CN108708542A - Feasible walking aerial working suspension platform and construction method for anti-collision wall construction - Google Patents

Feasible walking aerial working suspension platform and construction method for anti-collision wall construction Download PDF

Info

Publication number
CN108708542A
CN108708542A CN201810864780.2A CN201810864780A CN108708542A CN 108708542 A CN108708542 A CN 108708542A CN 201810864780 A CN201810864780 A CN 201810864780A CN 108708542 A CN108708542 A CN 108708542A
Authority
CN
China
Prior art keywords
frame
hanging basket
traveling wheel
gravitational equilibrium
basket frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810864780.2A
Other languages
Chinese (zh)
Inventor
房连生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China New Building Engineering Co Ltd
Original Assignee
China New Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China New Building Engineering Co Ltd filed Critical China New Building Engineering Co Ltd
Priority to CN201810864780.2A priority Critical patent/CN108708542A/en
Publication of CN108708542A publication Critical patent/CN108708542A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of feasible walking aerial working suspension platforms and construction method for anti-collision wall construction, suspension platform includes the hanging basket frame for carrying construction personnel, hanging basket frame upper end is connected with cantilever beam, hanging basket frame is vacantly hung by cantilever beam on the outside of building top layer edge, the cantilever beam includes horizontal two drop in beams being upturned and connect the two oblique pull arms tensed backward with drop in beam tilting end, the rear end of drop in beam and oblique pull arm is connected on a gravitational equilibrium frame, clump weight is placed on gravitational equilibrium frame, clump weight balances the load capacity of basket frame, gravitational equilibrium frame lower end quadrangle is respectively arranged with traveling wheel, the gravitational equilibrium frame drives the reciprocal walking on the outside of building top layer edge of hanging basket frame by traveling wheel.Present invention saves construction materials, since hanging basket Frame Design is at mobile crane hoop frame, it is therefore prevented that are assembled to the repeated removal of hanging basket frame, alleviate the labor intensity of worker, improve construction speed and efficiency, saved construction cost.

Description

Feasible walking aerial working suspension platform and construction method for anti-collision wall construction
Technical field
The present invention relates to building fields, more particularly to a kind of feasible walking aerial working suspension platform for anti-collision wall construction And construction method.
Background technology
The parapet of building or structures top layer typically once takes installation form and pours completion, operation labor intensity Greatly, long in time limit, and the installation form in outside is needed by hanging basket, which is usually fixed motionless, needs building The top layer of object or structures sets up fixing bracket, then installs counterweight, finally connects workbench, and workbench passes through electronic dress It sets and moves up and down.The shortcomings that this technique is after construction and installation of hanging basket, can not integrally to be moved, if mobile Whole device must all be removed, re-starts assembling.When large-area construction, needs to arrange whole alien invasions and hang Basket, it is very inconvenient using this equipment when being related to local alien invasion.The horizontal directions such as bridge are extended to construct component of thing(As prevented Hit wall)When construction, using nacelle device or along structures extended line direction expire scaffolding etc. it is traditional by the way of, efficiency compared with It is low.
Invention content
It is an object of the invention to propose a kind of feasible walking aerial working suspension platform for anti-collision wall construction and construction Method is segmented installation form, section construction to anti-collision wall by discrete method, and hanging basket is designed to removable hanging basket, improves Construction speed, has saved construction cost, reduces the intensity of construction.
To achieve the goals above, the technical scheme is that:
A kind of feasible walking aerial working suspension platform for anti-collision wall construction includes the hanging basket frame of carrying construction personnel, In, hanging basket frame upper end is connected with cantilever beam, and hanging basket frame is vacantly hung by cantilever beam on building or structures top layer side Along outside, the cantilever beam includes horizontal two drop in beams being upturned and connect two tensed backward with drop in beam tilting end tiltedly The rear end of torque arm, drop in beam and oblique pull arm is connected on a gravitational equilibrium frame, and four angles of hanging basket frame upper end pass through linking arm It being connected on two drop in beams, the linking arm of two anterior angles in hanging basket frame upper end is connected to the front end that drop in beam level is upturned, Clump weight is placed on gravitational equilibrium frame, clump weight balances the load capacity of basket frame, gravitational equilibrium frame lower end quadrangle point It is not provided with traveling wheel, the gravitational equilibrium frame drives hanging basket frame outside building or structures top layer edge by traveling wheel It back and forth walks side.
Scheme is further:It states gravitational equilibrium frame lower end quadrangle while being provided with traveling wheel positioning device, traveling wheel positioning Device prevents traveling wheel to be rotated further for lockking traveling wheel after traveling wheel goes to designated position.
Scheme is further:It is fixed with two parallel channel steels on the ground of the building or structures top layer, two Parallel channel steel is arranged along the run trace of traveling wheel, and the traveling wheel is walked in the groove of channel steel, in the channel steel groove Both sides side wall upper edge channel steel length direction is provided with penetrating notch, and the rotation axis of the traveling wheel is one and carries centre bore Rotation axis, pivot pin is provided in centre bore, and the notch being arranged on the side wall of channel steel groove both sides is stretched out at the pivot pin both ends.
Scheme is further:Directive wheel is respectively set in building or structures top layer along channel steel longitudinal direction both ends, at two Winding is provided with dragging steel wire rope on directive wheel, pulls steel wire rope and is passed through from gravitational equilibrium frame bottom side, and with gravitational equilibrium frame bottom The pendant of end setting is fixedly connected, and a dragging motor is fixed on building top layer, is pulled motor and is connected with retarder, pulls Steel wire rope is intertwined and connected with the spiral notch on retarder shaft wheel disc, pulls rotating and reverse by pulling steel wire rope for motor Gravitational equilibrium frame is dragged to move back and forth.
Scheme is further:The spiral notch is at least 2 weeks circular spiral notchs.
Scheme is further:It is provided between the directive wheel and retarder shaft wheel disc and pulls steel wire rope tension adjustment Wheel.
Scheme is further:The pivot pin both ends are cased with sliding bearing, sliding bearing and the notch upper and lower end face respectively Sliding contact.
A kind of anti-collision wall construction method is the anti-collision wall construction method based on the feasible walking aerial working suspension platform, Sequentially include:Operating personnel station assembling reinforcement, installation form, assistance concreting and form removal in hanging basket frame, In, it is completed the gravitational equilibrium frame and hanging basket frame of suspension platform respectively on ground first before assembling reinforcement, then by hanging Gravitational equilibrium frame is first hung on building or structures top layer by vehicle, clump weight is mounted on gravitational equilibrium frame, in the building The ground of object or structures top layer is fixed with two parallel channel steels, walking of two parallel channel steels along suspension platform traveling wheel Track is arranged, and the traveling wheel is walked in the groove of channel steel, in channel steel groove both sides side wall upper edge channel steel length direction It is provided with penetrating notch, the rotation axis of the traveling wheel is a rotation axis for carrying centre bore, and axis is provided in centre bore The notch being arranged on the side wall of channel steel groove both sides is stretched out at pin, the pivot pin both ends;Then again by hanging basket frame hang on building or Structures top layer, the angle of hanging basket frame upper end four are connected on two drop in beams of gravitational equilibrium frame by linking arm described in completion A row is arranged in building or structures top layer platform first before installation form in the assembling of feasible walking aerial working suspension platform Earth anchor, is installed during installation form first by the inner template of top layer platform, and inner template is passed through shank of bolt and ground Anchor is fixed temporarily, and by inner template by installing outer template again after the completion of shank of bolt and earth anchorage, inner template passes through with outer template Split bolt is connected and fixed, and it is that installation personnel is completed by standing in hanging basket frame that split bolt, which is connected and fixed,.
Scheme is further:It is flat to adjust inner template height that one layer of offset plate is lined between inner template and top layer platform Face.
Scheme is further:Gravitational equilibrium frame lower end quadrangle is provided with traveling wheel positioning device simultaneously, is needing to move When dynamic hanging basket frame, traveling wheel positioning device is unclamped first, and after hanging basket frame is moved to position, locking traveling wheel positioning device will Traveling wheel locks, and constructing operation is carried out subsequently into installation personnel.
The beneficial effects of the invention are as follows:
Construction materials are saved, since hanging basket Frame Design is at mobile crane hoop frame, it is therefore prevented that torn open to the repetition of hanging basket frame Assembly is unloaded, the labor intensity of worker is alleviated, reduces construction intensity, improve construction speed and efficiency, saved and be constructed into This.
The present invention will be described in detail with reference to the accompanying drawings and examples.
Description of the drawings
Fig. 1 suspension platform structural schematic diagrams of the present invention;
The mobile control structure of Fig. 2 suspension platforms of the present invention.
Specific implementation mode
Embodiment 1:
A kind of feasible walking aerial working suspension platform for anti-collision wall construction, as shown in Figure 1, the suspension platform includes carrying The hanging basket frame 1 of construction personnel, hanging basket frame upper end are connected with cantilever beam 2, and hanging basket frame is vacantly hung by cantilever beam On the outside of 3 edge of building or structures top layer, the cantilever beam includes two extensions of 10 to the 15 oblique tiltings of degree in horizontal direction It beam 201 and tilts end with drop in beam and connect the two oblique pull arms 202 tensed backward, the connection clip of drop in beam 201 and the formation of oblique pull arm 202 Angle is between 20 degree to 30 degree;Drop in beam 201 and the rear end of oblique pull arm 202 are connected on a gravitational equilibrium frame 4, and hanging basket frame is Four angles of rectangle, hanging basket frame upper end are connected to by linking arm 101 on two drop in beams, the anterior angle of hanging basket frame upper end two Linking arm is connected to the front end that drop in beam level is upturned, and gravitational equilibrium frame is the frame structure welded by square steel, flat in gravity Clump weight 5 is placed on weighing apparatus frame, clump weight balances the load capacity of basket frame, and gravitational equilibrium frame lower end quadrangle is respectively set It is rubber tire to have traveling wheel 6, traveling wheel, and the gravitational equilibrium frame drives hanging basket frame along building or structures top by traveling wheel Reciprocal walking on the outside of layer edge, operating personnel station on hanging basket frame assembling reinforcement, build or remove anti-collision wall construction template.
Wherein:Gravitational equilibrium frame lower end quadrangle is provided with traveling wheel positioning device 7 simultaneously, and traveling wheel positioning device is A kind of pushing card(Industry is referred to as skate), push after card pushes and be stuck on the rubber tire of traveling wheel, traveling wheel positioning device is used for Traveling wheel is lockked after traveling wheel goes to designated position, traveling wheel is prevented to be rotated further.
Although balancing the load capacity of basket frame, generally use 3 by clump weight:1 counterweight, but happen suddenly in order to prevent Situation, the present embodiment further use the scheme of dual fail-safe, therefore:Pass through on the ground of the building or structures top layer Foundation bolt(Expansion bolt)Two parallel channel steels 8 are fixed with, two parallel channel steels are arranged along the run trace of traveling wheel, The traveling wheel is walked in the groove of channel steel, and on channel steel groove both sides, side wall upper edge channel steel length direction is provided with penetrating Notch 801, the rotation axis of the traveling wheel is a rotation axis for carrying centre bore, and pivot pin 9 is provided in centre bore, described The notch being arranged on the side wall of channel steel groove both sides is stretched out at pivot pin both ends.This structure ensure that emergency situations moment occurs in hanging basket frame Counterweight is had exceeded, will not overturn, improve safety coefficient.In order to which the pivot pin 9 in the case where having troubles can be smoothly It is moved in notch, the pivot pin both ends are cased with sliding bearing, sliding bearing and notch upper and lower end face sliding contact respectively.
Gravitational equilibrium frame 4 may be used the mode that people pushes away and move, but the present embodiment uses a kind of electronic mobile control, makes Must move it is more convenient, therefore:As shown in Fig. 2, guiding is respectively set in the building or structures top layer along channel steel longitudinal direction both ends Wheel 10, winding, which is provided with, on two directive wheels pulls steel wire rope 11, pulls steel wire rope and is passed through from gravitational equilibrium frame bottom side, and with The pendant 401 of gravitational equilibrium frame bottom end setting is fixedly connected, and a dragging motor 12 is fixed on building top layer, pulls motor It is connected with retarder 13, steel wire rope is pulled and is intertwined and connected with the spiral notch on retarder shaft wheel disc 13-1, pull motor It rotates and reverse and drags the reciprocating motion of gravitational equilibrium frame by pulling steel wire rope.The spiral notch therein is at least 2 weeks Circular spiral notch.And:It is provided between the directive wheel and retarder shaft wheel disc and pulls steel wire rope tension adjustment Wheel 14, tension adjustment wheel move left and right the elastic tension that can be adjusted and pull steel wire rope.
Embodiment 2:
A kind of anti-collision wall construction method is the anti-collision wall construction side based on feasible walking aerial working suspension platform described in embodiment 1 Method, therefore the content in embodiment 1 is suitable for the present embodiment, should be regarded as the present embodiment content.
The method sequence include:Operating personnel station assembling reinforcement, installation form, assistance concrete on hanging basket frame pour It builds and form removal, wherein the feasible walking aerial working suspention before assembling reinforcement first described in ground assembled embodiment 1 is flat Platform is respectively completed the assembling of the gravitational equilibrium frame and hanging basket frame of suspension platform on ground first, then by crane first by gravity Balancing stand hangs on building or structures top layer, clump weight is mounted on gravitational equilibrium frame, in the building or structures The ground of top layer is fixed with two parallel channel steels, and two parallel channel steels are arranged along the run trace of suspension platform traveling wheel, The traveling wheel is walked in the groove of channel steel, and on channel steel groove both sides, side wall upper edge channel steel length direction is provided with penetrating Notch, the rotation axis of the traveling wheel is a rotation axis for carrying centre bore, and pivot pin, the pivot pin are provided in centre bore The notch being arranged on the side wall of channel steel groove both sides is stretched out at both ends;Then hanging basket frame is hung on into building or structures top layer again, The angle of hanging basket frame upper end four is connected to by linking arm 101 on two drop in beams of gravitational equilibrium frame, and 1 institute of embodiment is finally completed The assembling for the feasible walking aerial working suspension platform stated is arranged in building or structures top layer platform first before installation form One row earth anchor 15 as shown in Figure 1, is installed during installation form first by the inner template of top layer platform, by internal model Plate is fixed temporarily by shank of bolt 16 with earth anchor, can be adjusted tension inner template by adjusting shank of bolt, be passed through by inner template Shank of bolt installs outer template again after the completion of being fixed temporarily with earth anchor, inner template passes through inner template with outer template by split bolt 17 It is connected and fixed with outer template, it is that installation personnel is completed by standing in hanging basket frame that split bolt, which is connected and fixed,.
Wherein:One layer of 5 to 10mm thick offset plate 18 is lined between inner template and top layer platform to adjust inner template height Spend the consistency of plane.
In embodiment:The method further includes being provided with traveling wheel positioning simultaneously in gravitational equilibrium frame lower end quadrangle Device unclamps traveling wheel positioning device first when needing moving hanging basket frame, after hanging basket frame is moved to position, locking row It walks to take turns positioning device and locks traveling wheel, constructing operation is carried out subsequently into installation personnel.
One complete construction method flow is:Surveying setting-out → horizontal construction joint picks chisel → reinforcing bar binding → locomotive group Dress → locomotive lifting → suspension platform combination forming → hanging basket loading test → hanging basket operation → template installation and examination → is mixed Solidifying soil pours → form removable → suspension platform movement →... ... → suspension platform dismounting.
In embodiment:Suspension platform to ensure safety, reliability, must carry out pressure testing after installation is complete before. After the completion of assembly, by 1.25 times of peak load of design(Consider safety coefficient)Pressure testing is carried out, carries out level Four pressurization stage by stage(Design 60%, 80%, 100%, the 125% of load).
Load test method.Installation is complete for suspension platform, it is in place after, clump weight loading successively is hung using hoisting and hanging machinery It carries.Every time after the completion of load, hanging beam, column, the element joints etc. of locomotive and hanging basket are observed, if occur snapping, transfinite It deforms, topple phenomena such as tending to.If without the above phenomenon, load presses after 2h, starts next stage pressurization.Pressure testing finishes, is without exception Afterwards, next step construction can be carried out.
During installation form:
It is first that inner side template is in place, then, outboard template is slowly hoisted to by precalculated position using hoisting and hanging machinery, is not torn open In the case of hoist cable, installer carries out template installation on hanging basket frame job platform, as required by template adjustment, correction After in place, connection bolt is tightened, it is ensured that installation quality meets code requirement, finally, loosens hoist cable, completes a standard knot mould Plate is installed.
In template operation worker by cat ladder down toward hanging basket frame workbench, it is necessary to by articles for labour protection such as safety belts After in full rig, formwork can be carried out.Hanging basket frame outrigger platform only installs the operating platform use as template, not handy In heap putting material, it must not be used for any type of support of template and fixation, and working load to must not exceed design load.
During assisting concreting:
Dough figurine person is poured, vibrated and received when concrete construction to complete on the inside of anti-collision wall, if the outer side mold in casting process There is exception in plate, and maintenance personal realizes maintenance work in station in hanging basket on the outside of hanging basket frame suspension platform.
During form removal:
Have form removal condition, it, can form removal after application is agreed to.The dismounting of outboard template is in hanging basket frame suspension platform Personnel in the hanging basket of outside realize, are hung template by hoisting and hanging machinery after form removable, heap as required after form removable It puts, in case being used in turn.
The movement of hanging basket frame suspension platform:
Before movable suspension platform, it is necessary to ensure that template installer has been moved off, and the ladder above and below installer is removed.It is first First, by fixing device of the tire(Skate)It opens, then, hanging basket frame suspension platform is moved at hypomere anti-collision wall construction.
So far, an anti-collision wall standard flowing water section operation is completed.

Claims (10)

1. a kind of feasible walking aerial working suspension platform for anti-collision wall construction includes the hanging basket frame of carrying construction personnel, It is characterized in that, hanging basket frame upper end is connected with cantilever beam, hanging basket frame is vacantly hung in building or is constructed by cantilever beam On the outside of object top layer edge, the cantilever beam includes horizontal two drop in beams being upturned and tilts end with drop in beam and connect to tense backward Two oblique pull arms, the rear end of drop in beam and oblique pull arm is connected on a gravitational equilibrium frame, and four angles of hanging basket frame upper end are logical It crosses linking arm to be connected on two drop in beams, the linking arm of two anterior angles in hanging basket frame upper end is connected to what drop in beam level was upturned Front end, places clump weight on gravitational equilibrium frame, and clump weight balances the load capacity of basket frame, gravitational equilibrium frame lower end Quadrangle is respectively arranged with traveling wheel, and the gravitational equilibrium frame drives hanging basket frame along building or structures top layer by traveling wheel Reciprocal walking on the outside of edge.
2. suspension platform according to claim 1, which is characterized in that gravitational equilibrium frame lower end quadrangle is provided with simultaneously Traveling wheel positioning device, traveling wheel positioning device prevent from walking for lockking traveling wheel after traveling wheel goes to designated position Wheel is rotated further.
3. suspension platform according to claim 1, which is characterized in that solid on the ground of the building or structures top layer There are two parallel channel steels, two parallel channel steels to be arranged along the run trace of traveling wheel, the traveling wheel is in the recessed of channel steel surely It walks in slot, on channel steel groove both sides, side wall upper edge channel steel length direction is provided with penetrating notch, the traveling wheel Rotation axis is a rotation axis for carrying centre bore, and pivot pin is provided in centre bore, and channel steel groove two is stretched out at the pivot pin both ends The notch being arranged on avris wall.
4. suspension platform according to claim 3, which is characterized in that the building along channel steel longitudinal direction both ends or structures top Directive wheel is respectively set in layer, is wound on two directive wheels and is provided with dragging steel wire rope, pulls steel wire rope from gravitational equilibrium frame bottom Side passes through, and is fixedly connected with the pendant of gravitational equilibrium frame bottom end setting, and a dragging motor is fixed on building top layer, is dragged It drags motor and is connected with retarder, pull steel wire rope and be intertwined and connected with the spiral notch on retarder shaft wheel disc, pull motor It rotates and reverse and drags the reciprocating motion of gravitational equilibrium frame by pulling steel wire rope.
5. suspension platform according to claim 4, which is characterized in that the spiral notch is at least 2 weeks circular spiral shells Spin slot mouth.
6. suspension platform according to claim 3, which is characterized in that between the directive wheel and retarder shaft wheel disc It is provided with and pulls steel wire rope tension adjustment wheel.
7. suspension platform according to claim 3, which is characterized in that the pivot pin both ends are cased with sliding bearing respectively, sliding Dynamic bearing and notch upper and lower end face sliding contact.
8. a kind of anti-collision wall construction method is that the anti-collision wall based on feasible walking aerial working suspension platform described in claim 1 is applied Work method sequentially includes:Operating personnel station assembling reinforcement, installation form, assistance concreting and dismounting in hanging basket frame Template, which is characterized in that be completed the gravitational equilibrium frame and hanging basket of suspension platform respectively on ground first before assembling reinforcement Then gravitational equilibrium frame is first hung on building or structures top layer by frame by crane, clump weight is mounted on gravitational equilibrium frame On, two parallel channel steels are fixed on the ground of the building or structures top layer, two parallel channel steels are flat along suspention The run trace of platform traveling wheel is arranged, and the traveling wheel is walked in the groove of channel steel, on the side wall of channel steel groove both sides Penetrating notch is provided with along channel steel length direction, the rotation axis of the traveling wheel is a rotation axis for carrying centre bore, in Pivot pin is provided in heart hole, the notch being arranged on the side wall of channel steel groove both sides is stretched out at the pivot pin both ends;Then again by basket Frame hangs on building or structures top layer, and the angle of hanging basket frame upper end four is connected to two extensions of gravitational equilibrium frame by linking arm The assembling that the feasible walking aerial working suspension platform is completed on beam, first on building or structures top before installation form Row's earth anchor is arranged in layer platform, is installed first during installation form by the inner template of top layer platform, by inner template It is fixed temporarily by shank of bolt and earth anchor, by inner template by installing outer template, internal model again after the completion of shank of bolt and earth anchorage Plate is connected and fixed with outer template by split bolt, and it is that installation personnel is complete in hanging basket frame by standing that split bolt, which is connected and fixed, At.
9. method according to claim 8, which is characterized in that be lined between inner template and top layer platform one layer of offset plate to Adjust inner template elevation plane.
10. method according to claim 8, which is characterized in that gravitational equilibrium frame lower end quadrangle is provided with walking simultaneously Positioning device is taken turns, when needing moving hanging basket frame, unclamps traveling wheel positioning device first, after hanging basket frame is moved to position, Locking traveling wheel positioning device locks traveling wheel, and constructing operation is carried out subsequently into installation personnel.
CN201810864780.2A 2018-08-01 2018-08-01 Feasible walking aerial working suspension platform and construction method for anti-collision wall construction Pending CN108708542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810864780.2A CN108708542A (en) 2018-08-01 2018-08-01 Feasible walking aerial working suspension platform and construction method for anti-collision wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810864780.2A CN108708542A (en) 2018-08-01 2018-08-01 Feasible walking aerial working suspension platform and construction method for anti-collision wall construction

Publications (1)

Publication Number Publication Date
CN108708542A true CN108708542A (en) 2018-10-26

Family

ID=63875519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810864780.2A Pending CN108708542A (en) 2018-08-01 2018-08-01 Feasible walking aerial working suspension platform and construction method for anti-collision wall construction

Country Status (1)

Country Link
CN (1) CN108708542A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505309A (en) * 2019-01-07 2019-03-22 浙江大学城市学院 A kind of shift system of piping lane segment and the piping lane installation method of application shift system
CN109573875A (en) * 2019-01-18 2019-04-05 中国建筑第二工程局有限公司 A kind of anti-collision wall template hoisting device and anti-collision wall Formwork Installation Method
CN110777666A (en) * 2019-11-12 2020-02-11 广州市第一市政工程有限公司 Steel box girder construction platform and use method
CN111119043A (en) * 2019-12-13 2020-05-08 中建城市建设发展有限公司 External suspension operation platform for anti-collision wall construction
CN111335615A (en) * 2020-04-18 2020-06-26 中建七局建筑装饰工程有限公司 Large-span net rack eaves mouth suspension type automatic movement construction platform
CN111350340A (en) * 2020-03-30 2020-06-30 中建七局第四建筑有限公司 Protective device for super high-rise building construction and use method thereof
CN112900828A (en) * 2021-01-29 2021-06-04 中建七局第二建筑有限公司 Movable type operation platform that encorbelments

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102774620A (en) * 2012-07-05 2012-11-14 无锡金洋铝业有限公司 Abnormal-shape I-shaped guide rail
CN102877418A (en) * 2012-10-26 2013-01-16 济南城建集团有限公司 Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof
CN103015325A (en) * 2012-12-24 2013-04-03 中铁十七局集团第二工程有限公司 Construction method of cast-in-place concrete crash barrier with eaves
CN103233424A (en) * 2013-04-19 2013-08-07 济南城建集团有限公司 Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN206859051U (en) * 2017-06-02 2018-01-09 武汉市市政建设集团有限公司 Hanging basket platform for bridge construction
CN108083105A (en) * 2017-12-21 2018-05-29 合肥市春华起重机械有限公司 A kind of connection structure of crane support and walking crossbeam
CN208702120U (en) * 2018-08-01 2019-04-05 中国新兴建筑工程有限责任公司 A kind of feasible walking aerial working suspension platform for anti-collision wall construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102774620A (en) * 2012-07-05 2012-11-14 无锡金洋铝业有限公司 Abnormal-shape I-shaped guide rail
CN102877418A (en) * 2012-10-26 2013-01-16 济南城建集团有限公司 Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof
CN103015325A (en) * 2012-12-24 2013-04-03 中铁十七局集团第二工程有限公司 Construction method of cast-in-place concrete crash barrier with eaves
CN103233424A (en) * 2013-04-19 2013-08-07 济南城建集团有限公司 Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN206859051U (en) * 2017-06-02 2018-01-09 武汉市市政建设集团有限公司 Hanging basket platform for bridge construction
CN108083105A (en) * 2017-12-21 2018-05-29 合肥市春华起重机械有限公司 A kind of connection structure of crane support and walking crossbeam
CN208702120U (en) * 2018-08-01 2019-04-05 中国新兴建筑工程有限责任公司 A kind of feasible walking aerial working suspension platform for anti-collision wall construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505309A (en) * 2019-01-07 2019-03-22 浙江大学城市学院 A kind of shift system of piping lane segment and the piping lane installation method of application shift system
CN109505309B (en) * 2019-01-07 2023-09-26 浙江大学城市学院 Pipe gallery segment displacement system and pipe gallery installation method using same
CN109573875A (en) * 2019-01-18 2019-04-05 中国建筑第二工程局有限公司 A kind of anti-collision wall template hoisting device and anti-collision wall Formwork Installation Method
CN110777666A (en) * 2019-11-12 2020-02-11 广州市第一市政工程有限公司 Steel box girder construction platform and use method
CN111119043A (en) * 2019-12-13 2020-05-08 中建城市建设发展有限公司 External suspension operation platform for anti-collision wall construction
CN111350340A (en) * 2020-03-30 2020-06-30 中建七局第四建筑有限公司 Protective device for super high-rise building construction and use method thereof
CN111335615A (en) * 2020-04-18 2020-06-26 中建七局建筑装饰工程有限公司 Large-span net rack eaves mouth suspension type automatic movement construction platform
CN112900828A (en) * 2021-01-29 2021-06-04 中建七局第二建筑有限公司 Movable type operation platform that encorbelments

Similar Documents

Publication Publication Date Title
CN108708542A (en) Feasible walking aerial working suspension platform and construction method for anti-collision wall construction
CN107338727A (en) A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN105692470B (en) Inner climbing crane tower and its operating method
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN112458918A (en) High-pier hydraulic jacking integral steel frame platform formwork turnover construction system and construction method
CN208934425U (en) Self-propelled multifunctional material distributing machine
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN107060349A (en) A kind of large-span steel girder upper air installing system in place and its construction
CN206255777U (en) Self-propelled multipurpose is adjustable double lifting point truss straddle truck
CN106976797A (en) Three suspension centres turn round suspender
CN208702120U (en) A kind of feasible walking aerial working suspension platform for anti-collision wall construction
CN110468743A (en) A kind of traveling cradle and construction method for the transformation of old pier coping
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN109881585A (en) A kind of assembly flow shop platform for high pier construction
CN105484166A (en) Ladder-shaped mast type cantilever assembling crane
CN211255042U (en) Hoisting device with cantilever rotating in all directions
CN205529915U (en) Ladder type masts type hangs pieces together loop wheel machine
JPH09317183A (en) Construction method of building
CN107881926B (en) Combined hanging basket with full-rotation crane and construction method thereof
CN207293976U (en) A kind of cantilever crane set up for bridge subsection transport
CN105883645B (en) The method for dismounting of tower crane attachment device
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
Nguyen et al. An improvement of a hydraulic self-climbing formwork
CN111747313A (en) Construction method for hoisting precast beam in warehouse logistics building
CN106081913B (en) Gin-pole truck control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181026