CN203319589U - Hoisting machine for installing air hose - Google Patents

Hoisting machine for installing air hose Download PDF

Info

Publication number
CN203319589U
CN203319589U CN2013202967104U CN201320296710U CN203319589U CN 203319589 U CN203319589 U CN 203319589U CN 2013202967104 U CN2013202967104 U CN 2013202967104U CN 201320296710 U CN201320296710 U CN 201320296710U CN 203319589 U CN203319589 U CN 203319589U
Authority
CN
China
Prior art keywords
base
airduct
door frame
tube
gig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2013202967104U
Other languages
Chinese (zh)
Inventor
李鹏
刘暖寿
宋志红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Industrial Equipment Installation Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN2013202967104U priority Critical patent/CN203319589U/en
Application granted granted Critical
Publication of CN203319589U publication Critical patent/CN203319589U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a hoisting machine for installing an air hose. The hoisting machine comprises a triangular base and a gantry hinged with the base, wherein a hoisting mechanism is arranged on the gantry; the base is hinged with the gantry; an oblique support pole is arranged between the gantry and the base; one end of the oblique support pole is fixed on the gantry, while the other end of the oblique support pole is fixed on the base when the gantry is vertical to the base; four universal wheels are arranged below the base; three universal wheels are arranged below a support bottom tube; one universal wheel is arranged below the base at one corner on which an operation rack is arranged; the gantry comprises two upright posts which are of telescopic structures; at least two connecting holes matched with the oblique support pole are formed in each upright post; the hoisting mechanism comprises an air hose support rack which is matched with the gantry in a manner of sliding up and down; a drive element is connected to the air hose support rack; a rope driven by an electric motor or a piston rod of a hydraulic cylinder is adopted as the drive element. By adopting the hoisting machine, the installation work of the air hose can be efficiently finished; the hoisting machine is less in required manpower, low in labor intensity and suitable for installation of the air hose inside a building.

Description

Airduct is installed gig
Technical field
The utility model relates to the building installation engineering technical field, relates in particular to a kind of airduct mounting appliance.
Background technology
The airduct installation work of interior of building is a part very important in electromechanical installation, airduct generally is positioned at top, house, higher apart from ground distance, whole airduct is comprised of multistage, and at first airduct is installed needs airduct is raised to certain altitude, generally by first airduct is positioned over to scaffold, near its setting height(from bottom), then manually be raised to accurate setting height(from bottom) by several workmans, two sections airducts connected, now airduct is fixed and two sections airducts between connection.Carry out the installation of next section airduct after installing, movable Scaffold, to new airduct installation site, repeats aforesaid operations, and this mounting means combines for constructor's man-made assembly and artificial lifting, and its operating efficiency is low, and the coordinative construction personnel that need are many.
The utility model content
The technical matters that the utility model solves is to provide a kind of simple in structure, easy to operate airduct gig is installed.
The technical solution adopted in the utility model is that a kind of airduct is installed gig, comprise base and the door frame be connected with base, lift system is installed on door frame, base and door frame are hinged, be provided with the diagonal brace pole between door frame and base, door frame is during perpendicular to base, and diagonal brace pole one end is fixed in door frame, the other end is fixed in base, and the base below is provided with roller.
Base is triangular in shape, by three steel pipes, is joined end to end and is formed, and one jiao of triangle base is provided with crosshead, and crosshead is provided with handrail, and a steel pipe relative with handrail is for supporting bottom tube, and door frame is hinged in supporting bottom tube, and the roller of base below is cardan wheel.
Cardan wheel is four, below supporting bottom tube, is provided with three cardan wheels, and the base below at crosshead place is provided with a cardan wheel.
Door frame comprises two columns, and column is telescopic structure, and each column is provided with at least two connecting bores that match with hound.
Each column comprises inner sleeve and the outer tube of suit mutually, and outer tube is connected in base, and the inner sleeve below is provided with spring, and inner sleeve and outer tube are provided with pin-and-hole, and pin fixedly inner sleeve and outer tube relative height are set on pin-and-hole.
Lift system comprises with door frame and slides up and down the airduct bracing frame coordinated, and on the airduct bracing frame, is connected with actuator.
Actuator is the rope that electro-motor drives, or is the piston rod of hydraulic actuating cylinder.
Electro-motor is installed on crosshead, and door frame is during perpendicular to base, and airduct bracing frame and crosshead lay respectively at the both sides of door frame.The beneficial effects of the utility model are to complete efficiently the airduct erection work, and required manpower is few, and labour intensity is low.
The accompanying drawing explanation
Fig. 1 is the utility model structural representation
In figure, be labeled as: the 1-door frame, the 2-base, the 21-crosshead, the 22-roller, 23-supports bottom tube, 3-hound, 4-lift system, 41-airduct bracing frame, 5-rope.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Airduct of the present utility model is installed gig and is comprised base 2 and the door frame 1 be connected with base 2, lift system 4 is installed on door frame 1 and is used for raising airduct.
Because construction site equipment, material are more, therefore adopt the triangle underframe, floor area is few, stabilized structure, adopts three steel pipes or shaped steel at first to be connected and to be welded and fixed and gets final product.Door frame 1 is hinged with base 2, while not using, door frame 1 is fallen to base 2 directions, saves space, also avoids interfering the operation of other operation of building site.Door frame 1 is installed on wherein support bottom tube 23 of triangle underframe, between door frame 1 and base 2, also is provided with hound 3, forms like this gusseted, make door frame 1 firm perpendicular to base 2.
Door frame 1 comprises two telescopic posts, column comprises outer tube and inner sleeve wherein, be equipped with pin-and-hole on it, outer tube is connected with the support bottom tube 23 of base 2, inner sleeve outer tube relatively slides up and down, adjust to suitable position, pin is inserted on pin-and-hole corresponding on inner sleeve and outer tube, in order to adapt to telescopic post, each column is provided with at least two connecting bores that match with hound 3, the height of column just can be fixed like this, when the airduct of differing heights is installed, just can suitably adjust by the column height.
One jiao of triangle base 2 is provided with crosshead 21, and crosshead 21 is provided with handrail, and a steel pipe relative with handrail is the support bottom tube 23 be hinged with door frame.Base 2 belows arrange roller 22, are used for moving easily whole mechanism, and for flexibly mobile, roller 22 all adopts cardan wheel.Cardan wheel is four, be provided with three cardan wheels below supporting bottom tube 23, base 2 belows that crosshead 21 place is one jiao are provided with a cardan wheel, support bottom tube 23 belows 2-5 cardan wheel is set, when slightly there is deviation the airduct position, slightly promote base 2 and can easily correct position be adjusted to in the airduct position, easy to adjust like this, time saving and energy saving.Airduct weight is large, volume is large, by the direct running fix of personnel stood on scaffold, limited by operational space, and working security is low, the Level tune of the lifting by the door frame vertical direction and cardan wheel is by making whole process simple like this, and required personnel amount is less, and efficiency is higher.
Lift system 4 is set on door frame 1, comprises with door frame 1 and slide up and down the airduct bracing frame 41 coordinated, the rope 5 that airduct bracing frame 41 is driven by electro-motor drives, or drives by hydraulic cylinder piston rod.Because the construction site environment is severe, preferably electro-motor drives the scheme that rope 5 promotes airduct bracing frame 41, because airduct bracing frame 41 and crosshead 21 lay respectively at the both sides of door frame 1, electro-motor is arranged on crosshead 21, hound 3 bears tensile stress, the moment of torsion of the opposite direction that 2 pairs of door frames of airduct bracing frame 41 and base produce, both balance each other and make the anterior-posterior balance of holding door frame 1, when promoted airduct weight is larger, can near the base 2 crosshead 21, increase counterweight to increase the moment of torsion of base to door frame 1, guarantee the balance of door frame 1 and base 2, the airduct that goes for like this plurality of specifications and weight is installed.

Claims (8)

1. airduct is installed gig, comprise base and the door frame be connected with base, lift system is installed on door frame, it is characterized in that: described base and door frame are hinged, be provided with the diagonal brace pole between door frame and base, door frame is during perpendicular to base, and diagonal brace pole one end is fixed in door frame, the other end is fixed in base, and the base below is provided with roller.
2. airduct as claimed in claim 1 is installed gig, it is characterized in that: described base is triangular in shape, join end to end and form by three steel pipes, one jiao of triangle base is provided with crosshead, crosshead is provided with handrail, a steel pipe relative with handrail is for supporting bottom tube, and door frame is hinged in supporting bottom tube, and the roller of base below is cardan wheel.
3. airduct as claimed in claim 2 is installed gig, and it is characterized in that: described cardan wheel is four, below supporting bottom tube, is provided with three cardan wheels, and the base below at crosshead place is provided with a cardan wheel.
4. airduct as claimed in claim 1 is installed gig, and it is characterized in that: described door frame comprises two columns, and column is telescopic structure, and each column is provided with at least two connecting bores that match with hound.
5. airduct as claimed in claim 4 is installed gig, it is characterized in that: each column comprises inner sleeve and the outer tube of suit mutually, outer tube is connected in base, the inner sleeve below is provided with spring, inner sleeve and outer tube are provided with pin-and-hole, and pin fixedly inner sleeve and outer tube relative height are set on pin-and-hole.
6. airduct as claimed in claim 1 is installed gig, it is characterized in that: described lift system comprises with door frame and slides up and down the airduct bracing frame coordinated, and on the airduct bracing frame, is connected with actuator.
7. airduct as claimed in claim 6 is installed gig, it is characterized in that: described actuator is the rope that electro-motor drives, or is the piston rod of hydraulic actuating cylinder.
8. airduct as claimed in claim 6 is installed gig, and it is characterized in that: electro-motor is installed on crosshead, and door frame is during perpendicular to base, and airduct bracing frame and crosshead lay respectively at the both sides of door frame.
CN2013202967104U 2013-05-27 2013-05-27 Hoisting machine for installing air hose Active CN203319589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202967104U CN203319589U (en) 2013-05-27 2013-05-27 Hoisting machine for installing air hose

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202967104U CN203319589U (en) 2013-05-27 2013-05-27 Hoisting machine for installing air hose

Publications (1)

Publication Number Publication Date
CN203319589U true CN203319589U (en) 2013-12-04

Family

ID=49658958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202967104U Active CN203319589U (en) 2013-05-27 2013-05-27 Hoisting machine for installing air hose

Country Status (1)

Country Link
CN (1) CN203319589U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103318808A (en) * 2013-05-27 2013-09-25 中国建筑股份有限公司 Air duct installation lifter
CN108298449A (en) * 2018-01-24 2018-07-20 南通市中南建工设备安装有限公司 A kind of indoor material elevator and its application method convenient for disassembly and assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103318808A (en) * 2013-05-27 2013-09-25 中国建筑股份有限公司 Air duct installation lifter
CN108298449A (en) * 2018-01-24 2018-07-20 南通市中南建工设备安装有限公司 A kind of indoor material elevator and its application method convenient for disassembly and assembly

Similar Documents

Publication Publication Date Title
CN201417657Y (en) Installation device of indoor transformer
CN102587646A (en) Hydraulic lifting self-ascending template system of intelligent independent unit structure
CN106429885B (en) A kind of entirety Zi moves the more loop wheel machine pedestal operation platforms of Ding Sheng rotation types
CN203684634U (en) Lifting frame
CN203097316U (en) Foldable hydraulic lifting support secure channel for high altitude construction
CN203319589U (en) Hoisting machine for installing air hose
CN105201197A (en) Combined movable lifting scaffold
CN206319625U (en) Equipment is installed in a kind of building inner partition plate transhipment
CN205742942U (en) A kind of gardens special-purpose multifunctional construction platform
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN206636233U (en) Concreting workbench is built in room
KR102038877B1 (en) Pile frame and its installation method
CN205820800U (en) The hydraulic lift without scaffold building template frame can be realized
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN103318808A (en) Air duct installation lifter
CN210064983U (en) High-rise building electromechanical device installation carrying device
CN204626997U (en) Partition board transport fitting machine
CN110552507A (en) Well is from automatic cloth system of concrete that climbs
CN203639006U (en) Construction device of large-span special net rack roof
CN203977832U (en) Folding multilayer construction working platform
CN201074167Y (en) Indoor light movable crane
CN104047417B (en) Folding multilayer construction working platform
CN203702188U (en) Tunnel engineering lining steel bar installing support
CN208056658U (en) Aerial for industrialized building makes building machine
CN103711299A (en) Liftable scaffold for building outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CP01 Change in the name or title of a patent holder

Address after: 100037 Beijing, Haidian District, Li River Road, No. three, No. 15

Co-patentee after: China Construction Installation Group Co., Ltd.

Patentee after: China State Construction Corp.

Address before: 100037 Beijing, Haidian District, Li River Road, No. three, No. 15

Co-patentee before: China Construction Industrial Equipment Installation Co., Ltd.

Patentee before: China State Construction Corp.

CP01 Change in the name or title of a patent holder