CN204632242U - Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room - Google Patents
Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room Download PDFInfo
- Publication number
- CN204632242U CN204632242U CN201520307385.6U CN201520307385U CN204632242U CN 204632242 U CN204632242 U CN 204632242U CN 201520307385 U CN201520307385 U CN 201520307385U CN 204632242 U CN204632242 U CN 204632242U
- Authority
- CN
- China
- Prior art keywords
- workspace
- engineering simulation
- building
- stair
- control zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The open imitation multi-functional intelligent building generic cabling engineering simulation building Training Room of the utility model, it comprises engineering simulation building, engineering simulation building is divided into workspace, control zone and floor battery limits, workspace is divided into workspace and lower workspace, upper workspace arranged outside has corridor, corridor end is provided with stair one, floor battery limits are arranged on the right side of workspace, and end, floor battery limits is provided with stair two, control zone is arranged on outside lower workspace, and offer telecommunication well lid above control zone, inside, control zone is provided with underground pipeline, the utility model long service life, cost is low, maintain and replace ratio is easier to, security is high.
Description
Technical field
The utility model relates to teaching equipment technical field, particularly relates to imitation multi-functional intelligent building generic cabling engineering simulation building Training Room.
Background technology
National exemplary higher vocational colleges construction plan promotes the course system reform work of Liao Ge universities and colleges based on the course of work; on the one hand; curricular system based on the course of work is conducive to the Comprehensive Vocation Ability of training student, is therefore the Focal point and difficult point of Specialized Construction work based on the curriculum development of the course of work.On the other hand, Action Orientation teaching, " learning by doing " are the principal modes adopted in implementation process based on the course of the course of work.But, no matter be Action Orientation teaching or " learning by doing ", all need " the software and hardware teaching environment " of the intension such as the technological requirement that can reflect in actual production process, production procedure.For it, building " school workshop " is domestic many demonstration vocational universities and colleges carry out productivity real training Condition Construction in the school a kind of Main when implementing the course based on the course of work, existing relevant product, function is incomplete, structure imperfection, part Experiment real training can only be done, can not being made of one experimental real-training teaching.
Utility model content
The purpose of this utility model is to provide imitation multi-functional intelligent building generic cabling engineering simulation building Training Room, solves that function in prior art is incomplete, the incomplete technical matters of structure;
The technical scheme that the utility model solves the problems of the technologies described above is as follows:
Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room, comprise engineering simulation building, described engineering simulation building is divided into workspace, control zone and floor battery limits, described workspace is divided into workspace and lower workspace, described upper workspace arranged outside has corridor, described corridor end is provided with stair one, described floor battery limits are arranged on the right side of workspace, and end, floor battery limits is provided with stair two, described control zone is arranged on outside lower workspace, and offering telecommunication well lid above control zone, inside, described control zone is provided with underground pipeline;
On the basis of technique scheme, the utility model can also do following improvement:
Further, the thickness of wall body in described engineering simulation building is 15-24cm, and the body of wall inside in engineering simulation building is provided with pvc pipe, adopts the beneficial effect of this step to be allow student simulate house wiring;
Further, described upper workspace is divided into workspace one, workspace two and workspace three successively by dividing plate, adopts the beneficial effect of this step to be to provide different indoor environments, is convenient to the routing capabilities that student tempers oneself;
Further, stair three are provided with between described workspace two and lower workspace;
Further, the width of described stair one, stair two and stair three is 60cm.
The utility model can meet the demand of Integrated Teaching, the comprehensive wiring system of an intelligent building can be simulated, the utility model can analog telecommunications pipeline wiring, have network center to connect up to the arrangement in building wiring topology by, the outside run that the utility model can also allow student's simulate formation pipeline manage, the house wiring of intelligent building.
The beneficial effects of the utility model are:
1, the utility model structure is simple, easy to manufacture, and assembling flexible and convenient, can put according to the specific environment of Training Room and real needs independent assortment;
2, the utility model provides height Simulation Engineering environment, makes trainer know from experience real client's environment for use comprehensively, increases the enjoyment of practice-training teaching;
3, the utility model long service life, cost is low, and maintain and replace ratio is easier to, and security is high.
Accompanying drawing explanation
Fig. 1 is the front view of the imitation multi-functional intelligent building generic cabling engineering simulation building Training Room described in the utility model specific embodiment;
In accompanying drawing, the list of parts representated by each label is as follows:
1, engineering simulation building, 2, workspace, 3, control zone, 4, floor battery limits, 5, upper workspace, 6, lower workspace, 7, corridor, 8, stair one, 9, stair two, 10, telecommunication well lid, 11, underground pipeline, 12, workspace one, 13, workspace two, 14, workspace three, 15, stair three.
Embodiment
Be described principle of the present utility model and feature below in conjunction with accompanying drawing, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room, comprise engineering simulation building 1, described engineering simulation building 1 is divided into workspace 2, control zone 3 and floor battery limits 4, described workspace 2 is divided into workspace 5 and lower workspace 6, described upper workspace 5 arranged outside has corridor 7, described corridor 7 end is provided with stair 1, described floor battery limits 4 are arranged on the right side of workspace 5, and end, floor battery limits 4 is provided with stair 29, described control zone 3 is arranged on outside lower workspace 6, and offer telecommunication well lid 10 above control zone 3, inside, described control zone 3 is provided with underground pipeline 11,
The thickness of wall body in wherein said engineering simulation building 1 is 15-24cm, and the body of wall inside in engineering simulation building 1 is provided with pvc pipe, described upper workspace 5 is divided into workspace 1, workspace 2 13 and workspace 3 14 successively by dividing plate, be provided with stair 3 15 between described workspace 2 13 and lower workspace 6, the width of described stair 1, stair 29 and stair 3 15 is 60cm.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (5)
1. imitation multi-functional intelligent building generic cabling engineering simulation building Training Room, comprise engineering simulation building, it is characterized in that, described engineering simulation building is divided into workspace, control zone and floor battery limits, described workspace is divided into workspace and lower workspace, described upper workspace arranged outside has corridor, described corridor end is provided with stair one, described floor battery limits are arranged on the right side of workspace, and end, floor battery limits is provided with stair two, described control zone is arranged on outside lower workspace, and offer telecommunication well lid above control zone, inside, described control zone is provided with underground pipeline.
2. imitation multi-functional intelligent building generic cabling engineering simulation building Training Room according to claim 1, it is characterized in that, the thickness of wall body in described engineering simulation building is 15-24cm, and the body of wall inside in engineering simulation building is provided with pvc pipe.
3. imitation multi-functional intelligent building generic cabling engineering simulation building Training Room according to claim 2, it is characterized in that, described upper workspace is divided into workspace one, workspace two and workspace three successively by dividing plate.
4. imitation multi-functional intelligent building generic cabling engineering simulation building Training Room according to claim 3, is characterized in that, be provided with stair three between described workspace two and lower workspace.
5. imitation multi-functional intelligent building generic cabling engineering simulation building Training Room according to claim 4, it is characterized in that, the width of described stair one, stair two and stair three is 60cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520307385.6U CN204632242U (en) | 2015-05-14 | 2015-05-14 | Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520307385.6U CN204632242U (en) | 2015-05-14 | 2015-05-14 | Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204632242U true CN204632242U (en) | 2015-09-09 |
Family
ID=54051244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520307385.6U Expired - Fee Related CN204632242U (en) | 2015-05-14 | 2015-05-14 | Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204632242U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152944A (en) * | 2021-04-25 | 2021-07-23 | 中国人民解放军陆军军医大学第一附属医院 | Comprehensive training method for knowledge skill thinking and humanity based on clinical training center |
-
2015
- 2015-05-14 CN CN201520307385.6U patent/CN204632242U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152944A (en) * | 2021-04-25 | 2021-07-23 | 中国人民解放军陆军军医大学第一附属医院 | Comprehensive training method for knowledge skill thinking and humanity based on clinical training center |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105206124A (en) | Mathematics learning teaching system | |
CN204632242U (en) | Imitation multi-functional intelligent building generic cabling engineering simulation building Training Room | |
CN201673614U (en) | Comprehensive wiring training simulation building and component unit thereof | |
CN202816182U (en) | Multimedia financial teaching system | |
CN207023709U (en) | A kind of pole simplicity connects desk and multi-functional intelligent practice teaching room arrangement | |
CN201518182U (en) | Generic cabling practical training wall apparatus | |
CN206058583U (en) | A kind of Remote Education System Based On Internet | |
CN203260248U (en) | Remote-control pneumatic practical training device | |
CN201066899Y (en) | Network integrated cabling practical training device | |
CN201359787Y (en) | Practice training device of generic cabling of network engineering | |
CN203055218U (en) | Multimedia interaction teaching system for primary education | |
CN202615630U (en) | University student group cooperation studying system | |
CN201203956Y (en) | Education training emulation system for cable operation | |
CN205541587U (en) | Presentation device is used in power equipment training | |
CN204406750U (en) | A kind of music teaching device | |
CN103208210A (en) | Visual classroom teaching system | |
CN103400532A (en) | Integrated Texaco coal-to-methanol simulation teaching factory | |
CN202332068U (en) | Multilayer combined bridge frame demonstrating device | |
CN204288684U (en) | A kind of oil tank fire control model | |
CN209232151U (en) | A kind of construction management simulation demonstrating apparatus | |
CN208922571U (en) | A kind of simple presentation tool of mathematical education solid figure | |
CN104361777A (en) | Water supply and drainage engineering construction technology network course teaching system | |
CN202025450U (en) | Fundamental network integration routing real-training teaching device | |
CN206249763U (en) | To the device of simulating plant hormonal action in biology teaching in junior middle school | |
Royal | UNIVERSITY ENGINEERING EDUCATION LED BY INDUSTRY ENGINEERS: A CASE-STUDY FOR A SENIOR DESIGN PROJECT |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20160514 |
|
CF01 | Termination of patent right due to non-payment of annual fee |