CN204753816U - Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock - Google Patents

Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock Download PDF

Info

Publication number
CN204753816U
CN204753816U CN201520124409.4U CN201520124409U CN204753816U CN 204753816 U CN204753816 U CN 204753816U CN 201520124409 U CN201520124409 U CN 201520124409U CN 204753816 U CN204753816 U CN 204753816U
Authority
CN
China
Prior art keywords
wire rope
anchor point
steel
vestibule
frock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520124409.4U
Other languages
Chinese (zh)
Inventor
陈菁
徐晗
钱利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGTIAN CONSTRUCTION GROUP ZHEJIANG STEEL CO Ltd
Original Assignee
ZHONGTIAN CONSTRUCTION GROUP ZHEJIANG STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGTIAN CONSTRUCTION GROUP ZHEJIANG STEEL CO Ltd filed Critical ZHONGTIAN CONSTRUCTION GROUP ZHEJIANG STEEL CO Ltd
Priority to CN201520124409.4U priority Critical patent/CN204753816U/en
Application granted granted Critical
Publication of CN204753816U publication Critical patent/CN204753816U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model provides a steel vestibule integrally lift up goes up the anchor point frock, including connecting the roof, the system has the wire rope handling hole that can vertically link up on the roof, connects the curb plate. Go up anchor point frock and original structural welding, original structure needs the part to strengthen, be H shaped steel like chord member cross -section form, the node equipment is a day style of calligraphy, the chord member is the box, sets up enhancements such as baffle in the node box component. For the monolithic stability of guaranteeing the steel bracket, the upper chord working face increases the bearing diagonal. Wire rope handling hole aperture can make wire rope pass through smoothly simultaneously. The connection curb plate is triangle -shaped. The utility model discloses being different from traditional bracket and supporting upward anchor point, this is the little and construction convenience of steel volume for the frock, is favorable to reduce cost, improves production efficiency. Increase by 1 times of hoisting point number and can improve vestibule overall stability, reduce and warp. The same perspective plane not many vestibules of co -altitude promotes, can avoid wire rope and install the collision of steel vestibule producing the danger that the spark blows wire rope.

Description

Steel vestibule hydraulic integral promotes upper anchor point frock
Technical field
The utility model relates to the upper anchor point frock that a kind of steel vestibule hydraulic integral promotes, and is specifically that ground integral assembling steel vestibule promotes increase suspension centre number, improves vestibule resistance to overturning.
Background technology
Connected by steel vestibule between many high levels, all there is the situation of steel vestibule at different level place, same plane of projection, if use conventional method, need to set up a large amount of scaffolds, when vestibule is higher, high altitude bulk is to programming, Engineering Quality Control all can bring adverse effect, in engineering safety production management, difficulty is also very large, therefore the Steel corridor projected position of normal consideration different level is identical, therefore need to adopt reverse CONTROLLED INTEGRAL LIFT TECHNOLOGY to lift, namely the steel vestibule of same position uses mobile crane to carry out assembled on ground, then Integral lifting is carried out from top to bottom.Component assembly carries out on the moulding bed of ground, and efficiency of construction is high, and construction quality is easy to ensure.Extensive work can complete on ground, reduces tool scaffold consumption, avoids work high above the ground, reduce the difficulty of the safety management of engineering.
Steel vestibule promotes to be needed to be provided with anchorage, and upper anchor point is arranged at and promotes on bracket, and hydraulic jack is connected with lifting bracket by upper anchor point frock; Anchorage is arranged on chord member of truss.Vestibule installation on ground integrally after, utilize hydraulic jack promote put in place, butt welding complete vestibule install.
Existing vestibule Integral lifting must arrange bracket of temporarily encorbelmenting as lifting platform at original vertical structure, arranges anchor point frock thereon for connecting hydraulic jack and promoting bracket.For meeting the requirement of many vestibules Integral lifting, this bracket of temporarily encorbelmenting needs to ensure certain sectional dimension and span of encorbelmenting, and design and installation is loaded down with trivial details; Promote complete, bracket needs to cut off, and itself and original structure contact surface are comparatively large, not easily remove, destructible original structure, and cannot utilize by secondary, improves cost.In addition, different level place, same plane of projection is all had to the situation of steel vestibule, on existing vestibule Integral lifting, anchor point frock easily causes wire rope and installs steel vestibule generation frictional impact, and wire rope speckles with lubrication oil, collision easily produces spark thus blows wire rope, there is potential safety hazard.
Summary of the invention
Technical problem to be solved in the utility model is the deficiency overcoming above-mentioned background technology, and provide a kind of steel vestibule Integral lifting anchor point frock, this frock should guarantee Steel Structure Installation quality, and easy construction, be conducive to enhancing productivity.Main couple one end arranges 2 upper anchor points can place corresponding 2 anchorages of 2 jack, increases by 1 times of suspension centre number, can improve vestibule resistance to overturning, reduce distortion.This frock is arranged on original structure upper chord, directly utilizes structure upper chord as the temporary support of hydraulic jack, improves component utilization rate, and is convenient to peace and tears open.
The utility model provides following technical scheme: anchor point frock on a kind of steel vestibule Integral lifting, comprises connection top board, top board is shaped with can be vertically through lacing hole; Connecting lateral plate.
Upper anchor point frock is welded with original structure, and original structure needs local strengthening, and if chord member of truss section form is H profile steel, Nodes is assembled into a day font; Chord member is box, arranges the reinforcements such as dividing plate in Nodes box-type member.For ensureing the monolithic stability of steel bracket, upper chord work plane increases bearing diagonal.
Described lacing hole aperture can make wire rope pass through smoothly simultaneously.
Described connecting lateral plate is triangle.
The beneficial effects of the utility model are: the little and easy construction of this frock steel using amount, is conducive to reducing costs, enhancing productivity.Increase by 1 times of suspension centre number and can improve vestibule resistance to overturning, reduce distortion.Differing heights many vestibule in same plane of projection promotes, and can avoid wire rope and install steel vestibule and collide and produce the danger that spark blows wire rope.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present utility model.Fig. 2 is the utility model elevation.
Fig. 3 is the utility model plane figure.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
In upper anchor point frock as shown in the figure: lifting member edge of a wing 240mm respectively chosen by top board 1. two ends, 1. top board is provided with two diameters is that 2. the perforation of 150mm wire rope shuttles back and forth for two lifting means wire rope, wire rope perforated base and top board be short side edge distance about 140mm 1., wire rope has with a certain distance from agent structure, prevents wire rope and original structure from 4. to rub generation spark.
Truss one end arranges 2 suspension centres, and vestibule lifting process is more stable.
3. 1. top board be welded as a whole with connecting lateral plate.4. 3. side plate weld with original structure, and original structure is 4. according to member section form and stressing conditions local strengthening.Wire rope by lacing hole 2. after, by wire rope with promote hydraulic jack be connected.

Claims (4)

1. the upper anchor point frock of a steel vestibule hydraulic integral lifting; Comprise and connect top board (1), top board leaves can through vertical lacing hole (2); Top board and connecting lateral plate (3) are welded as a whole; Side plate welds with original structure (4).
2. the upper anchor point frock of a kind of steel vestibule hydraulic integral lifting according to claim 1, it is characterized in that: original structure truss one end of winding up can arrange two suspension centres and installs two wire rope, wire rope, by after lacing hole, is connected with hydraulic jack by wire rope.
3. the upper anchor point frock of a kind of steel vestibule hydraulic integral lifting according to claim 2, it is characterized in that: lifting member edge of a wing 240mm is respectively chosen at top board two ends, it is 150mm lacing hole that top board is provided with 2 diameters, shuttles back and forth for 2 lifting means wire rope.
4. the upper anchor point frock of a kind of steel vestibule hydraulic integral lifting according to claim 3, is characterized in that: lacing hole center and top board short side edge distance about 140mm, wire rope has with a certain distance from agent structure, avoids rubbing in lifting process.
CN201520124409.4U 2015-03-04 2015-03-04 Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock Expired - Fee Related CN204753816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520124409.4U CN204753816U (en) 2015-03-04 2015-03-04 Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520124409.4U CN204753816U (en) 2015-03-04 2015-03-04 Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock

Publications (1)

Publication Number Publication Date
CN204753816U true CN204753816U (en) 2015-11-11

Family

ID=54468539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520124409.4U Expired - Fee Related CN204753816U (en) 2015-03-04 2015-03-04 Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock

Country Status (1)

Country Link
CN (1) CN204753816U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052277A (en) * 2016-07-20 2016-10-26 青岛海尔特种电冰柜有限公司 Compressor cabin structure and electric refrigerating cabinet adopting compressor cabin structure
CN113585710A (en) * 2021-07-06 2021-11-02 中建八局第二建设有限公司 Large-span cantilever truss integral lifting hydraulic press platform
CN114517550A (en) * 2022-01-30 2022-05-20 中冶(上海)钢结构科技有限公司 Steel structure joint for cable penetrating through steel beam and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052277A (en) * 2016-07-20 2016-10-26 青岛海尔特种电冰柜有限公司 Compressor cabin structure and electric refrigerating cabinet adopting compressor cabin structure
CN113585710A (en) * 2021-07-06 2021-11-02 中建八局第二建设有限公司 Large-span cantilever truss integral lifting hydraulic press platform
CN114517550A (en) * 2022-01-30 2022-05-20 中冶(上海)钢结构科技有限公司 Steel structure joint for cable penetrating through steel beam and construction method thereof
CN114517550B (en) * 2022-01-30 2024-04-05 中冶(上海)钢结构科技有限公司 Steel structure node when cable passes through steel beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN204753816U (en) Steel vestibule hydraulic pressure integrally lift up goes up anchor point frock
CN203499229U (en) Operating platform for construction of elevator shaft
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN102003078A (en) Assembling method of net rack
CN209308175U (en) A kind of factory building roof rack mounting structure
CN202658590U (en) Integral assembled drilling platform
CN102767282A (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN212866793U (en) Assembled construction elevator stops layer platform
CN204728717U (en) Steel vestibule hydraulic integral promotes anchorage frock
CN205741942U (en) A kind of great cantilever chooses arm pier cap beam segmental timbering
CN201809042U (en) Lifting frame for lifting whole steel reinforcement framework of box beam
CN216190654U (en) Line-straight-down type station room finite space large-span steel structure lifting tool
CN108518071B (en) Installation method of double-layer large-span steel structure corridor
CN103924673B (en) A kind of support node and construction method thereof of controlling spatial mesh structure accumulated error
CN207526141U (en) Small-section tower-shaped steel structure assembled operating platform
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN109440942A (en) A kind of factory building roof rack mounting structure and construction technology
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN211622717U (en) Integrated girder steel of cross-line installation convenient to implement
CN209941512U (en) Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111