CN2154288Y - Tube type mud auto-anchor solum anchor rod - Google Patents

Tube type mud auto-anchor solum anchor rod Download PDF

Info

Publication number
CN2154288Y
CN2154288Y CN 93238744 CN93238744U CN2154288Y CN 2154288 Y CN2154288 Y CN 2154288Y CN 93238744 CN93238744 CN 93238744 CN 93238744 U CN93238744 U CN 93238744U CN 2154288 Y CN2154288 Y CN 2154288Y
Authority
CN
China
Prior art keywords
anchor
soil
anchor rod
rod body
mud jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93238744
Other languages
Chinese (zh)
Inventor
姚开绥
姚舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 93238744 priority Critical patent/CN2154288Y/en
Application granted granted Critical
Publication of CN2154288Y publication Critical patent/CN2154288Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a supporting protection anchor rod for preventing soil walls from collapsing, comprising a tubular rod body and a taper-shaped tip head fixed on the front end of the tubular rod body. The outer wall of the tubular rod body is provided with a plurality of agnail-shaped anchoring wing sheets. The main body of the tubular rod body under the agnail-shaped anchoring wing sheets is provided with a mud jacking hole penetrating through the inner and the outer walls of the rod body. The external force is used to strike the anchor rod into the soil walls. Pressure cement mud is poured into the soil walls through the tail end of the anchor rod exposed out of the soil walls to penetrate into the anchored soil layer through the mud jacking hole, and the anchor rod and the soil layer are solidified together for acting an anchoring supporting protection effect. The utility model avoids drilling operation, and is especially suitable for the anchoring supporting protection to the soft soil layer with the hole-forming difficulty.

Description

Tube type mud auto-anchor solum anchor rod
The utility model relates to the support anchor rod that a kind of Tu Bi of preventing caves in.
In the excavation of foundation pit supporting of civil works, bolt support structure that the stability of slope processing operation adopts often, must hole on side slope or Tu Bi with the rotary impact rig earlier, and then implantation reinforced anchor bolt, grout injection is solidified as a whole reinforced anchor bolt and desire fixing soil again, to improve the shear strength of soil, prevent that Tu Bi from collapsing.The deficiency of this employing reinforced anchor bolt mode is in broken grounds such as some common miscellaneous fills, sand, very easily collapse in the hole that rig breaks into, even bore not pore-forming at all, influence the perfusion of the implantation of reinforcing bar and cement paste and make and stablize the supporting operation quality and be difficult to guarantee.
The purpose of this utility model be overcome the above-mentioned deficiency of prior art and provide a kind of need not into the tubular type mud jacking of implanting the special punching of anchor pole from the anchor soil bolt.
The purpose of this utility model is achieved through the following technical solutions: the tubular type mud jacking is from the anchor soil bolt, comprise that a tubulose shaft and is fixed in the taper tip of this tubulose shaft front end, the outer wall of tubulose shaft is provided with some reversed acanthoid anchor tab, has the mud jacking hole that runs through the inside and outside wall of tubulose shaft on the tubular rod shaft body below the reversed acanthoid anchor tab.Using external force during use inserts in the native wall anchor pole to requiring anchorage depth, press water mud is then by being exposed at outward that the outer anchor pole tail end of Tu Bi pours into the inner chamber of tubulose shaft and the mud jacking hole offered penetrates into and desires in the consolidated soil on tubulose shaft body, reach the anchoring of vertical foundation pit retaining wall, guarantee its stability.The anchor tab available angle steel of reversed acanthoid is done, and increases the anchored force of anchor pole in soil except that playing, and squeezes at anchor pole and also plays the protection unlikely effect of being stopped up by soil in mud jacking hole in the soil layer process.What, alternate distance of its distribution are decided by the situation of the supporting Tu Bi of institute.The quantity in mud jacking hole can corresponding setting with anchor tab, also can be less than anchor tab.
The utility model project organization is reasonable, and processing and fabricating is easy and with low cost; Omitted the drilling operation in the existing bolt support operation simultaneously, operation simplification, efficient are improved.Be particularly suitable for the anchoring support of the broken ground of some pore-forming difficulties.
Further specify the utility model below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present utility model
As shown in Figure 1, formation of the present utility model comprises tubulose shaft 1, taper tip 2, reversed acanthoid anchor tab 3 and mud jacking hole 4.Tubulose shaft 1 can be the welded steel pipe making of 50mm with diameter, also can select for use the steel pipe of other diameter and wall thickness to process according to anti-earth lateral pressure and anchored force needs; Taper tip 2 can be that the II grade reinforcing steel of 20~25mm is forged or lathe grinding processes through heat with diameter, is welded on the front end of tubulose shaft 1.The situation of anchoring soil layer is along the alternate certain distance setting of all directions of tube wall on demand in mud jacking hole 4, and reversed acanthoid anchor tab 3 available angle steels are done, and is welded on the tubulose shaft outer wall and protects in the top in mud jacking hole 4.The size of angle steel section and length can resistance to plucking anchored force on request be determined.

Claims (2)

1, the tubular type mud jacking is from the anchor soil bolt, it is characterized in that described tubular type mud jacking comprises that from the anchor soil bolt tubulose shaft and is fixed in the taper tip of this tubulose shaft front end, the outer wall of tubulose shaft is provided with some reversed acanthoid anchor tab, has the mud jacking hole that runs through the inside and outside wall of tubulose shaft on the tubulose shaft body below the reversed acanthoid anchor tab.
2, tubular type mud jacking as claimed in claim 1 is characterized in that from the anchor soil bolt described reversed acanthoid anchor tab is made of the angle steel that is welded on the tubulose shaft outer wall.
CN 93238744 1993-05-24 1993-05-24 Tube type mud auto-anchor solum anchor rod Expired - Fee Related CN2154288Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93238744 CN2154288Y (en) 1993-05-24 1993-05-24 Tube type mud auto-anchor solum anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93238744 CN2154288Y (en) 1993-05-24 1993-05-24 Tube type mud auto-anchor solum anchor rod

Publications (1)

Publication Number Publication Date
CN2154288Y true CN2154288Y (en) 1994-01-26

Family

ID=33813407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93238744 Expired - Fee Related CN2154288Y (en) 1993-05-24 1993-05-24 Tube type mud auto-anchor solum anchor rod

Country Status (1)

Country Link
CN (1) CN2154288Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892852A (en) * 2010-07-30 2010-11-24 陈洪凯 Self-anchored emergency anchor rod and installation method thereof
CN102051882A (en) * 2010-11-23 2011-05-11 北京市公路桥梁建设集团有限公司 Anchor pipe and anchor pipe type soil nailing wall support method
CN102155015A (en) * 2011-03-01 2011-08-17 中国有色金属工业昆明勘察设计研究院 Barbed implanted steel pipe anchor rod
CN102605779A (en) * 2012-04-02 2012-07-25 胡忠志 High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure
CN103572757A (en) * 2013-11-07 2014-02-12 山东交通学院 Multi-level back-grasp-type hollow anchor rod and construction method thereof
CN103590422A (en) * 2012-08-17 2014-02-19 青岛天力建筑加固工程有限公司 Pull rod with cross short column
CN106120821A (en) * 2016-08-20 2016-11-16 三峡大学 Root-type anchoring support device and slope anchorage method for protecting support thereof in a kind of
CN106494573A (en) * 2016-11-02 2017-03-15 上海理工大学 A kind of floating marine formula platform seabed mooring fixing device with fractal characteristic
CN107816041A (en) * 2017-10-24 2018-03-20 建研地基基础工程有限责任公司 Non-dumping pore-forming prestressed anchor rod, anchor hole leakage-proof structure and construction method thereof
CN111270662A (en) * 2020-03-05 2020-06-12 安徽安舜水利建设工程有限公司 Construction method of composite foundation

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892852A (en) * 2010-07-30 2010-11-24 陈洪凯 Self-anchored emergency anchor rod and installation method thereof
CN101892852B (en) * 2010-07-30 2011-11-09 陈洪凯 Self-anchored emergency anchor rod and installation method thereof
CN102051882A (en) * 2010-11-23 2011-05-11 北京市公路桥梁建设集团有限公司 Anchor pipe and anchor pipe type soil nailing wall support method
CN102155015A (en) * 2011-03-01 2011-08-17 中国有色金属工业昆明勘察设计研究院 Barbed implanted steel pipe anchor rod
CN102605779A (en) * 2012-04-02 2012-07-25 胡忠志 High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure
CN102605779B (en) * 2012-04-02 2014-11-26 胡忠志 High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure
CN103590422A (en) * 2012-08-17 2014-02-19 青岛天力建筑加固工程有限公司 Pull rod with cross short column
CN103572757A (en) * 2013-11-07 2014-02-12 山东交通学院 Multi-level back-grasp-type hollow anchor rod and construction method thereof
CN106120821A (en) * 2016-08-20 2016-11-16 三峡大学 Root-type anchoring support device and slope anchorage method for protecting support thereof in a kind of
CN106494573A (en) * 2016-11-02 2017-03-15 上海理工大学 A kind of floating marine formula platform seabed mooring fixing device with fractal characteristic
CN107816041A (en) * 2017-10-24 2018-03-20 建研地基基础工程有限责任公司 Non-dumping pore-forming prestressed anchor rod, anchor hole leakage-proof structure and construction method thereof
CN107816041B (en) * 2017-10-24 2023-02-07 建研地基基础工程有限责任公司 Non-dumping hole-forming prestressed anchor rod, anchor hole leakage-proof structure and construction method thereof
CN111270662A (en) * 2020-03-05 2020-06-12 安徽安舜水利建设工程有限公司 Construction method of composite foundation

Similar Documents

Publication Publication Date Title
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN206784372U (en) Injection forming club-footed pile
CN2154288Y (en) Tube type mud auto-anchor solum anchor rod
CN109930609A (en) A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN106759295B (en) The quiet combined pile and its construction method for boring extruding-enlarging branch tray and tubular pole
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
JP2011017248A (en) Prefabricated pile
CN106120714A (en) A kind of device improving hollow pile bearing capacity and using method thereof
JP4724879B2 (en) Foundation pile structure
CN217206466U (en) Curved middle wall anti-deflection structure of multi-arch tunnel under terrain bias pressure
CN215482928U (en) Fill and silt district pressure-bearing type anti-floating anchor rod
CN205475207U (en) A construction equipment is pour to exposed basement rock or shallow overburden basement rock
CN109469055A (en) A kind of part pipe seam formula end expansion type energy-absorption anchor rod and its construction method
CN205975582U (en) Improve device of hollow pile bearing capacity
JP4724873B2 (en) Ready-made pile
US4588327A (en) Precast concrete pile and method of placing it in the ground
CN208039240U (en) A kind of built pile
CN206418494U (en) Steel reinforcement cage plants pile foundation structure
CN206956724U (en) A kind of anti-float roof bolt stump
CN220686085U (en) Composite anchor rod enclosure structure for oversized foundation pit
CN108149679A (en) A kind of construction for inserting special reinforcing bar rear in the plain concrete of CFG
CN214738005U (en) Long spiral jet enlarged footing pile
CN217810963U (en) Composite pile with built-in precast tubular pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee