CN104167150B - Acousto-optic integrated building structure synthetic instruction model - Google Patents

Acousto-optic integrated building structure synthetic instruction model Download PDF

Info

Publication number
CN104167150B
CN104167150B CN201410427885.3A CN201410427885A CN104167150B CN 104167150 B CN104167150 B CN 104167150B CN 201410427885 A CN201410427885 A CN 201410427885A CN 104167150 B CN104167150 B CN 104167150B
Authority
CN
China
Prior art keywords
beam column
lamplight pointing
model
teaching
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410427885.3A
Other languages
Chinese (zh)
Other versions
CN104167150A (en
Inventor
陈月萍
汪扬
宣晴
曹青
张赛
杜向琴
卢晨怡
张平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANQING VOCATIONAL & TECHNICAL COLLEGE
Original Assignee
ANQING VOCATIONAL & TECHNICAL COLLEGE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANQING VOCATIONAL & TECHNICAL COLLEGE filed Critical ANQING VOCATIONAL & TECHNICAL COLLEGE
Priority to CN201410427885.3A priority Critical patent/CN104167150B/en
Publication of CN104167150A publication Critical patent/CN104167150A/en
Application granted granted Critical
Publication of CN104167150B publication Critical patent/CN104167150B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to Building class teaching aid field, be specifically related to acousto-optic integrated building structure synthetic instruction model.The present invention at least includes foundation engineering and major project;Present invention additionally comprises for indicating each beam column Impact direction and the indicating member of bending amplitude on above-mentioned framework of steel reinforcement, described indicating member includes lamplight pointing arrow and lamplight pointing band, and the overall Impact direction of the direction indication of lamplight pointing arrow and corresponding beam column is arranged in the same direction;The corresponding each beam column number of lamplight pointing band is set to many groups, often group lamplight pointing band on each beam column is more than two that bending amplitude is different, in the same direction, and the actual loading bending direction of its radian direction and corresponding beam column is arranged in the same direction for its length direction and respective beam column length direction;Present invention additionally comprises sound and report unit.The present invention is three-dimensional by force, and the integrated level of each architecture basics is high, and the reception directly perceived of student is good, can effectively promote the teaching, training effect of current Building class universities and colleges.

