Comprehensive wiring real training operator's console
Technical field
The utility model relates to a kind of actual training device, is specifically related to the actual training device that a kind of comprehensive wiring technique teaching is used.
Background technology
Comprehensive wiring is in a kind of modular, buildings that dirigibility is high or the information transfer channel between the groups of building.It can make voice, data, vision facilities and switching equipment and out of Memory management system be connected with each other, and these equipment are connected with external communication network.All cables between the tie point that it also comprises buildings external network or telecommunication line and the application system equipment and relevant link.According to international ISO/IEC11801:2007 regulation, comprehensive wiring system is divided into six subsystems, is respectively workspace subsystem, horizontal subsystem, ADMINISTRATION SUBSYSTEM, riser backbone subsystem, equipment room subsystem, Campus Subsystem.
Comprehensive wiring is the important component part and the transmission channel of modern intelligent construction, therefore, the construction of integration laying line system engineering has the demand and the market space very widely, the Ministry of Information industry and the Ministry of Education are also doing a lot of leading positions aspect the construction of standard and the personnel training, the numerous colleges and universities in the whole nation offer the comprehensive wiring course one after another on its computing machine or network specialty, turn out the generic cabling engineering teacher of some to industry.
But, the comprehensive wiring technology is a comprehensive engineering, because of its project implementation is a flow process with design, construction, examination generally, traditional instructional mode then biases toward the education of knowwhy, greatly develop professorship education in national Eleventh-Five Year Plan, cultivate under the guidance of practicality technician's thought in short supply, many experiments, actual training device arise at the historic moment, purpose is platform and the scheme that relevant speciality technical ability practical operation teaching is provided to universities and colleges, and comprehensive wiring real training chamber is exactly the solution of comprehensive wiring specialty practical operation teaching.
Existing comparatively perfect comprehensive wiring real training chamber generally need possess the function of three parts, i.e. knowledge learning part; Skill training part and engineering practice part, knowledge learning partly provides various data, image, video recording, sample etc., and integral body presents integration laying line system engineering related various knowledge and product.The skill training part mainly offers the student to the basic installation of various place-and-route products and the basic skills of operation by trainer.Engineering practice partly is divided into practical engineering project teaching and the teaching of model engineering project, teaching with respect to this practice type of practical engineering project, model engineering project practical teaching is in the analog wire laying engineering-environment through in-depth design, and the omnibearing training such as design, management, installation of each subsystem that wiring installation relates to and route are provided to the student.
The content of existing comprehensive wiring skill training solution generally comprises the making of wire jumper crystal head, information module termination, distributing frame termination or wire jumper test etc.Yet the trainer is as the comprehensive wiring system technician, and it is far from being enough that above several technical ability is only arranged, and imparts knowledge to students so school need have multi-purpose real training operating means.But for fear of the difficulty that realizes commercialization, the product of domestic each big real training chamber brand is never broken through on the training function project.The various needs of facing the reality and imparting knowledge to students, the existing various solutions of the industry deficiency all to some extent aspect skill training and model engineering Item Practice Training.
Summary of the invention
For addressing the above problem, the purpose of this utility model is to provide a kind of multi-functional comprehensive wiring real training operator's console, and its complete function provides the solution of the comprehensive comprehensive wiring operative skill real training of a cover for the student of universities and colleges.
The utility model is achieved in that a kind of comprehensive wiring real training operator's console, comprise a multi-functional operation table frame main body, it is characterized in that: described multi-functional operation table frame main body is provided with: be used to install the various standard distribution plants and the network equipment the embedded frame of standard, be used for termination and mount message module the workspace panel that has information interface, be used for the horizontal wiring groove of horizontal subsystem wiring; Wherein horizontal wiring groove one end is communicated with the embedded frame of standard, and the other end extends to panel rear, workspace, constitutes the network layout link.
Described operator's console frame is provided with the active network switch.
The embedded frame of described standard is provided with the fibre distribution frame that can carry out the fused fiber splice training.
Comprise that also one is used to hold the dish line cabinet of trunk cable.
The utility model solves the existing less problem of real training operating means training function, same product than the existing market has increased many training functions such as frame/rack equipment installation training, trunk cable termination, fused fiber splice, horizontal subsystem installation, workspace information interface termination, after finishing, real training can form active network communication link, and can produce true available work on the spot environment, by integrated design, better solved the problem that comprehensive wiring actual training device real training function is added to the difficulties.
Description of drawings
Fig. 1 is an one-piece construction synoptic diagram of the present utility model;
Fig. 2 is a upper frame structural representation of the present utility model;
Fig. 3 is a underframe structural representation of the present utility model;
Fig. 4 is a workspace of the present utility model panel structure chart;
Fig. 5 is a horizontal wiring groove structural drawing of the present utility model;
Fig. 6 is a real training operational flowchart of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing and object lesson, but the utility model is not limited to this specific examples.
Shown in Fig. 1-5, the utility model is a kind of multi-functional comprehensive wiring real training operator's console, comprise a multi-functional operation table frame main body 1, on multi-functional operation table frame main body 1, be provided with workspace panel 5, horizontal wiring groove 7, the dish line cabinet 3 of 19 inches embedded frames 2 of standard, the breath interface 51 of taking a message etc.
Multi-functional operation table frame main body 1 is made up of underframe 11 and upper frame 12.The three-dimensional frontal width in assembling back is 1.8 meters, highly is that 1.48 meters, the degree of depth are 0.8 meter.
19 inches embedded frames 2 of standard are positioned at operator's console chassis body 1 upper left side (being upper frame 12 left sides), can be used for installing the various standard distribution plants and the network equipment, it is between management in the comprehensive wiring system, here gathered switch distributing frame reason coil holder etc., for the place of the various distribution plant installations of student training, termination and network equipment Installation and Debugging training is provided.In 19 inches embedded frames of standard fibre distribution frame (not illustrating in the drawings) can be installed, the student can the employing instrument carries out the training and operation of fused fiber splice.
Workspace panel 5 is positioned at operator's console chassis body 1 upper right side (being upper frame 12 the right), it is between management and the carrier between the product of terminal device, its role is to provides the information access point for each terminal device, have 6 86*86 information interfaces 51 above, 6 of GB 86 profile plates can be installed, and the student can carry out the termination of 12 information modules in the above and training and operation is installed.
Metal level wiring groove 7 is positioned at operator's console chassis body 1 inside, is the horizontal riser backbone subsystem in the comprehensive wiring six big subsystems, and it is the route place of horizontal cable wiring, is used for the training that the student carries out the horizontal subsystem wiring.19 inches embedded frames 2 of horizontal wiring groove 7 one ends and standard are communicated with, and the other end extends to information interface 51 rears of workspace panel 5, is communicated with its back space, thereby can forms the network layout link.
Dish line cabinet 3 is positioned at operator's console chassis body 1 lower left, is used for storage and stays the trunk cable to carry out trunk termination training usefulness for the student.Dish line cabinet 3 upper surfaces offer line outlet 31, upwards cause in 19 inches embedded frames 2 of standard for the cable in the dish line cabinet 3.Be equipped with the backbone cable in the dish line cabinet 3, comprised twisted-pair feeder, the 25 pairs of big logarithm voice cables, inside cable or the like respectively.
In addition, in 19 inches embedded frames 2 of described standard, source network switch (not illustrating in the drawings) can be installed, thereby can form active network communication link.
(position beyond 19 inches embedded frames 2 of standard, the workspace panel 5) also can be provided with wire jumper on off test device 4, routing actual training device 6 or the like as required above operator's console chassis body 1, further enriches the real training function.Wire jumper on off test device 4 is to set up on the basis of above-mentioned several functions, is positioned at operator's console chassis body 1 center, the break-make situation that is used to test wire jumper, thus guarantee between management and the connectivity of other link.Routing actual training device 6 also is to set up on the basis of above-mentioned several functions, be arranged in the below and the lower right of operator's console chassis body 1, its role is to carry out routing training, thus between management and the construction of other all links due technical support is provided.
As shown in Figure 6, the real training process is:
Equipment comprises multifunctional comprehensive wiring real training operator's console of the present utility model and external equipment room rack.
Equipment room is the data center of buildings, is one of carrier of data transmission.
Be equipped with the trunk cable (this cable is the lay-by material of technical ability real training) of the reservation certain-length that comes by the equipment room rack in the dish line cabinet 3, the student causes 19 inches embedded frames 2 of upper left standard by the cable that vertical riser backbone subsystem will coil (mainly be made up of various cables, comprise connecting equipment room to all links between management) line cabinet 3;
Then with the fibre distribution frame of cable termination to 19 inches embedded frames 2 of standard to finish the trunk portion termination, carry out trunk termination training back 19 inches embedded frames 2 of standard the student and form physical connection with the equipment room rack;
Then down via horizontal wiring groove 7, adopt twisted-pair feeder to lay information interface 51 to workspace panel 5 by distributing frame, carry out the information module termination, form whole network cloth wired link;
Last cable is connected to end user---the terminal device of comprehensive wiring system, its role is to test whether UNICOM of whole wiring real training;
By the active network switch that is installed in equipment room rack, 19 inches embedded frames 2 of standard, form active network communication link simultaneously.
Whole real training process can produce true available work on the spot environment, can carry out active equipment and connect test and other traditional technical ability real training, with the achievement of flexible check real training, increases the enjoyment of practice-training teaching.