CN207904914U - A kind of anti-floating constructing structure of filling pile cage of reinforcement - Google Patents

A kind of anti-floating constructing structure of filling pile cage of reinforcement Download PDF

Info

Publication number
CN207904914U
CN207904914U CN201820100244.0U CN201820100244U CN207904914U CN 207904914 U CN207904914 U CN 207904914U CN 201820100244 U CN201820100244 U CN 201820100244U CN 207904914 U CN207904914 U CN 207904914U
Authority
CN
China
Prior art keywords
reinforcement
filling pile
pile cage
gag lever
lever post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820100244.0U
Other languages
Chinese (zh)
Inventor
王巧利
解崇晖
吴洁
何萌
李宁
刘兴邦
杨斌
安军
张旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering Group Co Ltd
Original Assignee
Shaanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering Group Co Ltd filed Critical Shaanxi Construction Engineering Group Co Ltd
Priority to CN201820100244.0U priority Critical patent/CN207904914U/en
Application granted granted Critical
Publication of CN207904914U publication Critical patent/CN207904914U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of anti-floating constructing structures of filling pile cage of reinforcement, including the filling pile cage of reinforcement being vertically plugged in the stake holes of bored concrete pile and the limiting device limited to filling pile cage of reinforcement;The filling pile cage of reinforcement is coaxially laid with stake holes, and the filling pile cage of reinforcement bottom is laid in stake holes bottom, is extend out at the top of the filling pile cage of reinforcement on the outside of stake holes;The limiting device includes the gag lever post for binding the limit stirrup on filling pile cage of reinforcement and being pressed in above limit stirrup;The limit stirrup is laid in plane residing for stake holes aperture, and through filling pile cage of reinforcement and horizontal above stake holes aperture, the both ends of the gag lever post are separately fixed on the ground of stake holes aperture both sides the gag lever post.The utility model is limited the position of limit stirrup using gag lever post, indirectly limits the position of filling pile cage of reinforcement, solve the problems, such as that filling pile cage of reinforcement moves up when concrete pouring construction by that will limit in stirrup binding to filling pile cage of reinforcement.

Description

A kind of anti-floating constructing structure of filling pile cage of reinforcement
Technical field
The utility model belongs to reinforced concrete pile technical field of construction more particularly to a kind of anti-floating of filling pile cage of reinforcement Constructing structure.
Background technology
Deposited reinforced concrete pile is a kind of directly pore-forming on the spot on stake position at the scene, then in hole casting concrete or Steel reinforcement cage stake made of casting concrete again is placed, compared with sinking to the hammering method in stake, construction noise and vibrations are much smaller, And the more stakes bigger than the diameter of prefabricated pile can be usually built, it can be used on various grounds.
Borehole is first carried out when construction, then launches steel reinforcement cage, and carry out slip casting, but during slip casting, it is non-elongated to set The steel reinforcement cage set, at filling concrete to steel reinforcement cage bottom, concreting excessive velocities, what steel reinforcement cage generated in concrete When buoyancy and concrete rise the jacking force generated more than steel reinforcement cage dead weight, rising of steel cage is generated, and mud balance is excessively high, Increase mud pop-up buoyancy;On the other hand closely pre-hardening since the concrete duration of pouring is longer, concrete surface solidification mixes Solidifying soil will upwards be jacked after having certain bond stress, concrete to be routed up from conduit with steel reinforcement cage with certain speed, while also be driven Steel reinforcement cage moves up.
Utility model content
The technical problem to be solved by the utility model is to the deficiencies in for the above-mentioned prior art, provide a kind of perfusion The anti-floating constructing structure of pile cages is limited using gag lever post and is limited by that will limit in stirrup binding to filling pile cage of reinforcement The position of stirrup indirectly limits the position of filling pile cage of reinforcement, filling pile cage of reinforcement when solving concrete pouring construction The problem of moving up.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of anti-floating of filling pile cage of reinforcement Constructing structure, it is characterised in that:Including the filling pile cage of reinforcement being vertically plugged in the stake holes of bored concrete pile and to bored concrete pile reinforcing bar The limiting device that cage is limited;The filling pile cage of reinforcement is coaxially laid with stake holes, and the filling pile cage of reinforcement bottom is laid It is extend out at the top of stake holes bottom, the filling pile cage of reinforcement on the outside of stake holes;The limiting device includes binding in bored concrete pile Limit stirrup on steel reinforcement cage and the gag lever post being pressed in above limit stirrup;The limit stirrup is laid in residing for stake holes aperture and puts down On face, the gag lever post through filling pile cage of reinforcement and horizontal above stake holes aperture, fix respectively by the both ends of the gag lever post On the ground of stake holes aperture both sides.
A kind of anti-floating constructing structure of above-mentioned filling pile cage of reinforcement, it is characterised in that:The both ends of the gag lever post are logical It crosses soil nailing to be fixed on ground, the limit boom end offers the vertical hole installed for soil nailing.
A kind of anti-floating constructing structure of above-mentioned filling pile cage of reinforcement, it is characterised in that:It is laid on the gag lever post pair The clamping device that limit stirrup is clamped, the clamping device includes two clamping units being symmetrically mounted on gag lever post, Two clamping units are laid in the both sides of limit stirrup respectively.
A kind of anti-floating constructing structure of above-mentioned filling pile cage of reinforcement, it is characterised in that:The clamping unit includes abutting Gripping block, the vertical screw rod being laid in gripping block on the outside of limit stirrup and the fastening nut with screw rod cooperation installation, institute State the screw rod mounting hole for offering on gag lever post and being installed for screw rod, the screw rod mounting hole is vertical hole, the fastening nut and Gripping block is laid in the top and bottom of screw rod mounting hole respectively.
A kind of anti-floating constructing structure of above-mentioned filling pile cage of reinforcement, it is characterised in that:The screw rod mounting hole is along limit The strip hole that position pole length direction opens up.
A kind of anti-floating constructing structure of above-mentioned filling pile cage of reinforcement, it is characterised in that:The gag lever post is cylindrical bar, The axis of the gag lever post and the axis perpendicular of filling pile cage of reinforcement and intersection.
The utility model has the following advantages compared with prior art:
1, the utility model indirectly limits the position of filling pile cage of reinforcement using the position of gag lever post limitation limit stirrup It sets, solves the problems, such as that filling pile cage of reinforcement moves up when concrete pouring construction.
2, the utility model limit stirrup and gag lever post are simple in structure, easy to use, are limited by practice of construction place small.
In conclusion the utility model is limited by that will limit in stirrup binding to filling pile cage of reinforcement using gag lever post The position for limiting stirrup, indirectly limits the position of filling pile cage of reinforcement, bored concrete pile steel when solving concrete pouring construction The problem of muscle cage moves up.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is enlarged drawing at the A of Fig. 1.
Fig. 3 is the vertical view of Fig. 1.
Reference sign:
1-stake holes;2-filling pile cage of reinforcement;3-limit stirrups;
4-gag lever posts;5-grounds;6-soil nailings;
7-gripping blocks;8-screw rods;9-screw rod mounting holes;
10-fastening nuts.
Specific implementation mode
