, and the second cylinder 5 is placed by way of bolt or socket in the upper end of sleeve 1, then poured into grouting gun 6 After colored adhesion agent, colored adhesion agent inject from Grouting Pipe 2 into sleeve 1 by grouting gun 6, until colour adhesion agent is from row It starches pipe 3 to flow out, after being blocked to discharge pipe 3 using rubber stopper, extracts grouting gun 6 and reuse rubber stopper closure Grouting Pipe 2, During this, student can clearly be observed that colored adhesion agent flows in sleeve inner and is gradually filled with the feelings of entire sleeve Condition, and can clearly be observed that connection of two cylinders in sleeve, the reinforcing bar for fully simulating construction site exists Connection structure in grout sleeve makes student more intuitively, clearly learn the relevant knowledge of grout sleeve.After demonstration, This training model is integrally picked up and is raised, extracts the rubber stopper for blocking discharge pipe 3 and Grouting Pipe 2, colored adhesion agent outflow can be right The colored adhesion agent of outflow is collected, with recycling;Can by into sleeve 1 injected clear water colored adhesion agent rinsed it is dry Only, it realizes and reuses.
Although above-mentioned be described the specific implementation mode of utility model in conjunction with attached drawing, not to the utility model The limitation of protection domain, based on the technical solution of the present invention, those skilled in the art need not pay creativeness The various modifications or changes that working can make are still within the scope of the present invention.

Claims (4)

1. assembled architecture sleeve be in the milk practice teaching model, which is characterized in that including sleeve (1), the sleeve (1) be equipped with The cylinder of axially extending bore (11), the sleeve (1) are equipped with the discharge pipe (3) being distributed up and down and Grouting Pipe (2), the slip casting (2) and discharge pipe (3) is managed to be arranged in the side of sleeve (1), and the Grouting Pipe (2), discharge pipe (3) respectively with sleeve (1) Axially extending bore communicates, and the sleeve (1) is made of transparent polymer material, axially extending bore (11) lower end of the sleeve (1) It is sleeved on the first cylinder (4), axially extending bore (11) upper end of the sleeve (1) is internally provided with the second cylinder (5).
The practice teaching model 2. assembled architecture sleeve as described in claim 1 is in the milk, which is characterized in that the axially extending bore (11) upper end is equipped with internal thread, and the lower end of second cylinder (5) is equipped with external screw thread, second cylinder (5) and sleeve (1) It is connected through a screw thread.
The practice teaching model 3. assembled architecture sleeve as described in claim 1 is in the milk, which is characterized in that second cylinder (5) diameter is less than the diameter of axially extending bore (11), and the second cylinder (5) is socketed in axially extending bore (11).
The practice teaching model 4. assembled architecture sleeve as described in claim 1 is in the milk, which is characterized in that first cylinder (4) lower end is fixed with a pedestal (41), and the pedestal (41) is horizontally disposed.
CN201721363006.0U 2017-10-20 2017-10-20 Assembled architecture sleeve grouting practice teaching model Active CN207765006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721363006.0U CN207765006U (en) 2017-10-20 2017-10-20 Assembled architecture sleeve grouting practice teaching model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721363006.0U CN207765006U (en) 2017-10-20 2017-10-20 Assembled architecture sleeve grouting practice teaching model

Publications (1)

Publication Number Publication Date
CN207765006U true CN207765006U (en) 2018-08-24

Family

ID=63177982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721363006.0U Active CN207765006U (en) 2017-10-20 2017-10-20 Assembled architecture sleeve grouting practice teaching model

Country Status (1)

Country Link
CN (1) CN207765006U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110288870A (en) * 2019-07-12 2019-09-27 山东盈先信息科技有限公司 A kind of reusable visualization grouting experience system
CN110675693A (en) * 2019-10-17 2020-01-10 杭州优达教学设备有限公司 Assembled building sleeve grouting training device
CN111583759A (en) * 2020-06-18 2020-08-25 上海震旦职业学院 Embedded training equipment for manufacturing nodes of assembled building components

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110288870A (en) * 2019-07-12 2019-09-27 山东盈先信息科技有限公司 A kind of reusable visualization grouting experience system
CN110675693A (en) * 2019-10-17 2020-01-10 杭州优达教学设备有限公司 Assembled building sleeve grouting training device
CN111583759A (en) * 2020-06-18 2020-08-25 上海震旦职业学院 Embedded training equipment for manufacturing nodes of assembled building components

Similar Documents

Publication Publication Date Title
CN207765006U (en) Assembled architecture sleeve grouting practice teaching model
CN207895753U (en) Precast concrete reinforced bar sleeve grouting connection Practical training equipment
CN107620485A (en) Building cylinder reparation template framework and construction method
CN104747216A (en) Ultra-soft cracked coal and rock mass drill and grouting integrated fractional grouting method
CN209723633U (en) A kind of construction concreting tamping equipment
CN106906996B (en) Reusable pre-buried ring
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN207904914U (en) A kind of anti-floating constructing structure of filling pile cage of reinforcement
CN207700201U (en) A kind of building municipal works slope reinforcement device
CN206091264U (en) Outer wall scaffold frame is wall spare even
CN209297537U (en) Assembled architecture shear wall grouting teaching training apparatus
CN105239571B (en) Tree root shape electric pole lateral conductor fixator
CN209011169U (en) A kind of experimental rig for simulating underground engineering impervious blocking material
CN204589831U (en) A kind of rc beam bridge girder reinforcing construction
CN207633342U (en) A kind of bridge pile foundation pile crown abolishes device
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN203689815U (en) Teaching simulation body for tunnel micro-step method technology
CN205976503U (en) Vertical concrete structure's template lacing device
CN104992613A (en) Visual prefabricated shear wall construction indoor simulation teaching tool and mounting method
CN207405498U (en) A kind of high ferro box beam portable awning portal support device
CN212003113U (en) Broken rock mass slip casting is with only thick liquid device
CN208502220U (en) A kind of embedded nut method wall-connecting piece
CN206607905U (en) A kind of concrete drill core sampling damage revamping device
CN205938174U (en) Borehole operation filled type blowout pipeline line foundation pier of watering
CN206928434U (en) Total-prefabricated construction metal connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Teaching and training model of prefabricated construction sleeve grouting

Effective date of registration: 20210517

Granted publication date: 20180824

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY Co.,Ltd.

Registration number: Y2021980003719

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220330

Granted publication date: 20180824

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2021980003719

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Teaching and training model of prefabricated building sleeve grouting

Effective date of registration: 20220330

Granted publication date: 20180824

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2022980003692

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230117

Granted publication date: 20180824

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2022980003692

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Teaching and training model of sleeve grouting for prefabricated building

Effective date of registration: 20230322

Granted publication date: 20180824

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2023980035514

PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180824

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2023980035514

PC01 Cancellation of the registration of the contract for pledge of patent right