CN208556521U - 一种定子铁芯与机壳的热套定位工装 - Google Patents
一种定子铁芯与机壳的热套定位工装 Download PDFInfo
- Publication number
- CN208556521U CN208556521U CN201821363665.9U CN201821363665U CN208556521U CN 208556521 U CN208556521 U CN 208556521U CN 201821363665 U CN201821363665 U CN 201821363665U CN 208556521 U CN208556521 U CN 208556521U
- Authority
- CN
- China
- Prior art keywords
- casing
- stator core
- positioning
- hot jacket
- mounting base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacture Of Motors, Generators (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821363665.9U CN208556521U (zh) | 2018-08-23 | 2018-08-23 | 一种定子铁芯与机壳的热套定位工装 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821363665.9U CN208556521U (zh) | 2018-08-23 | 2018-08-23 | 一种定子铁芯与机壳的热套定位工装 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208556521U true CN208556521U (zh) | 2019-03-01 |
Family
ID=65451145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821363665.9U Active CN208556521U (zh) | 2018-08-23 | 2018-08-23 | 一种定子铁芯与机壳的热套定位工装 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208556521U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110571986A (zh) * | 2019-09-19 | 2019-12-13 | 河南师范大学 | 一种直驱电机的机壳与定子的装配工装 |
CN110587221A (zh) * | 2019-08-28 | 2019-12-20 | 中国航发成都发动机有限公司 | 一种装配型架辅助安装装置及施工方法 |
CN110649769A (zh) * | 2019-09-19 | 2020-01-03 | 河南师范大学 | 一种伺服电机的机壳与定子的装配工装 |
CN111644805A (zh) * | 2020-06-03 | 2020-09-11 | 北京首钢股份有限公司 | 一种联轴器的热装工具及方法 |
CN112828950A (zh) * | 2021-03-02 | 2021-05-25 | 王晔 | 一种聚乙烯丙纶复合防水卷材制备加工方法 |
CN116460583A (zh) * | 2023-04-23 | 2023-07-21 | 烟台东德实业有限公司 | 一种高速离心空压机主轴气动装配方法 |
-
2018
- 2018-08-23 CN CN201821363665.9U patent/CN208556521U/zh active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110587221A (zh) * | 2019-08-28 | 2019-12-20 | 中国航发成都发动机有限公司 | 一种装配型架辅助安装装置及施工方法 |
CN110571986A (zh) * | 2019-09-19 | 2019-12-13 | 河南师范大学 | 一种直驱电机的机壳与定子的装配工装 |
CN110649769A (zh) * | 2019-09-19 | 2020-01-03 | 河南师范大学 | 一种伺服电机的机壳与定子的装配工装 |
CN111644805A (zh) * | 2020-06-03 | 2020-09-11 | 北京首钢股份有限公司 | 一种联轴器的热装工具及方法 |
CN111644805B (zh) * | 2020-06-03 | 2022-02-22 | 北京首钢股份有限公司 | 一种联轴器的热装工具及方法 |
CN112828950A (zh) * | 2021-03-02 | 2021-05-25 | 王晔 | 一种聚乙烯丙纶复合防水卷材制备加工方法 |
CN116460583A (zh) * | 2023-04-23 | 2023-07-21 | 烟台东德实业有限公司 | 一种高速离心空压机主轴气动装配方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108723699A (zh) | 一种定子铁芯与机壳的热套定位工装 | |
CN208556521U (zh) | 一种定子铁芯与机壳的热套定位工装 | |
CN208571772U (zh) | 一种便于安装的伺服电机安装底座 | |
CN108818366B (zh) | 一种衬套定位装夹机构 | |
CN210757331U (zh) | 一种电机加工用的夹持装置 | |
CN209433303U (zh) | 一种计算机用可进行快速拆卸的机箱 | |
CN110181250A (zh) | 多段铁芯轴上压装装置 | |
CN110340639A (zh) | 一种轴孔高精度自定心装配装置 | |
CN209039535U (zh) | 一种齿轮淬火压模 | |
CN209206883U (zh) | 一种卧式自动压装机 | |
CN203918668U (zh) | 大型发动机曲轴数控磨床 | |
CN209110088U (zh) | 一种汽车轴承的压铆装置 | |
CN104339148A (zh) | 一种回转芯模高精度快速安装装置及方法 | |
CN107717419A (zh) | 一种快速安装汽车球头销卡簧的设备 | |
CN114448188B (zh) | 用于电机磁钢片的清理、打胶、装配一体化设备 | |
CN116441891A (zh) | 一种弹簧探针铆压组装装置 | |
CN104044024B (zh) | 大型发动机曲轴数控磨床 | |
CN108907918A (zh) | 一种外圆磨床 | |
CN208773170U (zh) | 一种外圆磨床 | |
CN209963215U (zh) | 一种腔体滤波器中的谐振杆装配结构 | |
CN102275059A (zh) | 活塞环自动修口机床 | |
CN210152956U (zh) | 风扇摆头角度控制旋转底盘 | |
CN208575776U (zh) | 轴承套圈卡环安装机构 | |
CN208375163U (zh) | 汽轮机和发电机的转子及主轴装配工装 | |
CN207736770U (zh) | 一种多爪同步防尘罩装配装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Shrinkage fit and positioning tool for stator core and casing Effective date of registration: 20200117 Granted publication date: 20190301 Pledgee: Zhejiang Tyrone commercial bank Limited by Share Ltd Taizhou Wenling branch Pledgor: Wenling Nine Continent Motor Manufacturing Co., Ltd. Registration number: Y2020330000045 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CP03 | Change of name, title or address |
Address after: 3 Wanjin Road, Zeguo Town, Wenling City, Taizhou City, Zhejiang Province Patentee after: Zhejiang Jiuzhou New Energy Technology Co.,Ltd. Address before: 317523 air compressor Park, Zeguo Town, Wenling City, Taizhou City, Zhejiang Province Patentee before: WENLING JIUZHOU ELECTROMECHANICAL Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220224 Granted publication date: 20190301 Pledgee: Zhejiang Tyrone commercial bank Limited by Share Ltd. Taizhou Wenling branch Pledgor: WENLING JIUZHOU ELECTROMECHANICAL Co.,Ltd. Registration number: Y2020330000045 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |