CN202404822U - Comprehensive training model device for building - Google Patents

Comprehensive training model device for building Download PDF

Info

Publication number
CN202404822U
CN202404822U CN2011205621857U CN201120562185U CN202404822U CN 202404822 U CN202404822 U CN 202404822U CN 2011205621857 U CN2011205621857 U CN 2011205621857U CN 201120562185 U CN201120562185 U CN 201120562185U CN 202404822 U CN202404822 U CN 202404822U
Authority
CN
China
Prior art keywords
main body
building
model device
window
brick wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205621857U
Other languages
Chinese (zh)
Inventor
张威
王旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING TECHNICAL VOCATIONAL COLLEGE
Original Assignee
NANJING TECHNICAL VOCATIONAL COLLEGE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING TECHNICAL VOCATIONAL COLLEGE filed Critical NANJING TECHNICAL VOCATIONAL COLLEGE
Priority to CN2011205621857U priority Critical patent/CN202404822U/en
Application granted granted Critical
Publication of CN202404822U publication Critical patent/CN202404822U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses a comprehensive training model device for a building, which comprises a brick wall main body, a window embedded into the brick wall main body, a breastsummer module arranged above the window, and a roof arranged above the brick wall main body. According to the comprehensive training model device for the building, students perceive connection, cooperation and combination of different types of work by a plurality of models of training, and the problem of singleness of types of work in the professional training of the constructional engineering is solved; the comprehensive training model device accords with physiological characteristics of the students, so that the students easily feel fulfilled during the training, and the comprehensive training model device accords with the rules of educational psychology and also accords with the developing theory of working process systematization.

Description

Building comprehensive practical traning model equipment
Technical field
The utility model relates to a kind of building comprehensive practical traning model equipment.
Background technology
Existing building training simulation operation work post is single, non-modularization, labour intensity is big, does not meet student's Physiological Psychology characteristics, nor meets actual building requirements.
Summary of the invention
The utility model purpose is: a kind of multiplex's kind is provided, building comprehensive practical traning model equipment.
The technical scheme of the utility model is: a kind of building comprehensive practical traning model equipment, it comprises: the brick wall main body, be embedded into window in the brick wall main body, be arranged on the roof of crossing beam module and being arranged on brick wall main body top of window top.
On the basis of technique scheme, further comprise attached technical scheme:
Described window is the plaid window.
Described beam module excessively is that reinforced concrete is processed.
Described roof is that wooden structures and cross section are triangular in shape.
The utility model advantage is:
The utility model is through the real standard of multimode, lets linking, cooperation, the combination of the cognitive work post of student, solved the single work post problem of the real standard of construction work specialty.By a plurality of work post modules of single work post projects module combination, applicable to the real standard aspect of difference needs of students.The real standard content that the student grasps is through well-designed, meets student's physilogical characteristics, and is with different levels, modular, differentiation.A plurality ofly can independently accomplish single work post module small-scale workshops, complete heavy die block operation of one-tenth capable of being combined lets be prone to perception of accomplishment in the real standard of student, meets the educational psychology rule, meets the developing principle of " course of work systematization ".
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further described:
Fig. 1 is the front elevational schematic of the utility model;
Fig. 2 is the schematic side view of the utility model.
Embodiment
Embodiment: shown in Fig. 1-2; The utility model provides a kind of specific embodiment of building the comprehensive practical traning model equipment, and it comprises: brick wall main body 10, be embedded into window 20 in the brick wall main body 10, be arranged on the roof 40 of crossing beam module 30 and being arranged on brick wall main body 10 tops of window 20 tops.Wherein window 20 is the plaid window, crosses beam module 30 and processes for reinforced concrete, and roof 40 is that wooden structures and cross section are triangular in shape.
The utility model is instructed through the real of multimode, the miniaturization of single work post module, and it is capable of being combined that the multiplex (MUX) plants module; Meet laddering teaching and " course of work systematization " principle, controlled labour intensity, taken into full account the physilogical characteristics in stage in Higher Vocational-Technical College Students 16-18 year; Can satisfy the sense of accomplishment after Higher Vocational-Technical College Students is accomplished; Thereby further improve students'interest in learning, let linking, cooperation, the combination of cognitive each work post of student, solved the single work post problem of the real standard of construction work specialty.
Certainly the foregoing description only is the technical conceive and the characteristics of explanation the utility model, and its purpose is to let the people who is familiar with this technology can understand content of the utility model and enforcement according to this, can not limit the protection domain of the utility model with this.All equivalent transformation or modifications of doing according to the spirit of the utility model main technical schemes all should be encompassed within the protection domain of the utility model.

Claims (4)

1. building comprehensive practical traning model equipment is characterized in that it comprises: brick wall main body (10), be embedded into window (20) in the brick wall main body (10), be arranged on the roof (40) of crossing beam module (30) and being arranged on brick wall main body (10) top of window (20) top.
2. building comprehensive practical traning model equipment according to claim 1 is characterized in that: described window (20) is the plaid window.
3. building comprehensive practical traning model equipment according to claim 1 and 2 is characterized in that: the described beam module (30) of crossing is processed for reinforced concrete.
4. building comprehensive practical traning model equipment according to claim 3 is characterized in that: described roof (40) are that wooden structures and cross section are triangular in shape.
CN2011205621857U 2011-12-29 2011-12-29 Comprehensive training model device for building Expired - Fee Related CN202404822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205621857U CN202404822U (en) 2011-12-29 2011-12-29 Comprehensive training model device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205621857U CN202404822U (en) 2011-12-29 2011-12-29 Comprehensive training model device for building

Publications (1)

Publication Number Publication Date
CN202404822U true CN202404822U (en) 2012-08-29

Family

ID=46702456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205621857U Expired - Fee Related CN202404822U (en) 2011-12-29 2011-12-29 Comprehensive training model device for building

Country Status (1)

Country Link
CN (1) CN202404822U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105931519A (en) * 2016-06-27 2016-09-07 江苏建筑职业技术学院 Masonry project construction hazard source identification and experience area and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105931519A (en) * 2016-06-27 2016-09-07 江苏建筑职业技术学院 Masonry project construction hazard source identification and experience area and use method thereof

Similar Documents

Publication Publication Date Title
CN203759926U (en) Physical training room for enterprise safety education
CN202404822U (en) Comprehensive training model device for building
CN104167150B (en) Acousto-optic integrated building structure synthetic instruction model
CN104167148A (en) Building structure comprehensive teaching model with light indication function
CN201540683U (en) Simulated construction model for teaching
CN204102468U (en) Possesses the building structure teaching mode of fire demonstration function
CN101515416A (en) Simulation building model for teaching use
CN201359787Y (en) Practice training device of generic cabling of network engineering
CN202736341U (en) Novel electrical mounting and building practical training examination device
CN202816201U (en) Fraction addition and subtraction operation demonstration device
CN205211194U (en) Supplementary teaching device of sports psychology
CN204870222U (en) Drawing rule is used in natural sciences teaching
CN204960337U (en) A instrument for cast -in -place concrete floor shows thickness
Kuc Impact of the Construction subject on the quality of student projects in general building design in landscape architecture
CN219842765U (en) Simulation elevator experience equipment
CN202516268U (en) Skiing simulating machine
CN203028512U (en) Movable type training aid for teaching in political education course
CN205609091U (en) Remote -controlled robot
Voitenko et al. Trends and Opportunities of Training Highly Qualified IT Specialists in Accordance with International Standards
CN204706281U (en) One punches continuous beam stress demonstrating model
CN201006224Y (en) Novel psychology behavior exercising device
Delmas et al. State-of-the-art of Education on Solar Energy in Urban Planning Part I: Approaches and Methods in Education
CN207818044U (en) Teaching demonstration hydraulic control one-way valve model
Yi Research on Virtual Experiment Teaching Oriented to Innovative Ability Cultivation in Mechanical Engineering Curriculums
Jelinek et al. Balint and supervision groups in a Master's Program for Complementary Health Sciences. Evaluation research based on a standardised questionnaire

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20141229

EXPY Termination of patent right or utility model