As shown in Figure 1, Figure 2 and Figure 3, the utility model includes the bored concrete pile steel being vertically plugged in the stake holes 1 of bored concrete pile Muscle cage 2 and the limiting device that filling pile cage of reinforcement 2 is limited;The filling pile cage of reinforcement 2 and the coaxial laying of stake holes 1, institute It states 2 bottom of filling pile cage of reinforcement and is laid in 1 bottom of stake holes, the top of the filling pile cage of reinforcement 2 extend out to 1 outside of stake holes;Institute It includes the gag lever post 4 for binding the limit stirrup 3 on filling pile cage of reinforcement 2 and being pressed in above limit stirrup 3 to state limiting device;Institute It states limit stirrup 3 to be laid in plane residing for 1 aperture of stake holes, the gag lever post 4 is through filling pile cage of reinforcement 2 and horizontal in stake holes Above 1 aperture, the both ends of the gag lever post 4 are separately fixed on the ground 5 of 1 aperture both sides of stake holes.
In the present embodiment, the limit stirrup 3 is the reinforcing bar being wrapped on filling pile cage of reinforcement 2.
In the present embodiment, the gag lever post 4 is steel pipe fittings.
It should be noted that when practice of construction, limit is bound on filling pile cage of reinforcement 2 according to the depth of stake holes 1 first One end of gag lever post 4 is horizontally through filling pile cage of reinforcement by stirrup 3 after then filling pile cage of reinforcement 2 is placed in stake holes 1 2, keep gag lever post 4 horizontal on 1 aperture of stake holes, and ensure that gag lever post 4 is pressed in limit stirrup 3 top, then by the both ends of gag lever post 4 It is fixed on the ground 5 of 1 aperture both sides of stake holes.Then the casting concrete into stake holes 1, when filling pile cage of reinforcement 2 is by coagulation When the buoyancy and concrete generated in soil rises the jacking force generated, because gag lever post 4 is fixed on ground 5, gag lever post 4 is to limit Stirrup 3 applies buoyancy and jacking force of the counterforce counteraction concrete to steel reinforcement cage, ensures that the position of filling pile cage of reinforcement 2 will not It changes, the construction quality of bored concrete pile is effectively ensured, after concrete final set, release the fixation at 4 both ends of gag lever post, will limit The extraction of bar 4 waits for next use.
As shown in figures 1 and 3, in the present embodiment, the both ends of the gag lever post 4 are fixed on by soil nailing 6 on ground 5, 4 end of the gag lever post offers the vertical hole installed for soil nailing 6.
As shown in figures 1 and 3, in the present embodiment, the gag lever post 4 is often held is fixed on ground 5 by three soil nailings 6 On, three soil nailings 6 are laid on the same line along the length direction of gag lever post 4, and three soil nailings 6 are uniformly distributed.
It should be noted that being the advantage that the end of gag lever post 4 is fixed on ground 5 using soil nailing 6, soil nailing 6 is Component is commonly used in construction, is not only convenient for buying, and convenient for squeezing into the soil body of ground 5, can be conveniently by the end of gag lever post 4 Portion is fixed on ground 5.
As shown in Figure 1, Figure 2 and Figure 3, it in the present embodiment, is laid on the gag lever post 4 and limit stirrup 3 is clamped Clamping device, the clamping device includes two clamping units being symmetrically mounted on gag lever post 4, and two clampings are single Member is laid in the both sides of limit stirrup 3 respectively.
It is clamped it should be noted that laying two clamping units by stirrup 3 is limited, can effectively prevent from pouring mixed The problem of filling pile cage of reinforcement 2 is impacted by slurries and is shaken when solidifying soil.
As shown in Figure 1, Figure 2 and Figure 3, the clamping unit include the gripping block 7 for being connected to limit stirrup 3 outside, it is vertical The screw rod 8 that is laid in gripping block 7 and fastening nut 10 with the cooperation installation of screw rod 8 are offered for screw rod on the gag lever post 4 The screw rod mounting hole 9 of 8 installations, the screw rod mounting hole 9 are vertical hole, and the fastening nut 10 and gripping block 7 are laid in respectively The top and bottom of screw rod mounting hole 9.
In the present embodiment, the gripping block 7 is rubber block.
As shown in Figure 1, Figure 2 and Figure 3, the screw rod mounting hole 9 is the strip hole opened up along 4 length direction of gag lever post.
It should be noted that when practice of construction, unscrews fastening nut 10 along 9 sliding screw 8 of screw rod mounting hole, make two folders Tight block 7 is clamped in the both sides of limit stirrup 3, then tightens fastening nut 10, the position of gripping block 7 is enable to fix, lasting to protect Handle the clamp position to limiting stirrup 3.When unscrewing fastening nut 10, screw rod 8 can be slided along screw rod mounting hole 9, make two folders The distance between tight block 7 can adjust, to adapt to the clamping needs of various sizes of limit stirrup 3.
As shown in figure 3, in the present embodiment, the gag lever post 4 is cylindrical bar, the axis and bored concrete pile of the gag lever post 4 The axis perpendicular of steel reinforcement cage 2 and intersection.
It should be noted that ensure the axis of the gag lever post 4 and the axis perpendicular of filling pile cage of reinforcement 2 and intersection, Ensure that 2 part of filling pile cage of reinforcement of gag lever post 4 both sides is exactly half of filling pile cage of reinforcement 2, bored concrete pile when practice of construction The active force that steel reinforcement cage 2 can apply by gag lever post 4 ensures that 2 part of filling pile cage of reinforcement of 4 both sides of gag lever post is exactly half Filling pile cage of reinforcement 2 can reduce the influence that gag lever post 4 is stablized to reducing filling pile cage of reinforcement 2.
The above is only the preferred embodiment of the utility model, not imposed any restrictions to the utility model, every Any simple modification, change and equivalent structure made by above example are changed according to the utility model technical spirit, still Belong in the protection domain of technical solutions of the utility model.

Claims (6)

1. a kind of anti-floating constructing structure of filling pile cage of reinforcement, it is characterised in that:Stake holes (1) including being vertically plugged in bored concrete pile Interior filling pile cage of reinforcement (2) and the limiting device that filling pile cage of reinforcement (2) is limited;The filling pile cage of reinforcement (2) With the coaxial laying of stake holes (1), filling pile cage of reinforcement (2) bottom is laid in stake holes (1) bottom, the filling pile cage of reinforcement (2) it is extend out at the top of on the outside of stake holes (1);The limiting device includes limit stirrup of the binding on filling pile cage of reinforcement (2) (3) and the gag lever post (4) that is pressed in above limit stirrup (3);The limit stirrup (3) is laid in plane residing for stake holes (1) aperture On, the gag lever post (4) is through filling pile cage of reinforcement (2) and horizontal above stake holes (1) aperture, and the two of the gag lever post (4) End is separately fixed on the ground (5) of stake holes (1) aperture both sides.
2. the anti-floating constructing structure of a kind of filling pile cage of reinforcement described in accordance with the claim 1, it is characterised in that:The gag lever post (4) both ends are fixed on by soil nailing (6) on ground (5), and gag lever post (4) end is offered installs for soil nailing (6) Vertical hole.
3. according to a kind of anti-floating constructing structure of filling pile cage of reinforcement as claimed in claim 1 or 2, it is characterised in that:The limit The clamping device being clamped to limit stirrup (3) is laid on position bar (4), the clamping device is symmetrically mounted on including two Clamping unit on gag lever post (4), two clamping units are laid in the both sides of limit stirrup (3) respectively.
4. the anti-floating constructing structure of a kind of filling pile cage of reinforcement described in accordance with the claim 3, it is characterised in that:The clamping is single Member includes the screw rod (8) and and screw rod for being connected to gripping block (7) on the outside of limit stirrup (3), being laid in vertically in gripping block (7) (8) coordinate the fastening nut (10) of installation, the screw rod mounting hole (9) installed for screw rod (8) offered on the gag lever post (4), The screw rod mounting hole (9) is vertical hole, and the fastening nut (10) and gripping block (7) are laid in screw rod mounting hole (9) respectively Top and bottom.
5. the anti-floating constructing structure of a kind of filling pile cage of reinforcement according to claim 4, it is characterised in that:The screw rod peace It is the strip hole opened up along gag lever post (4) length direction to fill hole (9).
6. according to a kind of anti-floating constructing structure of filling pile cage of reinforcement as claimed in claim 1 or 2, it is characterised in that:The limit Position bar (4) is cylindrical bar, the axis of the gag lever post (4) and the axis perpendicular of filling pile cage of reinforcement (2) and intersection.
CN201820100244.0U 2018-01-19 2018-01-19 A kind of anti-floating constructing structure of filling pile cage of reinforcement Expired - Fee Related CN207904914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820100244.0U CN207904914U (en) 2018-01-19 2018-01-19 A kind of anti-floating constructing structure of filling pile cage of reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820100244.0U CN207904914U (en) 2018-01-19 2018-01-19 A kind of anti-floating constructing structure of filling pile cage of reinforcement

Publications (1)

Publication Number Publication Date
CN207904914U true CN207904914U (en) 2018-09-25

Family

ID=63564233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820100244.0U Expired - Fee Related CN207904914U (en) 2018-01-19 2018-01-19 A kind of anti-floating constructing structure of filling pile cage of reinforcement

Country Status (1)

Country Link
CN (1) CN207904914U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881667A (en) * 2019-04-15 2019-06-14 中建一局集团第三建筑有限公司 Construction platform for pouring cast-in-place pile concrete and construction method thereof
CN110241818A (en) * 2019-06-01 2019-09-17 天津弘野建设集团有限公司 Drill-pouring pilework and its construction method
CN111877320A (en) * 2020-07-21 2020-11-03 湖南北山建设集团股份有限公司 Integrated construction method for foundation pit support system cast-in-place pile and steel lattice column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881667A (en) * 2019-04-15 2019-06-14 中建一局集团第三建筑有限公司 Construction platform for pouring cast-in-place pile concrete and construction method thereof
CN109881667B (en) * 2019-04-15 2024-02-13 中建一局集团第三建筑有限公司 Construction platform for pouring cast-in-place pile concrete and construction method thereof
CN110241818A (en) * 2019-06-01 2019-09-17 天津弘野建设集团有限公司 Drill-pouring pilework and its construction method
CN111877320A (en) * 2020-07-21 2020-11-03 湖南北山建设集团股份有限公司 Integrated construction method for foundation pit support system cast-in-place pile and steel lattice column

Similar Documents

Publication Publication Date Title
CN207904914U (en) A kind of anti-floating constructing structure of filling pile cage of reinforcement
CN105113716B (en) The many floors of major diameter are high to throw self-compaction steel tube concrete superposed column construction method
CN205735482U (en) A kind of structure of fixing built-in fitting
CN112523215B (en) Multi-equipment efficient construction method for carrier pile
CN101942830B (en) Construction method of combined concrete soil pile with core pile
CN107964944B (en) Bored concrete pile reinforcement cage assembly and construction method thereof
CN205291219U (en) Reinforced concrete mould
CN109024654B (en) Structure of pier pile foundation and construction method thereof
CN208309396U (en) A kind of bridge pier column overturn-preventing operation platform
CN108487080B (en) Super-span T-type rigid structure beam side earnestly supports pinner reversed construction method
CN206352340U (en) Connecting node between precast concrete column and pedestal
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN206495520U (en) A kind of intensive steel muscle portion position concrete auxiliary tamping equipment
CN208088827U (en) The detachable earth anchor of iron on floor beam
CN209775994U (en) High strength sculpture structure
CN204589831U (en) A kind of rc beam bridge girder reinforcing construction
CN216042592U (en) Exterior wall template structure without fertilizer groove
CN208415984U (en) A kind of steel column reinforced concrete enveloped ruggedized construction
CN109853730A (en) A kind of novel precast reinforced concrete frame joint and its method of construction
CN213508431U (en) Building pile foundation structure
CN205475207U (en) A construction equipment is pour to exposed basement rock or shallow overburden basement rock
GB2120304A (en) Forming concrete piles
CN109537586B (en) Pile with large head
CN113175237A (en) Building outer wall reinforcing structure and reinforcing method
CN103866763B (en) Method for making pile by performing pile pressure irrigation through immersed tube and special device and application

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710003 Xi'an, Lianhu District, Shaanxi, North Street, No. 199

Patentee after: Shaanxi Construction Engineering Group Co.,Ltd.

Address before: 710003 Xi'an, Lianhu District, Shaanxi, North Street, No. 199

Patentee before: SHAANXI CONSTRUCTION ENGINEERING GROUP Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180925