CN205475207U - A construction equipment is pour to exposed basement rock or shallow overburden basement rock - Google Patents

A construction equipment is pour to exposed basement rock or shallow overburden basement rock Download PDF

Info

Publication number
CN205475207U
CN205475207U CN201620101324.9U CN201620101324U CN205475207U CN 205475207 U CN205475207 U CN 205475207U CN 201620101324 U CN201620101324 U CN 201620101324U CN 205475207 U CN205475207 U CN 205475207U
Authority
CN
China
Prior art keywords
basement rock
steel
pour
exposed
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620101324.9U
Other languages
Chinese (zh)
Inventor
刘其杰
张永敏
王迎
李坚
王斌
张先智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Port Engineering Group Co Ltd
Original Assignee
China State Construction Port Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Port Engineering Group Co Ltd filed Critical China State Construction Port Engineering Group Co Ltd
Priority to CN201620101324.9U priority Critical patent/CN205475207U/en
Application granted granted Critical
Publication of CN205475207U publication Critical patent/CN205475207U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a construction equipment is pour to exposed basement rock or shallow overburden basement rock, including setting up the drilling on the basement rock, buy in rod iron or steel strand wires in drilling, set up steel on the basement rock and protect a section of thick bamboo, it is fixed through the bracing piece that the steel protects a section of thick bamboo, upper end of the support bar connects the steel and protects the bobbin top end, and the lower extreme passes through the anchor log to be fixed on the basement rock. Via the structure, the utility model discloses a construction equipment is pour to exposed basement rock or shallow overburden basement rock also need not to build and demolish the platform owing to need not to deep -cut the foundation ditch, so cheap cost, construction cycle is short, through drawing the bracing piece to replace platform fixed to the steel cylinder to one side, all convenient and fast are installed and dismantled, punch on the basement rock and squeeze into the method of crude steel pipe, make full use of the characteristic of exposed basement rock, both guaranteed the firm of pile foundation, reduced the engineering volume again.

Description

A kind of Exposed bedrock or shallow overburden basement rock pour pile driving construction device
Technical field
This utility model relates to foundation engineering technical field, a kind of constructing device filling stake under water.
Background technology
Build the construction such as bridge and port and pier to need to build a large amount of pile foundation; as shown in Figure 1; prior art is built on exposed basement rock 1 or shallow overburden basement rock above the usual basement rock of pile foundation and is set up platform 2; platform 2 is constructed, uses jump bit to pulverize basement rock, dig out the hole 3 that diameter matches with pile foundation; then lifting steel reinforcement cage 4; by making of platform 2, steel pile casting 5, casting concrete pile, platform 2 of finally dismantling are installed.Such as Chinese utility model patent CN The construction method of the inserting steel column in bored pile of 102041806 A.
This construction method is set for this platform due to needs, and foundation ditch to be deep-cut backfilling, and the workload of needs is huge, long construction period, costly.
Utility model content
Problem to be solved in the utility model is to provide on the exposed bedrock that a kind of short construction period, expense are low and fills stake suspension device and construction method.
For solving above-mentioned technical problem, exposed bedrock of the present utility model or shallow overburden basement rock pour pile driving construction device, including the boring being arranged on basement rock, buy in rod iron or steel strand wires in the borehole, the steel pile casting being arranged on basement rock, described steel pile casting is fixed by support bar, and described post upper connects steel pile casting top, and lower end is fixed on basement rock by anchoring pile.
Described post upper is hinged on steel pile casting, and described support bar is divided into two sections, and two sections of support bars are connected by the bolt of adjustable-length.
Described steel pile casting bottom outside arranges concrete mould bag.
After using such structure, exposed bedrock of the present utility model or shallow overburden basement rock pour pile driving construction device due to without deep-cutting foundation ditch, without building and removing platform, so low cost, short construction period;Replace platform by oblique pull support bar steel cylinder is fixed, mount and dismount the most convenient and swift;The method punched on basement rock and squeeze into thick steel pipe, takes full advantage of the characteristic of exposed bedrock, both ensure that the firm of pile foundation, and had decreased again quantities.
Accompanying drawing explanation
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is the schematic diagram that in prior art, basement rock pours pile driving construction device.
Fig. 2 is the schematic diagram that basement rock of the present utility model pours pile driving construction device, represents the state having beaten hole on basement rock 1 in figure.
Fig. 3 is the schematic diagram that basement rock of the present utility model pours pile driving construction device, represents the state after having poured in figure.
Fig. 4 is the top view that basement rock of the present utility model pours pile driving construction device.
Detailed description of the invention
Exposed bedrock of the present utility model or shallow overburden basement rock pour pile driving construction device, including the boring 2 being arranged on basement rock 1, thicker rod iron 3 is imbedded in boring 2, thicker steel strand wires or prestress anchorage cable can also be used, pouring into viscous and material, the steel pile casting 4 being arranged on basement rock 1, steel pile casting 4 is fixed by many support bars 5, support bar 5 upper end thereof steel pile casting 4 top, lower end is fixed on basement rock by anchoring pile 6.Support bar 5 is divided into two sections, two sections of support bars are connected by the bolt 8 of adjustable-length, the length of support bar 5 is adjusted by the length of furnishing bolt 8, thus adjust the angle of inclination of steel pile casting 4, steel pile casting 4 bottom outside arranges concrete mould bag 7, due to basement rock out-of-flatness, may there is gap bottom steel pile casting, cram gap by concrete mould bag 7.
Construction method comprises the following steps, clears up basement rock 1;As in figure 2 it is shown, punching 2 on basement rock 1, in hole 2, squeeze into crude steel rod 3 as shown in Figure 3, basement rock 1 arranges steel pile casting 4;As shown in Figure 3 and Figure 4, the top surrounding at steel pile casting 4 fixes oblique pull support bar 5, and the other end of oblique pull support bar 5 is fixed on basement rock 1;(5) pour;(6) disassembling fixture.
Owing to this construction method is without getting out macropore by impact brill on basement rock, only the aperture matched with rod iron diameter need to be got, so supporting without setting up platform.Which offers a saving brill macropore and the expense of installing/dismounting platform and man-hour.The firmness degree using rod iron or steel strand wires rock is higher than concrete, utilizes rock to rod iron or steel strand anchoring, uses whole casting concrete structures more firm than prior art.

Claims (3)

1. an exposed bedrock or shallow overburden basement rock pour pile driving construction device, it is characterized in that: include the boring being arranged on basement rock, buy in rod iron or steel strand wires in the borehole, the steel pile casting being arranged on basement rock, described steel pile casting is fixed by support bar, described post upper connects steel pile casting top, and lower end is fixed on basement rock by anchoring pile.
2. pour pile driving construction device according to the exposed bedrock described in claim 1 or shallow overburden basement rock, it is characterised in that: described post upper is hinged on steel pile casting, and described support bar is divided into two sections, and two sections of support bars are connected by the bolt of adjustable-length.
3. pour pile driving construction device according to the exposed bedrock described in claim 2 or shallow overburden basement rock, it is characterised in that: described steel pile casting bottom outside arranges concrete mould bag.
CN201620101324.9U 2016-02-02 2016-02-02 A construction equipment is pour to exposed basement rock or shallow overburden basement rock Expired - Fee Related CN205475207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620101324.9U CN205475207U (en) 2016-02-02 2016-02-02 A construction equipment is pour to exposed basement rock or shallow overburden basement rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620101324.9U CN205475207U (en) 2016-02-02 2016-02-02 A construction equipment is pour to exposed basement rock or shallow overburden basement rock

Publications (1)

Publication Number Publication Date
CN205475207U true CN205475207U (en) 2016-08-17

Family

ID=56673099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620101324.9U Expired - Fee Related CN205475207U (en) 2016-02-02 2016-02-02 A construction equipment is pour to exposed basement rock or shallow overburden basement rock

Country Status (1)

Country Link
CN (1) CN205475207U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364492A (en) * 2020-03-11 2020-07-03 中国建筑第六工程局有限公司 Deep-water shallow-covering-layer steel pipe anchoring construction device and method
CN112081101A (en) * 2020-09-14 2020-12-15 重庆大学 Steel pipe temporary support restraint system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364492A (en) * 2020-03-11 2020-07-03 中国建筑第六工程局有限公司 Deep-water shallow-covering-layer steel pipe anchoring construction device and method
CN112081101A (en) * 2020-09-14 2020-12-15 重庆大学 Steel pipe temporary support restraint system
CN112081101B (en) * 2020-09-14 2021-10-19 重庆大学 Steel pipe temporary support restraint system

Similar Documents

Publication Publication Date Title
CN108842791B (en) Detachable load pile anchor multistage supporting structure and construction method
KR100886922B1 (en) Footing reinforcing or structure recovering method
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN109024721A (en) A kind of underpinning and improve the method that ability is cut in the bending resistance of existing building rigid foundation
KR101341260B1 (en) Method of reinforcing existing concrete footing structure using micropile
CN205475207U (en) A construction equipment is pour to exposed basement rock or shallow overburden basement rock
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
CN2154288Y (en) Tube type mud auto-anchor solum anchor rod
CN206015511U (en) One implant post steel pipe column
JP2000120080A (en) Hollow cylindrical body and its construction method
CN203701104U (en) Connection structure for prefabricated open column and foundation pit
CN104929101B (en) Resistance to plucking prestress anchoraging broken stone pile and construction method that a kind of base expanding and base expanding multistage side is expanded
JP5628459B1 (en) Guard fence support structure
CN209669861U (en) Prestressed reinforced concrete screw thread tubular pole
CN208586640U (en) A kind of large form support construction for constructing no holdfast concrete barricade
CN108797593A (en) A kind of engineering tubular pile basis
CN207143937U (en) A kind of prestressed concrete pipe pile pile top
KR101027668B1 (en) Foundation structure using micro pile
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
RU2089706C1 (en) Pile frozen into permafrost and method of erection of pile frozen into permafrost
CN110219323A (en) A kind of anti-floating pilework and its wet season construction method in soft soil foundation
CN212506237U (en) Reinforced cast-in-situ bored pile
CN204418208U (en) Anchor rod foundation
CN220686085U (en) Composite anchor rod enclosure structure for oversized foundation pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20210202