CN108545628B CN201810685092.XA CN201810685092A CN108545628B CN 108545628 B CN108545628 B CN 108545628B CN 201810685092 A CN201810685092 A CN 201810685092A CN 108545628 B CN108545628 B CN 108545628B
Authority
CN
China
Prior art keywords
outside
track
support
inner orbit
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810685092.XA
Other languages
Chinese (zh)
Other versions
CN108545628A (en
Inventor
喻庆先
郭新雅
杨政宝
刘博�
孙文宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jangho Group Co Ltd
Original Assignee
Jangho Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jangho Group Co Ltd filed Critical Jangho Group Co Ltd
Priority to CN201810685092.XA priority Critical patent/CN108545628B/en
Publication of CN108545628A publication Critical patent/CN108545628A/en
Application granted granted Critical
Publication of CN108545628B publication Critical patent/CN108545628B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Abstract

A kind of mobile hanging device of Super High and its hanging method, hanging device include track support, are equipped with inner orbit and outside track at the top of track support, and top sets that there are two hoisting frames;Hoisting frame includes carriage, and carriage bottom is fixed with four first driving walking mechanisms, and support arm is equipped on the outside of carriage, and inside is equipped with inner support, and top is equipped with the support beam vertical with inner orbit and outside track;Support beam outer end extends to outside construction steel structure, and is fixed with round tube in bottom;Top tape notch is arranged with outside round tube waves set;It waves set bottom and is equipped with sliding rail, be fixedly connected by fixed plate with respectively waving to cover at the top of sliding rail;Sliding rail is equipped with the second driving walking mechanism that can be slided on the slide rail, and the second driving walking mechanism bottom is fixedly connected with lifting cucurbit;Two lifting cucurbits that two hoisting frames are located at outside are fixedly connected with the both ends of hanging basket respectively;Two lifting cucurbits that two hoisting frames are located inside are fixedly connected with lifting part respectively.

