CN201359787Y - Practice training device of generic cabling of network engineering - Google Patents
Practice training device of generic cabling of network engineering Download PDFInfo
- Publication number
- CN201359787Y CN201359787Y CNU2009201444447U CN200920144444U CN201359787Y CN 201359787 Y CN201359787 Y CN 201359787Y CN U2009201444447 U CNU2009201444447 U CN U2009201444447U CN 200920144444 U CN200920144444 U CN 200920144444U CN 201359787 Y CN201359787 Y CN 201359787Y
- Authority
- CN
- China
- Prior art keywords
- media
- mixed
- network modules
- modules mixed
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Instructional Devices (AREA)
Abstract
The utility model discloses a practice training device of generic cabling of network engineering, consisting of one or more than one practice training unit; each practice training unit is provided with two steel structure columns, a base support frame, a top beam, a working area operating panel, a network module bracket, an embedded pipeline, a network module bracket mounting hole and a network module concealed box; the steel structure columns are vertically fixed at the two ends of the base support frame; the top beam is horizontally fixed at the upper ends of the two columns; the top beam, the columns and the base support frame form a square frame shaped structure; the working area operating panel is fixed at the front of the square frame shaped structure; the network module bracket is fixed on the practice training units or the combination of the practice training units; the embedded pipeline is distributed in the square frame shaped structure; and cables used in the practice training operation of generic cabling of the network engineering enter the network module mounting concealed box of the working area by the embedded pipeline. The practice training device is applicable to practice training of generic cabling of the network engineering, has perfect structure, convenient use and good training effect and is very similar with the practical wall.
Description
Technical field
The utility model belongs to a kind of teaching equipment, it specifically is a kind of a kind of utility model of simulant building thing body of wall, the device of network engineering comprehensive wiring real training is carried out in simulation in the constructed building space of body of wall, it is the equipment that the comprehensive wiring real training is carried out in the computer network and the communications field, be used for universities and colleges and carry out network engineering comprehensive wiring real training and experimental teaching, also can be used for professional training mechanism and carry out network engineering comprehensive wiring real training and experimental teaching.
Background technology
At present, the trainee of all kinds of universities, junior college, Vocational colleges student and training organization of specialized education carries out that the comprehensive cloth practical experience of network engineering is few, and manipulative ability is poor, is difficult to satisfy the needs of current computer network and communication high speed development.All kinds of schools and education and training organization particularly offer the school or the educational institution of computer network Engineering Speciality, strongly the device that need carry out the experiment of network engineering comprehensive wiring real training at intelligent building, comprehensive building construction.Present existing network comprehensive lining real training laboratory adopts teaching demonstration, plank or density board simulation, steel construction template die to intend mode mostly, also take to utilize waste and old buildings direct modeling, but these simulations all have a common characteristic, that is: all wire laying mode all adopts on simulant building wall surface and lays wire casing, and all comprehensive wiring real trainings experiments are all carried out in the wire casing of simulating the wall surface.Such real training experiment utilizes the mode of the real network engineering wiring of pre-buried pipeline that a great difference is arranged with newly-built building, really the time of day of real embodiment network engineering comprehensive wiring.In addition, existing these methods can not realize the state of network egress connection module in the network engineering comprehensive wiring workspace and true body of wall splicing.
The utility model content
The purpose of this utility model provides a kind of network engineering comprehensive wiring actual training device, it is can comprehensive simulated and realize the device of intelligent construction, comprehensive building building network engineering comprehensive wiring system real training, particularly it can accurately be simulated and utilize pre-buried pipeline to realize the network engineering comprehensive wiring in the building, and the device that comprises pre-buried pipeline installation real training, pre-buried pipeline and workspace network egress connection module installation real training can be provided.
The purpose of this utility model is achieved through the following technical solutions: network engineering comprehensive wiring actual training device, it is characterized in that: it is made up of the real training unit more than 1 or 1, and each real training unit is provided with two steel construction columns, base support frame, back timber, workspace guidance panel, mixed-media network modules mixed-media support, pre-buried pipeline, mixed-media network modules mixed-media support mounting hole, mixed-media network modules mixed-media concealed installation box; Described steel construction column is vertically fixed on the two ends of base support frame, and back timber is horizontally fixed on the upper end of two columns, and back timber and column, base support are configured to square frame shape framework, and the workspace guidance panel is fixed on the front of this square frame shape framework; The mixed-media network modules mixed-media support be fixed on real training unit or real training unit combination above; Described pre-buried pipeline uses pvc pipe or the metal tube of diameter 10mm-40mm, and this pre-buried pipeline cloth is placed in the square frame shape framework, pre-buried pipeline one end is connected to by the mixed-media network modules mixed-media support the employed mixed-media network modules mixed-media concealed installation of mixed-media network modules mixed-media box is installed, and be fixed on the real training unit by the mixed-media network modules mixed-media support, the other end of pre-buried pipeline is connected to the cable end of incoming cables; The cable that network engineering comprehensive wiring real training is manipulated enters the workspace mixed-media network modules mixed-media by pre-buried pipeline magazine is installed.
The utility model further improves and the additional project of enforcement is:
Be provided with incrustation buckle, side buckle, back timber buckle and acrylic transparent decorative plate on the surface of described square frame shape framework, the height of base support frame more than 1 meter adopt easy-to-dismount, highly be not less than the acrylic transparent decorative plate of 60cm; The incrustation buckle is installed in guidance panel top, workspace, and the side buckle is installed in the column outside, and the back timber buckle is installed in above the back timber.
The fixed orifice that is provided with the fixed orifice of erection bridge, the fixed orifice that the foot bolt of adjustment height is installed, installation light fixture on back timber and base support frame reaches in order to dispel the heat and to alleviate the louvre of this device deadweight.
Connect into the base form of " one " font or " L " font, " ten " font, " mouth " font, hexagonal, eight limit types between each real training unit by connector, or make up once more to make up by these base forms and form composite unit structure, above described real training unit or composite unit structure, be provided with crane span structure.
Described column, back timber and the base support frame groove shape that takes the shape of the letter U is provided with a plurality of holes that are connected and fixed at its edge and adjacent component junction.
On workspace guidance panel or incrustation buckle, be provided with the mixed-media network modules mixed-media support mounting hole of rectangle and the mixed-media network modules mixed-media concealed installation box that meets national standard of easy disassembly, and mixed-media network modules mixed-media support mounting hole, mixed-media network modules mixed-media concealed installation box are installed in the bottom of described square frame shape framework, and setting height(from bottom) is lower than apart from the position of ground 1500mm.
Mixed-media network modules mixed-media support mounting hole length and width are 70mm to 100mm.
The utility model basic component is the steel construction standard component, and it is general, interchangeable that these members install in each real training unit at this, so aggregate erection makes things convenient for the efficient height, can carry out the real training experiment repeatedly.Be connected into the base form of " one " font, " L " font, " ten " font, " mouth " font between each real training unit by the standard connector, and make up once more by these base forms and to make up the structure form, not only be used in combination conveniently, relation between more can each sub-subsystem of visual simulation buildings makes things convenient for the real training experiment.
Description of drawings
Fig. 1 is the structural representation of the utility model back timber;
Fig. 2 is the structural representation of back timber buckle;
Fig. 3 is the structural representation of base support;
Fig. 4 is the structural representation of middle part brace summer;
Fig. 5 is the structural representation of side buckle;
Fig. 6 is the structural representation of incrustation buckle;
Fig. 7 is the structural representation of workspace guidance panel;
Fig. 8 is the structural representation of column;
Fig. 9 is the structural representation of mixed-media network modules mixed-media support and mixed-media network modules mixed-media magazine;
Figure 10 is the structural representation of real training unit;
Figure 11 is the structural representation of real training unit combination body.
Embodiment
Below in conjunction with drawings and Examples the utility model is further described: embodiment: referring to accompanying drawing, network engineering comprehensive wiring actual training device, it is characterized in that: it is made up of 8 real training unit, and each real training unit is provided with two steel construction columns 2, base support frame 3, back timber 1, workspace guidance panel 5, mixed-media network modules mixed-media support 10, pre-buried pipeline 8, mixed-media network modules mixed-media support mounting hole 7, mixed-media network modules mixed-media concealed installation box 11; Described steel construction column is vertically fixed on the two ends of base support frame, and back timber is horizontally fixed on the upper end of two columns, and back timber and column, base support are configured to square frame shape framework, and the workspace guidance panel is fixed on the front of this square frame shape framework; The mixed-media network modules mixed-media support be fixed on real training unit or real training unit combination above; Described pre-buried pipeline uses the pvc pipe of diameter 20mm, and this pre-buried pipeline cloth is placed in the square frame shape framework, pre-buried pipeline one end is connected to by the mixed-media network modules mixed-media support the employed mixed-media network modules mixed-media concealed installation of mixed-media network modules mixed-media box 11 is installed, and be fixed on the real training unit by the mixed-media network modules mixed-media support, the other end of pre-buried pipeline is connected to the cable end of incoming cables; The cable that network engineering comprehensive wiring real training is manipulated enters the workspace mixed-media network modules mixed-media by pre-buried pipeline magazine is installed.
Be provided with incrustation buckle 4, side buckle 2.1, back timber buckle 1.1 and acrylic transparent decorative plate 6 on the surface of described square frame shape framework, the height of base support frame more than 1 meter adopt easy-to-dismount, highly be the acrylic transparent decorative plate of 60cm; The incrustation buckle is installed in guidance panel top, workspace, and the side buckle is installed in the column outside, and the back timber buckle is installed in above the back timber.
The fixed orifice that is provided with the fixed orifice of erection bridge, the fixed orifice that the foot bolt of adjustment height is installed, installation light fixture on back timber and base support frame reaches in order to dispel the heat and to alleviate the louvre of this device deadweight.Connect into two " ten " font composite unit structures by connector between each real training unit, above this composite unit structure, be provided with crane span structure 9.Described column, back timber and the base support frame groove shape that takes the shape of the letter U is provided with a plurality of holes 12 that are connected and fixed at its edge and adjacent component junction.
On workspace guidance panel or incrustation buckle, be provided with the mixed-media network modules mixed-media support mounting hole 7 of rectangle and the mixed-media network modules mixed-media concealed installation box 11 that meets national standard of easy disassembly, and mixed-media network modules mixed-media support mounting hole 7, mixed-media network modules mixed-media concealed installation box 11 are installed in the bottom of described square frame shape framework, and setting height(from bottom) is lower than apart from the position of ground 1500mm.Mixed-media network modules mixed-media support mounting hole 7 length are 100mm, and width is 70mm.
Present embodiment is very good through trial effect, is subjected to faculty's welcome deeply.
Claims (7)
1, a kind of network engineering comprehensive wiring actual training device, it is characterized in that: it is made up of the real training unit more than 1 or 1, and each real training unit is provided with two steel construction columns (2), base support frame (3), back timber (1), workspace guidance panel (5), mixed-media network modules mixed-media support (10), pre-buried pipeline (8), mixed-media network modules mixed-media support mounting hole (7), mixed-media network modules mixed-media concealed installation box (11); Described steel construction column is vertically fixed on the two ends of base support frame, and back timber is horizontally fixed on the upper end of two columns, and back timber and column, base support are configured to square frame shape framework, and the workspace guidance panel is fixed on the front of this square frame shape framework; The mixed-media network modules mixed-media support be fixed on real training unit or real training unit combination above; Described pre-buried pipeline uses pvc pipe or the metal tube of diameter 10mm-40mm, and this pre-buried pipeline cloth is placed in the square frame shape framework, pre-buried pipeline one end is connected to by the mixed-media network modules mixed-media support mixed-media network modules mixed-media employed mixed-media network modules mixed-media concealed installation box (11) is installed, and be fixed on the real training unit by the mixed-media network modules mixed-media support, the other end of pre-buried pipeline is connected to the cable end of incoming cables; The cable that network engineering comprehensive wiring real training is manipulated enters the workspace mixed-media network modules mixed-media by pre-buried pipeline magazine is installed.
2, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: be provided with incrustation buckle (4), side buckle (2.1), back timber buckle (1.1) and acrylic transparent decorative plate (6) on the surface of described square frame shape framework, the height of base support frame more than 1 meter adopt easy-to-dismount, highly be not less than the acrylic transparent decorative plate of 60cm; The incrustation buckle is installed in guidance panel top, workspace, and the side buckle is installed in the column outside, and the back timber buckle is installed in above the back timber.
3, network engineering comprehensive wiring actual training device according to claim 1 is characterized in that: the fixed orifice that is provided with the fixed orifice of erection bridge, the fixed orifice that the foot bolt of adjustment height is installed, installation light fixture on back timber and base support frame reaches in order to dispel the heat and to alleviate the louvre of this device deadweight.
4, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: the base form that connects into " one " font or " L " font, " ten " font, " mouth " font, hexagonal, eight limit types between each real training unit by connector, or make up once more to make up by these base forms and form composite unit structure, above described real training unit or composite unit structure, be provided with crane span structure (9).
5, network engineering comprehensive wiring actual training device according to claim 1 is characterized in that: described column, back timber and the base support frame groove shape that takes the shape of the letter U is provided with a plurality of holes (12) that are connected and fixed at its edge and adjacent component junction.
6, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: on workspace guidance panel or incrustation buckle, be provided with the mixed-media network modules mixed-media support mounting hole (7) of rectangle and the mixed-media network modules mixed-media concealed installation box (11) that meets national standard of easy disassembly, and mixed-media network modules mixed-media support mounting hole (7), mixed-media network modules mixed-media concealed installation box (11) are installed in the bottom of described square frame shape framework, and setting height(from bottom) is lower than apart from the position of ground 1500mm.
7, network engineering comprehensive wiring actual training device according to claim 1, it is characterized in that: mixed-media network modules mixed-media support mounting hole (7) length and width are 70mm to 100mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009201444447U CN201359787Y (en) | 2009-02-23 | 2009-02-23 | Practice training device of generic cabling of network engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009201444447U CN201359787Y (en) | 2009-02-23 | 2009-02-23 | Practice training device of generic cabling of network engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201359787Y true CN201359787Y (en) | 2009-12-09 |
Family
ID=41425552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2009201444447U Expired - Fee Related CN201359787Y (en) | 2009-02-23 | 2009-02-23 | Practice training device of generic cabling of network engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201359787Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104992591A (en) * | 2015-07-07 | 2015-10-21 | 厦门南洋职业学院 | Removable double-layer integrated wiring teaching training simulation wall with open installation and concealed installation functions |
CN113327476A (en) * | 2021-06-23 | 2021-08-31 | 西安开元电子实业有限公司 | Installation and maintenance skill training and identification device for comprehensive wiring system |
-
2009
- 2009-02-23 CN CNU2009201444447U patent/CN201359787Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104992591A (en) * | 2015-07-07 | 2015-10-21 | 厦门南洋职业学院 | Removable double-layer integrated wiring teaching training simulation wall with open installation and concealed installation functions |
CN113327476A (en) * | 2021-06-23 | 2021-08-31 | 西安开元电子实业有限公司 | Installation and maintenance skill training and identification device for comprehensive wiring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203759926U (en) | Physical training room for enterprise safety education | |
CN201359787Y (en) | Practice training device of generic cabling of network engineering | |
CN201812416U (en) | Power distribution training system for electricians | |
CN201673614U (en) | Comprehensive wiring training simulation building and component unit thereof | |
CN201066899Y (en) | Network integrated cabling practical training device | |
CN201518182U (en) | Generic cabling practical training wall apparatus | |
CN202976598U (en) | Axonometric drawing and three view drawing forming demonstrator | |
CN206058583U (en) | A kind of Remote Education System Based On Internet | |
CN201369120Y (en) | Novel concave-convex combined wiring practical training simulated wall group | |
CN102750864A (en) | Teaching and practical training device arranged on equipment | |
CN202736341U (en) | Novel electrical mounting and building practical training examination device | |
CN209118623U (en) | Assembled architecture gluing practice teaching model equipment | |
CN102779442A (en) | Piano type combined control table | |
CN208569909U (en) | A kind of practice training device of generic cabling of network engineering | |
CN202887551U (en) | Electrical installation and practical training examine platform | |
CN206741739U (en) | A kind of Chinese literature teaching demonstration device | |
CN204667721U (en) | A kind of physical teaching demonstration device | |
CN106128283A (en) | Underground piping vestibule tectonic model and manufacture method | |
CN201689562U (en) | Indoor electric installation and assessment device | |
CN216053573U (en) | Assembled steel structure solid model for teaching | |
CN206931295U (en) | A kind of building structure model for being used to simulate seismic experiment | |
CN202306937U (en) | Novel comprehensive wiring practical training simulation building and component unit thereof | |
CN205920641U (en) | Information network examining device that lays wire | |
CN205541587U (en) | Presentation device is used in power equipment training | |
CN106297460A (en) | A kind of generic cabling practical training wall apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091209 Termination date: 20100223 |