CN201359787Y CNU2009201444447U CN200920144444U CN201359787Y CN 201359787 Y CN201359787 Y CN 201359787Y CN U2009201444447 U CNU2009201444447 U CN U2009201444447U CN 200920144444 U CN200920144444 U CN 200920144444U CN 201359787 Y CN201359787 Y CN 201359787Y
Authority
CN
China
Prior art keywords
media
mixed
network modules
modules mixed
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009201444447U
Other languages
Chinese (zh)
Inventor
阎子骥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2009201444447U priority Critical patent/CN201359787Y/en
Application granted granted Critical
Publication of CN201359787Y publication Critical patent/CN201359787Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses a practice training device of generic cabling of network engineering, consisting of one or more than one practice training unit; each practice training unit is provided with two steel structure columns, a base support frame, a top beam, a working area operating panel, a network module bracket, an embedded pipeline, a network module bracket mounting hole and a network module concealed box; the steel structure columns are vertically fixed at the two ends of the base support frame; the top beam is horizontally fixed at the upper ends of the two columns; the top beam, the columns and the base support frame form a square frame shaped structure; the working area operating panel is fixed at the front of the square frame shaped structure; the network module bracket is fixed on the practice training units or the combination of the practice training units; the embedded pipeline is distributed in the square frame shaped structure; and cables used in the practice training operation of generic cabling of the network engineering enter the network module mounting concealed box of the working area by the embedded pipeline. The practice training device is applicable to practice training of generic cabling of the network engineering, has perfect structure, convenient use and good training effect and is very similar with the practical wall.

Description

Network engineering comprehensive wiring actual training device
Technical field
The utility model belongs to a kind of teaching equipment, it specifically is a kind of a kind of utility model of simulant building thing body of wall, the device of network engineering comprehensive wiring real training is carried out in simulation in the constructed building space of body of wall, it is the equipment that the comprehensive wiring real training is carried out in the computer network and the communications field, be used for universities and colleges and carry out network engineering comprehensive wiring real training and experimental teaching, also can be used for professional training mechanism and carry out network engineering comprehensive wiring real training and experimental teaching.
Background technology
At present, the trainee of all kinds of universities, junior college, Vocational colleges student and training organization of specialized education carries out that the comprehensive cloth practical experience of network engineering is few, and manipulative ability is poor, is difficult to satisfy the needs of current computer network and communication high speed development.All kinds of schools and education and training organization particularly offer the school or the educational institution of computer network Engineering Speciality, strongly the device that need carry out the experiment of network engineering comprehensive wiring real training at intelligent building, comprehensive building construction.Present existing network comprehensive lining real training laboratory adopts teaching demonstration, plank or density board simulation, steel construction template die to intend mode mostly, also take to utilize waste and old buildings direct modeling, but these simulations all have a common characteristic, that is: all wire laying mode all adopts on simulant building wall surface and lays wire casing, and all comprehensive wiring real trainings experiments are all carried out in the wire casing of simulating the wall surface.Such real training experiment utilizes the mode of the real network engineering wiring of pre-buried pipeline that a great difference is arranged with newly-built building, really the time of day of real embodiment network engineering comprehensive wiring.In addition, existing these methods can not realize the state of network egress connection module in the network engineering comprehensive wiring workspace and true body of wall splicing.
The utility model content
The purpose of this utility model provides a kind of network engineering comprehensive wiring actual training device, it is can comprehensive simulated and realize the device of intelligent construction, comprehensive building building network engineering comprehensive wiring system real training, particularly it can accurately be simulated and utilize pre-buried pipeline to realize the network engineering comprehensive wiring in the building, and the device that comprises pre-buried pipeline installation real training, pre-buried pipeline and workspace network egress connection module installation real training can be provided.
The purpose of this utility model is achieved through the following technical solutions: network engineering comprehensive wiring actual training device, it is characterized in that: it is made up of the real training unit more than 1 or 1, and each real training unit is provided with two steel construction columns, base support frame, back timber, workspace guidance panel, mixed-media network modules mixed-media support, pre-buried pipeline, mixed-media network modules mixed-media support mounting hole, mixed-media network modules mixed-media concealed installation box; Described steel construction column is vertically fixed on the two ends of base support frame, and back timber is horizontally fixed on the upper end of two columns, and back timber and column, base support are configured to square frame shape framework, and the workspace guidance panel is fixed on the front of this square frame shape framework; The mixed-media network modules mixed-media support be fixed on real training unit or real training unit combination above; Described pre-buried pipeline uses pvc pipe or the metal tube of diameter 10mm-40mm, and this pre-buried pipeline cloth is placed in the square frame shape framework, pre-buried pipeline one end is connected to by the mixed-media network modules mixed-media support the employed mixed-media network modules mixed-media concealed installation of mixed-media network modules mixed-media box is installed, and be fixed on the real training unit by the mixed-media network modules mixed-media support, the other end of pre-buried pipeline is connected to the cable end of incoming cables; The cable that network engineering comprehensive wiring real training is manipulated enters the workspace mixed-media network modules mixed-media by pre-buried pipeline magazine is installed.
The utility model further improves and the additional project of enforcement is:
Be provided with incrustation buckle, side buckle, back timber buckle and acrylic transparent decorative plate on the surface of described square frame shape framework, the height of base support frame more than 1 meter adopt easy-to-dismount, highly be not less than the acrylic transparent decorative plate of 60cm; The incrustation buckle is installed in guidance panel top, workspace, and the side buckle is installed in the column outside, and the back timber buckle is installed in above the back timber.
The fixed orifice that is provided with the fixed orifice of erection bridge, the fixed orifice that the foot bolt of adjustment height is installed, installation light fixture on back timber and base support frame reaches in order to dispel the heat and to alleviate the louvre of this device deadweight.
Connect into the base form of " one " font or " L " font, " ten " font, " mouth " font, hexagonal, eight limit types between each real training unit by connector, or make up once more to make up by these base forms and form composite unit structure, above described real training unit or composite unit structure, be provided with crane span structure.
Described column, back timber and the base support frame groove shape that takes the shape of the letter U is provided with a plurality of holes that are connected and fixed at its edge and adjacent component junction.
On workspace guidance panel or incrustation buckle, be provided with the mixed-media network modules mixed-media support mounting hole of rectangle and the mixed-media network modules mixed-media concealed installation box that meets national standard of easy disassembly, and mixed-media network modules mixed-media support mounting hole, mixed-media network modules mixed-media concealed installation box are installed in the bottom of described square frame shape framework, and setting height(from bottom) is lower than apart from the position of ground 1500mm.
Mixed-media network modules mixed-media support mounting hole length and width are 70mm to 100mm.
The utility model basic component is the steel construction standard component, and it is general, interchangeable that these members install in each real training unit at this, so aggregate erection makes things convenient for the efficient height, can carry out the real training experiment repeatedly.Be connected into the base form of " one " font, " L " font, " ten " font, " mouth " font between each real training unit by the standard connector, and make up once more by these base forms and to make up the structure form, not only be used in combination conveniently, relation between more can each sub-subsystem of visual simulation buildings makes things convenient for the real training experiment.
Description of drawings
Fig. 1 is the structural representation of the utility model back timber;
Fig. 2 is the structural representation of back timber buckle;
Fig. 3 is the structural representation of base support;
Fig. 4 is the structural representation of middle part brace summer;
Fig. 5 is the structural representation of side buckle;
Fig. 6 is the structural representation of incrustation buckle;
Fig. 7 is the structural representation of workspace guidance panel;
Fig. 8 is the structural representation of column;
Fig. 9 is the structural representation of mixed-media network modules mixed-media support and mixed-media network modules mixed-media magazine;
Figure 10 is the structural representation of real training unit;
Figure 11 is the structural representation of real training unit combination body.
Embodiment
Below in conjunction with drawings and Examples the utility model is further described: embodiment: referring to accompanying drawing, network engineering comprehensive wiring actual training device, it is characterized in that: it is made up of 8 real training unit, and each real training unit is provided with two steel construction columns 2, base support frame 3, back timber 1, workspace guidance panel 5, mixed-media network modules mixed-media support 10, pre-buried pipeline 8, mixed-media network modules mixed-media support mounting hole 7, mixed-media network modules mixed-media concealed installation box 11; Described steel construction column is vertically fixed on the two ends of base support frame, and back timber is horizontally fixed on the upper end of two columns, and back timber and column, base support are configured to square frame shape framework, and the workspace guidance panel is fixed on the front of this square frame shape framework; The mixed-media network modules mixed-media support be fixed on real training unit or real training unit combination above; Described pre-buried pipeline uses the pvc pipe of diameter 20mm, and this pre-buried pipeline cloth is placed in the square frame shape framework, pre-buried pipeline one end is connected to by the mixed-media network modules mixed-media support the employed mixed-media network modules mixed-media concealed installation of mixed-media network modules mixed-media box 11 is installed, and be fixed on the real training unit by the mixed-media network modules mixed-media support, the other end of pre-buried pipeline is connected to the cable end of incoming cables; The cable that network engineering comprehensive wiring real training is manipulated enters the workspace mixed-media network modules mixed-media by pre-buried pipeline magazine is installed.
Be provided with incrustation buckle 4, side buckle 2.1, back timber buckle 1.1 and acrylic transparent decorative plate 6 on the surface of described square frame shape framework, the height of base support frame more than 1 meter adopt easy-to-dismount, highly be the acrylic transparent decorative plate of 60cm; The incrustation buckle is installed in guidance panel top, workspace, and the side buckle is installed in the column outside, and the back timber buckle is installed in above the back timber.
The fixed orifice that is provided with the fixed orifice of erection bridge, the fixed orifice that the foot bolt of adjustment height is installed, installation light fixture on back timber and base support frame reaches in order to dispel the heat and to alleviate the louvre of this device deadweight.Connect into two " ten " font composite unit structures by connector between each real training unit, above this composite unit structure, be provided with crane span structure 9.Described column, back timber and the base support frame groove shape that takes the shape of the letter U is provided with a plurality of holes 12 that are connected and fixed at its edge and adjacent component junction.
On workspace guidance panel or incrustation buckle, be provided with the mixed-media network modules mixed-media support mounting hole 7 of rectangle and the mixed-media network modules mixed-media concealed installation box 11 that meets national standard of easy disassembly, and mixed-media network modules mixed-media support mounting hole 7, mixed-media network modules mixed-media concealed installation box 11 are installed in the bottom of described square frame shape framework, and setting height(from bottom) is lower than apart from the position of ground 1500mm.Mixed-media network modules mixed-media support mounting hole 7 length are 100mm, and width is 70mm.
Present embodiment is very good through trial effect, is subjected to faculty's welcome deeply.

Claims (7)

1, a kind of network engineering comprehensive wiring actual training device, it is characterized in that: it is made up of the real training unit more than 1 or 1, and each real training unit is provided with two steel construction columns (2), base support frame (3), back timber (1), workspace guidance panel (5), mixed-media network modules mixed-media support (10), pre-buried pipeline (8), mixed-media network modules mixed-media support mounting hole (7), mixed-media network modules mixed-media concealed installation box (11); Described steel construction column is vertically fixed on the two ends of base support frame, and back timber is horizontally fixed on the upper end of two columns, and back timber and column, base support are configured to square frame shape framework, and the workspace guidance panel is fixed on the front of this square frame shape framework; The mixed-media network modules mixed-media support be fixed on real training unit or real training unit combination above; Described pre-buried pipeline uses pvc pipe or the metal tube of diameter 10mm-40mm, and this pre-buried pipeline cloth is placed in the square frame shape framework, pre-buried pipeline one end is connected to by the mixed-media network modules mixed-media support mixed-media network modules mixed-media employed mixed-media network modules mixed-media concealed installation box (11) is installed, and be fixed on the real training unit by the mixed-media network modules mixed-media support, the other end of pre-buried pipeline is connected to the cable end of incoming cables; The cable that network engineering comprehensive wiring real training is manipulated enters the workspace mixed-media network modules mixed-media by pre-buried pipeline magazine is installed.
2, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: be provided with incrustation buckle (4), side buckle (2.1), back timber buckle (1.1) and acrylic transparent decorative plate (6) on the surface of described square frame shape framework, the height of base support frame more than 1 meter adopt easy-to-dismount, highly be not less than the acrylic transparent decorative plate of 60cm; The incrustation buckle is installed in guidance panel top, workspace, and the side buckle is installed in the column outside, and the back timber buckle is installed in above the back timber.
3, network engineering comprehensive wiring actual training device according to claim 1 is characterized in that: the fixed orifice that is provided with the fixed orifice of erection bridge, the fixed orifice that the foot bolt of adjustment height is installed, installation light fixture on back timber and base support frame reaches in order to dispel the heat and to alleviate the louvre of this device deadweight.
4, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: the base form that connects into " one " font or " L " font, " ten " font, " mouth " font, hexagonal, eight limit types between each real training unit by connector, or make up once more to make up by these base forms and form composite unit structure, above described real training unit or composite unit structure, be provided with crane span structure (9).
5, network engineering comprehensive wiring actual training device according to claim 1 is characterized in that: described column, back timber and the base support frame groove shape that takes the shape of the letter U is provided with a plurality of holes (12) that are connected and fixed at its edge and adjacent component junction.
6, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: on workspace guidance panel or incrustation buckle, be provided with the mixed-media network modules mixed-media support mounting hole (7) of rectangle and the mixed-media network modules mixed-media concealed installation box (11) that meets national standard of easy disassembly, and mixed-media network modules mixed-media support mounting hole (7), mixed-media network modules mixed-media concealed installation box (11) are installed in the bottom of described square frame shape framework, and setting height(from bottom) is lower than apart from the position of ground 1500mm.
7, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: mixed-media network modules mixed-media support mounting hole (7) length and width are 70mm to 100mm.
CNU2009201444447U 2009-02-23 2009-02-23 Practice training device of generic cabling of network engineering Expired - Fee Related CN201359787Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009201444447U CN201359787Y (en) 2009-02-23 2009-02-23 Practice training device of generic cabling of network engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009201444447U CN201359787Y (en) 2009-02-23 2009-02-23 Practice training device of generic cabling of network engineering

Publications (1)

Publication Number Publication Date
CN201359787Y true CN201359787Y (en) 2009-12-09

Family

ID=41425552

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009201444447U Expired - Fee Related CN201359787Y (en) 2009-02-23 2009-02-23 Practice training device of generic cabling of network engineering

Country Status (1)

Country Link
CN (1) CN201359787Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104992591A (en) * 2015-07-07 2015-10-21 厦门南洋职业学院 Removable double-layer integrated wiring teaching training simulation wall with open installation and concealed installation functions
CN113327476A (en) * 2021-06-23 2021-08-31 西安开元电子实业有限公司 Installation and maintenance skill training and identification device for comprehensive wiring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104992591A (en) * 2015-07-07 2015-10-21 厦门南洋职业学院 Removable double-layer integrated wiring teaching training simulation wall with open installation and concealed installation functions
CN113327476A (en) * 2021-06-23 2021-08-31 西安开元电子实业有限公司 Installation and maintenance skill training and identification device for comprehensive wiring system

Similar Documents

Publication Publication Date Title
CN203759926U (en) Physical training room for enterprise safety education
CN201359787Y (en) Practice training device of generic cabling of network engineering
CN201812416U (en) Power distribution training system for electricians
CN201673614U (en) Comprehensive wiring training simulation building and component unit thereof
CN201066899Y (en) Network integrated cabling practical training device
CN201518182U (en) Generic cabling practical training wall apparatus
CN202976598U (en) Axonometric drawing and three view drawing forming demonstrator
CN206058583U (en) A kind of Remote Education System Based On Internet
CN201369120Y (en) Novel concave-convex combined wiring practical training simulated wall group
CN102750864A (en) Teaching and practical training device arranged on equipment
CN202736341U (en) Novel electrical mounting and building practical training examination device
CN209118623U (en) Assembled architecture gluing practice teaching model equipment
CN102779442A (en) Piano type combined control table
CN208569909U (en) A kind of practice training device of generic cabling of network engineering
CN202887551U (en) Electrical installation and practical training examine platform
CN206741739U (en) A kind of Chinese literature teaching demonstration device
CN204667721U (en) A kind of physical teaching demonstration device
CN106128283A (en) Underground piping vestibule tectonic model and manufacture method
CN201689562U (en) Indoor electric installation and assessment device
CN216053573U (en) Assembled steel structure solid model for teaching
CN206931295U (en) A kind of building structure model for being used to simulate seismic experiment
CN202306937U (en) Novel comprehensive wiring practical training simulation building and component unit thereof
CN205920641U (en) Information network examining device that lays wire
CN205541587U (en) Presentation device is used in power equipment training
CN106297460A (en) A kind of generic cabling practical training wall apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091209