CN208702120U - A kind of feasible walking aerial working suspension platform for anti-collision wall construction - Google Patents

A kind of feasible walking aerial working suspension platform for anti-collision wall construction Download PDF

Info

Publication number
CN208702120U
CN208702120U CN201821228125.XU CN201821228125U CN208702120U CN 208702120 U CN208702120 U CN 208702120U CN 201821228125 U CN201821228125 U CN 201821228125U CN 208702120 U CN208702120 U CN 208702120U
Authority
CN
China
Prior art keywords
frame
hanging basket
traveling wheel
gravitational equilibrium
basket frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821228125.XU
Other languages
Chinese (zh)
Inventor
房连生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China New Building Engineering Co Ltd
Original Assignee
China New Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China New Building Engineering Co Ltd filed Critical China New Building Engineering Co Ltd
Priority to CN201821228125.XU priority Critical patent/CN208702120U/en
Application granted granted Critical
Publication of CN208702120U publication Critical patent/CN208702120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of feasible walking aerial working suspension platforms for anti-collision wall construction, hanging basket frame including carrying construction personnel, hanging basket frame upper end is connected with cantilever beam, hanging basket frame is vacantly hung on the outside of building top layer edge by cantilever beam, the cantilever beam includes horizontal two drop in beams being upturned and connect the two oblique pull arms tensed backward with drop in beam tilting end, the rear end of drop in beam and oblique pull arm is connected on a gravitational equilibrium frame, clump weight is placed on gravitational equilibrium frame, the load capacity of clump weight balance basket frame, gravitational equilibrium frame lower end quadrangle is respectively arranged with traveling wheel, the gravitational equilibrium frame drives the reciprocal walking on the outside of building top layer edge of hanging basket frame by traveling wheel.The utility model saves construction materials, since hanging basket Frame Design is at mobile crane hoop frame, it is therefore prevented that assembles to the repeated removal of hanging basket frame, alleviates the labor intensity of worker, improve construction speed and efficiency, saved construction cost.

Description

A kind of feasible walking aerial working suspension platform for anti-collision wall construction
Technical field
The utility model relates to building field, in particular to a kind of feasible walking aerial working for anti-collision wall construction suspends in midair Platform.
Background technique
The parapet of building or structures top layer usually once takes installation template and pours completion, worker operation labor intensity Greatly, long in time limit, and the installation template in outside is needed by hanging basket, which is usually fixed motionless, needs building The top layer of object or structures sets up fixed bracket, then installs counterweight, finally connects workbench, and workbench passes through electronic dress It sets and moves up and down.The shortcomings that this technique is after construction and installation of hanging basket, can not integrally to be moved, if mobile Whole device must all be removed, re-start assembling.When large-area construction, needs to arrange whole alien invasions and hang Basket, it is very inconvenient using this equipment when being related to local alien invasion.The extended component of thing of constructing of the horizontal directions such as bridge is (as prevented Hit wall) construction when, using nacelle device or along structures extended line direction expire scaffolding etc. it is traditional by the way of, efficiency compared with It is low.
Summary of the invention
The purpose of this utility model is that proposing a kind of feasible walking aerial working suspension platform for anti-collision wall construction, lead to Cross discrete method and installation template, section construction be segmented to anti-collision wall, and hanging basket is designed to removable hanging basket, improve construct into Degree, has saved construction cost, has reduced the intensity of construction.
To achieve the goals above, the technical solution of the utility model is:
A kind of feasible walking aerial working suspension platform for anti-collision wall construction, the basket including carrying construction personnel Frame, wherein hanging basket frame upper end is connected with cantilever beam, and hanging basket frame is vacantly hung by cantilever beam on building or structures top On the outside of layer edge, the cantilever beam includes horizontal two drop in beams being upturned and connect two tensed backward with drop in beam tilting end The rear end of root oblique pull arm, drop in beam and oblique pull arm is connected on a gravitational equilibrium frame, and four angles of hanging basket frame upper end pass through company It connects arm to be connected on two drop in beams, the linking arm of two anterior angles in hanging basket frame upper end is connected to before drop in beam level is upturned End, places clump weight on gravitational equilibrium frame, and clump weight balances the load capacity of basket frame, gravitational equilibrium frame lower end four Angle is respectively arranged with traveling wheel, and the gravitational equilibrium frame drives hanging basket frame along building or structures top layer side by traveling wheel It back and forth walks along outside.
Scheme is further: it states gravitational equilibrium frame lower end quadrangle while being provided with traveling wheel positioning device, traveling wheel positioning Device prevents traveling wheel from continuing to rotate for lockking traveling wheel after traveling wheel goes to designated position.
Scheme is further: two parallel channel steels are fixed on the ground of the building or structures top layer, two Parallel channel steel is arranged along the run trace of traveling wheel, and the traveling wheel is walked in the groove of channel steel, in the channel steel groove Penetrating notch is provided on the side wall of both sides along channel steel length direction, the rotation axis of the traveling wheel is one with centre bore Rotation axis, pivot pin is provided in centre bore, and the notch being arranged on the side wall of channel steel groove both sides is stretched out at the pivot pin both ends.
Scheme is further: directive wheel is respectively set in building or structures top layer along channel steel longitudinal direction both ends, at two Winding is provided with dragging wirerope on directive wheel, pulls wirerope and passes through from gravitational equilibrium frame bottom side, and with gravitational equilibrium frame bottom The pendant of end setting is fixedly connected, and a dragging motor is fixed on building top layer, is pulled motor and is connected with retarder, pulls Wirerope is intertwined and connected with the spiral notch on retarder shaft wheel disc, pulls rotating and reverse by pulling wirerope for motor Gravitational equilibrium frame is dragged to move back and forth.
Scheme is further: the spiral notch is at least 2 weeks circular spiral notchs.
The beneficial effects of the utility model are:
Construction materials are saved, since hanging basket Frame Design is at mobile crane hoop frame, it is therefore prevented that the weight of hanging basket frame Multiple disassembly assembly, alleviates the labor intensity of worker, reduces construction intensity, improve construction speed and efficiency, saved and applied Work cost.
The utility model is described in detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Fig. 1 the utility model suspension platform structural schematic diagram;
The mobile control structure of Fig. 2 the utility model suspension platform.
Specific embodiment
A kind of feasible walking aerial working suspension platform for anti-collision wall construction, as shown in Figure 1, the suspension platform includes The hanging basket frame 1 of construction personnel is carried, hanging basket frame upper end is connected with cantilever beam 2, and hanging basket frame is hanging by cantilever beam On the outside of 3 edge of building or structures top layer, the cantilever beam includes two of 10 to the 15 oblique tiltings of degree in horizontal direction for hanging Root drop in beam 201 and end is tilted with drop in beam connect the two oblique pull arms 202 tensed backward, the company of drop in beam 201 and the formation of oblique pull arm 202 Angle is connect between 20 degree to 30 degree;The rear end of drop in beam 201 and oblique pull arm 202 is connected on a gravitational equilibrium frame 4, basket Frame is rectangle, and four angles of hanging basket frame upper end are connected on two drop in beams by linking arm 101, before hanging basket frame upper end two The linking arm at angle is connected to the front end that drop in beam level is upturned, and gravitational equilibrium frame is the frame structure welded by square steel, in weight Clump weight 5 is placed on dynamic balance frame, clump weight balances the load capacity of basket frame, gravitational equilibrium frame lower end quadrangle difference It is provided with traveling wheel 6, traveling wheel is rubber tire, and the gravitational equilibrium frame drives hanging basket frame along building or to construct by traveling wheel Reciprocal walking on the outside of object top layer edge, operator station on hanging basket frame assembling reinforcement, build or remove anti-collision wall construction mould Plate.
Wherein: gravitational equilibrium frame lower end quadrangle is provided with traveling wheel positioning device 7 simultaneously, and traveling wheel positioning device is A kind of pushing card (industry is referred to as skate) pushes after card pushes and is stuck on the rubber tire of traveling wheel, and traveling wheel positioning device is used for Traveling wheel is lockked after traveling wheel goes to designated position, prevents traveling wheel from continuing to rotate.
Although balancing the load capacity of basket frame by clump weight, the counterweight of 3:1 is generallyd use, is happened suddenly in order to prevent Situation, the present embodiment further use the scheme of dual fail-safe, therefore: passing through on the ground of the building or structures top layer Foundation bolt (expansion bolt) is fixed with two parallel channel steels 8, and two parallel channel steels are arranged along the run trace of traveling wheel, The traveling wheel is walked in the groove of channel steel, is provided on the side wall of channel steel groove both sides along channel steel length direction penetrating Notch 801, the rotation axis of the traveling wheel is the rotation axis for having centre bore, is provided with pivot pin 9 in centre bore, described The notch being arranged on the side wall of channel steel groove both sides is stretched out at pivot pin both ends.This structure ensure that emergency situations moment occurs in hanging basket frame Counterweight is had exceeded, will not overturn, improve safety coefficient.In order to which the pivot pin 9 in the case where having troubles can be smoothly It is moved in notch, the pivot pin both ends are cased with sliding bearing, sliding bearing and notch upper and lower end face sliding contact respectively.
Gravitational equilibrium frame 4 can move in such a way that people pushes away, but the present embodiment uses a kind of electronic mobile control, makes Must move it is more convenient, therefore: as shown in Fig. 2, guiding is respectively set in the building or structures top layer along channel steel longitudinal direction both ends Wheel 10, winding, which is provided with, on two directive wheels pulls wirerope 11, pulls wirerope and passes through from gravitational equilibrium frame bottom side, and with The pendant 401 of gravitational equilibrium frame bottom end setting is fixedly connected, and a dragging motor 12 is fixed on building top layer, pulls motor It is connected with retarder 13, wirerope is pulled and is intertwined and connected with the spiral notch on retarder shaft wheel disc 13-1, pull motor It rotates and reverse and drags the reciprocating motion of gravitational equilibrium frame by pulling wirerope.The spiral notch therein is at least 2 weeks Circular spiral notch.And: it is provided between the directive wheel and retarder shaft wheel disc and pulls steel wire rope tension adjustment Wheel 14, tension adjustment wheel move left and right the adjustable elastic tension for pulling wirerope.

Claims (5)

1. a kind of feasible walking aerial working suspension platform for anti-collision wall construction, the hanging basket frame including carrying construction personnel, It is characterized in that, hanging basket frame upper end is connected with cantilever beam, hanging basket frame is vacantly hung in building or is constructed by cantilever beam On the outside of object top layer edge, the cantilever beam includes horizontal two drop in beams being upturned and tilts end with drop in beam and connect to tense backward Two oblique pull arms, the rear end of drop in beam and oblique pull arm is connected on a gravitational equilibrium frame, and four angles of hanging basket frame upper end are logical It crosses linking arm to be connected on two drop in beams, the linking arm of two anterior angles in hanging basket frame upper end is connected to what drop in beam level was upturned Front end, places clump weight on gravitational equilibrium frame, and clump weight balances the load capacity of basket frame, gravitational equilibrium frame lower end Quadrangle is respectively arranged with traveling wheel, and the gravitational equilibrium frame drives hanging basket frame along building or structures top layer by traveling wheel Reciprocal walking on the outside of edge.
2. suspension platform according to claim 1, which is characterized in that gravitational equilibrium frame lower end quadrangle is provided with simultaneously Traveling wheel positioning device, traveling wheel positioning device prevent from walking for lockking traveling wheel after traveling wheel goes to designated position Wheel continues to rotate.
3. suspension platform according to claim 1, which is characterized in that solid on the ground of the building or structures top layer Surely there are two parallel channel steels, two parallel channel steels are arranged along the run trace of traveling wheel, and the traveling wheel is in the recessed of channel steel It walks in slot, is provided with penetrating notch along channel steel length direction on the side wall of channel steel groove both sides, the traveling wheel Rotation axis is the rotation axis for having centre bore, and pivot pin is provided in centre bore, and channel steel groove two is stretched out at the pivot pin both ends The notch being arranged on avris wall.
4. suspension platform according to claim 3, which is characterized in that building or structures top along channel steel longitudinal direction both ends Directive wheel is respectively set in layer, and winding is provided with dragging wirerope on two directive wheels, pulls wirerope from gravitational equilibrium frame bottom Side passes through, and is fixedly connected with the pendant of gravitational equilibrium frame bottom end setting, and a dragging motor is fixed on building top layer, is dragged It drags motor and is connected with retarder, pull wirerope and be intertwined and connected with the spiral notch on retarder shaft wheel disc, pull motor It rotates and reverse and drags the reciprocating motion of gravitational equilibrium frame by pulling wirerope.
5. suspension platform according to claim 4, which is characterized in that the spiral notch is at least 2 weeks circular spiral shells Spin slot mouth.
CN201821228125.XU 2018-08-01 2018-08-01 A kind of feasible walking aerial working suspension platform for anti-collision wall construction Active CN208702120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821228125.XU CN208702120U (en) 2018-08-01 2018-08-01 A kind of feasible walking aerial working suspension platform for anti-collision wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821228125.XU CN208702120U (en) 2018-08-01 2018-08-01 A kind of feasible walking aerial working suspension platform for anti-collision wall construction

Publications (1)

Publication Number Publication Date
CN208702120U true CN208702120U (en) 2019-04-05

Family

ID=65941237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821228125.XU Active CN208702120U (en) 2018-08-01 2018-08-01 A kind of feasible walking aerial working suspension platform for anti-collision wall construction

Country Status (1)

Country Link
CN (1) CN208702120U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708542A (en) * 2018-08-01 2018-10-26 中国新兴建筑工程有限责任公司 Feasible walking aerial working suspension platform and construction method for anti-collision wall construction
CN114046033A (en) * 2021-12-21 2022-02-15 浙江东新建设有限公司 Building outer wall suspends construction equipment in midair
CN114197850A (en) * 2022-01-25 2022-03-18 中建八局天津建设工程有限公司 Rail type sliding hanging basket equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708542A (en) * 2018-08-01 2018-10-26 中国新兴建筑工程有限责任公司 Feasible walking aerial working suspension platform and construction method for anti-collision wall construction
CN114046033A (en) * 2021-12-21 2022-02-15 浙江东新建设有限公司 Building outer wall suspends construction equipment in midair
CN114046033B (en) * 2021-12-21 2022-11-15 浙江东新建设有限公司 Building outer wall suspends construction equipment in midair
CN114197850A (en) * 2022-01-25 2022-03-18 中建八局天津建设工程有限公司 Rail type sliding hanging basket equipment

Similar Documents

Publication Publication Date Title
CN208702120U (en) A kind of feasible walking aerial working suspension platform for anti-collision wall construction
CN108545628B (en) A kind of mobile hanging device of Super High and its hanging method
CN108708542A (en) Feasible walking aerial working suspension platform and construction method for anti-collision wall construction
CN102174796A (en) Cantilever casting construction cradle with underlaid main truss
CN109335949A (en) The method of scale beam type counter-jib suspender and its hoisting steel beam component
CN101284628A (en) Hoisting method for framework of large tonnage pressing machine
CN111140169B (en) Method for assembling small-sized drilling equipment for climbing slope
CN109573851A (en) Arcuated roof internode steel truss hangs, fills integrated apparatus and docking hanging method
CN106241614B (en) A kind of shield machine assembly and dual-purpose gantry crane of slagging tap
CN205973523U (en) Super high -rise building is special to be hung from tearing formula roofing open
CN202324574U (en) Lifting scaffold with simple and convenient operations
CN213085256U (en) Single-beam portal crane with suspended trolley
CN210767776U (en) A platform is suspended in midair in walkable high altitude construction for crashproof wall construction
CN207524854U (en) A kind of amplitude variation type erection crane with A type structure arms
CN218371342U (en) Crane positioning device
CN107881926B (en) Combined hanging basket with full-rotation crane and construction method thereof
CN218201897U (en) Sliding and hoisting construction device
CN106522097A (en) Self-adaptive cable cranes for extra large space-cross cable face suspension bridge girder erection
CN207047716U (en) A kind of Bridge Erector for suspension bridge
CN209554695U (en) A kind of anti-collision wall template hoisting device
CN114645614A (en) Rapid moving aerial work platform based on rail device
CN205527413U (en) Hang cantilever crane
CN212426741U (en) Movable hanging basket suitable for high-altitude operation
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN215974668U (en) Building construction material lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant