CN208873387U - A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid - Google Patents
A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid Download PDFInfo
- Publication number
- CN208873387U CN208873387U CN201820906106.1U CN201820906106U CN208873387U CN 208873387 U CN208873387 U CN 208873387U CN 201820906106 U CN201820906106 U CN 201820906106U CN 208873387 U CN208873387 U CN 208873387U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- component
- column
- module
- several
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 238000004088 simulation Methods 0.000 title claims abstract description 14
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 19
- 235000010627 Phaseolus vulgaris Nutrition 0.000 claims abstract description 5
- 244000046052 Phaseolus vulgaris Species 0.000 claims abstract description 5
- 239000003292 glue Substances 0.000 claims abstract description 5
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 claims abstract description 5
- 229920002554 vinyl polymer Polymers 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 239000007788 liquid Substances 0.000 claims description 16
- 210000003205 muscle Anatomy 0.000 claims description 14
- 229920001684 low density polyethylene Polymers 0.000 claims description 10
- 239000004702 low-density polyethylene Substances 0.000 claims description 10
- 238000003825 pressing Methods 0.000 claims description 10
- 239000004793 Polystyrene Substances 0.000 claims description 6
- 229920002223 polystyrene Polymers 0.000 claims description 6
- 229920000515 polycarbonate Polymers 0.000 claims description 4
- 239000004417 polycarbonate Substances 0.000 claims description 4
- 229920000877 Melamine resin Polymers 0.000 claims description 3
- JDSHMPZPIAZGSV-UHFFFAOYSA-N melamine Chemical compound NC1=NC(N)=NC(N)=N1 JDSHMPZPIAZGSV-UHFFFAOYSA-N 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- 239000008267 milk Substances 0.000 claims 1
- 210000004080 milk Anatomy 0.000 claims 1
- 235000013336 milk Nutrition 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 11
- 230000000694 effects Effects 0.000 abstract description 4
- 238000003032 molecular docking Methods 0.000 abstract description 2
- 230000000875 corresponding effect Effects 0.000 description 14
- 238000010586 diagram Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 6
- 238000009417 prefabrication Methods 0.000 description 5
- 239000002699 waste material Substances 0.000 description 3
- 150000004651 carbonic acid esters Chemical class 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000009411 base construction Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000019771 cognition Effects 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000004816 latex Substances 0.000 description 1
- 229920000126 latex Polymers 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Utility model provides a kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid.The teaching aid includes chassis pedestal and several prefabricated beam modules, several prefabricated post modules and several prefabricated plate modules.When assembly, the prefabricated post module arrangement is on the pedestal of chassis.The pedestal joint bar component is inserted into the corresponding hole I of prefabricated post module.White glue with vinyl is injected in grouting mouth.The prefabricated beam module rides upon in adjacent two prefabricated post modules.Bean column node region is fixed using plasticine filling.The prefabricated plate module is laid on prefabricated beam module.The stirrup component protrudes into corresponding slot.The column joint bar component passes through corresponding hole II.The teaching aid can reach better demonstration lesson effect, and the connecting structure for showing bean column node, column and column that can be comprehensive requires, and can simulate lifting docking operation, grouting construction process and pour connection procedure, carry out detailed explanation to overall process and show.
Description
Technical field
The utility model relates to teaching aid technical field, in particular to a kind of frame structure teaching aid.
Background technique
With Chinese society rapid development of economy and continuing to increase for dynamics is opened, the technology innovation of all trades and professions is changed
For very fast, technological innovation ultimately improves the life of the people.Relative to internet industry, the fast development of high-tech industry
The impetus, the building trade to play an important role in the development of the national economy, which but seems, follows the beaten track, and especially construction site is not
Too many change.Assembling scaffold, setting up template, assembling reinforcement, concreting all is to be completed at the scene by worker, this work
Industry mode other than construction auxiliary equipment is more various, site operation waste of material also than more serious, the building waste of generation compared with
More, field operation condition is arduous, the large labor intensity of worker, has large effect to the environment of surrounding, these, which always are, builds
Build what industry was denounced.It is ready that the young man for putting into construction site is fewer and fewer now, using the cheap price of labour power as base
Its production method of the engineering project of plinth is also increasingly subject to challenge, and in face of the bottleneck of industry development, prefabrication is to use for reference
An effective breach of the mature experience of developed country to solve China's building trade Problems Existing, in recent years by state
The attention for living the portion of building has obtained popularization energetically.In China at the end of the 19th century, there have been concrete steel building, 20th century
Just use regularization, standardized assembled steel reinforced concrete component widely in general civil buildings the seventies,
It is compared with traditional form of construction work, the advantage of prefabricated assembled construction is it will be apparent that since building element is in the factory
Completion is poured, the operating environment of factory is greatly improved relative to construction site, and building element pours error, smooth
Degree, quality of vibrating will be better than field operation, and in addition to this, with constructing, convenient, project progress is fast, right for prefabricated assembled construction
The environment of surrounding influences the advantages that small.
Until the eighties, China starts various crane columns, prepared roofing column, prefabricated room panel, precast hollow building occur
Plate and large panel building etc., but on the whole, the Technical comparing of China's prefabrication falls behind, building industrialization entirety water
It is flat very low, into after the nineties, due to prefabrication from the fine degree and assembly in design level, building production
The reasons such as backward in technique and the at that time rapid development of cast-in-place concrete technology, the application of prefabrication is especially in the people
With in building using at low ebb, but nearly ten years, with the speed-raising of China's economic development, the rising of labor cost with
And prefabricated assembled construction construction technology and management development, prefabricated components machining accuracy and quality, prefabrication and assembly construction
The application of formula building heats up again, and is in the situation of accelerated development.Increasing with project, energy is widelyd popularize with country
Enough people for sufficiently grasping assembled architecture construction technology main points are few in number, and the talents reserve of entire assembled architecture industry is insufficient
Restrict the development speed of industry.Present building constructor in the tide that industry is reformed in order to keeping strong competition
Power periodically carries out the universal and training of assembled architecture technology, same Some Universities to the construction worker of company
The correlated curriculum teaching of assembled architecture technology is increased, but only is difficult to allow by contents such as the upper text of teaching notes, pictures
Student has sufficient understanding to the technical essential of assembled architecture, skillfully to grasp skills in the process of construction must go construction site into
Row practical training simulated, but it is often and unrealistic that construction site is moved in classroom, first is that student is numerous, is difficult to ensure safely;Second is that
The progress of construction site is formulated according to project planning, it is difficult to find the jobs node for meeting teaching request just;Third is that going
Construction site needs to put into part transport cost, and the time of most of student is wasted on road back and forth;Fourth is that scene
Empathic learning would generally affect to the progress of construction operation, and the entity component of construction site all must be by ripe
Experienced worker, which carries out installation, just can guarantee construction quality, and student is difficult to organic will do it actual cognition and operation practice.
Therefore, assembled architecture joint structure can intuitively be shown and can complete the religion of construction simulation analysis by developing one kind
Learning apparatus is particularly important.
Utility model content
The purpose of the utility model is to provide a kind of prefabricated assembled frame structure joint structure signal and construction simulation religions
Tool, to solve problems of the prior art.
To realize the utility model aim and the technical solution adopted is that a kind of such, prefabricated assembled frame structure section
The signal of point construction and construction simulation teaching aid, including chassis pedestal and several prefabricated beam modules, several prefabricated post modules and
Several prefabricated plate modules.
The prefabricated beam module includes beam ontology.The beam ontology uses polystyrene, low density polyethylene (LDPE) or poly- carbonic acid
Ester is made.Several pressing lever components, several foundation muscle components and several stirrup components are disposed in the beam ontology.The top
Muscle component and bottom muscle component are round steel.The pressing lever component and bottom muscle component are pierced by from the both ends of beam ontology.The stirrup component
For the round steel with ribbing for being bent to U-shaped.The stirrup component stretches out the upper surface of beam ontology.
The prefabricated post module includes column ontology.The column ontology uses polystyrene, low density polyethylene (LDPE) or poly- carbonic acid
Ester is made.The upper surface of the column ontology is embedded with several column joint bar components.The column joint bar component is round steel.The column sheet
The lower surface of body is provided with several holes I.Grouting mouth corresponding with hole I is provided in the column ontology bottom side of the wall.
Thick liquid discharge mouth corresponding with hole I is additionally provided in the column ontology bottom side of the wall.The grouting mouth is arranged in below thick liquid discharge mouth.
The grouting mouth and thick liquid discharge mouth correspond.The grouting mouth and thick liquid discharge mouth are connected to corresponding hole I and column outer body.
The prefabricated plate module is melamine plate, particieboard or glued board.It is arranged in the plate face of the prefabricated plate module
The hole II for thering are several to pass through for column joint bar component.Several are additionally provided in the plate face of the prefabricated plate module for stirrup group
The slot that part protrudes into.
