CN208934436U - A kind of combination circulation lifting-up support - Google Patents
A kind of combination circulation lifting-up support Download PDFInfo
- Publication number
- CN208934436U CN208934436U CN201821231265.2U CN201821231265U CN208934436U CN 208934436 U CN208934436 U CN 208934436U CN 201821231265 U CN201821231265 U CN 201821231265U CN 208934436 U CN208934436 U CN 208934436U
- Authority
- CN
- China
- Prior art keywords
- support
- platform
- lifting
- fixed
- hollow column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
This application provides a kind of combinations to recycle lifting-up support, belongs to the realm of building construction.It include: U-shaped hollow column, upper and lower side is equipped with U-shaped flange;Support platform is set between the U-shaped hollow column in cross structure;The support platform includes: climbing structure platform;Climbing structure supports fixed platform, is used to support the fixed climbing structure platform;The climbing structure support fixed platform is equipped with jacking apparatus.Combination provided by the present application recycles lifting-up support, flexible arrangement, lifting-up support production is simple, it is easy to install and use quick, securely and reliably, combination provided by the present application recycles lifting-up support, is equipped with U-shaped hollow column, support platform is movably arranged between the U-shaped hollow column by pin shaft, can guarantee the flexible operation of construction;Combination provided by the present application recycles lifting-up support, and U-shaped flange periphery is uniformly provided with fixed fixture block, can effectively fix U-shaped flange, improves safety.
Description
Technical field
The application belongs to the realm of building construction, is related to a kind of construction bracket for building more particularly to a kind of combination circulation top
Ascending branch frame and its construction technology.
Background technique
When large-scale rooftop air conditioning unit is constructed, generallys use and set up full hall scaffold, the mode of high altitude bulk carries out, this scheme
It is more that working measure takes height, long construction period, uncertain factor, may be limited by site condition, and hanging device can not march into the arena work
The factors such as industry influence.
When carrying out large-scale rooftop air conditioning unit construction using whole hoisting way, although roof structure can integrally spell on ground
Dress and welding, construction efficiency improves a lot, but this scheme is there is also many uncertain factors, as lifting bracket design and
Installation, the position of hoist point, structure situation, Ground arrangement etc., and hoisting frame setting position needs to mend after the installation is completed in structure
Dress influences subsequent handling construction.
Utility model content
(1) technical problems to be solved
In view of above-mentioned technical problem, lifting-up support is recycled this application provides a kind of combination, flexible arrangement, cycle operation,
Roof structure completes in ground integral assembling, and all jacking is in place, and lifting-up support production is simple, easy to install and use fast
Victory, securely and reliably.
(2) technical solution
This application provides a kind of combinations to recycle lifting-up support characterized by comprising
U-shaped hollow column, upper and lower side are equipped with U-shaped flange;
Support platform is set between the U-shaped hollow column in cross structure;
The support platform includes:
Climbing structure platform;
Climbing structure supports fixed platform, is used to support the fixed climbing structure platform;
The climbing structure support fixed platform is equipped with jacking apparatus.
In some embodiments of the present application, support platform cross structure periphery is equipped with fixed block.
In some embodiments of the present application, it is flexibly connected between the support platform and the U-shaped hollow column.
In some embodiments of the present application, pass through pin shaft activity between the support platform and the U-shaped hollow column
Connection.
In some embodiments of the present application, the jacking apparatus is jack.
In some embodiments of the present application, the U-shaped flange periphery is uniformly provided with fixed fixture block, and the fixed fixture block is in
Pentagonal configuration.
In some embodiments of the present application, the side wall of the U-shaped hollow column is equipped with fixed connecting plate.
In some embodiments of the present application, connecting rod, the connection are equipped between U-shaped hollow column described in any two
Bar is connect with the fixed connecting plate.
In some embodiments of the present application, the connecting rod includes:
First diagonal brace, the second diagonal brace and third diagonal brace;
Structure triangular in shape between first diagonal brace, the second diagonal brace, third diagonal brace and two U-shaped hollow columns.
In some embodiments of the present application, the U-shaped hollow column is combined by the U-shaped flanged joint of upper and lower side and is followed
Ring lifting-up support.
In some embodiments of the present application, the construction technology of combination circulation lifting-up support, the specific steps are as follows:
Step 1: construction site place circulation lifting-up support, including U-shaped hollow column, be set to U-shaped hollow column between
Climbing structure platform, be used to support the climbing structure support fixed platform and jacking dress of the fixed climbing structure platform
It sets;The U-shaped hollow column is prepared from the following components: 60-75 parts of magnesium chloride solution, 90-95 parts of magnesium chloride, magnesite modification
No. 8 13-18 parts of agent, 13-55 parts of di-iron trioxide, 5-18 parts of sawdust, 5-12 parts of silicone emulsion.
Step 2: first group of climbing structure platform is jacked upwards by jacking apparatus;
Step 3: after first group of climbing structure platform jacking in step 2, by fixing device for first group of jacking knot
Structure platform is fixed;
Step 4: climbing structure support fixed platform is displaced upwards, and U-shaped hollow column is connected by connecting rod
It is fixed;
Step 5: step 2 is repeated to step 4 and forms bracket circulation jacking process.
(3) beneficial effect
It can be seen from the above technical proposal that the application at least has the advantages that one of them:
(1) combination provided by the present application recycles lifting-up support, and flexible arrangement, cycle operation, roof structure is in ground entirety
Assembly completes, and all jacking is in place, and lifting-up support production is simple, easy to install and use quick, securely and reliably.
(2) combination provided by the present application recycles lifting-up support, is equipped with U-shaped hollow column, and support platform passes through pin shaft activity
Between the U-shaped hollow column, can flexible operation, complete circulation lifting operation.
(3) combination provided by the present application recycles lifting-up support, and U-shaped flange periphery is uniformly provided with fixed fixture block, can be effective
Fixed U-shaped flange, improves security performance.
(4) combination provided by the present application recycles lifting-up support, is equipped with the first diagonal brace, the second diagonal brace, third diagonal brace, and above-mentioned
Structure triangular in shape between connecting rod and two U-shaped hollow columns enhances steady between the U-shaped hollow column of any two
It is qualitative, security performance is further enhanced, guarantees that construction can be carried out orderly.
(5) combination provided by the present application recycles lifting-up support, and the U-shaped hollow column is connected by the U-shaped flange of upper and lower side
It connects and is combined into circulation lifting-up support, can satisfy the construction demand of arbitrary height, structure is simple, easy to operate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the application combines circulation lifting-up support.
Fig. 2 is the main view that the application combines circulation lifting-up support.
Specific embodiment
This application provides a kind of combinations to recycle lifting-up support, and flexible arrangement, cycle operation, roof structure is in ground entirety
Assembly completes, and all jacking is in place, and lifting-up support production is simple, easy to install and use quick, securely and reliably.
For the purposes, technical schemes and advantages of the application are more clearly understood, below in conjunction with specific embodiment, and reference
The application is further described in attached drawing.
Embodiment 1:
In an exemplary embodiment of the disclosure, a kind of combination circulation lifting-up support is provided, as shown in Figure 1, this
Application includes:
U-shaped hollow column 1, upper and lower side are equipped with U-shaped flange 2;
Support platform is set between the U-shaped hollow column 1 in cross structure;
The support platform includes:
Climbing structure platform 10;
Climbing structure supports fixed platform 7, is used to support the fixed climbing structure platform 10;
The climbing structure support fixed platform 7 is equipped with jacking apparatus 8.
As shown in Figure 1, support platform cross structure periphery is equipped with fixed block 11, support platform beam is rectangular configuration,
Its end is equipped with pin hole, fixes convenient for bolt.
As depicted in figs. 1 and 2, it is flexibly connected between the support platform and the U-shaped hollow column 1.
As depicted in figs. 1 and 2, it is flexibly connected between the support platform and the U-shaped hollow column 1 by pin shaft 5, by
In U-shaped hollow column 1 be hollow structure, therefore support platform by pin shaft 5 can be with U-shaped 1 mobile connection of hollow column;
It is adopted at pin shaft pin hole equipped with Circular Plate, can effectively reinforce the stability of pin shaft, guarantee support platform and U-shaped sky
The fastness that heart column 1 connects, and the service life of pin shaft can be effectively improved.
As depicted in figs. 1 and 2, the jacking apparatus 8 is jack.
As depicted in figs. 1 and 2,2 periphery of U-shaped flange is uniformly provided with fixed fixture block 20, and the fixed fixture block 20 is in five
Side shape structure, two right-angle sides are tightly attached to the edge of U-shaped hollow column 1 in the pentagonal configuration, are further used for fixing U-shaped method
Orchid 2.
As depicted in figs. 1 and 2, the side wall of the U-shaped hollow column 1 is equipped with fixed connecting plate 3.
As depicted in figs. 1 and 2, connecting rod, the connecting rod and institute are equipped between U-shaped hollow column 1 described in any two
State the connection of fixed connecting plate 3.
As depicted in figs. 1 and 2, the connecting rod includes:
First diagonal brace 4, the second diagonal brace 6 and third diagonal brace 9;
Knot triangular in shape between first diagonal brace 4, the second diagonal brace 6, third diagonal brace 9 and two U-shaped hollow columns 1
Structure, guaranteeing that a kind of combination recycles lifting-up support is a load bearing unit structural system, effectively improves stability, guarantees construction
The safety of member.
As depicted in figs. 1 and 2, the U-shaped hollow column 1 is combined into circulation jacking by the connection of U-shaped flange 2 of upper and lower side
Bracket, U-shaped hollow column 1 are bolted with U-shaped flange 2, support fixed platform 7 convenient for climbing structure platform 10 and climbing structure
It is without hindrance from the bottom up to pass through.
The construction technology of combination circulation lifting-up support, the specific steps are as follows:
Step 1: construction site place circulation lifting-up support, including U-shaped hollow column 1, be set to U-shaped hollow column 1 it
Between climbing structure platform 10, be used to support the fixed climbing structure platform 10 climbing structure support fixed platform 7 and
Jacking apparatus 8;The U-shaped hollow column 1 is prepared from the following components: 60 parts of magnesium chloride solution, 90 parts of magnesium chloride, magnesite change
Property No. 8 13 parts of agent, 13 parts of di-iron trioxide, 5 parts of sawdust, 5 parts of silicone emulsion, using the intrinsic color of iron oxide itself to product
Toning, and put into iron oxide and be equally beneficial for improving the intensity of column.It also can be replaced other as silicone emulsion similar to disappear
Infusion can effectively control production cost to improve the quality of product.
Step 2: first group of climbing structure platform 10 is jacked upwards by jacking apparatus 8;
Step 3: after first group of climbing structure platform 10 jacking in step 2, by fixing device for first group of jacking
Structure platform 10 is fixed;
Step 4: by climbing structure support fixed platform 7 be displaced upwards, and by connecting rod connect it is U-shaped it is hollow stand
Column 1 is fixed;
Step 5: step 2 is repeated to step 4 and forms bracket circulation jacking process.
The course of work of the application are as follows: when not constructing, it is fixed flat that the climbing structure platform 10 is set to climbing structure support
The top of platform 7, and climbing structure platform 10 is connect with U-shaped 1 pin shaft of hollow column with climbing structure support fixed platform 7;It applies
In working hour, since climbing structure support fixed platform 7 is equipped with jack, manual operation jack jacks upwards, at this time jacking knot
Structure platform 10 and the U-shaped hollow column 1 are in not-connected status, after jack jacks a stroke upwards, by climbing structure
Platform 10 is connect with the U-shaped hollow column 1 by pin shaft, then, is moved up climbing structure support fixed platform 7 and is consolidated again
Fixed, so circulation is jacked.Usual Jacking point position is set at node, that is, is set at pin hole, is pushed up on climbing structure platform 10
It rises point and is equipped with fetal membrane, it is ensured that be not subjected to displacement during jacking between node and climbing structure support platform.
Embodiment 2:
The present embodiment and the technical solution of embodiment 1 are essentially identical, uniquely the difference is that jack uses hydraulic jack,
When construction, after hydraulic jack completes a jacking stroke, pass through the fixed climbing structure platform of bolt on U-shaped hollow column 1
10, after climbing structure platform 10 is fixed, piston rod of hydraulic jack is withdrawn, is retightened by the bolt on U-shaped hollow column 1
Climbing structure supports fixed platform 7, and so circulation is jacked.
The construction technology of combination circulation lifting-up support, the specific steps are as follows:
Step 1: construction site place circulation lifting-up support, including U-shaped hollow column 1, be set to U-shaped hollow column 1 it
Between climbing structure platform 10, be used to support the fixed climbing structure platform 10 climbing structure support fixed platform 7 and
Jacking apparatus 8;The U-shaped hollow column 1 is prepared from the following components: 75 parts of magnesium chloride solution, 95 parts of magnesium chloride, magnesite change
Property No. 8 18 parts of agent, 55 parts of di-iron trioxide, 18 parts of sawdust, 12 parts of silicone emulsion.
Step 2: first group of climbing structure platform 10 is jacked upwards by jacking apparatus 8;
Step 3: after first group of climbing structure platform 10 jacking in step 2, by fixing device for first group of jacking
Structure platform 10 is fixed;
Step 4: by climbing structure support fixed platform 7 be displaced upwards, and by connecting rod connect it is U-shaped it is hollow stand
Column 1 is fixed;
Step 5: step 2 is repeated to step 4 and forms bracket circulation jacking process.
Embodiment 3:
The construction technology of combination circulation lifting-up support, the specific steps are as follows:
Step 1: construction site place circulation lifting-up support, including U-shaped hollow column 1, be set to U-shaped hollow column 1 it
Between climbing structure platform 10, be used to support the fixed climbing structure platform 10 climbing structure support fixed platform 7 and
Jacking apparatus 8;The U-shaped hollow column 1 is prepared from the following components: 66 parts of magnesium chloride solution, 92.5 parts of magnesium chloride, magnesite
No. 8 15 parts of modifying agent, 23 parts of di-iron trioxide, 12 parts of sawdust, 8 parts of silicone emulsion.
Step 2: first group of climbing structure platform 10 is jacked upwards by jacking apparatus 8;
Step 3: after first group of climbing structure platform 10 jacking in step 2, by fixing device for first group of jacking
Structure platform 10 is fixed;
Step 4: by climbing structure support fixed platform 7 be displaced upwards, and by connecting rod connect it is U-shaped it is hollow stand
Column 1 is fixed;
Step 5: step 2 is repeated to step 4 and forms bracket circulation jacking process.
So far, attached drawing is had been combined the present embodiment is described in detail.According to above description, those skilled in the art
There should be clear understanding to the application.
It should be noted that in attached drawing or specification text, the implementation for not being painted or describing is affiliated technology
Form known to a person of ordinary skill in the art, is not described in detail in field.In addition, the above-mentioned definition to each element and method is simultaneously
It is not limited only to various specific structures, shape or the mode mentioned in embodiment.
It should also be noted that, can provide the demonstration of the parameter comprising particular value herein, but these parameters are without definite etc.
In corresponding value, but analog value can be similar in acceptable error margin or design constraint.The side mentioned in embodiment
It is only the direction with reference to attached drawing to term, such as "upper", "lower", "front", "rear", "left", "right" etc., is not used to limit this
The protection scope of application.In addition, unless specifically described or the step of must sequentially occur, the sequences of above-mentioned steps there is no restriction in
It is listed above, and can change or rearrange according to required design.And above-described embodiment can be based on design and reliability
Consider, the collocation that is mixed with each other is used using or with other embodiments mix and match, i.e., the technical characteristic in different embodiments can be with
Freely form more embodiments.
Particular embodiments described above has carried out further in detail the purpose of the application, technical scheme and beneficial effects
Describe in detail it is bright, it is all it should be understood that be not intended to limit this application the foregoing is merely the specific embodiment of the application
Within spirit herein and principle, any modification, equivalent substitution, improvement and etc. done should be included in the guarantor of the application
Within the scope of shield.
Claims (9)
1. a kind of combination recycles lifting-up support characterized by comprising
U-shaped hollow column (1), upper and lower side are equipped with U-shaped flange (2);
Support platform is set between the U-shaped hollow column (1) in cross structure;The support platform includes:
Climbing structure platform (10);
Climbing structure supports fixed platform (7), is used to support the fixed climbing structure platform (10);The climbing structure support
Fixed platform (7) is equipped with jacking apparatus (8).
2. combination according to claim 1 recycles lifting-up support, which is characterized in that support platform cross structure periphery
Equipped with fixed block (11).
3. combination according to claim 1 recycles lifting-up support, which is characterized in that the support platform and the U-shaped sky
Heart column is flexibly connected between (1).
4. combination according to claim 1 recycles lifting-up support, which is characterized in that the support platform and the U-shaped sky
It is flexibly connected between heart column (1) by pin shaft (5).
5. combination according to claim 1 recycles lifting-up support, which is characterized in that the jacking apparatus (8) is jack.
6. combination according to claim 1 recycles lifting-up support, which is characterized in that U-shaped flange (2) periphery is uniformly set
Have fixed fixture block (20), the fixed fixture block (20) is in pentagonal configuration.
7. combination according to claim 1 recycles lifting-up support, which is characterized in that the side wall of the U-shaped hollow column (1)
Equipped with fixed connecting plate (3).
8. combination according to claim 7 recycles lifting-up support, which is characterized in that U-shaped hollow column described in any two
(1) connecting rod is equipped between, the connecting rod is connect with the fixed connecting plate (3);The U-shaped hollow column (1) passes through upper
U-shaped flange (2) connection of lower end is combined into circulation lifting-up support.
9. combination according to claim 8 recycles lifting-up support, which is characterized in that the connecting rod includes:
First diagonal brace (4), the second diagonal brace (6) and third diagonal brace (9);First diagonal brace (4), the second diagonal brace (6), third are oblique
Support structure triangular in shape between (9) and two U-shaped hollow columns (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821231265.2U CN208934436U (en) | 2018-08-01 | 2018-08-01 | A kind of combination circulation lifting-up support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821231265.2U CN208934436U (en) | 2018-08-01 | 2018-08-01 | A kind of combination circulation lifting-up support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208934436U true CN208934436U (en) | 2019-06-04 |
Family
ID=66717001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821231265.2U Expired - Fee Related CN208934436U (en) | 2018-08-01 | 2018-08-01 | A kind of combination circulation lifting-up support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208934436U (en) |
-
2018
- 2018-08-01 CN CN201821231265.2U patent/CN208934436U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234200B (en) | A kind of suspen-shell structure rope leverage is by ring lifting installation method | |
CN204152176U (en) | Assembly type large span Mobile operating platform | |
CN110043019A (en) | A kind of operating platform | |
CN205224622U (en) | Equipment operation platform with adjustable | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN105569054A (en) | Device and method for controlling direction and elevation of lattice column below ground | |
CN208934436U (en) | A kind of combination circulation lifting-up support | |
CN107514145A (en) | A kind of removable steel roofing liner installation construction device and method | |
CN204753816U (en) | Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock | |
CN110792267A (en) | Combined circulating jacking support and construction process thereof | |
CN205617770U (en) | Overhanging movable type edge construction operation platform | |
WO2019024290A1 (en) | Method for building scaffold device in hyperboloidal linear cabin | |
CN205873599U (en) | Connect formula elevator well soon | |
CN205369948U (en) | Lifting device for daylighting top is used for installing | |
CN204530492U (en) | A kind of hydraulic climbing mould construction platform | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN203319589U (en) | Hoisting machine for installing air hose | |
CN209651673U (en) | A kind of construction elevator attaching structure of lifting platform | |
CN205475256U (en) | Control is less than device of ground lattice column direction and elevation | |
CN205676914U (en) | A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt | |
CN206940369U (en) | A kind of dock wall hydraulic pressure maintenance platform | |
CN208966489U (en) | A kind of rectangular cabin bracket for wind power plant | |
CN205024840U (en) | A jacking system for installation of roofing rack | |
CN205822742U (en) | A kind of construction frame | |
CN204357085U (en) | Pin-connected panel operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190604 |