CN208347290U CN201820552251.4U CN201820552251U CN208347290U CN 208347290 U CN208347290 U CN 208347290U CN 201820552251 U CN201820552251 U CN 201820552251U CN 208347290 U CN208347290 U CN 208347290U
Authority
CN
China
Prior art keywords
climbing
wall
frame group
construction safety
group frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820552251.4U
Other languages
Chinese (zh)
Inventor
邱训琪
姚建南
郭东东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Lian Yao Construction Equipment Co Ltd
Original Assignee
Jiangsu Lian Yao Construction Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Lian Yao Construction Equipment Co Ltd filed Critical Jiangsu Lian Yao Construction Equipment Co Ltd
Priority to CN201820552251.4U priority Critical patent/CN208347290U/en
Application granted granted Critical
Publication of CN208347290U publication Critical patent/CN208347290U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

A kind of construction safety of the utility model protects climbing scaffold system, including climbing frame group frame, attached wall hoisting mechanism and Anti-inclining mechanism, the attached wall hoisting mechanism includes the motor for being vertically connected to the spur rack of wall (1) and being set on the climbing frame group frame, the output shaft of the motor is sequentially connected with gear, which engages with the spur rack;The Anti-inclining mechanism includes the guide groove for being connected to the directive wheel of wall and being vertically arranged on climbing frame group frame, the directive wheel is placed in the guide groove and the edge of directive wheel and the two sides inner wall of the guide groove are tangent, so that the climbing frame group frame invests surface of wall and vertically movable in surface of wall under the driving of the attached wall hoisting mechanism under the drawing of directive wheel.The utility model is driven using Rack and pinion mechanism, it can be achieved that climbing frame group frame promotes climbing frame that speed is promoted compared to existing electric block faster in the automatic lifting of wall arbitrary height position.

Description

A kind of construction safety protection climbing scaffold system
Technical field
The utility model relates to construction equipment field, specifically a kind of construction multifunctional safety protection climbing frame system System.
Background technique
Construction climbing frame is adopted with its advantage for saving steel by more and more construction sites, and substituted tradition is successively The trend for the scaffold built.Existing construction climbing frame is mostly based on electric block vertical-lift, exists and promotes speed slowly, automatically The problems such as changing low efficiency, and do not have corresponding function of safety protection, such as on-site supervision, fire defence, multicomputer clustered control Deng.
Summary of the invention
It is climbed in view of the above-mentioned problems of the prior art, the utility model provides a kind of construction multifunctional safety protection Frame system, is specifically realized by the following technical scheme:
A kind of construction safety protection climbing scaffold system, including climbing frame group frame, attached wall hoisting mechanism and Anti-inclining mechanism, The attached wall hoisting mechanism includes the motor for being vertically connected to the spur rack of wall (1) and being set on the climbing frame group frame, The output shaft of the motor is sequentially connected with gear, which engages with the spur rack;The Anti-inclining mechanism includes connection Directive wheel in wall and the guide groove that is vertically arranged on climbing frame group frame, the directive wheel be placed in the guide groove and The edge of directive wheel and the two sides inner wall of the guide groove are tangent, so that the climbing frame group frame invests under the drawing of directive wheel Surface of wall and vertically movable in surface of wall under the driving of the attached wall hoisting mechanism.
The construction safety protects climbing scaffold system, and further design is, if the wall is fixedly installed Dry guide rail bearing (2) is vertically connected with channel steel (8) on the guide rail bearing, and the spur rack is fixedly connected on the channel steel, from And the spur rack is made vertically to be connected to wall.
The construction safety protects climbing scaffold system, and further design is, the motor is phase asynchronous electricity Motivation, the turbine and worm retarder (12) and the gear which is fixedly installed on climbing frame group frame via one are drivingly connected.
The construction safety protects climbing scaffold system, and further design is that the bottom of the climbing frame group frame is set It is equipped with the fixed frame (14) for fixed turbine worm reducer (12).
The construction safety protects climbing scaffold system, and further design is, the side of the climbing frame group frame is perpendicular To be distributed with several horizontal directions protrusion anti-fall piece, the wall has been rotatably coupled several anti-fall block pieces, described Its upper side contradicts anti-fall piece of the downside or described anti-fall piece of disengaging when anti-fall block piece rotates.
The construction safety protects climbing scaffold system, and further design is, the side of the climbing frame group frame is vertical To being connected with channel steel component (19), the channel steel component forms the guide groove.
The construction safety protects climbing scaffold system, and further design is that the climbing frame group frame is fixedly connected There is rotary head, is provided with camera on the rotary head.
The construction safety protects climbing scaffold system, and further design is, the installation at the top of climbing frame group frame (4) There are smoke sensor device (6).
The construction safety protects climbing scaffold system, and further design is, is fixedly mounted on climbing frame group frame (4) Have fire extinguisher canvas hose (26), the water outlet of the fire extinguisher canvas hose (26) is provided with flat mouth spray head (25), the middle part concatenation of fire extinguisher canvas hose There is electrical ball valve.
The construction safety protects climbing scaffold system, and further design is, is provided on the climbing frame group frame Wireless signal transmitting and reception device.
The utility model has the beneficial effects that:
Compared with prior art, the utility model uses Rack and pinion mechanism, worm type of reduction gearing, phase asynchronous electricity The mode that motivation is combined with frequency converter passes through nibbling for the gear that is fixed on climbing frame group frame and the spur rack that is fixed on wall Transmission is closed, the driving through frequency converter, threephase asynchronous and worm type of reduction gearing is, it can be achieved that climbing frame group frame is any in wall The automatic lifting of height and position promotes climbing frame that speed is promoted compared to existing electric block faster;The turbine and worm of use subtracts Fast device has the function of to cut off self-lock, and can prevent car slipping under power blackout situation from falling;Anti-fall block piece is bonded with anti-fall piece, it is ensured that Climbing frame group frame does not fall when in use;The frequency converter of the driving threephase asynchronous has braking resistor and dynamic brake Function, it is ensured that climbing frame group frame does not fall in lifting process;In addition, the multifunctional safety protection climbing frame system that this technology proposes System also has far field vision monitoring function, and the long-range monitoring of construction site may be implemented;It is remotely monitored with smog and alarm function Can, the monitoring in advance of live fire hazard may be implemented;With remote auto spraying function, it can be achieved that the elimination of live fire, And effective barrier of floor gap fire, fire disasters protection safe coefficient are higher;Have the remote cluster control of each climbing frame group frame, from Dynamicization and visuality are more preferable.Thus, it is possible to greatly improve the working efficiency and safe coefficient of construction site.
Detailed description of the invention
Fig. 1 is the stereoscopic schematic diagram of the utility model.
Fig. 2 is the attached wall hoisting mechanism partial enlarged view of Fig. 1.
Fig. 3 is that the attached wall of Fig. 1 is anti-fall with Anti-inclining mechanism partial enlarged view.
Fig. 4 is the vision monitoring apparatus partial enlarged view of Fig. 1.
Fig. 5 is the smog alarm and automatic fire prevention device partial enlarged view of Fig. 1.
In figure: 1- wall, 2- guide rail bearing, 3- attached wall hoisting mechanism, 4- climbing frame group frame, 5- Anti-inclining mechanism, 6- smog Sensor, 7- camera, 8- channel steel, 9- spur rack, 10- gear, 11- shaft coupling, 12- worm type of reduction gearing, 13- tri- are different Motor is walked, 14- fixed frame, 15- wall-attached supporting seat, 16- adjusting screw rod, the anti-fall block piece of 17-, 18- is anti-fall fast, 19- channel steel, 20- Link block, 21- directive wheel, 22- attached wall baffle, 23- through-wall bolt, 24- holder, 25- flat mouth spray head, 26- fire extinguisher canvas hose.
Specific embodiment
The utility model is described in further detail below.
Construction safety as shown in Figures 1 to 5 protect climbing scaffold system, including climbing frame group frame, attached wall hoisting mechanism with And Anti-inclining mechanism, the attached wall hoisting mechanism include vertically being connected to the spur rack of wall 1 and being set to the climbing frame group The output shaft of motor on frame, the motor is sequentially connected with gear, which engages with the spur rack;Specifically, institute It states wall and is fixedly installed several guide rail bearings 2, channel steel 8 is vertically connected on the guide rail bearing, the spur rack 9 is fixed to be connected It is connected to the channel steel 8, so that the spur rack is vertically connected to wall.
The Anti-inclining mechanism includes the guiding for being connected to the directive wheel 21 of wall and being vertically arranged on climbing frame group frame Slot, the directive wheel is placed in the guide groove and the edge of directive wheel and the two sides inner wall of the guide groove are tangent, thus The climbing frame group frame invests surface of wall under the drawing of directive wheel and can erect under the driving of the attached wall hoisting mechanism To being displaced into surface of wall.Specifically, the side of the climbing frame group frame is longitudinally connected with channel steel component 19 by link block 20, Channel steel component forms the guide groove, and the directive wheel 21 is connected on wall-attached supporting seat 15, and wall-attached supporting seat 15 is then by attached Wall baffle 22 is fixedly connected on wall.
Attached wall hoisting mechanism 3 two are one group, in practical applications in order to ensure lifting process is stablized, on climbing frame group frame Multiple groups are provided with, each group attached wall hoisting mechanism is respectively symmetrically installed on the two sides of climbing frame group frame 4;Spur rack 9 is respectively symmetrically pacified Two sides loaded on channel steel 8 engage gear 10 with the spur rack 9 of the two sides of channel steel 8 respectively;Motor specifically uses transducer drive Threephase asynchronous 13.The turbine and worm retarder 12 and the gear that the motor is fixedly installed on climbing frame group frame via one drive Dynamic connection, the bottom of the climbing frame group frame is provided with the fixed frame 14 for fixed turbine worm reducer 12.
Anti-fall piece 18 of several horizontal directions protrusion is vertically distributed in the side of the climbing frame group frame, and the wall can turn Be connected with several anti-fall block pieces 17 dynamicly, when the anti-fall block piece rotates its upper side contradict anti-fall piece of the downside or Person is detached from described anti-fall piece.Specifically, being fixedly installed in attached wall on wall 1 by through-wall bolt 23 and attached wall baffle 22 Support 15 is fixedly installed on wall-attached supporting seat 15 by screw rod and adjusts screw rod 16, anti-fall block piece 17 is connected to by screw pair Adjust screw rod 16, thus anti-fall block piece 17 by screw pair on adjusting screw 16 rotate when can with screw pair rise or under Drop, so that climbing frame group frame and anti-fall piece are at various height, anti-fall block piece 17 can offset with corresponding anti-fall piece.
The climbing frame group frame is fixedly connected with rotary head 24, and camera 7 is provided on the rotary head.Climbing frame group frame 4 tops are equipped with smoke sensor device 6.Fire extinguisher canvas hose 26, the water outlet of the fire extinguisher canvas hose 26 are fixedly installed on climbing frame group frame 4 End is provided with flat mouth spray head 25, is serially connected with electrical ball valve in the middle part of fire extinguisher canvas hose;And wireless signal is provided on climbing frame group frame Transmitting and reception device.
Smoke sensor device drives electrical ball valve to open automatically when detecting certain density smog value, so that flat mouth spray head 25 Water spray;Flat mouth spray head 25 is installed on fire extinguisher canvas hose 26 according to the opening direction and constant spacing cross-distribution of flat mouth, big to realize Area sprinkling fire.

Claims (10)

1. a kind of construction safety protects climbing scaffold system, which is characterized in that including climbing frame group frame, attached wall hoisting mechanism and prevent Leaning device, the attached wall hoisting mechanism include vertically being connected to the spur rack of wall 1 and being set on the climbing frame group frame Motor, the output shaft of the motor is sequentially connected with gear, which engages with the spur rack;Anti-inclining mechanism packet The guide groove for including the directive wheel for being connected to wall and being vertically arranged on climbing frame group frame, the directive wheel are placed in the guide groove The two sides inner wall at interior and directive wheel edge and the guide groove is tangent, thus the climbing frame group frame directive wheel drawing it Under invest surface of wall and vertically movable in surface of wall under the driving of the attached wall hoisting mechanism.
2. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the wall fixed setting There are several guide rail bearings, channel steel is vertically connected on the guide rail bearing, the spur rack is fixedly connected on the channel steel, thus So that the spur rack is vertically connected to wall.
3. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the motor is three different Motor is walked, the turbine and worm retarder and the gear which is fixedly installed on climbing frame group frame via one are drivingly connected.
4. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the bottom of the climbing frame group frame Portion is provided with the fixed frame for fixed turbine worm reducer.
5. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the side of the climbing frame group frame Anti-fall piece of several horizontal directions protrusion is vertically distributed in side, and the wall has been rotatably coupled several anti-fall block pieces, Its upper side contradicts anti-fall piece of the downside or described anti-fall piece of disengaging when the anti-fall block piece rotates.
6. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the side of the climbing frame group frame While being longitudinally connected with channel steel component, the channel steel component forms the guide groove.
7. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the climbing frame group frame is fixed It is connected with rotary head, is provided with camera on the rotary head.
8. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that the peace of climbing frame group arch Equipped with smoke sensor device.
9. construction safety according to claim 1 protects climbing scaffold system, which is characterized in that fixed peace on climbing frame group frame Equipped with fire extinguisher canvas hose, the water outlet of the fire extinguisher canvas hose is provided with flat mouth spray head, is serially connected with electrical ball valve in the middle part of fire extinguisher canvas hose.
10. construction safety described in -9 any one protects climbing scaffold system according to claim 1, which is characterized in that described Wireless signal transmitting and reception device are provided on climbing frame group frame.
CN201820552251.4U 2018-04-18 2018-04-18 A kind of construction safety protection climbing scaffold system Active CN208347290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820552251.4U CN208347290U (en) 2018-04-18 2018-04-18 A kind of construction safety protection climbing scaffold system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820552251.4U CN208347290U (en) 2018-04-18 2018-04-18 A kind of construction safety protection climbing scaffold system

Publications (1)

Publication Number Publication Date
CN208347290U true CN208347290U (en) 2019-01-08

Family

ID=64886613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820552251.4U Active CN208347290U (en) 2018-04-18 2018-04-18 A kind of construction safety protection climbing scaffold system

Country Status (1)

Country Link
CN (1) CN208347290U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111270847A (en) * 2020-03-20 2020-06-12 福建鸿翔建筑模板有限公司 Driving device and building outer frame
CN112482735A (en) * 2020-11-03 2021-03-12 吴忠仁 Wind-resistant all-steel climbing frame
CN114232969A (en) * 2021-12-22 2022-03-25 尚珍珍 Building construction protection frame

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111270847A (en) * 2020-03-20 2020-06-12 福建鸿翔建筑模板有限公司 Driving device and building outer frame
CN112482735A (en) * 2020-11-03 2021-03-12 吴忠仁 Wind-resistant all-steel climbing frame
CN114232969A (en) * 2021-12-22 2022-03-25 尚珍珍 Building construction protection frame
CN114232969B (en) * 2021-12-22 2023-12-29 丽水市卓越建设有限公司 Building construction protection frame

Similar Documents

Publication Publication Date Title
CN208347290U (en) A kind of construction safety protection climbing scaffold system
CN201991276U (en) Vertical elevating garage with multi-row parking space carrier and traversing mechanism
CN102943609B (en) High-rise self-rescue escape window
CN1994844A (en) Lifting operation method and apparatus for mounting guide rail on outer wall of architecture
CN104860161B (en) Intelligent and safe jacking equipment
CN106976769A (en) A kind of building hoist automatic leveling method
CN201186113Y (en) Remote-control track type device for rescuing from high building
CN103599598B (en) A kind of device for rescuing from storied house
CN105460743A (en) Climbing robot
CN108283764B (en) Ring building rescue escape device
CN203008698U (en) Self-help escape window for high buildings
CN111145483A (en) Intelligent flame detection system for large oil-filled equipment for transformer substation
CN219491804U (en) Building outer wall face movable functional platform
CN202401943U (en) Movable heat-insulation shutter sunshade device
CN104912446A (en) Tall building self rescue escape window
CN107096138A (en) Intelligent controller for high-rise residential refuge device and working method thereof
CN111959796B (en) Parachuting training equipment and parachuting training method using same
CN211576283U (en) Hydraulic engineering water level monitoring device
CN211314025U (en) Dedicated rolling slats door of robot patrols and examines
CN203742430U (en) High-rise intelligent movable escape scaling ladder based on single chip microcomputer control
CN220989436U (en) Novel full-automatic safety anti-falling device control system
CN203620106U (en) Tall building life escape device
CN205472138U (en) Car safety device of elevator
CN215268532U (en) Intelligent monitoring equipment for intelligent building
CN103726782B (en) Intelligent movable high-rise escape scaling ladder based on singlechip control

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A safety protection climbing frame system for building construction

Effective date of registration: 20220607

Granted publication date: 20190108

Pledgee: Jiangsu Nantong Rural Commercial Bank Co.,Ltd. high tech Zone sub branch

Pledgor: JIANGSU LIANYAO CONSTRUCTION EQUIPMENT Co.,Ltd.

Registration number: Y2022320010203

PE01 Entry into force of the registration of the contract for pledge of patent right