CN208527358U - Semiconductor plastic package band high-voltage isulation test macro - Google Patents

Semiconductor plastic package band high-voltage isulation test macro Download PDF

Info

Publication number
CN208527358U
CN208527358U CN201820541477.4U CN201820541477U CN208527358U CN 208527358 U CN208527358 U CN 208527358U CN 201820541477 U CN201820541477 U CN 201820541477U CN 208527358 U CN208527358 U CN 208527358U
Authority
CN
China
Prior art keywords
plastic package
rack
test
semiconductor plastic
package band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820541477.4U
Other languages
Chinese (zh)
Inventor
吴忠其
伏道俊
施文俊
马浩锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN ACE ELECTRONIC EQUIPMENT CO Ltd
Original Assignee
JIANGYIN ACE ELECTRONIC EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN ACE ELECTRONIC EQUIPMENT CO Ltd filed Critical JIANGYIN ACE ELECTRONIC EQUIPMENT CO Ltd
Priority to CN201820541477.4U priority Critical patent/CN208527358U/en
Application granted granted Critical
Publication of CN208527358U publication Critical patent/CN208527358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of semiconductor plastic package band high-voltage isulation test macro, it includes rack, feeding device, feeding-distribution device, test device, traction device, material collecting device and waste material collection device;Feeding device is used to store the semiconductor plastic package band before test, feeding-distribution device is used to the semiconductor plastic package band in feeding device being moved to test device, test device is used for the Insulation test of semiconductor plastic package band, traction device from test device for removing the semiconductor plastic package band that Insulation test terminates, and the semiconductor plastic package band for wherein meeting Insulation test requirement is sent into material collecting device, material collecting device is used to carry out rewinding to the semiconductor plastic package band for meeting Insulation test requirement, waste material collection device is for being collected the semiconductor plastic package band for being unsatisfactory for Insulation test requirement.The utility model has the advantages of realizing automated job, reducing labor intensity of workers, improve production efficiency, reduce enterprise's production cost.

Description

Semiconductor plastic package band high-voltage isulation test macro
Technical field
The utility model relates to a kind of semiconductor plastic package band high-voltage isulation test macro and its test methods.
Background technique
The Insulation test of traditional semiconductor plastic package band is that artificial loading is put into test station, and artificial pressing is surveyed Examination, artificial blanking carry out rewinding and are manually collected waste material, and inefficiency, labor intensity of workers is big, can not achieve certainly Dynamic metaplasia produces, and reduces production efficiency, improves enterprise's production cost.Therefore seek a kind of realization automated job, reduce work People's labor intensity, improve production efficiency, reduce enterprise's production cost semiconductor plastic package band high-voltage isulation test macro and its Test method is particularly important.
Summary of the invention
Purpose of the utility model is to overcome the above-mentioned shortcomings and provide a kind of realization automated jobs, reduce worker's labour Intensity improves production efficiency, reduces semiconductor plastic package band high-voltage isulation test macro and its test side of enterprise's production cost Method.
Purpose of the utility model is realized as follows:
A kind of semiconductor plastic package band high-voltage isulation test macro, it includes rack, feeding device, feeding-distribution device, test Device, traction device, material collecting device and waste material collection device;Feeding device, feeding-distribution device, test device, traction device, receipts Material device and waste material collection device are set in rack;
Feeding device is used to store the semiconductor plastic package band before test,
Feeding-distribution device is used to the semiconductor plastic package band in feeding device being moved to test device,
Test device is used for the Insulation test of semiconductor plastic package band,
Traction device is used to remove the semiconductor plastic package band that Insulation test terminates from test device, and will wherein The semiconductor plastic package band for meeting Insulation test requirement is sent into material collecting device,
Material collecting device is used to carry out rewinding to the semiconductor plastic package band for meeting Insulation test requirement,
Waste material collection device is for being collected the semiconductor plastic package band for being unsatisfactory for Insulation test requirement.
The rack level is arranged, is offered among the leading portion of the rack for the semiconductor plastic package band in feeding device The rack channel risen through, the inner ring of rack channel are provided with more for the semiconductor plastic package band of rising to be oriented to Root guide rod, guide rod are fixed in the guide rod fixing seat of rack upper surface;
The feeding device includes feeding device rack, and feeding device rack level is arranged in below rack, feeding device Four upward connecting rods being evenly arranged are provided in rack, the top of four connecting rods is separately connected four machines in rack Frame connecting hole, feeding device rack upper surface are provided with lateral feed bin track, and feed bin Mobile base is provided on feed bin track, material Magazine fixed frame is provided on the Mobile base of storehouse, from left to right at least provided with two magazines, feeding device machine in magazine fixed frame A vertical feeding device vertical supports are provided with below frame, a feeding dress is provided on the right side of feeding device vertical supports Servo motor is set, a vertical feeding device support rod, feeding device support are provided on the left of feeding device vertical supports The lower end of bar is connected with feeding device support base to the left, and feeding device support base is fixed with the connection of feeding device rotating bar , it is provided with upward feeding device rotating bar on feeding device rotating bar attachment base, is set with and turns in feeding device rotating bar Dynamic link block, rotation connection block connect an elevating lever fixed seats, are connected with two elevating levers in elevating lever fixed seats, two rise The top of drop bar is connected with raising plate, the power output end of the servo motor and the gear power of feeding device rotating bar lower end It connects, is additionally provided with lateral feeding device transverse cylinder below the feeding device rack, feeding device transverse cylinder Tailpiece of the piston rod is connect with the bottom of feed bin Mobile base.
The feeding-distribution device include rack leading portion across door frame, be provided with traversing guide rail on the crossbeam of the door frame, The transverse-moving mechanism that traversing movement can be carried out on traversing guide rail is provided on traversing guide rail, the transverse-moving mechanism includes a cross Seat is moved, the traversing seat is slidably connected on traversing guide rail, and the traversing seat hangs be equipped with a hanger, the cross sliding machine up and down Structure is vertically provided with a sub-material draw frame machine.
Sub-material draw frame machine includes that a upward sub-material draws cylinder, two sub-materials draw guide sleeve, two sub-materials are inhaled Guide rod, upper connecting rod, lower connecting plate and multiple suction nozzles are taken, sub-material is drawn cylinder and is located in the middle part of the support plate of hanger, and two Sub-material draws guide sleeve and is located at sub-material absorption cylinder front and rear sides, and two sub-materials draw guide rods and are arranged in two sub-materials suctions respectively It takes in guide sleeve, upper connecting rod connects two sub-materials and draws the upper end of guide rod and the telescopic end of sub-material absorption cylinder, lower company Fishplate bar connects the lower end that two sub-materials draw guide rod, and multiple suction nozzles are down-set in lower connecting plate bottom surface.
The test device includes supporting mechanism, press mechanism and Shang Ding mechanism,
Supporting mechanism is used to support into the semiconductor plastic package band in test device,
Press mechanism is compressed for that will enter the semiconductor plastic package band in test device,
Top and semiconductor plastic package ribbon contacts in Shang Ding mechanism, so that the energization of semiconductor plastic package band carries out insulation survey Examination.
The supporting mechanism includes supporting mechanism bracket, and supporting mechanism bracket is fixed in rack, on supporting mechanism bracket It is provided with longitudinal test runner, the middle part hollow out of the test runner;
The press mechanism includes press mechanism bracket, and press mechanism bracket is fixed in rack, press mechanism bracket position In being provided with vertical press mechanism sliding rail on the distal end of feeding-distribution device, press mechanism bracket, it is provided on press mechanism sliding rail Press mechanism lifting seat, press mechanism lifting seat are connect with the telescopic end of a upward press mechanism cylinder, press mechanism gas The bottom of cylinder is fixed in rack, and press mechanism lifting seat passes through connector to the right and is connected with test board mounting base, test board The bottom of mounting base is connected with test board, test board electric signal connecting test instrument;
The Shang Ding mechanism includes upper top mechanism rack, and upper top mechanism rack is fixed in rack, upper top mechanism rack On be provided with vertical Shang Ding mechanism sliding rail, Shang Ding mechanism lifting seat, Shang Ding mechanism lifting seat are provided on Shang Ding mechanism sliding rail On be provided with electrode tip holder, test electrode is provided on electrode tip holder;Shang Ding mechanism lifting seat and a upward Shang Ding mechanism cylinder Telescopic end connection.
The traction device includes traction track, and a traction sliding shoe, the traction sliding are provided on traction track It is provided with a traction support on block, draws and is provided with a upward traction lifting cylinder on support, draw lifting cylinder Telescopic end connects a traction connection frame, and traction connection frame includes that one piece of transverse slat and one piece are located at that transverse slat front end is down-set to erect Plate is wherein connected with longitudinal traction mechanism at the top of transverse slat, traction gripper cylinder vertically upward is provided on front side of riser, The traction mechanism includes longitudinally arranged draw bar, and the front end of the draw bar is provided with upward hook, the draw bar Rear end be provided with upward pushing block, longitudinal hollow part is provided among the leading portion of the draw bar, setting in the hollow part There is an oscillating rod, the middle part of the oscillating rod and the main body of the draw bar of hollow part two sides are hinged, the upper end setting of oscillating rod There is a forward gripper jaw, the lower end of oscillating rod and the telescopic end of traction gripper cylinder are hinged.
The material collecting device includes intermediate longitudinally arranged rewinding runner, and the front end of rewinding runner connects leading stream Road is fixedly arranged above rewinding box in the middle part of the rewinding runner, and the lower section at left and right sides of rewinding box is provided with for semiconductor plastic package The hoisting mechanism of band lifting power.
The hoisting mechanism includes hoisting mechanism support frame, is provided with vertical hoisting mechanism on the outside of hoisting mechanism support frame Track is provided with hoisting mechanism sliding block, two hoisting mechanism sliding blocks in left side and two promotions on right side on hoisting mechanism track The lifting plate of a longitudinal direction is respectively arranged on mechanism sliding block, the middle part of the lifting plate connects a upward hoisting mechanism gas The lower end of the telescopic end of cylinder, hoisting mechanism cylinder is fixed in rack, inside front ends, middle section and the rear end difference of the lifting plate It is provided with preceding lift lever, middle lift lever and rear lift lever laterally inwardly, the preceding lift lever and rear lift lever are rectangular shaft, institute The leading portion and back segment for stating lifting plate are respectively arranged with one group of unidirectional feeding distribution mechanism, and the unidirectional feeding distribution mechanism includes feeding distribution mechanism branch Seat, the feeding distribution mechanism support are fixed on the upper surface of lifting plate, are hinged with laterally inwardly on feeding distribution mechanism support by pin shaft Cutting plate, a supporting block is provided on the feeding distribution mechanism support of the underface of cutting plate inner segment.
The rewinding box includes the corner post of four 90 degree of flangings positioned at quadrangle, and upper section connects between two corner posts in front It is connected to preceding connecting plate, upper section is connected with rear connecting plate, the medial surface of preceding connecting plate and rear connecting plate between two corner posts at rear It is provided with photoelectric sensor, the lower section of the corner post is respectively arranged with lacking for hoisting mechanism movement with right side to the left Mouthful.
The waste material collection device is located in the rack at material collecting device rear, and the waste material collection device includes garbage collection Frame, garbage collection frame are set in rack, and waste material guide plate is provided in garbage collection frame.
Compared with prior art, the utility model has the beneficial effects that
The utility model, which has, realizes automated job, reduces labor intensity of workers, improves production efficiency, it is raw to reduce enterprise The advantages of producing cost.
Detailed description of the invention
Fig. 1 is the schematic diagram of semiconductor plastic package band high-voltage isulation test macro.
Fig. 2 is Fig. 1 explosive view.
Fig. 3 is that rack and feeding device cooperate schematic diagram.
Fig. 4 is in schematic diagram when low level for the semiconductor plastic package band in feeding device.
Fig. 5 is the schematic diagram of two kinds of switching states of the magazine in feeding device.
Fig. 6 is the schematic diagram when semiconductor plastic package band in feeding device is in high-order.
Fig. 7 is the superstructure schematic diagram of feeding device.
Fig. 8 is the explosive view of Fig. 7.
Fig. 9 is the substructure schematic diagram of feeding device.
Figure 10 is the explosive view of Fig. 9.
Figure 11 is the schematic diagram of feeding-distribution device.
Figure 12 is the explosive view of Figure 11.
Figure 13 is the schematic diagram of test device.
Figure 14 is the supporting mechanism schematic diagram of test device.
Figure 15 is the press mechanism schematic diagram of test device.
Figure 16 is the explosive view of Figure 15.
Figure 17 is the upper top structural scheme of mechanism of test device.
Figure 18 is the explosive view of Figure 17.
Figure 19 is the schematic diagram of traction device.
Figure 20 is the explosive view of Figure 19.
Figure 21 is the schematic diagram of the traction mechanism of traction device.
Figure 22 is schematic diagram of the traction device in the case where drawing gripper cylinder stretching state.
Figure 23 is schematic diagram of the traction device under traction clamping cylinders retract state.
Figure 24 is the schematic diagram of material collecting device.
Figure 25 is the explosive view of Figure 24.
Figure 26 is the unidirectional feeding distribution mechanism schematic diagram of material collecting device.
Figure 27 is the explosive view of Figure 26.
Figure 28 is the schematic diagram of waste material collection device.
Figure 29 is the location diagram of waste material collection device and material collecting device.
Wherein:
Rack 1, rack channel 101, guide rod 102, guide rod fixing seat 103, rack connecting hole 104
Feeding device 2, feeding device rack 201, connecting rod 202, feed bin track 203, feed bin Mobile base 204, magazine 205, magazine fixed frame 206, tightening cylinder block 206.1, tightening cylinder 206.2, lever 206.3, tightening bolt 206.4, feed bin Mobile limit base 207, vertical supports 208, feeding device servo motor 209, feeding device support rod 210, feeding device support Seat 211, feeding device rotating bar attachment base 212, feeding device rotating bar 213, rotation connection block 214, elevating lever fixed seats 215, elevating lever 216, raising plate 217, gear 218, feeding device transverse cylinder 219
Feeding-distribution device 3, door frame 301, traversing guide rail 302, feeding-distribution device drag chain mounting base 303, feeding-distribution device motor 304, Feeding-distribution device drag chain 305, transverse-moving mechanism 306, transverse-moving mechanism limit switch 307, sub-material draw frame machine 308, sub-material draw cylinder 308.1, sub-material draws guide sleeve 308.2, sub-material draws guide rod 308.3, upper connecting rod 308.4, lower connecting plate 308.5, inhales First 308.6
Test device 4, supporting mechanism 401, supporting mechanism bracket 401.1, test runner 401.2, lower collets 401.3, Press mechanism 402, press mechanism bracket 402.1, press mechanism sliding rail 402.2, press mechanism lifting seat 402.3, press mechanism Cylinder 402.4, test board mounting base 402.5, test board 402.6, upper collets 402.7, Shang Ding mechanism 403, Shang Ding mechanism branch Frame 403.1, Shang Ding mechanism sliding rail 403.2, Shang Ding mechanism lifting seat 403.3, electrode tip holder 403.4, test electrode 403.6
Traction device 5, traction track 501, traction sliding shoe 502, traction connector 503, traction belts 504, traction electricity Machine 505, traction support 506, traction lifting cylinder 507, traction connection frame 508, transverse slat 508.1, riser 508.2, traction mechanism 509, draw bar 509.1, hook 509.2, pushing block 509.3, oscillating rod 509.4, gripper jaw 509.5, traction gripper cylinder 510, Draw drag chain 511, traction drag chain guide rail 512
Material collecting device 6, rewinding runner 601, leading stream road 602, rewinding box 603, corner post 603.1, preceding connecting plate 603.2, rear connecting plate 603.3, hoisting mechanism 604, hoisting mechanism support frame 604.1, hoisting mechanism track 604.2, elevator Structure sliding block 604.3, lifting plate 604.4, hoisting mechanism cylinder 604.5, unidirectional feeding distribution mechanism 605, feeding distribution mechanism support 605.1, Pin shaft 605.2, cutting plate 605.3, supporting block 605.4
Waste material collection device 7, garbage collection frame 701, guide plate 702
Semiconductor plastic package band 8.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only invention a part of the embodiment, instead of all the embodiments.Based on this Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts Example is applied, is fallen within the protection scope of the utility model.
Referring to Fig. 1-Figure 29, the utility model relates to a kind of semiconductor plastic package band high-voltage isulation test macro, it is wrapped Including rack 1, feeding device 2, feeding-distribution device 3, test device 4, traction device 5, material collecting device 6 and waste material collection device 7;On Material device 2, feeding-distribution device 3, test device 4, traction device 5, material collecting device 6 and waste material collection device 7 are set to rack 1 On;
Wherein: a kind of working method of semiconductor plastic package band high-voltage isulation test macro:
Feeding device 2 is used to store the semiconductor plastic package band 8 before test, and feeding-distribution device 3 is used for will be in feeding device 2 Semiconductor plastic package band 8 is moved in test device 4, and test device 4 is used for the Insulation test of semiconductor plastic package band 8, traction Device 5 will wherein meet insulation for removing the semiconductor plastic package band 8 that Insulation test terminates from test device 4 The semiconductor plastic package band 8 of test request is sent into material collecting device 6, and then meets Insulation test requirement by 6 pairs of material collecting device Semiconductor plastic package band 8 carry out rewinding, wherein the semiconductor plastic package band 8 for being unsatisfactory for Insulation test requirement is partly led by subsequent Body plastic packaging band 8 is sequentially ejected to be sent into waste material collection device 7 and is collected.
Preferably, test device 4, traction device 5 and material collecting device 6 have been arranged in parallel two groups.
The rack 1 is horizontally disposed, offers among the leading portion of the rack 1 for the semiconductor plastic package in feeding device 2 The rack channel 101 that band 8 rises through, the inner ring of rack channel 101 are provided with the semiconductor plastic package band 8 for that will rise More guide rods 102 being oriented to, guide rod 102 are fixed in the guide rod fixing seat 103 of 1 upper surface of rack;
The feeding device 2 includes feeding device rack 201, and feeding device rack 201 is horizontally disposed below rack 1, The upward connecting rod 202 of four be evenly arranged, the top difference of four connecting rods 202 are provided in feeding device rack 201 Four rack connecting holes 104 in rack 1 are connected, 201 upper surface of feeding device rack is provided with lateral feed bin track 203, It is provided with feed bin Mobile base 204 on feed bin track 203, magazine fixed frame 206 is provided on feed bin Mobile base 204, magazine is fixed From left to right at least provided with two magazines 205 in frame 206, the front openings of the magazine fixed frame 206 are set in opening It is equipped with magazine opening tightening system, the magazine opening tightening system includes being set to the left right lateral receipts of magazine fixed frame 206 Tight cylinder block 206.1, tightens and is provided with forward tightening cylinder 206.2 on cylinder block 206.1, tightens the front end of cylinder 206.2 The opening direction of magazine 205 is provided with a lever 206.3, a tightening bolt backward is provided on lever 206.3 206.4,201 upper surface of feeding device rack of the left and right of feed bin Mobile base 204 is each provided with the mobile limit of a feed bin Position seat 207, is provided with a vertical feeding device vertical supports 208 below feeding device rack 201, feeding device is vertical The right side of bracket 208 is provided with a feeding device servo motor 209, and the left side of feeding device vertical supports 208 is provided with one The vertical feeding device support rod 210 of root, the lower end of feeding device support rod 210 are connected with feeding device support base to the left 211, feeding device support base 211 is fixed with feeding device rotating bar attachment base 212, on feeding device rotating bar attachment base 212 It is provided with upward feeding device rotating bar 213, rotation connection block 214, rotation connection are set in feeding device rotating bar 213 Block 214 connects an elevating lever fixed seats 215, is connected with two elevating levers 216, two elevating levers in elevating lever fixed seats 215 216 top is connected with raising plate 217, power output end and 213 lower end of feeding device rotating bar of the servo motor 209 Gear 218 is connected by power, and the lower section of the feeding device rack 201 is additionally provided with lateral feeding device transverse cylinder 219, The tailpiece of the piston rod of feeding device transverse cylinder 219 is connect with the bottom of feed bin Mobile base 204;
The feeding-distribution device 3 include 1 leading portion of rack across door frame 301, be provided with cross on the crossbeam of the door frame 301 Guide rail 302 and feeding-distribution device drag chain mounting base 303 are moved, feeding-distribution device drag chain mounting base 303 is located at traversing 302 top of guide rail, point Left section of rear of material device drag chain mounting base 303 is provided with feeding-distribution device motor 304, after feeding-distribution device drag chain mounting base 303 Side is provided with feeding-distribution device drag chain 305, and traversing movement can be carried out on traversing guide rail 302 by being provided on traversing guide rail 302 Transverse-moving mechanism 306, feeding-distribution device motor 304 are connected by power transverse-moving mechanism 306, and the free end of feeding-distribution device drag chain 305 connects horizontal Left section of telephone-moving structure 306, the front side of the door frame 301 is respectively arranged with a transverse-moving mechanism limit switch 307 with back segment, described Transverse-moving mechanism 306 includes a traversing seat 306.1, and the traversing seat 306.1 is slidably connected on traversing guide rail 302, traversing seat 306.1 connect with feeding-distribution device drag chain 305, and traversing about 306.1 seat, which is hung, is equipped with a hanger 306.2, described traversing Mechanism 306 is vertically provided with a sub-material draw frame machine 308, and the sub-material draw frame machine 308 includes that a upward sub-material is inhaled Take 308.1, two sub-materials of cylinder draw 308.2, two sub-materials of guide sleeve draw guide rods 308.3, upper connecting rod 308.4, under Connecting plate 308.5 and multiple suction nozzles 308.6, sub-material are drawn cylinder 308.1 and are located in the middle part of the support plate of hanger 306.2, and two Sub-material draws guide sleeve 308.2 and is located at sub-material absorption 308.1 front and rear sides of cylinder, and two sub-materials are drawn guide rods 308.3 and distinguished It is arranged in two sub-materials to draw in guide sleeve 308.2, upper connecting rod 308.4 connects two sub-materials and draws the upper of guide rod 308.3 End and sub-material draw the telescopic end of cylinder 308.1, and lower connecting plate 308.5 connects two sub-materials and draws under guide rod 308.3 End, multiple suction nozzles 308.6 are down-set in 308.5 bottom surface of lower connecting plate;Suction nozzle 308.6 connects air extractor;
The test device 4, which is located on the leading portion of rack 1 and is symmetrically arranged, two groups, with a test in left side For device 4, which includes supporting mechanism 401, press mechanism 402 and Shang Ding mechanism 403, supporting mechanism 401 It is used to support the semiconductor plastic package band 8 entered in test device 4, press mechanism 402 is used for will be into half in test device 4 Conductor plastic packaging band 8 compresses, and pushes up in Shang Ding mechanism 403 and contacts with semiconductor plastic package band 8, so that semiconductor plastic package band 8, which are powered, carries out Insulation test;
The supporting mechanism 401 includes supporting mechanism bracket 401.1, and supporting mechanism bracket 401.1 is fixed in rack 1, Longitudinal test runner 401.2 is provided on supporting mechanism bracket 401.1, the centre of test runner 401.2 has the platform of recess Rank, the middle part hollow out of the test runner 401.2, test runner 401.2 is interior to be equipped with lower collets 401.3, tests runner 401.2 upper surface is provided with location hole,
The press mechanism 402 includes press mechanism bracket 402.1, and press mechanism bracket 402.1 is fixed in rack 1, Press mechanism bracket 402.1 is located at the distal end of feeding-distribution device 3, is provided with vertical press mechanism on press mechanism bracket 402.1 Sliding rail 402.2, is provided with press mechanism lifting seat 402.3 on press mechanism sliding rail 402.2, press mechanism lifting seat 402.3 with The telescopic end connection of one upward press mechanism cylinder 402.4, rack 1 is fixed in the bottom of press mechanism cylinder 402.4 On, press mechanism lifting seat 402.3 is connected with test board mounting base 402.5, test board mounting base by connector to the right 402.5 bottom is connected with test board 402.6,402.6 electric signal connecting test instrument of test board, and interval is embedding in test board 402.6 Be equipped with collets 402.7,402.6 bottom of test board is provided with downward pilot pin, above-mentioned lower collets 401.3 and it is upper absolutely Edge block 402.7 is for wrapping up the part that the semiconductor plastic package band 8 in test process should be exposed in air;
The Shang Ding mechanism 403 includes upper top mechanism rack 403.1, and upper top mechanism rack 403.1 is fixed in rack 1, It is provided with vertical Shang Ding mechanism sliding rail 403.2 on upper top mechanism rack 403.1, is provided on Shang Ding mechanism sliding rail 403.2 Shang Ding mechanism lifting seat 403.3 is provided with electrode tip holder 403.4 on Shang Ding mechanism lifting seat 403.3, is arranged on electrode tip holder 403.4 There is test electrode 403.6;Shang Ding mechanism lifting seat 403.3 is connect with the telescopic end of a upward Shang Ding mechanism cylinder 403.5;
The test method of the test device 4:
Normal condition, semiconductor plastic package band 8 are put into runner by the suction nozzle 308.6 of feeding-distribution device 3, and suction nozzle 308.6 moves After walking, test board is pushed, and the semiconductor plastic package band 8 that the pilot pin on test board treats Insulation test carries out correcting, test board Whole packages are carried out to semiconductor plastic package band 8 after pushing, semiconductor plastic package band 8 forms cathode;
Stitching state, test electrode are connect by pushing up in the control of Shang Ding mechanism cylinder 404.5 with 8 pin of semiconductor plastic package band Touching, in place after, for board to signal tester, tester pressurization carries out Insulation test, under certain parameter setting, if semiconductor is moulded Strip of paper used for sealing band 8 is intact, and tester gives board non-defective unit signal, if semiconductor plastic package band 8 is not encapsulated completely, tester is bad to board Product signal.
The traction device 5 includes traction track 501, is provided with a traction sliding shoe 502 on traction track 501, leads Draw the traction belts 504 that sliding shoe 502 connects a longitudinal direction by a traction connector 503 of its bottom, traction belts 504 A traction electric machine 505 is connected, a traction support 506 is provided on the traction sliding shoe 502, draws and is set on support 506 It is equipped with a upward traction lifting cylinder 507, the telescopic end of traction lifting cylinder 507 connects a traction connection frame 508, leads Drawing connection frame 508 includes that one piece of transverse slat 508.1 and one piece are located at the down-set riser 508.2 in 508.1 front end of transverse slat, wherein horizontal The top of plate 508.1 is connected with longitudinal traction mechanism 509, and the front side of riser 508.2 is provided with the clamping of traction vertically upward Cylinder 510, the traction mechanism 509 include longitudinally arranged draw bar 509.1, and the front end of the draw bar 509.1 is provided with Upward hook 509.2, the rear end of the draw bar 509.1 are provided with upward pushing block 509.3, the draw bar 509.1 It is provided with longitudinal hollow part among leading portion, an oscillating rod 509.4 is provided in the hollow part, the oscillating rod 509.4 Middle part and the main body of the draw bar 509.1 of hollow part two sides are hinged, and the upper end of oscillating rod 509.4 is provided with a forward folder Pawl 509.5 is held, the lower end of oscillating rod 509.4 and the telescopic end of traction gripper cylinder 510 are hinged.The traction device 5 further includes Longitudinal traction drag chain 511, traction drag chain 511 and longitudinal traction drag chain guide rail 512 are cooperatively connected, traction drag chain 511 from Traction support 506 is connected by end.
The traction method of the traction device 5:
Traction electric machine 505 acts, so that traction belts 504 will draw sliding shoe 502 and drive to front end, hook at this time 509.2 are located at the lower section for 8 back segment of semiconductor plastic package band tested in test device 4, and traction lifting cylinder 507 ejects, So that hook 509.2 is inserted into the gap of 8 back segment of semiconductor plastic package band, the traction ejection of gripper cylinder 510 drives oscillating rod 509.4 rotations, then 8 end of semiconductor plastic package band is clamped and is stablized by gripper jaw 509.5, then the movement of traction electric machine 505 traction Belt 504 will draw sliding shoe 502 and drive to rear end, until the semiconductor plastic package band 8 enters the rewinding runner of material collecting device 6 It in 601, then draws gripper cylinder 510 and retracts, traction lifting cylinder 507 retracts, and traction mechanism 509 drops to semiconductor modeling 8 lower section of strip of paper used for sealing band, then carries out the towage of next circulation again, and laggard in the entrance material collecting device 6 of semiconductor plastic package band 8 The subsequent rewinding operation of row, at this time if there is the semiconductor plastic package band 8 not promoted in the rewinding runner 601 of material collecting device 6 Waste material, then the pushing block 509.3 of traction mechanism 509 is by the waste material of the semiconductor plastic package band 8 to pusher.
The material collecting device 6, which is located on the middle section of rack 1 and is symmetrically arranged, two groups, with a rewinding in left side For device 6, which is also symmetrical structure, and material collecting device 6 includes intermediate longitudinally arranged rewinding stream Road 601, the front end of rewinding runner 601 connect leading stream road 602, and guide runner after the rear end connection of rewinding runner 601 is leading The front end in stream road 602 and the rear end of the test runner 401.2 of test device 4 are close, the rear end of rewinding runner 601 and preceding guide The front end of runner 602 is provided with guiding surface obliquely, and 601 middle part of rewinding runner is fixedly arranged above rewinding box 603, the lower section of 603 left and right sides of rewinding box is provided with the hoisting mechanism 604 for 8 lifting power of semiconductor plastic package band, described Rewinding box 603 includes the corner post 603.1 of four 90 degree of flangings positioned at quadrangle, upper section between two corner posts 603.1 in front It is connected with preceding connecting plate 603.2, upper section is connected with rear connecting plate 603.3, preceding connecting plate between two corner posts 603.1 at rear 603.2 and the medial surface of rear connecting plate 603.3 be provided with photoelectric sensor, the lower section of the corner post 603.1 to the left and Right side is respectively arranged with the notch acted for hoisting mechanism 604, and the hoisting mechanism 604 includes being located at outside corner post 603.1 The hoisting mechanism support frame 604.1 of side-lower is provided with vertical hoisting mechanism track on the outside of hoisting mechanism support frame 604.1 604.2, hoisting mechanism sliding block 604.3, the stroke up and down of hoisting mechanism sliding block 604.3 are provided on hoisting mechanism track 604.2 With the matched of the notch of 603.1 lower section of corner post, two hoisting mechanism sliding blocks 604.3 in left side and two promotions on right side The lifting plate 604.4 of a longitudinal direction is respectively arranged on mechanism sliding block 604.3, the middle part of the lifting plate 604.4 connects one The telescopic end of upward hoisting mechanism cylinder 604.5, the lower end of hoisting mechanism cylinder 604.5 is fixed in rack 1, described to mention Inside front ends, middle section and the rear end of lift slab 604.4 are respectively arranged with preceding lift lever, middle lift lever and rear promotion laterally inwardly Bar, the preceding lift lever and rear lift lever are rectangular shaft, and the free end upper surface of the middle lift lever is provided with a notch shape At step surface, matched of the setting of step surface due to the notch with 601 corresponding section of rewinding runner, the lifting plate 604.4 leading portion and back segment is respectively arranged with one group of unidirectional feeding distribution mechanism 605, and the unidirectional feeding distribution mechanism 605 includes depiler Structure support 605.1, the feeding distribution mechanism support 605.1 are fixed on the upper surface of lifting plate 604.4, feeding distribution mechanism support 605.1 Upper to be hinged with cutting plate 605.3 laterally inwardly by pin shaft 605.2, it is outer that the upper surface of cutting plate 605.3 forms inner segment sinking The flanging risen is held, which to form the limit that a step is used for 8 left and right sides of semiconductor plastic package band at flanging, A supporting block 605.4, supporting block are provided on the feeding distribution mechanism support 605.1 of the underface of 605.3 inner segment of cutting plate 605.4 for free state under 605.3 gravity of cutting plate when the inner segment of cutting plate 605.3 is shelved so that at this time Cutting plate 605.3 is in horizontality;That is the height of apical side height with pin shaft 605.2 of supporting block 605.4 is consistent;
The rewinding method of the material collecting device 6:
The semiconductor plastic package band 8 tested enters rewinding runner 601 by leading stream road 602, if the semiconductor Plastic packaging band 8 is that then hoisting mechanism cylinder 604.5 acts qualified products, and hoisting mechanism cylinder 604.5 acts so that lifting plate 604.4 rise, and preceding lift lever, middle lift lever and the rear lift lever on lifting plate 604.4 are lifted respectively in rewinding runner 601 Semiconductor plastic package band 8 leading portion, middle section and back segment promoted so that semiconductor plastic package band 8 is whole, semiconductor plastic package band When 8 promotion, the cutting plate 605.3 of unidirectional feeding distribution mechanism 605, cutting plate 605.3 are touched in 8 left and right edges of semiconductor plastic package band It is rotated up around pin shaft 605.2 until vertical state, lifting plate 604.4 continue to rise, semiconductor plastic package band 8 continues to lift up directly It is higher than the height of cutting plate 605.3 to semiconductor plastic package band 8, lifting plate 604.4 drops to original position, cutting plate 605.3 at this time Since gravity is also rotated down around pin shaft 605.2 until horizontality, the semiconductor plastic package band 8 promoted up before Bottom is held on cutting plate 605.3, repeat above-mentioned process until semiconductor plastic package band 8 rewinding is extremely in rewinding box 603 Certain altitude, the photoelectric sensor induction alarm in rewinding box 603, then need the semiconductor plastic package item of rewinding to certain altitude Band 8 takes out;Hoisting mechanism cylinder 604.5 is failure to actuate if the semiconductor plastic package band 8 is not qualified products, is waited next Hoisting mechanism cylinder 604.5 acts when semiconductor plastic package band 8 is qualified products, in the process underproof semiconductor plastic package Band 8 is ejected backward by next semiconductor plastic package band 8 into rewinding runner 601, final underproof semiconductor modeling Strip of paper used for sealing band 8 is collected by waste material collection device 7.
The waste material collection device 7 is located in the rack 1 at 6 rear of material collecting device, and the waste material collection device 7 includes waste material Collection frame 701, garbage collection frame 701 are set in rack 1, and two groups of waste material guide plates 702 are provided in garbage collection frame 701, Two groups of waste material guide plates 702 are located at the rear of the rear guide runner of material collecting device 6, and waste material guide plate 702 has a finger Inclined-plane to the right, so that 8 waste material of semiconductor plastic package band into waste material guide plate 702 is fallen into garbage collection frame 701.
The above is only the specific application examples of the utility model, do not constitute any limit to the protection scope of the utility model System.Any technical scheme formed by adopting equivalent transformation or equivalent replacement, all fall within the utility model rights protection scope it It is interior.

Claims (10)

1. a kind of semiconductor plastic package band high-voltage isulation test macro, it is characterised in that it include rack (1), feeding device (2), Feeding-distribution device (3), test device (4), traction device (5), material collecting device (6) and waste material collection device (7);Feeding device (2), feeding-distribution device (3), test device (4), traction device (5), material collecting device (6) and waste material collection device (7) are set to In rack (1);
Feeding device (2) is used to store the semiconductor plastic package band (8) before test,
Feeding-distribution device (3) is used to the semiconductor plastic package band (8) in feeding device (2) being moved to test device (4),
Test device (4) is used for the Insulation test of semiconductor plastic package band (8),
Traction device (5) is used to remove the semiconductor plastic package band (8) that Insulation test terminates from test device (4), and The semiconductor plastic package band (8) for wherein meeting Insulation test requirement is sent into material collecting device (6),
Material collecting device (6) is used to carry out rewinding to the semiconductor plastic package band (8) for meeting Insulation test requirement,
Waste material collection device (7) is for being collected the semiconductor plastic package band (8) for being unsatisfactory for Insulation test requirement.
2. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 1, it is characterised in that the machine Frame (1) is horizontally disposed, is offered among the leading portion of the rack (1) on the semiconductor plastic package band (8) in feeding device (2) The rack channel (101) passed through is risen, the inner ring of rack channel (101) is provided with the semiconductor plastic package band (8) for that will rise More guide rods (102) being oriented to, guide rod (102) are fixed on the guide rod fixing seat positioned at rack (1) upper surface (103) on;
The feeding device (2) includes feeding device rack (201), and feeding device rack (201) is horizontally disposed under rack (1) Side, is provided with the upward connecting rod (202) of four be evenly arranged in feeding device rack (201), four connecting rods (202) Top is separately connected four rack connecting holes (104) on rack (1), and feeding device rack (201) upper surface is provided with transverse direction Feed bin track (203), be provided with feed bin Mobile base (204) on feed bin track (203), feed bin Mobile base is provided on (204) Magazine fixed frame (206), magazine fixed frame (206) are interior from left to right at least provided with two magazines (205), feeding device rack (201) lower section is provided with a vertical feeding device vertical supports (208), and feeding device vertical supports are set on the right side of (208) It is equipped with a feeding device servo motor (209), is provided with a vertical feeding on the left of feeding device vertical supports (208) Device support rod (210), the lower end of feeding device support rod (210) are connected with feeding device support base (211) to the left, on Material device support base (211) is fixed with feeding device rotating bar attachment base (212), on feeding device rotating bar attachment base (212) It is provided with upward feeding device rotating bar (213), rotation connection block (214) is set in feeding device rotating bar (213), is turned Dynamic link block (214) connect an elevating lever fixed seats (215), are connected with two elevating levers in elevating lever fixed seats (215) (216), the top of two elevating levers (216) is connected with raising plate (217), the power output end of the servo motor (209) with The gear (218) of feeding device rotating bar (213) lower end is connected by power, and is also set up below the feeding device rack (201) There are lateral feeding device transverse cylinder (219), the tailpiece of the piston rod and feed bin Mobile base of feeding device transverse cylinder (219) (204) bottom connection.
3. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 1, it is characterised in that described point Material device (3) be included in rack (1) leading portion across door frame (301), be provided with traversing guide rail on the crossbeam of the door frame (301) (302), it is provided with the transverse-moving mechanism (306) that traversing movement can be carried out on traversing guide rail (302) on traversing guide rail (302), The transverse-moving mechanism (306) includes a traversing seat (306.1), and the traversing seat (306.1) is slidably connected to traversing guide rail (302) on, the traversing seat (306.1) hangs up and down and is equipped with a hanger (306.2), and the transverse-moving mechanism (306) is to dividing into It is equipped with a sub-material draw frame machine (308);
Sub-material draw frame machine (308) includes that a upward sub-material draws cylinder (308.1), two sub-materials draw guide sleeve (308.2), two sub-materials draw guide rod (308.3), upper connecting rod (308.4), lower connecting plate (308.5) and multiple suction nozzles (308.6), sub-material is drawn cylinder (308.1) and is located in the middle part of the support plate of hanger (306.2), and two sub-materials draw guide sleeve (308.2) it is located at sub-material and draws cylinder (308.1) front and rear sides, two sub-materials draws guide rod (308.3) and are arranged in two respectively Root sub-material is drawn in guide sleeve (308.2), and upper connecting rod (308.4) connects the upper end that two sub-materials draw guide rod (308.3) And sub-material draws the telescopic end of cylinder (308.1), lower connecting plate (308.5) connects two sub-materials and draws guide rod (308.3) Lower end, multiple suction nozzles (308.6) are down-set in lower connecting plate (308.5) bottom surface.
4. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 1, it is characterised in that the survey It includes supporting mechanism (401), press mechanism (402) and Shang Ding mechanism (403) that (4) are set in trial assembly,
Supporting mechanism (401) is used to support into the semiconductor plastic package band (8) in test device (4),
Press mechanism (402) is compressed for that will enter the semiconductor plastic package band (8) in test device (4),
In Shang Ding mechanism (403) top contacted with semiconductor plastic package band (8) so that semiconductor plastic package band (8) be powered into Row Insulation test.
5. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 4, it is characterised in that the branch Support mechanism (401) includes supporting mechanism bracket (401.1), and supporting mechanism bracket (401.1) is fixed on rack (1), supports machine Longitudinal test runner (401.2), the middle part hollow out of test runner (401.2) are provided on structure bracket (401.1);
The press mechanism (402) includes press mechanism bracket (402.1), and press mechanism bracket (402.1) is fixed on rack (1) On, press mechanism bracket (402.1) is located at the distal end of feeding-distribution device (3), is provided on press mechanism bracket (402.1) vertical Press mechanism sliding rail (402.2) is provided with press mechanism lifting seat (402.3), press mechanism on press mechanism sliding rail (402.2) Lifting seat (402.3) is connect with the telescopic end of a upward press mechanism cylinder (402.4), press mechanism cylinder (402.4) Bottom be fixed on rack (1), press mechanism lifting seat (402.3) is connected with test board mounting base by connector to the right (402.5), the bottom of test board mounting base (402.5) is connected with test board (402.6), the connection of test board (402.6) electric signal Tester;
The Shang Ding mechanism (403) includes upper top mechanism rack (403.1), and upper top mechanism rack (403.1) is fixed on rack (1) On, vertical Shang Ding mechanism sliding rail (403.2), Shang Ding mechanism sliding rail (403.2) are provided on upper top mechanism rack (403.1) On be provided with Shang Ding mechanism lifting seat (403.3), electrode tip holder (403.4), electrode are provided on Shang Ding mechanism lifting seat (403.3) Test electrode (403.6) is provided on seat (403.4);Shang Ding mechanism lifting seat (403.3) and a upward Shang Ding mechanism gas The telescopic end of cylinder (403.5) connects.
6. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 1, it is characterised in that described to lead Leading-in device (5) includes traction track (501), and a traction sliding shoe (502), the traction are provided on traction track (501) It is provided with a traction support (506) on sliding shoe (502), a upward traction lifting is provided in traction support (506) Cylinder (507), the telescopic end of traction lifting cylinder (507) connect a traction connection frame (508), traction connection frame (508) packet It includes one piece of transverse slat (508.1) and one piece is located at the down-set riser (508.2) in transverse slat (508.1) front end, wherein transverse slat (508.1) it is connected at the top of longitudinal traction mechanism (509), traction vertically upward is provided on front side of riser (508.2) Gripper cylinder (510), the traction mechanism (509) include longitudinally arranged draw bar (509.1), the draw bar (509.1) Front end be provided with upward hook (509.2), the rear end of the draw bar (509.1) is provided with upward pushing block (509.3), It is provided with longitudinal hollow part among the leading portion of the draw bar (509.1), an oscillating rod is provided in the hollow part (509.4), the main body of the draw bar (509.1) at the middle part and hollow part two sides of the oscillating rod (509.4) is hinged, oscillating rod (509.4) upper end is provided with a forward gripper jaw (509.5), the lower end of oscillating rod (509.4) and traction gripper cylinder (510) telescopic end is hinged.
7. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 1, it is characterised in that the receipts Material device (6) includes intermediate longitudinally arranged rewinding runner (601), and the front end of rewinding runner (601) connects leading stream road (602), being fixedly arranged above rewinding box (603) in the middle part of the rewinding runner (601), the lower section at left and right sides of rewinding box (603) It is provided with the hoisting mechanism (604) for semiconductor plastic package band (8) lifting power.
8. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 7, it is characterised in that described to mention Rising mechanism (604) includes hoisting mechanism support frame (604.1), is provided with vertical mention on the outside of hoisting mechanism support frame (604.1) It rises mechanism track (604.2), is provided with hoisting mechanism sliding block (604.3) on hoisting mechanism track (604.2), two of left side mention Rise the lifting plate that a longitudinal direction is respectively arranged on two hoisting mechanism sliding blocks (604.3) on mechanism sliding block (604.3) and right side (604.4), the middle part of the lifting plate (604.4) connects the telescopic end of a upward hoisting mechanism cylinder (604.5), mentions The lower end for rising mechanism cylinder (604.5) is fixed on rack (1), inside front ends, middle section and the rear end of the lifting plate (604.4) It is respectively arranged with preceding lift lever, middle lift lever and rear lift lever laterally inwardly, the preceding lift lever and rear lift lever are rectangle Bar, the leading portion and back segment of the lifting plate (604.4) are respectively arranged with one group of unidirectional feeding distribution mechanism (605), the unidirectional sub-material Mechanism (605) includes feeding distribution mechanism support (605.1), and the feeding distribution mechanism support (605.1) is fixed on lifting plate (604.4) Upper surface is hinged with cutting plate (605.3) laterally inwardly by pin shaft (605.2) on feeding distribution mechanism support (605.1), is located at A supporting block (605.4) is provided on the feeding distribution mechanism support (605.1) of the underface of cutting plate (605.3) inner segment.
9. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 7, it is characterised in that the receipts Magazine (603) includes the corner post (603.1) of four 90 degree of flangings positioned at quadrangle, between two corner posts (603.1) in front Upper section is connected with preceding connecting plate (603.2), and upper section is connected with rear connecting plate (603.3) between two corner posts (603.1) at rear, The medial surface of preceding connecting plate (603.2) and rear connecting plate (603.3) is provided with photoelectric sensor, the corner post (603.1) Lower section is respectively arranged with the notch for hoisting mechanism (604) movement with right side to the left.
10. a kind of semiconductor plastic package band high-voltage isulation test macro according to claim 1, it is characterised in that described useless Material collection device (7) is located in the rack (1) at material collecting device (6) rear, and the waste material collection device (7) includes garbage collection frame (701), garbage collection frame (701) is set on rack (1), is provided with waste material guide plate (702) in garbage collection frame (701).
CN201820541477.4U 2018-04-16 2018-04-16 Semiconductor plastic package band high-voltage isulation test macro Active CN208527358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820541477.4U CN208527358U (en) 2018-04-16 2018-04-16 Semiconductor plastic package band high-voltage isulation test macro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820541477.4U CN208527358U (en) 2018-04-16 2018-04-16 Semiconductor plastic package band high-voltage isulation test macro

Publications (1)

Publication Number Publication Date
CN208527358U true CN208527358U (en) 2019-02-22

Family

ID=65396060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820541477.4U Active CN208527358U (en) 2018-04-16 2018-04-16 Semiconductor plastic package band high-voltage isulation test macro

Country Status (1)

Country Link
CN (1) CN208527358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108655018A (en) * 2018-04-16 2018-10-16 江阴新基电子设备有限公司 System and its test method are tested in semiconductor plastic package band high-voltage isulation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108655018A (en) * 2018-04-16 2018-10-16 江阴新基电子设备有限公司 System and its test method are tested in semiconductor plastic package band high-voltage isulation
CN108655018B (en) * 2018-04-16 2023-08-04 江阴新基电子设备有限公司 Semiconductor plastic seal strip high-voltage insulation test system

Similar Documents

Publication Publication Date Title
CN205732024U (en) LED support automatic detecting machine cutting agency
CN104332439B (en) A kind of wafer disk pusher
CN108655018A (en) System and its test method are tested in semiconductor plastic package band high-voltage isulation
CN208527358U (en) Semiconductor plastic package band high-voltage isulation test macro
CN208527359U (en) Semiconductor plastic package band high-voltage isulation test macro traction device
CN208527357U (en) Semiconductor plastic package band high-voltage isulation test system and test device
CN208527360U (en) Semiconductor plastic package band high-voltage isulation test macro material collecting device
CN113998457B (en) Multi-chip detection system
CN106006394B (en) A kind of feeding device of door of elevator
CN108594087A (en) System material collecting device and its rewinding method are tested in semiconductor plastic package band high-voltage isulation
CN205873708U (en) Loading attachment of elevator door plant
CN206067035U (en) A kind of paper foot labelling machine
CN108655017A (en) Semiconductor plastic package band high-voltage isulation test system and test device and its test method
CN108655016A (en) System draft gear and its traction method are tested in semiconductor plastic package band high-voltage isulation
CN209205823U (en) A kind of online test machine of parallel organization enhancing
CN208471031U (en) A kind of full-automatic LCD feeder
CN207655517U (en) A kind of Automatic sieve material device
CN205327582U (en) Mechanism of automatic blank pressing and removal can realize
CN213735800U (en) Automatic box filling machine
CN107840144A (en) A kind of material collecting device of photovoltaic junction box component
CN208560985U (en) Automatic blank arranging machine suitable for assembly line
CN211881434U (en) Automatic grid frame machine and supporting device under edible mushroom package fungus stick
CN204689111U (en) The reclaimer system of toothbrush glue-injection machine
CN209618320U (en) Automatic putting pallet apparatus
CN203306728U (en) Automatic lug conveyor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant