CN207918273U - A kind of subway is total to pole door type truss combined hanging and sets - Google Patents

A kind of subway is total to pole door type truss combined hanging and sets Download PDF

Info

Publication number
CN207918273U
CN207918273U CN201721829084.5U CN201721829084U CN207918273U CN 207918273 U CN207918273 U CN 207918273U CN 201721829084 U CN201721829084 U CN 201721829084U CN 207918273 U CN207918273 U CN 207918273U
Authority
CN
China
Prior art keywords
crane system
girder
supporting leg
guide rail
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721829084.5U
Other languages
Chinese (zh)
Inventor
吕永胜
张玄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
CCCC SHEC Third Highway Engineering Co Ltd
Original Assignee
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU filed Critical THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority to CN201721829084.5U priority Critical patent/CN207918273U/en
Application granted granted Critical
Publication of CN207918273U publication Critical patent/CN207918273U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of subway of the utility model offer is total to pole door type truss combined hanging and sets, including truss crane system and combination crane system, the truss crane system includes supporting leg I, girder I, walking beam I, the guide rail II being layed on girder I, the guide rail I being layed on walking beam I, the anti-pendulum cross in longitudinal direction being arranged on supporting leg I, trolley and operating room, the combination crane system includes the bracket being fixed on supporting leg I, the walking beam II being fixed on bracket, the guide rail III being layed on walking beam II, the girder II being laterally arranged, top end transverse member trolley and the electric block being arranged on girder II, the supporting leg II of II other end of support girder, ground beam trolley, foundation beam and the guide rail IV being arranged on foundation beam.Truss crane system is combined crane system by the utility model innovation with gantry crane system in combination at total pole door type truss, is reduced the horizontal carrying amount of worker, is improved the processing efficiency of reinforcing bar and steel construction piece, reduce truck crane lease expenses.

Description

A kind of subway is total to pole door type truss combined hanging and sets
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a kind of subway of tunnel shaft construction is total to pole door type truss Combined hanging is set.
Background technology
Subway tunnel Construction of Silo place is generally more narrow, after installing the truss for being used for vertical lifting and hanging, without field Ground condition installs gantry crane again.Horizontal transport in reinforcing bar and steel construction piece process relies primarily on artificial or rents vapour temporarily Vehicle is hung, and utilization rate of equipment and installations is low, labor intensity is big, processing efficiency is low, and machinery rental is costly.
Invention content
It is total to pole door type truss combined hanging the purpose of this utility model is to provide a kind of subway and sets, to solve the prior art In caused the above-mentioned defects.
The technical solution of the utility model is:A kind of subway is total to pole door type truss combined hanging and sets, including truss crane system With combination crane system, the truss crane system has included the supporting leg I of support function, the girder I being laterally laid on supporting leg I, has indulged To laying walking beam I, be layed on girder I guide rail II, be layed on walking beam I guide rail I, be arranged on supporting leg I Longitudinal anti-pendulum cross, trolley and operating room, the combination crane system includes the bracket being fixed on supporting leg I, fixation Walking beam II on bracket, the girder II being laterally arranged, is arranged on girder II guide rail III being layed on walking beam II Top end transverse member trolley and electric block, the supporting leg II of II other end of support girder, ground beam trolley, foundation beam and be arranged on basis Guide rail IV on beam.
Further, the combination crane system shares supporting leg I to scheme with truss crane system, and combination crane system is arranged in truss On the inside of crane system.
Further, II one end of the girder is connect scheme with supporting leg II, ground beam trolley, walks in the guide rail on foundation beam IV, II other end of girder is connect with top end transverse member trolley, walks in the guide rail III on walking beam II.
Further, the bracket is welded scheme by steel plate I, steel plate II and steel plate III, is welded in truss crane system Supporting leg I on.
The utility model has the advantages that:The utility model innovation by truss crane system and gantry crane system in combination Cheng Gongzhu Gate-type truss combines crane system, and pole door type truss combination crane system girder one end is connect with top end transverse member trolley altogether, walks in walking On guide rail III on beam II, walking beam II, which is fixed on, to be welded at the top of the bracket that truss is hung on supporting leg I.In narrow site condition Under, constitute vertical shaft vertical lifting system and ground processing space horizontal transport and Lift-on/Lift-off System.After the equipment investment use, reduce The horizontal carrying amount of worker, improves the processing efficiency of reinforcing bar and steel construction piece, reduces truck crane lease expenses.
Description of the drawings
Fig. 1 is the utility model structural front view.
Fig. 2 is the utility model structural side view.
Fig. 3 is the partial enlargement structural representation of bracket part in Fig. 1.
Wherein:1, supporting leg I, 2, walking beam I, 3, guide rail I, 4, girder I, 5, guide rail II, 6, trolley, 7, operating room, 8, bracket, 9, walking beam II, 10, guide rail III, 11, ground beam trolley 12, supporting leg II, 13, girder II, 14, top end transverse member trolley, 15, Electric block, 16, longitudinal anti-pendulum cross, 17, steel plate I, 18, steel plate II, 19, steel plate III.
Specific implementation mode
Clearly complete description is done to the utility model below in conjunction with the accompanying drawings, so that those skilled in the art is not needing Under conditions of making creative work, it can fully implement the utility model.
Specific embodiment of the present utility model is:As shown in Figure 1, 2, a kind of subway is total to pole door type truss combined hanging It sets, including truss crane system and combination crane system, the truss crane system has included the supporting leg I of support function(1), laterally be laid with In supporting leg I(1)On girder I(4), the longitudinal walking beam I that is laid with(2), be layed in girder I(4)On guide rail II(5), be laid with In walking beam I(2)On guide rail I(3), be arranged in supporting leg I(1)On the anti-pendulum cross in longitudinal direction(16), trolley(6)And Operating room(7), the combination crane system includes being fixed on supporting leg I(1)On bracket(8), be fixed on bracket(8)On walking Beam II(9), be layed in walking beam II(9)On guide rail III(10), the lateral girder II that is arranged(13), be arranged in girder II(13) On top end transverse member trolley(14)And electric block(15), support girder II(13)The supporting leg II of the other end(12), ground beam trolley (11), foundation beam and the guide rail IV being arranged on foundation beam.
Further, the combination crane system shares supporting leg I with truss crane system(1), combination crane system setting is in truss On the inside of crane system.
Further, the girder II(13)One end and supporting leg II(12), ground beam trolley(11)Connection, walks in foundation beam On guide rail IV, girder II(13)The other end and top end transverse member trolley(14)Connection, walks in walking beam II(9)On guide rail III (10).
As shown in figure 3, the bracket(8)By steel plate I(17), steel plate II(18)With steel plate III(19)It is welded, welds In the supporting leg I of truss crane system(1)On.
The preferred embodiment of the utility model is described above, it should be pointed out that the utility model not office It is limited to above-mentioned particular implementation, wherein the equipment and structure be not described in detail to the greatest extent are construed as with the common side in this field Formula is practiced;Any technical person familiar with the field, in the case where not departing from technical solutions of the utility model ambit, foundation The technical essence of the utility model any simple modifications, equivalents, and modifications made to the above embodiment still fall within this In the range of the protection of utility model technical solution.

Claims (4)

1. a kind of subway is total to pole door type truss combined hanging and sets, which is characterized in that including truss crane system and combination crane system, institute State supporting leg I that truss crane system has included support function, the girder I being laterally laid on supporting leg I, the walking beam I being longitudinally laid with, The guide rail II that is layed on girder I, the anti-pendulum cross in longitudinal direction being arranged on supporting leg I, rises the guide rail I being layed on walking beam I Weight trolley and operating room, the combination crane system includes the bracket being fixed on supporting leg I, the walking beam that is fixed on bracket II, the guide rail III that is layed on walking beam II, the girder II being laterally arranged, the top end transverse member trolley being arranged on girder II and electronic Cucurbit, the supporting leg II of II other end of support girder, ground beam trolley, foundation beam and the guide rail IV being arranged on foundation beam.
2. a kind of subway according to claim 1 is total to pole door type truss combined hanging and sets, which is characterized in that the combination is hung System shares supporting leg I with truss crane system, and combination crane system is arranged on the inside of truss crane system.
3. a kind of subway according to claim 2 is total to pole door type truss combined hanging and sets, which is characterized in that the girder II One end is connect with supporting leg II, ground beam trolley, walks in the guide rail IV on foundation beam, and II other end of girder connects with top end transverse member trolley It connects, walks in the guide rail III on walking beam II.
4. a kind of subway according to claim 3 is total to pole door type truss combined hanging and sets, which is characterized in that the bracket by Steel plate I, steel plate II and steel plate III are welded, and are welded on the supporting leg I of truss crane system.
CN201721829084.5U 2017-12-25 2017-12-25 A kind of subway is total to pole door type truss combined hanging and sets Active CN207918273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721829084.5U CN207918273U (en) 2017-12-25 2017-12-25 A kind of subway is total to pole door type truss combined hanging and sets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721829084.5U CN207918273U (en) 2017-12-25 2017-12-25 A kind of subway is total to pole door type truss combined hanging and sets

Publications (1)

Publication Number Publication Date
CN207918273U true CN207918273U (en) 2018-09-28

Family

ID=63607665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721829084.5U Active CN207918273U (en) 2017-12-25 2017-12-25 A kind of subway is total to pole door type truss combined hanging and sets

Country Status (1)

Country Link
CN (1) CN207918273U (en)

Similar Documents

Publication Publication Date Title
CN103244151B (en) Tunnel arch multifunctional supporting chassis
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN204851302U (en) Underground mine large -span chamber crane beam stock fixed structure
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN207918273U (en) A kind of subway is total to pole door type truss combined hanging and sets
CN206692230U (en) A kind of skyscraper row is hung
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN107620317A (en) Piping lane construction foundation pit supporting supporting device
CN202899639U (en) Concrete column structure
CN203285458U (en) Multifunctional supporting trolley of tunnel arch center
CN201722937U (en) Sliding platform for installation of net rack
CN206174482U (en) Outsourcing concrete ring beam reinforcing bar integral erection device of no bracket steel -pipe column
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN204825924U (en) Square steel tube concrete waist rail
CN106437047B (en) A kind of equipment transported for factory building roof plate with installing
CN205367533U (en) Agricultural hoist device convenient to remove
CN205135656U (en) Modular two lining platform trucks of multipurpose
CN203923923U (en) High pier steel truss girder sets up gate-type lifting station
CN202369932U (en) Bridge curtain board installation trolley
CN205204733U (en) Sunshade installation platform truck
CN206189271U (en) Wave form steel abdomen slab bridge roof beam hoist device
CN106836019B (en) Adjustable large-scale component hanging apparatus for bridge strengthening repair
CN206917297U (en) A kind of large-span steel girder upper air installing system in place
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment
CN206128656U (en) A instrument for transporting installation roof boarding