CN201673614U - Comprehensive wiring training simulation building and component unit thereof - Google Patents

Comprehensive wiring training simulation building and component unit thereof Download PDF

Info

Publication number
CN201673614U
CN201673614U CN2010201793559U CN201020179355U CN201673614U CN 201673614 U CN201673614 U CN 201673614U CN 2010201793559 U CN2010201793559 U CN 2010201793559U CN 201020179355 U CN201020179355 U CN 201020179355U CN 201673614 U CN201673614 U CN 201673614U
Authority
CN
China
Prior art keywords
building
real training
comprehensive wiring
assembly unit
training simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201793559U
Other languages
Chinese (zh)
Inventor
吴少鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG VCOM EDUCATION TECHNOLOGY CO., LTD.
Original Assignee
Guangzhou Weikang Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Weikang Communication Technology Co Ltd filed Critical Guangzhou Weikang Communication Technology Co Ltd
Priority to CN2010201793559U priority Critical patent/CN201673614U/en
Application granted granted Critical
Publication of CN201673614U publication Critical patent/CN201673614U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses a comprehensive wiring training simulation building and a component unit thereof. The component unit is a square body. At least one end face of the square body is provided with a mounting hole array and the inside of the end face is provided with a density board. The training simulation building is formed by movably splicing a plurality of component units into a plurality of simulation working regions. Compared with the prior art, the comprehensive wiring training simulation building has the advantages of 1, simple structure, easy manufacturing, flexible and simple and convenient assembly and capability of being combined and arranged freely according to the specific environment and specific requirements of a training room; 2, high simulation of the engineering environment so as to make a trainer experience the real client use environment comprehensively and increase fun of training teaching; and 3, long service life, low cost, easier maintenance and replacement and high safety.

Description

Comprehensive wiring real training simulation building and assembly unit thereof
Technical field
The utility model relates to a kind of comprehensive wiring actual training device, refers in particular to a kind of comprehensive wiring real training simulation building and assembly unit thereof.
Background technology
Comprehensive wiring is the important component part of modern intelligent construction, be a kind of modular, interior of building that dirigibility is high or the information transfer channel between the buildings, speech ciphering equipment, vision facilities, data equipment, switching equipment and information management system are connected with each other, these equipment and external communication network are interconnected, so the construction of integration laying line system engineering have the very urgent market demand and the market space very widely.And the Ministry of Information industry and the Ministry of Education are doing a lot of concrete guiding works aspect the construction of standard and the personnel training, the numerous colleges and universities in the whole nation offer the comprehensive wiring course one after another on its computing machine or network major setting, for relevant industries have been cultivated a collection of high-quality generic cabling engineering teacher.
But comprehensive wiring is a comprehensive engineering, and its project implementation is a general flow with design, construction, examination, and traditional instructional mode then biases toward the education of knowwhy.Greatly develop professorship education in national Eleventh-Five Year Plan, cultivate under the guidance of practicality technician's thought in short supply, many experiments, actual training device arise at the historic moment, thereby be platform and scheme that universities and colleges provide the practical operation of relevant speciality technical ability to impart knowledge to students, the comprehensive wiring experience system is wherein a kind of.
At present, existing comparatively perfect comprehensive wiring experience system generally need possess the function of three parts, i.e. knowledge learning part, skill training part and engineering practice part.Knowledge learning partly provides various data, image, video recording, sample etc., and integral body presents integration laying line system engineering related various knowledge and product; The basic skills that the main training of students of skill training part is installed and operated various place-and-route products; Engineering practice partly comprises practical engineering project teaching and the teaching of model engineering project, teaching with respect to this practice type of practical engineering project, model engineering project teaching is in the analog wire laying engineering-environment through the in-depth design, and the omnibearing training such as design, management, installation of each related subsystem of wiring installation and route are provided for the student.Yet, the various needs of facing the reality and imparting knowledge to students, the existing various solutions of industry are not enough all to some extent aspect skill training and model engineering Item Practice Training, the content of existing comprehensive wiring skill training solution generally comprises the making of wire jumper crystal head, information module termination, distributing frame termination or wire jumper test etc., but the trainer is as the technician of comprehensive wiring system in future, it is far from being enough that above several technical ability of putting into practice is only arranged, so school presses for and has multi-purpose real training operating system and impart knowledge to students; On the other hand, existing real training simulation building generally adopts solid wall, for example brick and tile wall or wood siding wall, there is problems such as lacking repetitive operation, real training poor effect, cost height in this real training simulation building, and for fear of the difficulty that realizes commercialization, the product of domestic each big real training chamber brand is never broken through at present on the real training functional item.
The utility model content
The purpose of this utility model is to overcome shortcoming of the prior art with not enough, provides a kind of comprehensive wiring real training simple in structure, the assembling flexible and convenient to simulate the building assembly unit.
Another purpose of the present utility model is to provide a kind of comprehensive wiring real training simulation building of height Simulation Engineering environment.
To achieve these goals one, the utility model is realized by following technical scheme:
A kind of comprehensive wiring real training simulation building assembly unit, described assembly unit is a square body, at least one end face of square body is provided with the mounting hole array and a density board has been set up in this end face inboard.
Further, described assembly unit comprises the square body metal framework and covers metal decking outward that covering metal decking outward is that loading and unloading type is fixedlyed connected with the square body metal framework.
Further, describedly outer cover metal decking and the square body metal framework is fixing for being spirally connected, or connect and fix.
What further, described assembly unit was relative two outer covers that metal decking is respectively equipped with the mounting hole array and a density board has been set up in its inboard.
Further, the described outer inboard opposite end of the metal decking portion of covering is provided with a draw-in groove that is used for fixing density board respectively.
Further, the mounting hole array of described assembly unit is provided with the mounting hole in different apertures.
To achieve these goals two, the utility model is realized by following technical scheme:
A kind of by the assembled comprehensive wiring real training simulation building of said modules unit activity, described real training simulation building forms a plurality of analog operation interval by several assembly unit activity assembly units.
Further, described real training simulation building is provided with the separation laminate, and the separation laminate will be simulated the building in vertical direction and is divided into upper and lower floor.
Further, the separation laminate in described real training simulation building is provided with the vertical pipe well that is communicated with upper and lower floor, and separates the supporting floor cat ladder that is provided with of laminate.
Further, each analog operation interval in described real training simulation building is respectively equipped with power supply and floor light.
The utility model compared with prior art, its beneficial effect is:
1, simple in structure, easy to manufacture, the assembling flexible and convenient can be put according to the concrete environment and the real needs independent assortment of real training chamber;
2, height Simulation Engineering environment makes the trainer know from experience real client's environment for use comprehensively, increases the enjoyment of practice-training teaching;
3, long service life, cost is low, and the maintain and replace ratio is easier to, and is safe.
In order to understand the utility model more clearly, set forth embodiment of the present utility model below with reference to description of drawings.
Description of drawings
Fig. 1 is the structural representation of comprehensive wiring real training simulation building assembly unit.
Fig. 2 is the inner structure synoptic diagram that Fig. 1 covers metal decking at home and abroad.
Fig. 3 is the package assembly synoptic diagram that Fig. 1 covers metal decking and density board at home and abroad.
Fig. 4 is the structural representation in comprehensive wiring real training simulation building.
Embodiment
Shown in Fig. 1~3, comprehensive wiring real training described in the utility model simulation building assembly unit 1 is a square body, and it comprises square body metal framework 11 and cover metal decking 12 outward, covers metal decking 12 and square body metal framework 11 outward and is connected by screw retention.Wherein, what described assembly unit 1 was relative two covers metal decking 12 and is respectively equipped with mounting hole array 13 outward, mounting hole array 13 is provided with the mounting hole in different apertures, to adapt to the standard web member of different size, and above-mentioned two the outer inboards of covering metal decking 12 also set up a density board 2 respectively, density board 2 is by being located at the outer draw-in groove 14 that covers the inboard opposite end of metal decking 12 portion and covering metal decking 12 activities outward and slip fixing.
As shown in Figure 4, comprehensive wiring real training simulation described in the utility model building 3, be assemblied to form by several said modules unit 1 activities, integral body is " E " font structure, between forming device, between management and analog operation interval such as workspace, each analog operation interval is respectively equipped with independent current source and floor light, but all comprehensive wiring function systems of simulant building thing, i.e. subsystem, vertical subsystem, horizontal subsystem and buildings subsystem between workspace subsystem, equipment room subsystem, management.Wherein, described real training simulation building 3 is provided with separates laminate 31, and separation laminate 31 will be simulated building 3 in vertical direction and is divided into upper and lower floor, can the real engineering-environment of height emulation.Further, described separation laminate 31 is provided with the vertical pipe well that is communicated with upper and lower floor, is used to be provided with vertical trunk wire casing, constitutes real building pipe well environment; Simultaneously, separate the laminate 31 supporting floor cat ladders 32 that are provided with, be convenient to.
Comprehensive wiring real training simulation described in the utility model building is not limited to said structure, it can carry out independent assortment according to the site environment of real training chamber and specific requirement and put, for example " rich " font structure, " ten " font structure, " soil " font structure or the like, the flexible and convenient practicality.
During real training, the student is according to the teaching requirement, can simulate on the metope that the building is made of assembly unit in real training utilizes tool master that various PVC wire casings are installed, metal raceway, connect support, the metal crane span structure, network cabinet, the network wiring frame, equipment such as the network switch and Graphic Panel, real training simulation building has enough redundancies to the mass loading of the said equipment, thereby on the basis of height Simulation Engineering environment, carry out the workspace subsystem, the equipment room subsystem, subsystem between management, vertical subsystem, comprehensive wirings such as horizontal subsystem and buildings subsystem exercise, make the student know from experience real client's environment for use, to strengthen the practical operation ability and to increase practice-training teaching enjoyment comprehensively.
The utility model does not limit to above-mentioned embodiment, if various changes of the present utility model or modification are not broken away from spirit and scope of the present utility model, if these are changed and modification belongs within claim of the present utility model and the equivalent technologies scope, then the utility model also is intended to comprise these changes and modification.

Claims (10)

1. a comprehensive wiring real training is simulated the building assembly unit, and it is characterized in that: described assembly unit is a square body, and at least one end face of square body is provided with the mounting hole array and a density board has been set up in this end face inboard.
2. comprehensive wiring real training simulation according to claim 1 building assembly unit, it is characterized in that: described assembly unit comprises the square body metal framework and covers metal decking outward that covering metal decking outward is that loading and unloading type is fixedlyed connected with the square body metal framework.
3. comprehensive wiring real training according to claim 2 simulation building assembly unit is characterized in that: describedly cover metal decking and the square body metal framework is fixing for being spirally connected outward, or connect and fix.
4. comprehensive wiring real training according to claim 2 simulation building assembly unit is characterized in that: what described assembly unit was relative two covers that metal decking is respectively equipped with the mounting hole array and a density board has been set up in its inboard outward.
5. comprehensive wiring real training according to claim 4 simulation building assembly unit is characterized in that: the described outer inboard opposite end of the metal decking portion of covering is provided with a draw-in groove that is used for fixing density board respectively.
6. comprehensive wiring real training simulation according to claim 1 building assembly unit, it is characterized in that: the mounting hole array of described assembly unit is provided with the mounting hole in different apertures.
7. one kind by the movable assembled comprehensive wiring real training simulation building of the described assembly unit of claim 1, and it is characterized in that: described real training simulation building forms a plurality of analog operation interval by several assembly unit activity assembly units.
8. comprehensive wiring real training simulation according to claim 7 building is characterized in that: described real training simulation building is provided with the separation laminate, and the separation laminate will be simulated the building in vertical direction and is divided into upper and lower floor.
9. comprehensive wiring real training simulation according to claim 8 building is characterized in that: the separation laminate in described real training simulation building is provided with the vertical pipe well that is communicated with upper and lower floor, and separates the supporting floor cat ladder that is provided with of laminate.
10. comprehensive wiring real training simulation according to claim 7 building is characterized in that: each analog operation interval in described real training simulation building is respectively equipped with power supply and floor light.
CN2010201793559U 2010-04-29 2010-04-29 Comprehensive wiring training simulation building and component unit thereof Expired - Fee Related CN201673614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201793559U CN201673614U (en) 2010-04-29 2010-04-29 Comprehensive wiring training simulation building and component unit thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201793559U CN201673614U (en) 2010-04-29 2010-04-29 Comprehensive wiring training simulation building and component unit thereof

Publications (1)

Publication Number Publication Date
CN201673614U true CN201673614U (en) 2010-12-15

Family

ID=43331023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201793559U Expired - Fee Related CN201673614U (en) 2010-04-29 2010-04-29 Comprehensive wiring training simulation building and component unit thereof

Country Status (1)

Country Link
CN (1) CN201673614U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298861A (en) * 2011-09-21 2011-12-28 西安西元电子科技有限公司 Application training system for internet of things
CN104112379A (en) * 2014-06-25 2014-10-22 苏州市职业大学 Comprehensive wiring practical training system for communication
CN104867375A (en) * 2015-05-14 2015-08-26 威海职业学院 Teaching platform for network integrated wiring simulation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298861A (en) * 2011-09-21 2011-12-28 西安西元电子科技有限公司 Application training system for internet of things
CN104112379A (en) * 2014-06-25 2014-10-22 苏州市职业大学 Comprehensive wiring practical training system for communication
CN104867375A (en) * 2015-05-14 2015-08-26 威海职业学院 Teaching platform for network integrated wiring simulation

Similar Documents

Publication Publication Date Title
CN103208220B (en) Intelligent type low-voltage is for distribution training system and practical training method thereof
CN201673614U (en) Comprehensive wiring training simulation building and component unit thereof
CN203759926U (en) Physical training room for enterprise safety education
CN201812416U (en) Power distribution training system for electricians
CN204102466U (en) Possesses the building structure synthetic instruction model of optical deictic function
CN202306937U (en) Novel comprehensive wiring practical training simulation building and component unit thereof
CN201066899Y (en) Network integrated cabling practical training device
CN204463553U (en) A kind of intelligent building comprehensive wiring training device
CN204102468U (en) Possesses the building structure teaching mode of fire demonstration function
CN202795851U (en) Comprehensive experiment platform for practical teaching of computer network
CN201616190U (en) Multifunctional comprehensive practical training device
CN201518182U (en) Generic cabling practical training wall apparatus
CN201315112Y (en) Integrated wiring training operation platform
CN202736341U (en) Novel electrical mounting and building practical training examination device
CN203966437U (en) A kind of experience system of automatic sorting feeding
CN102779442A (en) Piano type combined control table
CN202887551U (en) Electrical installation and practical training examine platform
CN104167150A (en) Acousto-optical integrated architectural structure comprehensive teaching model
CN201359787Y (en) Practice training device of generic cabling of network engineering
CN203149980U (en) Equipment fixed orifices of operation platform based on Internet of Things education training system
CN201689562U (en) Indoor electric installation and assessment device
CN204732034U (en) The portable Teaching of Single-computer Practice device of teaching and self-study single-chip microcomputer
CN204632242U (en) Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room
CN208873387U (en) A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN202615630U (en) University student group cooperation studying system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUANGDONG VCOM EDUCATION TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: WEIKANG COMMUNICATION TECH CO., LTD., GUANGZHOU CITY

Effective date: 20150722

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150722

Address after: 510000 Guangdong city of Guangzhou province Tianhe District Tangxia Kexinlu No. 8 and business center C block 102

Patentee after: GUANGDONG VCOM EDUCATION TECHNOLOGY CO., LTD.

Address before: 510630, Guangdong, Guangzhou, Tianhe District, Tangxia new road, excellent business center, D building, 2 floor, 1 Units

Patentee before: Guangzhou Weikang Communication Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215

Termination date: 20190429