Description

A kind of mobile hanging device of Super High and its hanging method
Technical field
The present invention relates to a kind of building external envelope structure, especially a kind of Super High movement hanging device and its lifting side Method.
Background technique
In recent years, with the fast development of construction market, new building both domestic and external, new material, new process are continued to bring out, and are built It is increasingly diversified to build facade.In order to the facade effect of abundant building, architect is no longer limited to conventional moulding, oblique cambered surface, The unconventional architectural conception such as tapered plane is increasingly favored by architect.But it is also increased in terms of curtain wall installs handling as a result, Difficulty of construction.
In Normal practice, as shown in Figure 5, Figure 6, has plenty of on certain main structure floor 1A, pressed along floor edge One fixed spacing arrangement sets up two groups of support arm 2A, and support arm 2A fixes upper end one of cantilever 3A, and structure floor 1A is stretched out in the front end cantilever 3A Then oblique pull wirerope 4A, two front ends cantilever 3A are arranged in certain distance between the both ends cantilever 3A and the centre upper end support arm 2A Hanging steel rope 5A is respectively set in setting, and the lower end hanging steel rope 5A hangs suspension platform 6A, and the setting of the rear side bottom support arm 2A is matched Weight 7A.Normal practice hanging basket is fixed on structure floor edge and can not move, and hanging basket suspension platform can only be run along the vertical direction.
It is also to be pressed on certain main structure floor 1B along floor edge as shown in Figure 7, Figure 8 in Normal practice One fixed spacing arrangement sets up cantilever I-steel 2B, and structure floor 1B certain distance is stretched out in the cantilever front end I-steel 2B, then outstanding Inside walking track I-steel 3B and outside walking track I-steel 4B, cantilever is respectively set in the front end arm I-steel 2B extension One of a stressed wire rope 5B and pipe protection wirerope 6B is arranged in the front end I-steel 2B.Wirerope lower end is solid by wirerope lower end Determine the front end otic placode 7B and cantilever I-steel 2B to fix, wirerope upper end passes through the fixed otic placode 8B in wirerope upper end and main structure building Plate 1B is fixed.Then one electric block 9B of suspension on track I-steel 3B is walked in inner row, the lower end electric block 9B is equipped with and hangs Hook 10B, suspension hook 10B are used for lifting curtain wall plate 11B.Then two electric blocks are hung on walking track I-steel 4B on the outside 9B, two electric block 9B are used for hanging basket 12B.Electric block 9B can on track 3B and track 4B direction along ng a path row It walks, realizes the level run of curtain wall plate 11B and hanging basket 12B;By start electric block 9B may be implemented curtain wall plate 11B and The vertical operation of hanging basket 12B.Curtain wall plate 11B and hanging basket 12B may be implemented along building level and vertical side in this Normal practice To operation, and then complete curtain wall installation.
It is also the vertical floor edge on certain main structure floor 1C as shown in Figure 9, Figure 10 in Normal practice Arrange fixed structure 2C, on fixed structure setting cantilever crane main structure 3C, cantilever crane main structure 3C and fixed structure 2C it Between connected by slewing equipment 4C, the cantilever crane front end main structure 3C stretch out structure floor 1C certain distance, projecting end lower part is set Set running gear 5C, the lower end running gear 5C fixed suspension hook 6C, cantilever crane main structure 3C rear end fixed weight 7C.This routine Cantilever crane can be by slewing equipment in the horizontal rotation in surface of certain angle range in way, also, running gear can be realized and be hung Level run of the object in vertical floor direction is filled, while lifting object can carry out the operation of vertical direction.
Traditional scheme has certain limitation, and installation hanging basket needs two electric blocks to work at the same time, the synchronism of the two It is unable to reach unanimously, for the track with certain slope, it is even more impossible to guarantee its climbing capacity for electric block;And it can only be by track Direction movement, can not be adjusted at a distance from main structure, i.e., worker can not be made to complete the operation such as installation in hanging basket.If simultaneously Glass is lifted, then needs that double-row track is installed, this has very high requirement to safety of structure.By taking certain engineering as an example, along structure Track maximum ramp angle is up to 14 °, and building facade is not regular plane, but has certain indent, hanging device The demand that can be supplied to the transport of platform and curtain wall plate of construction personnel's flexible operating need to be met, Normal practice is unable to satisfy It is required that.
Summary of the invention
In view of the problems of the existing technology, hanging device is moved the object of the present invention is to provide a kind of Super High and its hang Dress method, it is reasonable in design, consolidate it is safe, applied widely.
To achieve the above object, the present invention takes following technical scheme:
A kind of mobile hanging device of Super High, it includes the track support being set at the top of construction steel structure along Architectural fringes, Horizontal inner orbit and outside track are equipped at the top of the track support, it is equidistant fixed therebetween;On the inner orbit and outside track Hoisting frame there are two just setting;
The hoisting frame includes the carriage of rectangle, which is fixed with four first driving vehicle with walking machine Structure, wherein the driving walking mechanism sliding of two first, outside is set on the outside track, the driving walking mechanism of inside two first is sliding It is dynamic to be set on the inner orbit;Support arm is equipped on the outside of the carriage, inside is equipped with inner support, the support arm and inner support top Equipped with the support beam vertical with the inner orbit and outside track;The support beam outer end extends to outside the construction steel structure, and Round tube is fixed in bottom;Top tape notch is arranged with outside the round tube waves set, this waves set and can put along the round tube periphery It is dynamic;This waves set bottom and is equipped with the sliding rail that section is " work " type, is fixedly connected by fixed plate with respectively waving to cover at the top of the sliding rail; It is set on the sliding rail there are two the driving walking mechanism of can be slided on the sliding rail second, the second driving walking mechanism bottom and liter Drop cucurbit is fixedly connected;Two lifting cucurbits that two hoisting frames are located at outside are fixedly connected with the both ends of hanging basket respectively;Two Two lifting cucurbits that a hoisting frame is located inside are fixedly connected with lifting part respectively.
Further, the inner orbit and the outside track top surface are located at same level, the inner orbit inside and institute It states and is equipped with inclined interconnecting piece on the outside of outside track, and be fixedly connected respectively by the interconnecting piece with the track support;It is described First driving walking mechanism includes substrate, which is fixedly connected with the carriage, and bottom is equipped with and driving motor The first pulley of connection, the first pulley are contacted with the top surface of the inner orbit and outside track;The substrate side is equipped with side plate, should Side plate interior sides are equipped with second pulley, the inside face contact of the second pulley and the inner orbit and outside track;The side plate bottom is set There is third pulley, which contacts with the bottom surface of the inner orbit and outside track.
Further, the second driving walking mechanism includes the slide plate that two bottoms are fixedly connected, and each slide plate inside is Equipped with the first traveling wheel, which is located in the groove of the sliding rail side, and is located in the groove base plate;This first Traveling wheel connects driving motor;It is additionally provided with the second traveling wheel in the middle part of the slide plate side, the bottom plate of second traveling wheel and the groove Side contact.
Further, it is equipped with support column at the top of the support arm, is set between the support beam top surface on the inside of the support column There is bearing diagonal beam, is equipped with the first suspension cable, the support top end and the branch on the outside of the support column between the support beam top surface Support crossbeam both ends pass through the second suspension cable respectively and are fixedly connected.
Further, it is fixedly connected between two carriage sides by the telescopic rod of adjustable length;This is stretched Contracting bar both ends are equipped with spring, and centre is equipped with the pin shaft of adjustable length.
Further, the support beam inner end and the carriage top surface are equipped with clump weight.
Further, the carriage top surface is equipped with control cabinet, connect with towing cable is followed.
A kind of hanging method of the mobile hanging device of the Super High, including the following steps:
The attachment rail bracket on construction steel structure, installs inner orbit and outside track respectively on track support;It will lifting The carriage of rack is mounted on inner orbit and outside track, then that the third of overturn-preventing below the first driving walking mechanism is sliding Wheel installs, to prevent hoisting frame from falling off from inner orbit and outside track;
By being adjustable the telescopic rod of length, the position between two hoisting frames is adjusted;
Hanging basket is connect with the wirerope for the lifting cucurbit for being located at outside, and construction personnel reaches hanging basket designated position, binding peace Quan Sheng;The control device of operation lifting cucurbit, plays hanging basket and rises to operating position;Another is located at the steel of the lifting cucurbit of inside Cord is connected with the curtain wall plate of lower end by lifting part, and the control device of operation lifting cucurbit plays curtain wall plate and rises to peace Holding position;
Construction personnel and curtain wall plate arrived the same absolute altitude of installation site, by the second driving for adjusting hoisting frame Walking mechanism keeps construction personnel and curtain wall plate close to building structure edge, until reaching suitable installation site;
Construction personnel installs curtain wall plate until completing;
By the first driving walking mechanism on manipulation hoisting frame, make hoisting frame together with hanging basket along inner orbit and outer rail Road direction is mobile, until next installation point position, continues to install curtain wall plate, until curtain wall installs.
Further, the hanging method of the mobile hanging device of the Super High further includes the following steps:
After hanging device is finished, hanging basket is removed, the telescopic rod of hoisting frame is removed, two hoisting frames are separately torn open It unloads, first the third pulley of the overturn-preventing of the first driving walking mechanism is removed, hoisting frame is then transported to ground designated position;
After hoisting frame is removed from inner orbit and outside track, inner orbit and outside track are removed from construction steel structure.
The beneficial effects of the present invention are: the mobile hanging device of Super High of the present invention and its hanging method, structure design are closed Manage, consolidate it is safe, applied widely.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the mobile hanging device of Super High of the present invention.
Fig. 2 is the side view of the mobile hanging device of Super High of the present invention.
Fig. 3 is the structural schematic diagram for waving set of the mobile hanging device of Super High of the present invention.
Fig. 4 is the structural schematic diagram of the telescopic rod of the mobile hanging device of Super High of the present invention.
Fig. 5 is the side view of common hanging basket in the prior art.
Fig. 6 is the top view of common hanging basket in the prior art.
Fig. 7 is the side view of circular orbit hanging basket in the prior art.
Fig. 8 is the top view of circular orbit hanging basket in the prior art.
Fig. 9 is the side view of cantilever crane in the prior art.
Figure 10 is the top view of cantilever crane in the prior art.
Specific embodiment
It is right with reference to embodiments with attached drawing in order to which technical solution of the present invention and beneficial effect is more clearly understood The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, the present invention provides a kind of mobile hanging device of Super High, it includes along building side Edge is set to the track support 2 at the top of construction steel structure 1, is equipped with horizontal inner orbit 3 and outside track 4 at the top of the track support 2, and two It equidistantly fixes, sets above the inner orbit 3 and outside track 4 there are two hoisting frame 5 between person.
The hoisting frame 5 includes the carriage 51 of rectangle, which is fixed with four first drivings Walking mechanism 52, wherein driving walking mechanism 52 sliding of two first, outside is set on the outside track 4, the driving of inside two first The sliding of walking mechanism 52 is set on the inner orbit 3.Support arm 53 is equipped on the outside of the carriage 51, inside is equipped with inner support 54, The support beam 55 vertical with the inner orbit 3 and outside track 4 is equipped at the top of the support arm 53 and inner support 54.The support beam 55 Outer end extends to outside the construction steel structure 1, and is fixed with round tube 56 in bottom.Top tape notch is arranged with outside the round tube 56 Wave set 57, this waves set and 57 can swing along 56 periphery of round tube, allows to have certain angle adjusting.This waves 57 bottoms of set Portion is equipped with the sliding rail 58 that section is " work " type, which is fixedly connected with set 57 is respectively waved by fixed plate.The sliding rail It is set on 58 there are two the driving walking mechanism 59 of can be slided on the sliding rail second, second driving 59 bottom of walking mechanism and liter Drop cucurbit 6 is fixedly connected.Two lifting cucurbits 6 that two hoisting frames 5 are located at outside are fixed with the both ends of hanging basket 7 respectively to be connected It connects.Two lifting cucurbits 6 that two hoisting frames 5 are located inside are fixedly connected with lifting part respectively.
55 inner end of support beam and 51 top surface of carriage are equipped with clump weight 8, which also sets There is control cabinet 9, connects indoor power supply with following towing cable 91 to connect.In order to adapt to the size of curtain wall plate, two carriages It is fixedly connected between 51 sides by the telescopic rod 511 of adjustable length, convenient for adjusting the width of lifting part, the telescopic rod 511 Both ends are equipped with spring 512, and centre is equipped with the pin shaft of adjustable length.
The inner orbit 3 and 4 top surface of outside track are located at same level, and 3 inside of inner orbit and 4 outside of outside track are It is fixedly connected by the interconnecting piece with the track support 2 equipped with inclined interconnecting piece, and respectively.The first driving walking mechanism 52 Including substrate 521, which is fixedly connected with the carriage 51, and bottom is equipped with first connect with driving motor Pulley 522, the first pulley 522 are contacted with the top surface of the inner orbit 3 and outside track 4.521 side of substrate is equipped with side plate 523, Second pulley 524, the inside face contact of the second pulley 524 and the inner orbit 3 and outside track 4 are equipped on the inside of the side plate 523.It should 523 bottom of side plate is equipped with third pulley 525, which contacts with the bottom surface of the inner orbit 3 and outside track 4, the third Pulley 525 can prevent carriage 51 to be detached from from inner orbit 3 and outside track 4.
The second driving walking mechanism 59 includes the slide plate 591 that two bottoms are fixedly connected, and is equipped on the inside of each slide plate 591 First traveling wheel 592, first traveling wheel 592 are located in the groove 581 of 58 side of sliding rail, and are located at 581 bottom plate of groove On.First traveling wheel 592 connects driving motor.It is additionally provided with the second traveling wheel 593 in the middle part of 591 side of slide plate, second row Wheel 593 is walked to contact with the bottom panel side of the groove 581.
It is equipped with support column 531 at the top of the support arm 53, is equipped between 531 inside of support column and 55 top surface of support beam Bearing diagonal beam 532 is equipped with the first suspension cable 533, the support column between 531 outside of support column and 55 top surface of support beam 531 tops pass through the second suspension cable 534 with 55 both ends of support beam respectively and are fixedly connected.
The present invention also provides the hanging methods of the mobile hanging device of Super High described in one kind, including the following steps:
The attachment rail bracket 2 on construction steel structure 1, installs inner orbit 3 and outside track 4 respectively on track support 2;It will The carriage 51 of hoisting frame 5 is mounted on inner orbit 3 and outside track 4, is then driven first and is prevented below walking mechanism 52 The third pulley 525 to topple installs, to prevent hoisting frame 5 from falling off from inner orbit 3 and outside track 4;
In order to enable the co-ordination simultaneously of two hoisting frames 5 to adjust two liftings by being adjustable the telescopic rod of length Position between rack 5;
Hanging basket 7 is connect with the wirerope for the lifting cucurbit 6 for being located at outside, and construction personnel reaches 7 designated position of hanging basket, binding Safety rope;The control device of operation lifting cucurbit 6, plays hanging basket 7 and rises to operating position;Another is located at the lifting cucurbit of inside 6 wirerope is connected with the curtain wall plate of lower end by lifting part, and the control device of operation lifting cucurbit 6 plays curtain wall plate Rise to installation site;
Construction personnel and curtain wall plate arrived the same absolute altitude of installation site, drive by adjust hoisting frame 5 second Dynamic walking mechanism 59, keeps construction personnel and curtain wall plate close to building structure edge, until reaching suitable installation site;
Construction personnel installs curtain wall plate until completing;
By the first driving walking mechanism 52 on manipulation hoisting frame 5, make hoisting frame 5 together with hanging basket 7 along inner orbit 3 It is mobile with 4 direction of outside track, until next installation point position, continues to install curtain wall plate, until curtain wall installs.
The hanging method of the mobile hanging device of the Super High further includes the following steps:
After hanging device is finished, hanging basket is removed, the telescopic rod of hoisting frame 5 is removed, two hoisting frames 5 are separately torn open It unloads, first the third pulley 525 of the overturn-preventing of the first driving walking mechanism 52 is removed, hoisting frame 5 is then transported to ground and is referred to Positioning is set;
After hoisting frame 5 is removed from inner orbit 3 and outside track 4, by inner orbit 3 and outside track 4 from construction steel structure 1 It removes.
Advantages of the present invention is as follows:
1, rationally, horizontal and vertical force structure is all satisfied design requirement for structure of the invention design;
2, the present invention is suitable for erection face not in the complex environment of same level.
3, hanging device of the present invention has certain climbing capacity, can be suitably used for irregularly flat, facade building.
4, the demand that the present invention is able to satisfy hanging basket level, passes in and out position, the movement of vertical three directions.
5, the present invention it is applied widely, can by adjust hoisting frame spacing come realize different specification size hanging basket and The horizontal and vertical transport of curtain wall plate;
6, the firm safety of the present invention, it is easy to use, it is stronger compared with Normal practice, and hoisting frame and interior outside track disassembly side Just, it can be recycled.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, In the range of still falling within technical solution of the present invention.

Claims (8)

1. a kind of mobile hanging device of Super High, which is characterized in that it includes being set at the top of construction steel structure along Architectural fringes Track support, track support top are equipped with horizontal inner orbit and outside track, equidistant fixed therebetween;The inner orbit and Hoisting frame there are two being set above outside track;
The hoisting frame includes the carriage of rectangle, which is fixed with four first driving walking mechanisms, Wherein the driving walking mechanism sliding of two first, outside is set on the outside track, and the driving walking mechanism sliding of inside two first is set In on the inner orbit;Support arm is equipped on the outside of the carriage, inside is equipped with inner support, is equipped at the top of the support arm and inner support The support beam vertical with the inner orbit and outside track;The support beam outer end extends to outside the construction steel structure, and the bottom of at Portion is fixed with round tube;Top tape notch is arranged with outside the round tube waves set, this waves set and can swing along the round tube periphery;It should It waves set bottom and is equipped with the sliding rail that section is " work " type, be fixedly connected by fixed plate with respectively waving to cover at the top of the sliding rail;The cunning It is set on rail there are two the driving walking mechanism of can be slided on the sliding rail second, the second driving walking mechanism bottom and lifting calabash Reed is fixedly connected;Two lifting cucurbits that two hoisting frames are located at outside are fixedly connected with the both ends of hanging basket respectively;Two are hung Two lifting cucurbits that installation frame is located inside are fixedly connected with lifting part respectively;The inner orbit and outside track top surface position It is equipped with inclined interconnecting piece on the inside of same level, the inner orbit and on the outside of the outside track, and passes through the company respectively Socket part is fixedly connected with the track support;The first driving walking mechanism includes substrate, the substrate top and the bottom Vehicle frame is fixedly connected, and bottom is equipped with the first pulley connecting with driving motor, the first pulley and the inner orbit and outside track Top surface contact;The substrate side is equipped with side plate, which is equipped with second pulley, the second pulley and the inner orbit and The inside face contact of outside track;The side plate bottom is equipped with third pulley, the bottom of the third pulley and the inner orbit and outside track Face contact.
2. the mobile hanging device of Super High according to claim 1, it is characterised in that: the second driving walking mechanism packet The slide plate that two bottoms are fixedly connected is included, is equipped with the first traveling wheel on the inside of each slide plate, which is located at the sliding rail In the groove of side, and it is located in the groove base plate;First traveling wheel connects driving motor;It is additionally provided in the middle part of the slide plate side Second traveling wheel, second traveling wheel are contacted with the bottom panel side of the groove.
3. the mobile hanging device of Super High according to claim 1, it is characterised in that: be equipped with support at the top of the support arm Column is equipped with bearing diagonal beam, support column outside and the support beam top surface between support column inside and the support beam top surface Between be equipped with the first suspension cable, which passes through the second suspension cable with the support beam both ends respectively and is fixedly connected.
4. the mobile hanging device of Super High according to claim 1, it is characterised in that: two carriage sides it Between be fixedly connected by the telescopic rod of adjustable length;The telescopic rod both ends are equipped with spring, and centre is equipped with adjustable length Pin shaft.
5. the mobile hanging device of Super High according to claim 1, it is characterised in that: the support beam inner end and described Carriage top surface is equipped with clump weight.
6. the mobile hanging device of Super High according to claim 1, it is characterised in that: the carriage top surface is equipped with control Cabinet processed is connect with towing cable is followed.
7. a kind of hanging method of the mobile hanging device of Super High described in any one of claims 1 to 6, which is characterized in that Include the following steps:
The attachment rail bracket on construction steel structure, installs inner orbit and outside track respectively on track support;By hoisting frame Carriage be mounted on inner orbit and outside track, then by first driving walking mechanism below overturn-preventing third pulley pacify It installs, to prevent hoisting frame from falling off from inner orbit and outside track;
By being adjustable the telescopic rod of length, the position between two hoisting frames is adjusted;
Hanging basket is connect with the wirerope for the lifting cucurbit for being located at outside, and construction personnel reaches hanging basket designated position, binds safety rope; The control device of operation lifting cucurbit, plays hanging basket and rises to operating position;Another is located at the wirerope of the lifting cucurbit of inside It is connected with the curtain wall plate of lower end by lifting part, the control device of operation lifting cucurbit plays curtain wall plate and rises to installation position It sets;
Construction personnel and curtain wall plate arrived the same absolute altitude of installation site, and the second driving by adjusting hoisting frame is walked Mechanism keeps construction personnel and curtain wall plate close to building structure edge, until reaching suitable installation site;
Construction personnel installs curtain wall plate until completing;
By the first driving walking mechanism on manipulation hoisting frame, make hoisting frame together with hanging basket along inner orbit and outside track side To movement, until next installation point position, continues to install curtain wall plate, until curtain wall installs.
8. the hanging method of the mobile hanging device of Super High according to claim 7, which is characterized in that further include following step It is rapid:
After hanging device is finished, hanging basket is removed, the telescopic rod of hoisting frame is removed, two hoisting frames are separately dismantled, first The third pulley of the overturn-preventing of first driving walking mechanism is removed, hoisting frame is then transported to ground designated position;
After hoisting frame is removed from inner orbit and outside track, inner orbit and outside track are removed from construction steel structure.
CN201810685092.XA 2018-06-28 2018-06-28 A kind of mobile hanging device of Super High and its hanging method Active CN108545628B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810685092.XA CN108545628B (en) 2018-06-28 2018-06-28 A kind of mobile hanging device of Super High and its hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810685092.XA CN108545628B (en) 2018-06-28 2018-06-28 A kind of mobile hanging device of Super High and its hanging method

Publications (2)

Publication Number Publication Date
CN108545628A CN108545628A (en) 2018-09-18
CN108545628B true CN108545628B (en) 2019-06-25

Family

ID=63493123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810685092.XA Active CN108545628B (en) 2018-06-28 2018-06-28 A kind of mobile hanging device of Super High and its hanging method

Country Status (1)

Country Link
CN (1) CN108545628B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644372B (en) * 2019-10-08 2021-02-12 焦作大学 Overhead tower-attached cantilever type beam-lifting truss-hanging system for mountainous area
CN110847584A (en) * 2019-11-26 2020-02-28 中国二十冶集团有限公司 Multifunctional hanging basket device and construction method thereof
CN111377383B (en) * 2020-03-30 2022-05-27 中国电建集团山东电力建设第一工程有限公司 Hoisting system and hoisting method for overweight horizontal high-pressure heater
CN111943055A (en) * 2020-07-06 2020-11-17 上海金冠幕墙科技有限公司 Hoisting structure for curtain wall unit bodies of high-rise and super high-rise buildings
CN111891919B (en) * 2020-08-06 2022-11-01 李妍 Method for replacing and hoisting window cleaning machine of high building
CN112343328A (en) * 2020-09-21 2021-02-09 安徽同济建设集团有限责任公司 Construction and installation method for ultrahigh hanging basket support
CN111977518B (en) * 2020-09-22 2023-04-14 湖南汇渠建筑科技有限公司 External wall panel hoisting device for assembly type building construction
CN112320606B (en) * 2020-10-26 2022-12-23 中铁十四局集团建筑工程有限公司 Special device for integral lifting, mounting and construction of assembled curtain wall and using method
CN112573341B (en) * 2020-12-05 2023-04-11 李昇 Column top hoisting mechanism and construction method thereof
CN112709365B (en) * 2021-02-08 2021-09-21 山东省建设建工(集团)有限责任公司 System and method for installing unit type glass curtain wall of variable-angle inclined building
CN113027108A (en) * 2021-04-21 2021-06-25 浙江展诚建设集团股份有限公司 Rail type movable hanging basket
CN113333615A (en) * 2021-06-28 2021-09-03 东风汽车集团股份有限公司 Stay cable type lighting device for blanking area of stamping production line
CN113401796A (en) * 2021-07-09 2021-09-17 中信建设有限责任公司 Walking hoisting robot for double-layer bolt ball net rack rod supplementing and hoisting method thereof
CN114892948A (en) * 2022-05-31 2022-08-12 中铁二十局集团第六工程有限公司 Hanging basket support and mounting method
CN115288440A (en) * 2022-07-11 2022-11-04 中国建筑第八工程局有限公司 Rail mounted lift platform and rail mounted gallows integration system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3955844A (en) * 1973-08-07 1976-05-11 Baumatic S.A. Crane cable attachment
CN202245811U (en) * 2011-09-16 2012-05-30 姜清海幕墙系统工程武汉有限公司 Combined curtain wall hoisting equipment
CN202379601U (en) * 2011-11-29 2012-08-15 中建一局集团第五建筑有限公司 Dual annular rail hoisting device for curtain wall
CN104989094A (en) * 2015-07-06 2015-10-21 上海中建八局装饰有限责任公司 Walking hanging basket and installing method of walking hanging basket

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2909413B2 (en) * 1995-08-04 1999-06-23 株式会社三徳 Suspension device for building exterior walls

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3955844A (en) * 1973-08-07 1976-05-11 Baumatic S.A. Crane cable attachment
CN202245811U (en) * 2011-09-16 2012-05-30 姜清海幕墙系统工程武汉有限公司 Combined curtain wall hoisting equipment
CN202379601U (en) * 2011-11-29 2012-08-15 中建一局集团第五建筑有限公司 Dual annular rail hoisting device for curtain wall
CN104989094A (en) * 2015-07-06 2015-10-21 上海中建八局装饰有限责任公司 Walking hanging basket and installing method of walking hanging basket

Also Published As

Publication number Publication date
CN108545628A (en) 2018-09-18

Similar Documents

Publication Publication Date Title
CN108545628B (en) A kind of mobile hanging device of Super High and its hanging method
CN106703264A (en) Indoor mechanical automation mounting method for super high-rise unit curtain walls
CN110952755B (en) Indoor side installation method for building glass
JPH055987B2 (en)
CN108455449A (en) A kind of interior rail type mobile curtain wall Lift-on/Lift-off System
CN106006488B (en) aerial work platform
CN115402909A (en) Super high-rise inclined double-layer special-shaped curtain wall construction device
CN110778126B (en) Construction method of building glass curtain wall
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN104409997B (en) Transformer substation power transformation and distribution room switch cabinet mounting method
CN218438153U (en) Construction hanging basket device capable of moving horizontally
CN206494694U (en) A kind of Multi-layer electric hanging basket
CN204310700U (en) A kind of indoor hoisting crane
CN214498345U (en) High altitude hanging flower basket for construction
CN205348734U (en) A jenny scaffold for construction of horizontal bracket vacant duct
CN109231036B (en) Building promotes panel with fixed steady equipment of hanging
CN210064983U (en) High-rise building electromechanical device installation carrying device
CN104586316A (en) Adjustable slope hanging basket
CN104545667A (en) Rotary track type window cleaning machine
CN205346759U (en) Construction of integrated hanger rail formula outer wall, washing, maintenance machine
CN218843700U (en) Anti-sway device for construction hanging basket
CN204531349U (en) Anti-drop device and attachment guide rail anti-falling lifting scaffold
CN212503686U (en) Construction equipment of prefabricated building based on BIM
CN107473141A (en) A kind of portable high-altitude safe job platform
CN216613816U (en) Universal curtain wall and quick hoisting device for components thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant