CN201315112Y - Integrated wiring training operation platform - Google Patents

Integrated wiring training operation platform Download PDF

Info

Publication number
CN201315112Y
CN201315112Y CNU200820201367XU CN200820201367U CN201315112Y CN 201315112 Y CN201315112 Y CN 201315112Y CN U200820201367X U CNU200820201367X U CN U200820201367XU CN 200820201367 U CN200820201367 U CN 200820201367U CN 201315112 Y CN201315112 Y CN 201315112Y
Authority
CN
China
Prior art keywords
training
real training
standard
comprehensive wiring
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820201367XU
Other languages
Chinese (zh)
Inventor
吴少鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG VCOM EDUCATION TECHNOLOGY CO., LTD.
Original Assignee
Guangzhou Weikang Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Weikang Communication Technology Co Ltd filed Critical Guangzhou Weikang Communication Technology Co Ltd
Priority to CNU200820201367XU priority Critical patent/CN201315112Y/en
Application granted granted Critical
Publication of CN201315112Y publication Critical patent/CN201315112Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electrically Operated Instructional Devices (AREA)

Abstract

The utility model discloses an integrated wiring training operation platform, including a multi-functional operation platform frame body which is provided with a standard embedded frame, a working area panel with an information interface and a horizontal wiring tank and the like, wherein one end of the horizontal wiring tank is communicated with the embedded frame and the other end extends behind the working area panel to form a network wiring chain circuit. The platform solves the problem of few training functions of the existing training device, adds frame/cabinet installation training, trunk cable end connection, optical fiber melting connection, horizontal subsystem installation, working area information interface end connection and other training functions compared with products of the same kind in the existing market. After training, an active network communication chain line can be formed. Real and applicable on-site working environment can be formed. Through integrated design, the utility model solves the problem that the training functions of the integrated wiring training device are difficult to add.

Description

Comprehensive wiring real training operator's console
Technical field
The utility model relates to a kind of actual training device, is specifically related to the actual training device that a kind of comprehensive wiring technique teaching is used.
Background technology
Comprehensive wiring is in a kind of modular, buildings that dirigibility is high or the information transfer channel between the groups of building.It can make voice, data, vision facilities and switching equipment and out of Memory management system be connected with each other, and these equipment are connected with external communication network.All cables between the tie point that it also comprises buildings external network or telecommunication line and the application system equipment and relevant link.According to international ISO/IEC11801:2007 regulation, comprehensive wiring system is divided into six subsystems, is respectively workspace subsystem, horizontal subsystem, ADMINISTRATION SUBSYSTEM, riser backbone subsystem, equipment room subsystem, Campus Subsystem.
Comprehensive wiring is the important component part and the transmission channel of modern intelligent construction, therefore, the construction of integration laying line system engineering has the demand and the market space very widely, the Ministry of Information industry and the Ministry of Education are also doing a lot of leading positions aspect the construction of standard and the personnel training, the numerous colleges and universities in the whole nation offer the comprehensive wiring course one after another on its computing machine or network specialty, turn out the generic cabling engineering teacher of some to industry.
But, the comprehensive wiring technology is a comprehensive engineering, because of its project implementation is a flow process with design, construction, examination generally, traditional instructional mode then biases toward the education of knowwhy, greatly develop professorship education in national Eleventh-Five Year Plan, cultivate under the guidance of practicality technician's thought in short supply, many experiments, actual training device arise at the historic moment, purpose is platform and the scheme that relevant speciality technical ability practical operation teaching is provided to universities and colleges, and comprehensive wiring real training chamber is exactly the solution of comprehensive wiring specialty practical operation teaching.
Existing comparatively perfect comprehensive wiring real training chamber generally need possess the function of three parts, i.e. knowledge learning part; Skill training part and engineering practice part, knowledge learning partly provides various data, image, video recording, sample etc., and integral body presents integration laying line system engineering related various knowledge and product.The skill training part mainly offers the student to the basic installation of various place-and-route products and the basic skills of operation by trainer.Engineering practice partly is divided into practical engineering project teaching and the teaching of model engineering project, teaching with respect to this practice type of practical engineering project, model engineering project practical teaching is in the analog wire laying engineering-environment through in-depth design, and the omnibearing training such as design, management, installation of each subsystem that wiring installation relates to and route are provided to the student.
The content of existing comprehensive wiring skill training solution generally comprises the making of wire jumper crystal head, information module termination, distributing frame termination or wire jumper test etc.Yet the trainer is as the comprehensive wiring system technician, and it is far from being enough that above several technical ability is only arranged, and imparts knowledge to students so school need have multi-purpose real training operating means.But for fear of the difficulty that realizes commercialization, the product of domestic each big real training chamber brand is never broken through on the training function project.The various needs of facing the reality and imparting knowledge to students, the existing various solutions of the industry deficiency all to some extent aspect skill training and model engineering Item Practice Training.
Summary of the invention
For addressing the above problem, the purpose of this utility model is to provide a kind of multi-functional comprehensive wiring real training operator's console, and its complete function provides the solution of the comprehensive comprehensive wiring operative skill real training of a cover for the student of universities and colleges.
The utility model is achieved in that a kind of comprehensive wiring real training operator's console, comprise a multi-functional operation table frame main body, it is characterized in that: described multi-functional operation table frame main body is provided with: be used to install the various standard distribution plants and the network equipment the embedded frame of standard, be used for termination and mount message module the workspace panel that has information interface, be used for the horizontal wiring groove of horizontal subsystem wiring; Wherein horizontal wiring groove one end is communicated with the embedded frame of standard, and the other end extends to panel rear, workspace, constitutes the network layout link.
Described operator's console frame is provided with the active network switch.
The embedded frame of described standard is provided with the fibre distribution frame that can carry out the fused fiber splice training.
Comprise that also one is used to hold the dish line cabinet of trunk cable.
The utility model solves the existing less problem of real training operating means training function, same product than the existing market has increased many training functions such as frame/rack equipment installation training, trunk cable termination, fused fiber splice, horizontal subsystem installation, workspace information interface termination, after finishing, real training can form active network communication link, and can produce true available work on the spot environment, by integrated design, better solved the problem that comprehensive wiring actual training device real training function is added to the difficulties.
Description of drawings
Fig. 1 is an one-piece construction synoptic diagram of the present utility model;
Fig. 2 is a upper frame structural representation of the present utility model;
Fig. 3 is a underframe structural representation of the present utility model;
Fig. 4 is a workspace of the present utility model panel structure chart;
Fig. 5 is a horizontal wiring groove structural drawing of the present utility model;
Fig. 6 is a real training operational flowchart of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing and object lesson, but the utility model is not limited to this specific examples.
Shown in Fig. 1-5, the utility model is a kind of multi-functional comprehensive wiring real training operator's console, comprise a multi-functional operation table frame main body 1, on multi-functional operation table frame main body 1, be provided with workspace panel 5, horizontal wiring groove 7, the dish line cabinet 3 of 19 inches embedded frames 2 of standard, the breath interface 51 of taking a message etc.
Multi-functional operation table frame main body 1 is made up of underframe 11 and upper frame 12.The three-dimensional frontal width in assembling back is 1.8 meters, highly is that 1.48 meters, the degree of depth are 0.8 meter.
19 inches embedded frames 2 of standard are positioned at operator's console chassis body 1 upper left side (being upper frame 12 left sides), can be used for installing the various standard distribution plants and the network equipment, it is between management in the comprehensive wiring system, here gathered switch distributing frame reason coil holder etc., for the place of the various distribution plant installations of student training, termination and network equipment Installation and Debugging training is provided.In 19 inches embedded frames of standard fibre distribution frame (not illustrating in the drawings) can be installed, the student can the employing instrument carries out the training and operation of fused fiber splice.
Workspace panel 5 is positioned at operator's console chassis body 1 upper right side (being upper frame 12 the right), it is between management and the carrier between the product of terminal device, its role is to provides the information access point for each terminal device, have 6 86*86 information interfaces 51 above, 6 of GB 86 profile plates can be installed, and the student can carry out the termination of 12 information modules in the above and training and operation is installed.
Metal level wiring groove 7 is positioned at operator's console chassis body 1 inside, is the horizontal riser backbone subsystem in the comprehensive wiring six big subsystems, and it is the route place of horizontal cable wiring, is used for the training that the student carries out the horizontal subsystem wiring.19 inches embedded frames 2 of horizontal wiring groove 7 one ends and standard are communicated with, and the other end extends to information interface 51 rears of workspace panel 5, is communicated with its back space, thereby can forms the network layout link.
Dish line cabinet 3 is positioned at operator's console chassis body 1 lower left, is used for storage and stays the trunk cable to carry out trunk termination training usefulness for the student.Dish line cabinet 3 upper surfaces offer line outlet 31, upwards cause in 19 inches embedded frames 2 of standard for the cable in the dish line cabinet 3.Be equipped with the backbone cable in the dish line cabinet 3, comprised twisted-pair feeder, the 25 pairs of big logarithm voice cables, inside cable or the like respectively.
In addition, in 19 inches embedded frames 2 of described standard, source network switch (not illustrating in the drawings) can be installed, thereby can form active network communication link.
(position beyond 19 inches embedded frames 2 of standard, the workspace panel 5) also can be provided with wire jumper on off test device 4, routing actual training device 6 or the like as required above operator's console chassis body 1, further enriches the real training function.Wire jumper on off test device 4 is to set up on the basis of above-mentioned several functions, is positioned at operator's console chassis body 1 center, the break-make situation that is used to test wire jumper, thus guarantee between management and the connectivity of other link.Routing actual training device 6 also is to set up on the basis of above-mentioned several functions, be arranged in the below and the lower right of operator's console chassis body 1, its role is to carry out routing training, thus between management and the construction of other all links due technical support is provided.
As shown in Figure 6, the real training process is:
Equipment comprises multifunctional comprehensive wiring real training operator's console of the present utility model and external equipment room rack.
Equipment room is the data center of buildings, is one of carrier of data transmission.
Be equipped with the trunk cable (this cable is the lay-by material of technical ability real training) of the reservation certain-length that comes by the equipment room rack in the dish line cabinet 3, the student causes 19 inches embedded frames 2 of upper left standard by the cable that vertical riser backbone subsystem will coil (mainly be made up of various cables, comprise connecting equipment room to all links between management) line cabinet 3;
Then with the fibre distribution frame of cable termination to 19 inches embedded frames 2 of standard to finish the trunk portion termination, carry out trunk termination training back 19 inches embedded frames 2 of standard the student and form physical connection with the equipment room rack;
Then down via horizontal wiring groove 7, adopt twisted-pair feeder to lay information interface 51 to workspace panel 5 by distributing frame, carry out the information module termination, form whole network cloth wired link;
Last cable is connected to end user---the terminal device of comprehensive wiring system, its role is to test whether UNICOM of whole wiring real training;
By the active network switch that is installed in equipment room rack, 19 inches embedded frames 2 of standard, form active network communication link simultaneously.
Whole real training process can produce true available work on the spot environment, can carry out active equipment and connect test and other traditional technical ability real training, with the achievement of flexible check real training, increases the enjoyment of practice-training teaching.

Claims (9)

1. a comprehensive wiring real training operator's console comprises a multi-functional operation table frame main body, it is characterized in that: described multi-functional operation table frame main body is provided with:
Be used to install the various standard distribution plants and the network equipment the embedded frame of standard, be used for termination and mount message module the workspace panel that has information interface, be used for the horizontal wiring groove of horizontal subsystem wiring;
Wherein horizontal wiring groove one end is communicated with the embedded frame of standard, and the other end extends to panel rear, workspace, constitutes the network layout link.
2. comprehensive wiring real training operator's console according to claim 1 is characterized in that: the embedded frame of described standard is provided with the active network switch.
3. comprehensive wiring real training operator's console according to claim 1 is characterized in that: the embedded frame of described standard is provided with the fibre distribution frame that can carry out the fused fiber splice training.
4. comprehensive wiring real training operator's console according to claim 1 is characterized in that: also be provided with a dish line cabinet that is used to hold the trunk cable on the described multi-functional operation table frame main body.
5. comprehensive wiring real training operator's console according to claim 1 is characterized in that: the embedded frame of described standard is 19 inches embedded frames of standard.
6. comprehensive wiring real training operator's console according to claim 1 is characterized in that: have 6 86*86 information interfaces above the panel of described workspace.
7. comprehensive wiring real training operator's console according to claim 1 is characterized in that: described multi-functional operation table frame main body is made up of underframe and upper frame.
8. comprehensive wiring real training operator's console according to claim 4 is characterized in that: embedded frame of described standard and workspace panel are located at multi-functional operation table frame main body top, and described dish line cabinet is located at multi-functional operation table frame main body below.
9. comprehensive wiring real training operator's console according to claim 1 is characterized in that: described operator's console chassis body top also is provided with wire jumper on off test device, routing actual training device.
CNU200820201367XU 2008-09-28 2008-09-28 Integrated wiring training operation platform Expired - Lifetime CN201315112Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820201367XU CN201315112Y (en) 2008-09-28 2008-09-28 Integrated wiring training operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820201367XU CN201315112Y (en) 2008-09-28 2008-09-28 Integrated wiring training operation platform

Publications (1)

Publication Number Publication Date
CN201315112Y true CN201315112Y (en) 2009-09-23

Family

ID=41126910

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820201367XU Expired - Lifetime CN201315112Y (en) 2008-09-28 2008-09-28 Integrated wiring training operation platform

Country Status (1)

Country Link
CN (1) CN201315112Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102097019A (en) * 2011-01-12 2011-06-15 武文彦 Optical cable line construction site simulation system
CN102298861A (en) * 2011-09-21 2011-12-28 西安西元电子科技有限公司 Application training system for internet of things
CN109118871A (en) * 2018-10-23 2019-01-01 广东唯康教育科技股份有限公司 A kind of comprehensive wiring rack

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102097019A (en) * 2011-01-12 2011-06-15 武文彦 Optical cable line construction site simulation system
CN102097019B (en) * 2011-01-12 2015-11-18 武文彦 Optical cable line construction site simulation system
CN102298861A (en) * 2011-09-21 2011-12-28 西安西元电子科技有限公司 Application training system for internet of things
CN109118871A (en) * 2018-10-23 2019-01-01 广东唯康教育科技股份有限公司 A kind of comprehensive wiring rack

Similar Documents

Publication Publication Date Title
CN101354852B (en) Emulation experiment platform of buildings integrative wire laying system and emulation method thereof
ATE545880T1 (en) WIRING STATUS INDICATOR FOR A DISTRIBUTION CABINET
CN201315112Y (en) Integrated wiring training operation platform
CN102568297B (en) Comprehensive practical training device for process control
CN102298861A (en) Application training system for internet of things
CN201066546Y (en) Practical training device for network wiring
CN202306867U (en) Training platform for safety monitoring system of closed-circuit television
CN209103663U (en) A kind of optical fiber wiring simulator
CN211628464U (en) Desktop type multifunctional network wiring practical training cabinet
CN201673614U (en) Comprehensive wiring training simulation building and component unit thereof
CN201518182U (en) Generic cabling practical training wall apparatus
CN201251877Y (en) Simulation experiment platform of building comprehensive wiring system and simulation method thereof.
CN203134234U (en) Simulation real-training device for chemical reaction process control
EA200901556A1 (en) TRAINING COMPLEX FOR PREPARATION OF CREWS OF SHIPS
CN205486932U (en) Real standard machine of track traffic subway power supply relay protection teaching
CN205564083U (en) Modularization network experimental box based on IIC bus
CN212032432U (en) Mobile teaching terminal based on internet teaching
CN207799947U (en) A kind of network comprehensive lining copper cable and Cable's Fault simulation box and simulation system
CN208460227U (en) Building conversational system Practical teaching device
CN102779442A (en) Piano type combined control table
CN209607184U (en) Communication engineering experiment platform
CN211719071U (en) Intelligent wiring training equipment
CN205883243U (en) Analog communication terminal testing arrangement
CN206793727U (en) A kind of electronic information comprehensive experiment table
CN201689562U (en) Indoor electric installation and assessment device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGXI MINKANG INDUSTRY CO., LTD.

Free format text: FORMER OWNER: WEIKANG COMMUNICATION TECH CO., LTD., GUANGZHOU CITY

Effective date: 20141225

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 510630 GUANGZHOU, GUANGDONG PROVINCE TO: 344300 FUZHOU, JIANGXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141225

Address after: 344300 Jiangxi Industrial Park of Fuzhou province county

Patentee after: JIANGXI MINKANG INDUSTRY CO., LTD.

Address before: 510630, Guangdong, Guangzhou, Tangxia, Tianhe District new road excellent business center D building 201

Patentee before: Guangzhou Weikang Communication Technology Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160506

Address after: 510000, Guangdong, Guangzhou, Tangxia, Tianhe District new road, excellent business center, C building on the third floor

Patentee after: GUANGDONG VCOM EDUCATION TECHNOLOGY CO., LTD.

Address before: 344300 Jiangxi Industrial Park of Fuzhou province county

Patentee before: JIANGXI MINKANG INDUSTRY CO., LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090923