CN214796485U - Be used for building engineering teaching to demonstrate teaching aid with wall body construction - Google Patents
Be used for building engineering teaching to demonstrate teaching aid with wall body construction Download PDFInfo
- Publication number
- CN214796485U CN214796485U CN202121268949.1U CN202121268949U CN214796485U CN 214796485 U CN214796485 U CN 214796485U CN 202121268949 U CN202121268949 U CN 202121268949U CN 214796485 U CN214796485 U CN 214796485U
- Authority
- CN
- China
- Prior art keywords
- demonstration board
- demonstration
- wall
- steel bar
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The utility model discloses a be used for building engineering teaching to demonstrate teaching aid with wall body construction, the on-line screen storage device comprises a base, be equipped with an at least slide rail on the base, the base is located the one end of slide rail is equipped with vertical reinforcing bar row, slide on the slide rail be equipped with parallel fixed demonstration board of reinforcing bar, wall template demonstration board, the stupefied demonstration board of the back of the body and with vertical reinforcing bar row vertically sleeve pipe model, set up a plurality of reinforcing bar preformed holes on the fixed demonstration board of reinforcing bar, counter-pull screw rod preformed hole and pipe fitting preformed groove, set up a plurality of counter-pull screw rod preformed holes and pipe fitting preformed groove on the wall template demonstration board, stupefied demonstration board of the back of the body is for stupefied and the stupefied grid plate that interlocks each other and constitute of the back of the body by horizontal back of the body, the stupefied demonstration board of the back of the body sets up the pipe fitting preformed groove. The utility model belongs to the technical field of teaching aid, advantage compared with prior art lies in: the demonstration is visual and convenient to use.
Description
Technical Field
The utility model relates to a teaching aid field specifically indicates a be used for building engineering teaching to demonstrate teaching aid with wall body construction.
Background
The process and procedure of wall pouring in the teaching of building engineering are important, and teaching is usually explained by courseware such as textbooks, so the procedure of wall pouring construction cannot be visually shown, and a teacher cannot detail the problems occurring in each link accurately and in detail.
Therefore, in order to improve the teaching quality and simplify the knowledge receiving difficulty, a teaching aid capable of carrying out construction demonstration on the wall pouring construction link is needed.
Disclosure of Invention
The to-be-solved technical problem of the utility model is to overcome above technical defect, provide a demonstration teaching aid that is used for wall body construction demonstration for building engineering teaching directly perceived, convenient to use of demonstration.
In order to realize the purpose, the utility model discloses the technical scheme who adopts is: the design provides a be used for building engineering teaching to demonstrate teaching aid with wall body construction, the on-line screen storage device comprises a base, be equipped with an at least slide rail on the base, the base is located the one end of slide rail is equipped with vertical reinforcing bar row, slide on the slide rail be equipped with parallel fixed demonstration board of reinforcing bar, wall template demonstration board, the stupefied demonstration board of the back of the body of vertical reinforcing bar and with vertical reinforcing bar row vertically sleeve pipe model, set up a plurality of reinforcing bar preformed holes on the fixed demonstration board of reinforcing bar, to drawing screw rod preformed hole and pipe fitting preformed groove, set up a plurality of to drawing screw rod preformed hole and pipe fitting preformed groove on the wall template demonstration board, stupefied demonstration board of the back of the body is for stupefied and the stupefied grid plate that interlocks each other and constitute of the back of the body of the back of the body, stupefied demonstration board of the back of the body sets up pipe fitting preformed groove.
And furthermore, be located on the fixed demonstration board of reinforcing bar, wall form demonstration board and the stupefied demonstration board of the back of the body the pipe fitting preformed groove is used for supplying the sleeve pipe model runs through, is located the mutual one-to-one setting of counter-pull screw rod preformed hole on the fixed demonstration board of reinforcing bar, the wall form demonstration board.
Furthermore, the reinforcing steel bar fixing demonstration board and the wall template demonstration board are made of transparent materials.
Furthermore, the steel bar pre-opened hole comprises a plurality of horizontal steel bar components used for penetrating through the steel bar pre-opened hole and a counter-pulling screw used for penetrating through the counter-pulling screw pre-opened hole.
Further, fixed demonstration board of reinforcing bar, sleeve pipe model, wall form demonstration board and stupefied demonstration board of back of the body are in arrange in proper order according to keeping away from on the slide rail the direction that vertical reinforcing bar was arranged.
After the structure is adopted, compared with the prior art, the utility model the advantage that has is: the utility model provides a be used for building engineering teaching to demonstrate teaching aid with wall construction, can demonstrate how to carry out the outer wall construction when the wall body is poured through slidable reinforcing bar fixed demonstration board, wall form demonstration board, sleeve pipe model and stupefied demonstration board, above-mentioned demonstration board or demonstration subassembly are all installed on the slide rail, therefore can separate or combine by manual promotion, consequently can demonstrate the process flow directly perceived, make things convenient for the instructor to explain; the device does not need to be manually righted and fixed in the using process, so that the device can be operated by a single person and is simple and convenient to use.
Drawings
FIG. 1 is the utility model relates to a top view that is used for wall body construction demonstration teaching aid for building engineering teaching.
Fig. 2 is the utility model relates to a stupefied demonstration board side view of back of the body for building engineering teaching demonstration teaching aid of wall construction.
FIG. 3 is a utility model relates to a use schematic diagram of the stupefied demonstration board of back of the body that is used for wall construction demonstration teaching aid for building engineering teaching.
As shown in the figure: 1. the base, 2, slide rail, 3, vertical reinforcing bar row, 4, the demonstration board is fixed to the reinforcing bar, 5, wall form demonstration board, 6, the stupefied demonstration board of back of the body, 7, the sleeve pipe model, 8, reinforcing bar preformed hole, 9, to drawing screw rod preformed hole, 10, pipe fitting preformed groove, 11, stupefied on the back of the body, 12, indulge stupefied on the back of the body, 13, horizontal reinforcement component, 14, to drawing screw rod, 15, stagnant water bolt, 16, slider.
Detailed Description
The following description is only for the preferred embodiment of the present invention, and the protection scope of the present invention is not limited thereby, the present invention will be further explained with reference to the drawings and the embodiments.
Example 1, see FIGS. 1-2: the utility model relates to a be used for building engineering teaching to demonstrate teaching aid with wall body construction, including base 1, be equipped with the slide rail 2 of two parallels on base 1, base 1 is located slide rail 2's right-hand member is equipped with vertical reinforcing bar row 3, and vertical reinforcing bar row 3 comprises a plurality of reinforcing bar component models of vertical setting on base 1, and the plane that just forms is perpendicular with base 1.
Two slide rail 2 is gone up and is slided and is equipped with four pairs of slider 16, and every is fixed respectively on slider 16 and sets up fixed demonstration board of reinforcing bar 4, wall form demonstration board 5, stupefied demonstration board 6 of back of the body and sleeve pipe model 7, and wherein fixed demonstration board of reinforcing bar 4, wall form demonstration board 5, stupefied demonstration board 6 of the back of the body are parallel with 3 rows of vertical reinforcing bar. And the reinforcing steel bar fixing demonstration board 4, the sleeve model 7, the wall template demonstration board 5 and the dorsal bar demonstration board 6 are arranged on the sliding rail 2 in sequence in the direction away from the vertical reinforcing steel bar row 3. The casing model 7 of this embodiment is that two tubulose parts are used for the water and electricity pipeline pre-buried, and it is perpendicular with vertical reinforcing bar row 3.
Offer a plurality of reinforcing bar preformed holes 8, to drawing screw rod preformed hole 9 and pipe fitting preformed groove 10 on the fixed demonstration board 4 of reinforcing bar, offer a plurality of to drawing screw rod preformed holes 9 and pipe fitting preformed groove 10 on the wall form demonstration board 5, stupefied demonstration board 6 of the back of the body is for the grid plate that constitutes by stupefied 11 of the horizontal back of the body and stupefied 12 of the vertical back of the body crisscross each other, stupefied demonstration board 6 of the back of the body offers pipe fitting preformed groove 10.
The aforesaid is located on fixed demonstration board 4 of reinforcing bar, wall form demonstration board 5 of wall form and the stupefied demonstration board 6 of the back of the body pipe fitting preformed groove 10 is used for supplying casing model 7 runs through, is located the horizontal position and the mutual one-to-one setting of vertical position of counter-pull screw rod preformed hole 9 on fixed demonstration board 4 of reinforcing bar, the wall form demonstration board 5 consequently can run through fixed demonstration board 4 of reinforcing bar, wall form demonstration board 5 of wall form simultaneously and keep the level to counter-pull screw rod 14 after fixed demonstration board 4 of reinforcing bar, wall form demonstration board 5 are close to each other.
In this embodiment, the reinforcing steel bar fixing demonstration board 4 and the wall form demonstration board 5 are made of transparent acrylic plastic boards, and the positions of other parts can be observed in the using process, wherein the wall form demonstration board 5 can be covered with opaque tapes to achieve the purpose of wall form demonstration. And also requires a plurality of horizontal reinforcing bar members 13 and counter-pulling screws 14 during the demonstration.
During the specific use, refer to fig. 3, carry out the construction demonstration of one side to the pouring of foundation floor wall body: firstly, binding the horizontal steel bars of the wall column, pushing the steel bar fixing demonstration plate 4 to the vertical steel bar row 3, penetrating the steel bar preformed hole 8 through the horizontal steel bar member 13 to form transverse horizontal steel bar fixing, and placing the longitudinal horizontal steel bar member 13 on the transverse horizontal steel bar to finish steel bar binding demonstration; then, the demonstration of the hydropower through-wall rigid water stop sleeve is installed, and the sleeve model 7 is moved to be inserted into the reinforcing steel bar fixing demonstration board 4 to be inserted into the pipe fitting preformed groove 10 for demonstration; then, wall formwork supporting is carried out, firstly, the counter-pulling screw rods 14 are inserted into the reinforcing steel bar fixing demonstration board 4 for preliminary fixing, then, the wall formwork demonstration board 5 is pushed to serve as a wall formwork to be inserted into the counter-pulling screw rods 14, and the pipe fitting preformed grooves 10 penetrate through the casing pipe model 7; and finally, fixing the wall formwork, namely pushing the back ridge demonstration plate 6 to enable the counter-pulling screw 14 to penetrate through the intersection of the transverse back ridge 11 and the longitudinal back ridge 12, and fixing the back ridge by adopting a water stop bolt 15. Although the device only simulates the construction process of one side of the wall body, the construction process of the other side is the same, so the teaching aid can completely demonstrate the construction process of the wall body building.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.
Claims (5)
1. The utility model provides a be used for building engineering teaching to demonstrate teaching aid with wall body construction which characterized in that: comprises a base (1), at least one slide rail (2) is arranged on the base (1), one end of the base (1) positioned on the sliding rail (2) is provided with a vertical steel bar row (3), the sliding rail (2) is provided with a steel bar fixing demonstration board (4) parallel to the vertical steel bar row (3), a wall formwork demonstration board (5), a dorsal bar demonstration board (6) and a sleeve model (7) vertical to the vertical steel bar row (3) in a sliding way, the reinforcing steel bar fixing demonstration board (4) is provided with a plurality of reinforcing steel bar preformed holes (8), counter-pull screw rod preformed holes (9) and pipe fitting preformed grooves (10), the wall template demonstration board (5) is provided with a plurality of split screw preformed holes (9) and pipe fitting preformed grooves (10), the back arris demonstration board (6) is a grid board formed by mutually staggering transverse back arris (11) and longitudinal back arris (12), and the back arris demonstration board (6) is provided with a pipe fitting preformed groove (10).