Description

Acousto-optic integrated building structure synthetic instruction model
Technical field
The invention belongs to Building class teaching aid field, be specifically related to acousto-optic integrated building structure and combine Close teaching mode.
Background technology
Building is one of most important ingredient in human lives's element, either which country, All the building in each epoch as the extension of oneself civilization.Along with constantly adding of urbanization process Speed, the demand of the architectural speciality talent is increasing;Universities and colleges are as the training of the architectural speciality talent Cradle, the lasting injection to school work fresh in building trade serves vital effect especially.
In current universities and colleges' training, although country issues for various building foundations and structure The multiple drawing such as such as " 11G101 series atlas " series is so that field research;It may be evident, however, that , simple dependence is dull and does not possess relief planar drawing, is impossible to allow student true Real impression and study are to the many and numerous and diverse base structure in drawing.With other career fields Difference, architectural speciality teaching is closer in practice and practice, to guarantee that student is formed in brain Deep three dimensional thinking pattern, thus deepen student's impact.In traditional architectural speciality teaching, Owing to the building interior structure in reality is the most all covered by external top layers such as concrete;In reality When trampling operation, being positioned at the building foundation under heavy protection can not be open to student.And inside school The most also possess the nodal analysis method of part building, but still be far from reaching the three-dimensional of globality Teaching efficiency.It is positioned at which kind of position during certain basis practical operation, is processed into which kind of form, processes Inherent structure after one-tenth is how, even after foundation construction completes its stressed effect how, to entirety There is the impact of great active force in building, these the most all do not have the model of set of system Structure embodies, thus the field research result of training of current Building class universities and colleges is produced the biggest shadow Ring.
Summary of the invention
The purpose of the present invention is for overcoming the deficiencies in the prior art, it is provided that a kind of rational in infrastructure and practicality Acousto-optic integrated building structure synthetic instruction model, it is three-dimensional by force, the integrated level of each architecture basics Height, the reception directly perceived of student is good, can effectively promote the teaching, training effect of current Building class universities and colleges Really.
For achieving the above object, present invention employs techniques below scheme:
Acousto-optic integrated building structure synthetic instruction model, it is characterised in that: this model at least includes Foundation engineering and be arranged in the major project on foundation engineering, described foundation engineering includes that pile foundation is held Platform, isolated footing, strip footing and raft foundation;Major project include post flat method framework of steel reinforcement, Liangping method framework of steel reinforcement, shear wall flat method framework of steel reinforcement and plate muscle flat method framework of steel reinforcement;This model Also include for indicating each beam column Impact direction and the instruction list of bending amplitude on above-mentioned framework of steel reinforcement Unit, described indicating member includes lamplight pointing arrow and lamplight pointing band, described lamplight pointing arrow The overall Impact direction of direction indication and corresponding beam column arrange in the same direction;The corresponding each beam of lamplight pointing band Post number is set to many groups, and it is different that the often group lamplight pointing band on each beam column is bending amplitude Article two, more than, in the same direction, and its radian direction is with corresponding for its length direction and respective beam column length direction The actual loading bending direction of beam column is arranged in the same direction;This model also includes respectively working according to indicating member State and in addition the sound of voice broadcast report unit.
Lamplight pointing arrow on each beam column is multiple and is sequentially arranged along its length.
This model also includes the Quick Response Code of education informations in storing major project and foundation engineering, Described Quick Response Code is the multiple of the Instruction Components number layout of corresponding each foundation engineering and major project, And its position is positioned at the corresponding Instruction Components side of foundation engineering and major project.
This model also includes the handheld terminal being easy to control the running of each indicating member and for student Hand-held and receive the electronic plane of handheld terminal information, described electronic plane is provided with for receiving The receiving terminal of 2 D code information.
This model also includes that fire demonstration teaching module, described fire demonstration teaching module include possessing Manually and automatically alarm control function coordinated control system and and coordinated control system between respectively Automatic sprinkler fire-extinguishing system, fire-fighting smoke exhaust system, gas extinguishing system and the fire compartment system connected, The signal input part of each system all signal issuing sides with coordinated control system are connected to each other.
Main advantages of the present invention are:
1), the defect imparted knowledge to students based on current architectural discipline of the present invention, take full advantage of universities and colleges built-in Build the confined space resource of Practice Base, by the basis of foundation engineering, more integrated multiple master Body engineering, ultimately forms the multiple-project collecting structure of integration, annotates such as with systematized completing Specialized courses in multiple drawing series such as " 11G101 series atlas ".The present invention is not only at each knot Structure node is on foundation engineering, and around flat method rule, structure structure, construction requirement etc. is in addition real Thing is simulated, thus provides student to impart knowledge to students with the comprehensive sense organ being at physical existence of three-dimensional and need Ask.Meanwhile, with the layout of lamplight pointing assembly, with the light on and off degree of its light, structure is built The bending amplitude size building force direction or even force rear beam column all can present by visualization, and then Form such as Vierendeel girder, Cantilever Beams, column or even the block mold power under horizontal and vertical load Conductive process and force process.The paper educational mode of the teaching scarcity of planarization originally is by flexibly Three-dimensional is presented in the visual effect of student, its obvious can be with significant increase current Building class institute The teaching, training effect in school, it puts into practice degree height and operability is more preferable;Sound reports unit with front State lamplight pointing component integration, thus be vision and audition from the most simple visual reception transition Dual reception, when corresponding lamplight pointing is carried out, sound report unit i.e. carries out this light and refers to Show a series of information such as corresponding beam title, loading angle, Impact direction or even stress amplitude Report, and then more conducively student accepts corresponding education informations.
2), further, with the layout of handheld terminal, teacher can for the difference of teaching purpose, Control lamplight pointing assembly accordingly to be operated with handheld terminal.Even with corresponding signal control System, thus realize the various functions such as the answering questions of student's electronic plane on hand, education informations typing. The layout of Quick Response Code, facilitates when student's practice, for self study short slab in other words Vague learning link, records the Quick Response Code of information i.e. accordingly with electronic plane or mobile telephone scanning Can relearn;As there is query in raft foundation part, can scan targetedly by this part The Quick Response Code arranged at side, can realize the reinforcing learning effect of its online repetition.
3), fire demonstration teaching module layout, with the coordinated signals between system each in it so that Teacher can be intuitively by systematized to the fire fighting device in traditional architecture thing or even its duty Carry out sense organ displaying;The student caused because putting into practice nowhere when avoiding conventional teaching is difficult to accept Situation.The intuitive operation of its module and demonstrating effect are high, and student's receiving ability also can obtain into one Step promotes.
Accompanying drawing explanation
Fig. 1 is the structure schematic top plan view of the present invention;
Fig. 2 is the front view of the present invention after removing fire demonstration teaching module;
Fig. 3 is that the A-A of Fig. 2 is to sectional view;
Fig. 4 is the top view of Fig. 2.
Each parts of the present invention are as follows with each label corresponding relation of diagram:
11-post flat method framework of steel reinforcement 12-Liangping method framework of steel reinforcement
13-shear wall flat method framework of steel reinforcement 14-plate muscle flat method framework of steel reinforcement
21-lamplight pointing arrow 22-lamplight pointing band 30-fire demonstration teaching module
Detailed description of the invention
For ease of understanding, here in connection with diagram the present invention is embodied as structure and workflow is done Set forth further below:
The present invention be embodied as structure as it can be seen, it is in the indoor as real training place, be one The combinative structure single building of " the bar construction skeleton system " of two floor, from foundation engineering to master Body engineering arrives roofing again and only retains " framework of steel reinforcement structure ", and its frame structure is in strict accordance with " 11G101 Series atlas " requirement be designed and build.Constitute the basis of above-mentioned bar construction skeleton system Engineering and major project, the most then based on engineering include pile foundation support table, isolated footing, bar shaped Basis and raft foundation;Major project includes post flat method framework of steel reinforcement 11, Liangping method framework of steel reinforcement 12, shear wall flat method framework of steel reinforcement 13 and plate muscle flat method framework of steel reinforcement 14.For current model Class teaching aid is difficult to the digitized mechanical concept teaching embodied, herein also by lamplight pointing Arrow 21 and the setting of lamplight pointing band 22, on the one hand, the force Impact direction of each beam column is with lamp Light arrow 21 carries out presenting of visualization;On the other hand, self after stress of beam column Stress size or even the bending amplitude then light of the same center of curvature with multiple tracks bending amplitude difference Index strip 22 shows.So, the teaching of the digitized abstract conception of script now, quilt can The lamplight pointing effect of light on and off have as change be presented in face of student, its visual effect is extremely strong, Extremely easily stroke deep impression in student's brain, it is clear that be also more conducive to student and quickly digest suction Receive current building knowledge.
During practical operation, the needs explained according to " 11G101 series atlas ", the present invention can be arranged Up to 20 flat method canonical teaching nodes and three installing engineering specification nodes.Each node all around The knowledge points such as flat method rule, specification, structure structure, construction requirement, construction costs are designed, Construction.Can be by the efficient result of training with lower node teaching implementation student:
One) node one: summation node
Two) node two: bar material
Three) node three: foundation introduction
Four) node four: strip footing 1
Five) node five: strip footing 2
Six) node six: isolated footing 1
Seven) node seven: isolated footing 2
Eight) node eight: pile foundation support table
Nine) node nine: beam-slab bridge 1
Ten) node ten: beam-slab bridge 2
11) node 11: basis relative configurations
12) node 12: major project introduction
13) node 13: the flat method of post 1
14) node 14: the flat method of post 2
15) node 15: the flat method of post 3
16) node 16: the flat method of shear wall 1
17) node 17: the flat method of shear wall 2
18) node 18: the flat method of shear wall 3
19) node 19: Liangping method 1
20) node 20: Liangping method 2
21) node 21: Liangping method 3
22) node 22: Liangping method 4--is encorbelmented beam slab
23) node 23: have the flat method of beam superstructure
24) node 24: the flat method of floor relative configurations
25) node 25: the board-like stair of cast-in-place concrete 1
26) node 26: the board-like stair of cast-in-place concrete 2
27) node 27: electric and supply and drain water system
28) node 28: ventilation and air conditioning system
29) node 29: fire-fighting system
30) node 30: the examination of engineering project
On the basis of above-mentioned teaching node, the present invention is by arranging acousto-optic-electric simulation teaching demonstration mould Block system, specifically includes lamplight pointing, voice broadcast or even data transmission terminal etc. and overlaps assembly more System.
1, lamplight pointing and voice broadcast can be contained with lower part:
1) voice broadcast, lighting demonstration Impact direction and stress during the stress deformation of Vierendeel girder are curved Bent amplitude;
2) voice broadcast, lighting demonstration Impact direction and stress during the stress deformation of Cantilever Beams are curved Bent amplitude;
3) voice broadcast, lighting demonstration Impact direction and the stress bending when stress of post and power transmission Amplitude;
4) building voice broadcast of power transmission process under Action of Vertical Loads, lighting demonstration are subject to Force direction and stress bending amplitude;;
5) building voice broadcast of power transmission process under horizontal loads, lighting demonstration are subject to Force direction and stress bending amplitude;;
2, data transmission terminal can be divided into teachers ' teaching node teaching handheld terminal modular system and Quick Response Code autonomic learning modular system.
1, system equipment: the Quick Response Code at the hand-held handheld terminal of teacher, each node teaching indicates, The electronic plane that student is hand-held
2, practice-training teaching flow process: with the layout of handheld terminal, teacher can for teaching purpose not With, controlled lamplight pointing assembly by handheld terminal accordingly and operated, even with corresponding signal Control, thus realize the various functions such as the answering questions of student's electronic plane on hand, education informations typing. The layout of Quick Response Code, facilitates when student's practice, for self study short slab in other words Vague learning link, records the Quick Response Code of information i.e. accordingly with electronic plane or mobile telephone scanning Can relearn;As there is query in raft foundation part, can scan targetedly by this part The Quick Response Code arranged at side, can realize the reinforcing learning effect of its online repetition.
The present invention is by the layout of fire demonstration teaching module 30, with the linkage between system each in it Control so that teacher can be intuitively by the fire fighting device in traditional architecture thing or even its duty Systematized carry out sense organ displaying, it is to avoid the student caused because putting into practice nowhere during conventional teaching is difficult High with the situation accepted, its intuitive operation and demonstrating effect, student's receiving ability also can be entered One step promotes.
The guiding theory of the present invention:
Design phiolosophy of the present invention be base oneself upon professional teaching on the premise of, make full use of construction place Space resources, " concrete structure construction plan entirety representation is charted for annotation that system is complete Rule and the detail of construction "--11G101 series atlas, the most also can extension component, reach The purpose of other specialized courses compatible.
Each node is all made around flat method rule, structure structure, construction requirement, Architectural Mechanics, engineering Valencys etc. carry out Course Exercise.
This Project design structured teaching node is up to 30, and each node is respectively by teaching ppt literary composition Part folder, Photo folder teaching audio file folder, instructional video file composition;Broadcast by voice Put, new education model that lighting demonstration, the multiple directional run such as oral account statement are three-dimensional, Ke Yiwei The multi-door subjects such as building construction technology, Architectural Mechanics, construction costs provide Teaching Service;Its market Have a extensive future.

Claims (1)

1. acousto-optic integrated building structure synthetic instruction model, it is characterised in that: this model is at least Including foundation engineering and be arranged in the major project on foundation engineering, described foundation engineering includes Pile foundation support table, isolated footing, strip footing and raft foundation;Major project includes post flat method steel Muscles and bones frame (11), Liangping method framework of steel reinforcement (12), shear wall flat method framework of steel reinforcement (13) with And plate muscle flat method framework of steel reinforcement (14);This model also includes for indicating on above-mentioned framework of steel reinforcement each Beam column Impact direction and the indicating member of bending amplitude, described indicating member includes lamplight pointing arrow Head (21) and lamplight pointing band (22), the direction indication of described lamplight pointing arrow (21) and The overall Impact direction of corresponding beam column is arranged in the same direction;The corresponding each beam column number of lamplight pointing band (22) Mesh is set to many groups, and often group lamplight pointing band (22) on each beam column is bending amplitude not With more than two, its length direction and respective beam column length direction in the same direction, and its radian direction Arrange in the same direction with the actual loading bending direction of corresponding beam column;This model also includes according to instruction single The each duty of unit and in addition the sound of voice broadcast report unit;
Lamplight pointing arrow (21) on each beam column is multiple and cloth the most successively Put;
This model also includes the two dimension of education informations in storing major project and foundation engineering Code, described Quick Response Code is arranged in the corresponding teaching of each foundation engineering and major project one to one At component side.
CN201410427885.3A 2014-08-27 2014-08-27 Acousto-optic integrated building structure synthetic instruction model Expired - Fee Related CN104167150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410427885.3A CN104167150B (en) 2014-08-27 2014-08-27 Acousto-optic integrated building structure synthetic instruction model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410427885.3A CN104167150B (en) 2014-08-27 2014-08-27 Acousto-optic integrated building structure synthetic instruction model

Publications (2)

Publication Number Publication Date
CN104167150A CN104167150A (en) 2014-11-26
CN104167150B true CN104167150B (en) 2016-08-24

Family

ID=51910934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410427885.3A Expired - Fee Related CN104167150B (en) 2014-08-27 2014-08-27 Acousto-optic integrated building structure synthetic instruction model

Country Status (1)

Country Link
CN (1) CN104167150B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167148B (en) * 2014-08-27 2016-08-24 安庆职业技术学院 Possesses the building structure synthetic instruction model of optical deictic function
CN104992613B (en) * 2015-07-28 2018-03-06 上海建工二建集团有限公司 Visualize prefabricated assembled shear wall construction lab simulation teaching aid and installation method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101436360A (en) * 2008-12-10 2009-05-20 华中科技大学 Assistant experiment teaching aid for space cognition and light environment simulation
CN102042577A (en) * 2009-10-22 2011-05-04 陕西金合泰克信息科技发展有限公司 Human-machine interaction control system for displaying and illustrating product
CN202275549U (en) * 2011-07-13 2012-06-13 沈一军 Light wooden building model
CN203225053U (en) * 2012-12-20 2013-10-02 西安海舟信息技术有限公司 Mini-sized intelligent building used for teaching and exhibition
CN203412090U (en) * 2013-07-31 2014-01-29 深圳市建筑设计研究总院有限公司 Super high-rise building structure without inner barrel
CN104134395A (en) * 2014-08-06 2014-11-05 陶顺 Intelligent building demonstration teaching system based on joints
CN104167149A (en) * 2014-08-27 2014-11-26 安庆职业技术学院 Building structure comprehensive teaching model with two-dimension code scanning function
CN104167148A (en) * 2014-08-27 2014-11-26 安庆职业技术学院 Building structure comprehensive teaching model with light indication function
CN204102465U (en) * 2014-08-27 2015-01-14 安庆职业技术学院 Acousto-optic integrated building structure synthetic instruction model
CN204102467U (en) * 2014-08-27 2015-01-14 安庆职业技术学院 Possesses the building structure synthetic instruction model of Quick Response Code scan function
CN204102466U (en) * 2014-08-27 2015-01-14 安庆职业技术学院 Possesses the building structure synthetic instruction model of optical deictic function

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012083388A (en) * 2010-10-06 2012-04-26 Kayoko Umehara Model of architectural structure

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101436360A (en) * 2008-12-10 2009-05-20 华中科技大学 Assistant experiment teaching aid for space cognition and light environment simulation
CN102042577A (en) * 2009-10-22 2011-05-04 陕西金合泰克信息科技发展有限公司 Human-machine interaction control system for displaying and illustrating product
CN202275549U (en) * 2011-07-13 2012-06-13 沈一军 Light wooden building model
CN203225053U (en) * 2012-12-20 2013-10-02 西安海舟信息技术有限公司 Mini-sized intelligent building used for teaching and exhibition
CN203412090U (en) * 2013-07-31 2014-01-29 深圳市建筑设计研究总院有限公司 Super high-rise building structure without inner barrel
CN104134395A (en) * 2014-08-06 2014-11-05 陶顺 Intelligent building demonstration teaching system based on joints
CN104167149A (en) * 2014-08-27 2014-11-26 安庆职业技术学院 Building structure comprehensive teaching model with two-dimension code scanning function
CN104167148A (en) * 2014-08-27 2014-11-26 安庆职业技术学院 Building structure comprehensive teaching model with light indication function
CN204102465U (en) * 2014-08-27 2015-01-14 安庆职业技术学院 Acousto-optic integrated building structure synthetic instruction model
CN204102467U (en) * 2014-08-27 2015-01-14 安庆职业技术学院 Possesses the building structure synthetic instruction model of Quick Response Code scan function
CN204102466U (en) * 2014-08-27 2015-01-14 安庆职业技术学院 Possesses the building structure synthetic instruction model of optical deictic function

Also Published As

Publication number Publication date
CN104167150A (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN104167149B (en) Possesses the building structure synthetic instruction model of Quick Response Code scan function
CN204102465U (en) Acousto-optic integrated building structure synthetic instruction model
CN204102467U (en) Possesses the building structure synthetic instruction model of Quick Response Code scan function
CN105243485A (en) BIM network technology based architecture engineering management system platform
CN108447335A (en) A kind of assembled architecture AR imagings simulation training tutoring system
CN104167148B (en) Possesses the building structure synthetic instruction model of optical deictic function
CN105512978A (en) Smart model interactive learning examination system establishing method
CN204102466U (en) Possesses the building structure synthetic instruction model of optical deictic function
CN104167150B (en) Acousto-optic integrated building structure synthetic instruction model
CN203759926U (en) Physical training room for enterprise safety education
Ding Urban design needs urban morphology: a practitioner’s viewpoint W. Ding
CN204102468U (en) Possesses the building structure teaching mode of fire demonstration function
Radhamani et al. Role of Biotechnology simulation and remotely triggered virtual labs in complementing university education
CN104658353A (en) Network game-based learning system and method
Norina et al. Architectonics as synthesis of architectural and engineering disciplines
Pons et al. Improving the learning process in the latest prefabricated school buildings
CN204632158U (en) A kind of interactive English study Group Cooperation discussion teaching platform
Kuc Impact of the Construction subject on the quality of student projects in general building design in landscape architecture
CN205158709U (en) Computer network teaching test device
Rosas Using participatory action research for the reconceptualization of educational practice
CN202404822U (en) Comprehensive training model device for building
CN219430996U (en) Assembled steel construction building post skill real operation platform
Shi et al. The Design and Development of Virtual Teaching System based on Action-oriented
CN202306937U (en) Novel comprehensive wiring practical training simulation building and component unit thereof
Jiang et al. Interpretation, Construction and Exhibition-Seeking the Positive Significance of Ancient Architecture Model Making in the Teaching of History of Chinese Architecture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20170827

CF01 Termination of patent right due to non-payment of annual fee