CN206128656U - A instrument for transporting installation roof boarding - Google Patents

A instrument for transporting installation roof boarding Download PDF

Info

Publication number
CN206128656U
CN206128656U CN201620773711.7U CN201620773711U CN206128656U CN 206128656 U CN206128656 U CN 206128656U CN 201620773711 U CN201620773711 U CN 201620773711U CN 206128656 U CN206128656 U CN 206128656U
Authority
CN
China
Prior art keywords
vertical rod
bearing
instrument
cross bar
roof boarding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620773711.7U
Other languages
Chinese (zh)
Inventor
赵敏捷
董燕囡
刘奎
都永波
杨航
张素平
刘英营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of CTCE Group
Original Assignee
Construction Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of CTCE Group filed Critical Construction Engineering Co Ltd of CTCE Group
Priority to CN201620773711.7U priority Critical patent/CN206128656U/en
Application granted granted Critical
Publication of CN206128656U publication Critical patent/CN206128656U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Problem to the roof boarding installation, the utility model provides an instrument for transporting installation roof boarding which comprises support, wheel, pole setting, bracing, horizontal pole and the jack. Wherein, be equipped with the wheel in the bottom of support. Top at the support is equipped with the pole setting. Be equipped with the bracing between 1 in pole setting and support. Top in the pole setting is equipped with the horizontal pole. One end at the horizontal pole is equipped with the jack. Be used for lifting by crane building material through the jack. Profitable technological effect: the utility model discloses stable in structure simple and practical, easily dismantlement, convenient to use, reduce installer labour simultaneously, reduced the safe risk scheduling problem in the installer installation.