2. The wall construction demonstration teaching aid for building engineering teaching of claim 1, wherein: lie in on fixed demonstration board of reinforcing bar (4), wall form demonstration board (5) and the stupefied demonstration board of back of the body (6) pipe fitting preformed groove (10) are used for the confession sleeve pipe model (7) run through, lie in the mutual one-to-one setting of split screw rod preformed hole (9) on fixed demonstration board of reinforcing bar (4), wall form demonstration board (5).
3. The wall construction demonstration teaching aid for building engineering teaching of claim 1, wherein: the reinforcing steel bar fixing demonstration board (4) and the wall template demonstration board (5) are made of transparent materials.
4. The wall construction demonstration teaching aid for building engineering teaching of claim 1, wherein: the steel bar pre-opened hole is characterized by further comprising a plurality of horizontal steel bar components (13) used for penetrating through the steel bar pre-opened holes (8) and counter-pulling screws (14) used for penetrating through the counter-pulling screw pre-opened holes (9).
5. The wall construction demonstration teaching aid for building engineering teaching of claim 1, wherein: fixed demonstration board of reinforcing bar (4), sleeve pipe model (7), wall form demonstration board (5) and stupefied demonstration board of back of the body (6) are in according to keeping away from on slide rail (2) the direction of vertical reinforcing bar row (3) is arranged in proper order.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121268949.1U CN214796485U (en) | 2021-06-07 | 2021-06-07 | Be used for building engineering teaching to demonstrate teaching aid with wall body construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121268949.1U CN214796485U (en) | 2021-06-07 | 2021-06-07 | Be used for building engineering teaching to demonstrate teaching aid with wall body construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214796485U true CN214796485U (en) | 2021-11-19 |
Family
ID=78701922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121268949.1U Expired - Fee Related CN214796485U (en) | 2021-06-07 | 2021-06-07 | Be used for building engineering teaching to demonstrate teaching aid with wall body construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214796485U (en) |
-
2021
- 2021-06-07 CN CN202121268949.1U patent/CN214796485U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108447335A (en) | A kind of assembled architecture AR imagings simulation training tutoring system | |
CN214796485U (en) | Be used for building engineering teaching to demonstrate teaching aid with wall body construction | |
CN204791675U (en) | How much teaching aids that mechanical drawing used | |
CN208873387U (en) | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid | |
CN201673614U (en) | Comprehensive wiring training simulation building and component unit thereof | |
CN201359787Y (en) | Practice training device of generic cabling of network engineering | |
CN108711354A (en) | A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid | |
CN208848485U (en) | Shear wall and raft foundation construction teaching facilities | |
US10937335B2 (en) | Introduced in sets of structural parts for composition of architectural didactic materials | |
Santoso et al. | Design development of building materials lab for teacher education institutes on vocational and academic program | |
Lv et al. | Application of Various Teaching Methods in Building Construction Technology in Vocational and Technical Colleges | |
CN210329789U (en) | Education explanation platform | |
CN208460303U (en) | Changeable beam column reinforcing bar nodal analysis method | |
Lv et al. | Study on BIM technology teaching under the background of three-dimensional design | |
CN213582695U (en) | Use statistics data column diagram display device | |
Kastelan et al. | Students perspective of the embedded engineering learning platform—A case study in digital design | |
CN220639354U (en) | Portable teaching device | |
CN211149775U (en) | Auxiliary device for music convenient to study note | |
CN210667268U (en) | Wiring engineering simulation training room | |
La et al. | Application Research of Building Model in Teaching | |
CN208569993U (en) | A kind of cantilever method technique instructional device | |
Wang | Discussion on the Training Mode of Assembly-type Construction Talents in Higher Vocational College | |
CN211207670U (en) | Two-digit addition teaching device for primary school mathematical teaching | |
CN210777507U (en) | Assembled building prefabricated component model display device that can assemble | |
Lu et al. | Study on Architectural Drawing and AutoCAD Course System Based on Combination of “Post, Course, Certificate and Competition” |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211119 |
|