The upper surface of the chassis pedestal is provided with several foundation seat joint bar components.
When assembly, the prefabricated post module arrangement is on the pedestal of chassis.The pedestal joint bar component is inserted into prefabricated post module
In corresponding hole I.White glue with vinyl is injected in grouting mouth.The prefabricated beam module rides upon in adjacent two prefabricated post modules.Beam
Column border node region is fixed using plasticine filling.The prefabricated plate module is laid on prefabricated beam module.The stirrup component is stretched
Enter in corresponding slot.The column joint bar component passes through corresponding hole II.
Further, the pressing lever component and bottom muscle component select 8mm round steel.The stirrup component selects 6mm circle with ribbing
Steel.The spacing of two neighboring stirrup component is 250mm.
Further, the column joint bar component selects 8mm round steel.
Having the technical effect that for the utility model is unquestionable:
1. work progress is intuitive as it can be seen that prefabricated assembled frame construction process, student or behaviour can be shown indoors comprehensively
Making worker in kind can watch and operate in person, and classroom interaction is good;
2. better demonstration lesson effect can be reached, the connection structure for showing bean column node, column and column that can be comprehensive
Requirement is made, and lifting docking operation, grouting construction process can be simulated and pour connection procedure, overall process is carried out detailed
Explanation is shown;
3. teaching aid can use at any time, and can recycle, reduce the waste of resource, greatly reduce teaching at
This;
4. simple in construction, easy to disassemble and assemble.
Detailed description of the invention
Fig. 1 is teaching aid structure schematic diagram;
Fig. 2 is partial enlarged view at A;
Fig. 3 is precast beam modular structure schematic diagram;
Fig. 4 is prefabricated post modular structure schematic diagram;
Fig. 5 is grouting mouth and thick liquid discharge mouth schematic diagram;
Fig. 6 is prefabricated board modular structure schematic diagram;
Fig. 7 is chassis base construction schematic diagram.
In figure: prefabricated beam module 1, Liang Benti 101, pressing lever component 102, bottom muscle component 103, stirrup component 104, prefabricated post
Module 2, column ontology 201, hole I 2011, grouting mouth 2012, thick liquid discharge mouth 2013, column joint bar component 202, prefabricated plate module 3, hole
Hole II 301, slot 302, chassis pedestal 4, pedestal joint bar component 401, plasticine 5.
Specific embodiment
Below with reference to embodiment, the utility model is described in further detail, but should not be construed the above-mentioned master of the utility model
Topic range is only limitted to following embodiments.It is common according to this field in the case where not departing from the above-mentioned technical idea of the utility model
Technological know-how and customary means make various replacements and change, should all include within the protection scope of the present utility model.
Embodiment 1:
Referring to Fig. 1, the present embodiment discloses a kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid,
Including being arranged in laboratory or training the chassis pedestal 4 and prefabricated beam module 1, prefabricated post module 2 and prefabricated template die in place
Block 3.
Referring to Fig. 3, the prefabricated beam module 1 includes beam ontology 101.The beam ontology 101 uses polystyrene, low-density
Polyethylene or polycarbonate are made.3 horizontal direction pressing lever components, 102,4 horizontal direction bottom muscle are disposed in the beam ontology 101
Component 103 and 16 piece vertical stirrup component 104.The pressing lever component 102 and bottom muscle component 103 select 8mm round steel.The top
Muscle component 102 and bottom muscle component 103 are pierced by from the both ends of beam ontology 101.The stirrup component 104 selects the 6mm for being bent to U-shaped
Round steel with ribbing.The spacing of two neighboring stirrup component 104 is 250mm.The stirrup component 104 stretches out the upper table of beam ontology 101
Face.
Referring to fig. 4, the prefabricated post module 2 includes column ontology 201.The column ontology 201 uses polystyrene, low-density
Polyethylene or polycarbonate are made.The upper surface of the column ontology 201 is embedded with 12 column joint bar components 202.The column joint bar
Component 202 selects 8mm round steel.12 column joint bar components 202 divide for 4 rows, are arranged on 4 sides of 201 upper surface of column ontology.The column
Joint bar component 202 is round steel.Referring to Fig. 5, the lower surface of the column ontology 201 is provided with 12 holes I 2011.The column ontology
16 grouting mouth 2012 corresponding with hole I 2011 is provided in 201 bottom side of the wall.In 201 bottom side of the wall of column ontology
It is additionally provided with 16 thick liquid discharge mouths 2013 corresponding with hole I 2011.4 are provided on every side side wall of 201 lower end of column ontology
A grouting mouth 2012 and corresponding 4 thick liquid discharge mouths 2013.The grouting mouth 2012 is arranged in 2013 lower section of thick liquid discharge mouth.The grouting
Mouth 2012 is corresponded with thick liquid discharge mouth 2013.The grouting mouth 2012 and thick liquid discharge mouth 2013 are connected to corresponding hole I 2011 and column
201 outside of ontology.
Referring to Fig. 6, the prefabricated plate module 3 is melamine plate, particieboard or glued board.The prefabricated plate module 3
Several holes II 301 passed through for column joint bar component 202 are provided in plate face.It is also set in the plate face of the prefabricated plate module 3
It is equipped with several slots 302 protruded into for stirrup component 104.
Referring to Fig. 7, the upper surface of the chassis pedestal 4 is provided with pedestal joint bar component 401.
When assembly, the prefabricated post module 2 is arranged on chassis pedestal 4.The pedestal joint bar component 401 is inserted into prefabricated post
In the corresponding hole I 2011 of module 2.It is injected into grouting mouth 2012 using syringe holder white glue with vinyl, until there is the latex of white
Until being overflowed from corresponding thick liquid discharge mouth 2013.The work progress for completing assembled pillar is just simulated in this way.It is fixed to whole pillars
After good, prefabricated beam module 1 is ridden upon in adjacent two prefabricated post modules 2, the work progress of assembled beam is completed in simulation.Institute
It states referring to fig. 2, the empty portions (i.e. bean column node region) between Liang Yuliang are filled fixation using plasticine 5, and use rubber
Skin mud carries out levelling.This process simulation is concreting during work.After the completion of one layer of beam column is set up, prefabricated template die
Block 3 is laid on prefabricated beam module 1.The stirrup component 104 protrudes into corresponding slot 302.The column joint bar component 202 passes through
Corresponding hole II 301.After completing the mating formation of prefabricated plate module 3, if teaching is in need, two layers of assembled can be continued
Construction simulation.
It is worth noting that the present embodiment can intuitively reflect prefabricated assembled frame structure joint structure and construction
The course of work, overcome general room impart knowledge to students in the presence of writing on the blackboard or multimedia teaching it is in the form of a single, be easy to cause teaching
Dull in content dull and operator cannot operate in person, lack interactive problem.The present embodiment greatly improves religion
Learn efficiency.Can be by way of grouping, construction simulation work is completed in 5~10 one group of people collaborations.After completing installation, timely
Disassembly, and clean the white glue with vinyl in grouting mouth, can use repeatedly, saved instruction cost.
Claims (3)
1. a kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid, it is characterised in that: including chassis base
Seat (4) and several prefabricated beam modules (1), several prefabricated post modules (2) and several prefabricated plate modules (3);
The prefabricated beam module (1) includes beam ontology (101);The beam ontology (101) uses polystyrene, low density polyethylene (LDPE)
Or polycarbonate is made;Several pressing lever components (102), several foundation muscle components (103) are disposed in the beam ontology (101)
With several stirrup components (104);The pressing lever component (102) and bottom muscle component (103) are round steel;The pressing lever component
(102) it is pierced by with bottom muscle component (103) from the both ends of Liang Benti (101);The stirrup component (104) is the band for being bent to U-shaped
Rib round steel;The stirrup component (104) stretches out the upper surface of beam ontology (101);
The prefabricated post module (2) includes column ontology (201);The column ontology (201) uses polystyrene, low density polyethylene (LDPE)
Or polycarbonate is made;The upper surface of the column ontology (201) is embedded with several column joint bar components (202);The column joint bar
Component (202) is round steel;The lower surface of the column ontology (201) is provided with several holes I (2011);The column ontology
(201) grouting mouth (2012) corresponding with hole I (2011) is provided in bottom side of the wall;Column ontology (201) lower end side
Thick liquid discharge mouth (2013) corresponding with hole I (2011) is additionally provided on wall;The grouting mouth (2012) is arranged in thick liquid discharge mouth
(2013) lower section;The grouting mouth (2012) and thick liquid discharge mouth (2013) correspond;The grouting mouth (2012) and thick liquid discharge mouth
(2013) it is connected on the outside of corresponding hole I (2011) and column ontology (201);
The prefabricated plate module (3) is melamine plate, particieboard or glued board;It is set in the plate face of the prefabricated plate module (3)
It is equipped with several holes II (301) passed through for column joint bar component (202);It is also set up in the plate face of the prefabricated plate module (3)
The slot (302) for thering are several to protrude into for stirrup component (104);
The upper surface of the chassis pedestal (4) is provided with several foundation seat joint bar components (401);
When assembly, the prefabricated post module (2) is arranged on chassis pedestal (4);Pedestal joint bar component (401) insertion is prefabricated
In the corresponding hole I (2011) of column module (2);It is in the milk in mouth (2012) and injects white glue with vinyl;The prefabricated beam module (1) rides upon
On adjacent two prefabricated post modules (2);Bean column node region is fixed using plasticine (5) filling;Prefabricated plate module (3) paving
It is located on prefabricated beam module (1);The stirrup component (104) is protruded into corresponding slot (302);The column joint bar component (202)
Across corresponding hole II (301).
2. a kind of prefabricated assembled frame structure joint structure signal according to claim 1 and construction simulation teaching aid,
Be characterized in that: the pressing lever component (102) and bottom muscle component (103) select 8mm round steel;The stirrup component (104) is selected
6mm round steel with ribbing;The spacing of two neighboring stirrup component (104) is 250mm.
3. a kind of prefabricated assembled frame structure joint structure signal according to claim 1 and construction simulation teaching aid,
Be characterized in that: the column joint bar component (202) selects 8mm round steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820906106.1U CN208873387U (en) | 2018-06-12 | 2018-06-12 | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820906106.1U CN208873387U (en) | 2018-06-12 | 2018-06-12 | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208873387U true CN208873387U (en) | 2019-05-17 |
Family
ID=66462185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820906106.1U Expired - Fee Related CN208873387U (en) | 2018-06-12 | 2018-06-12 | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208873387U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108711354A (en) * | 2018-06-12 | 2018-10-26 | 重庆大学 | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid |
-
2018
- 2018-06-12 CN CN201820906106.1U patent/CN208873387U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108711354A (en) * | 2018-06-12 | 2018-10-26 | 重庆大学 | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104167149B (en) | Possesses the building structure synthetic instruction model of Quick Response Code scan function | |
CN208873387U (en) | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid | |
CN214068026U (en) | Real device of instructing of bridge cushion cap construction | |
CN108711354A (en) | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid | |
Zhang et al. | A study of undergraduate engineering management education reform using CDIO engineering education model | |
CN208848485U (en) | Shear wall and raft foundation construction teaching facilities | |
CN211912569U (en) | Multifunctional graduation wall experience type training application equipment | |
CN104167150B (en) | Acousto-optic integrated building structure synthetic instruction model | |
Hong et al. | Application of Training Simulation Software and Virtual Reality Technology in Civil Engineering | |
CN208460303U (en) | Changeable beam column reinforcing bar nodal analysis method | |
CN214796485U (en) | Be used for building engineering teaching to demonstrate teaching aid with wall body construction | |
CN110211480A (en) | A kind of long-span cablestayed bridges model applied to BIM teaching | |
Ma et al. | Teaching Effect Analysis of the ‘Prefabricated Concrete Structure’Course Based on Building Information Modeling | |
CN208938507U (en) | A kind of PC superimposed sheet shear wall combination engineering method teaching equipment | |
CN214068027U (en) | Real device of instructing of bridge pier stud construction | |
Li et al. | A Study on the Training Path of Craftsman Talents in Higher Vocational Colleges Against the Background of the Transformation of Old and New Kinetic Energy | |
CN217718893U (en) | Prefabricated superposed beam sleeve grouting simulation test device of prefabricated building | |
Lv et al. | Study on BIM technology teaching under the background of three-dimensional design | |
Pan et al. | Research on quality assurance system of civil engineering talents' ability training under the background “the Belt and Road” based on BIM information technology | |
CN209765898U (en) | Model building for teaching | |
Luo et al. | Practical exploration of design teaching of architecture and structure coordination based on the ideology of Archi-Neering——Taking the innovative practice of ice and snow architecture as an example | |
Wang et al. | Research on “Dual Ability” Innovative Talent Training Mode of BIM Assembly Design Competition and Graduation Project Integration | |
Li et al. | Exploration on the Mode of Collaborative Education between Schools and Enterprises under the Background of Integration of Industry and Education | |
Zang | Research on Teaching Method Based on “Hardware and Software” Way of Building Structure and Reading Engineering Drawings Course | |
Zhang | Research on Teaching Reform Strategy of Civil Engineering Specialty under the Background of Double Carbon Strategy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190517 |