Description

For the instrument that roof boarding is installed in transport
Technical field
The utility model belongs to Architectural Equipment technical field, and in particular to for the instrument that roof boarding is installed in transport.
Background technology
With the fast development of urban track traffic, newly-built a large amount of rolling stock sections make regular check on maintenance for train, due to car Section area is larger, and light-duty swollen masonry building panel is adopted building roof more, because it has design, application, installs and compare easily Feature and it is applied widely the characteristics of, therefore suffer from the popular welcome of building field.
But, at present conventional roof boarding hanging method is:Roof boarding is lifted to installation roofing using crane On, then to be transported to mount point using flat car or small handcart, then a dead lift installation, its defect mainly has following side Face:
1st, lift to roofing, need manually to carry out being carried on flat car or small handcart, roof boarding is weighed about per block 300kg, needs 4 workers carries, lavishes labor on.
2nd, need manually to unload to mount point to designated mounting point in transport, workman needs to stand on girder steel, exists larger Security risk.
3rd, in installation process, need to adjust roof boarding installation site, using manual adjustment, more difficultly, and exist larger Security risk.
Utility model content
For the problems referred to above, the utility model provides the instrument for installing roof boarding for transport, by the utility model, carries High installation personnel transport material, mounting material efficiency in roof boarding installation process, and increase installation personnel safety guarantee.This Utility model is specific as follows:
For transporting the instrument for installing roof boarding, including bearing 1, wheel 2, vertical rod 3, diagonal brace 4, cross bar 5 and jack 6.Its In,
Wheel 2 is provided with the bottom of bearing 1.
Vertical rod 3 is provided with the top of bearing 1.Diagonal brace 4 is provided between vertical rod 3 and bearing 1.
Cross bar 5 is provided with the top of vertical rod 3.Jack 6 is provided with one end of cross bar 5.It is used to lift by crane Building wood by jack 6 Material 8.
Beneficial technique effect
The utility model Stability Analysis of Structures is simple and practical, be readily disassembled, it is easy to use, while reducing installation personnel work Power, reduce installation personnel installation process in security risk the problems such as.
1st, Stability Analysis of Structures of the present utility model, fastness is strong, and has certain gravity energy to prevent from toppling.
2nd, after using the utility model, installation personnel can be lifted by crane in work progress all of machinery, save big Amount labour.
3rd, in traditional installation process, non-installation region only has girder steel, is unfavorable for that installation personnel is stood and operated, this reality With it is new roof boarding can be mounted directly in place after, workmen goes forward to be operated again, reduce installation personnel during peace Full blast danger.
Description of the drawings
Fig. 1 is schematic perspective view of the present utility model.
Fig. 2 is the front view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the structural representation of bearing 1 in FIG.
Fig. 5 is to be provided with the schematic diagram of guide rail 9 in the bottom of structure shown in Fig. 2.
Specific embodiment
Design feature of the present utility model is described in detail in conjunction with accompanying drawing.
Referring to Fig. 1,2 and 3, for transporting the instrument for installing roof boarding, including bearing 1, wheel 2, vertical rod 3, diagonal brace 4, horizontal stroke Bar 5 and jack 6.Wherein,
Wheel 2 is provided with the bottom of bearing 1.
Vertical rod 3 is provided with the top of bearing 1.Diagonal brace 4 is provided between vertical rod 3 and bearing 1.
Cross bar 5 is provided with the top of vertical rod 3.Jack 6 is provided with one end of cross bar 5.It is used to lift by crane Building wood by jack 6 Material 8.
Referring to Fig. 1 and 4, furtherly, bearing 1 is rectangular.Reinforcement is provided with the bearing 1 of rectangle.The four of bearing 1 Angle is respectively equipped with a wheel 2.The wheel 2 is simple wheels or the wheel with turning to.
Referring to Fig. 1 to 3, furtherly, three vertical rods 3 are provided with bearing 1.Three vertical rods 3 are along arranged in a straight line.
Referring to Fig. 1 and 2, furtherly, the length of three vertical rods 3 is successively decreased one by one, and the top of three vertical rods 3 is conllinear.
Referring to Fig. 1 and 4, furtherly, the length of cross bar 5 is more than 2 times of the length of bearing 1.Prolong at the two ends of cross bar 5 The outside of bearing 1 is extended, as shown in Fig. 1,2,4 and 5.
Referring to Fig. 1,2 and 4, furtherly, set between the shaft of cross bar 5 near jack 6 and the vertical rod 3 near jack 6 There is knighthead 7.
Furtherly, bearing 1 is welded by 10# channel-section steels.The material of vertical rod 3 is 10# channel-section steels.Cross bar 5 is coating steel pipe.
Referring to Fig. 1 and 4, furtherly, bearing 1 is " mouth " the character form structure part being made up of 4 channel-section steels.
Reinforcement is provided between an opposite side of bearing 1.
A vertical rod is respectively provided with being respectively arranged at the two ends with place of a vertical rod 3, i.e. reinforcement are connected with bearing 1 for reinforcement 3, a vertical rod 3 is provided with the shaft of reinforcement.The vertical rod 3 is perpendicular with bearing 1.
The length of three vertical rods 3 is successively decreased one by one, and the top of three vertical rods 3 is conllinear.According to the length of vertical rod 3 successively decrease it is suitable Sequence, three vertical rods 3 are referred to as successively the first vertical rod, the second vertical rod, the 3rd vertical rod.Order is this instrument near the side of the first vertical rod Front end, near the 3rd vertical rod side be this instrument tail end.That is the first vertical rod is arranged on one end of reinforcement, the 3rd vertical rod It is arranged on the other end of reinforcement.The second vertical rod is provided with the middle of the shaft of reinforcement.
The top of three vertical rods 3 is connected with the shaft of cross bar 5 jointly.The two ends of cross bar 5 all extend to the outer of bearing 1 Portion.
Knighthead 7 is provided between the shaft of cross bar 5 near jack 6 and the first vertical rod.
Furtherly, the four edges and reinforcement of bearing 1 are 10# channel-section steels.First vertical rod, the second vertical rod, the 3rd vertical rod It is 10# channel-section steels.Cross bar 5 is coating steel pipe.
Referring to Fig. 1 and 2, furtherly, the side for remembering the bearing 1 being connected with the first vertical rod is front channel-section steel, with the 3rd vertical rod phase The side of bearing 1 even is rear channel-section steel, then:A diagonal brace 4 is respectively provided between the two ends of front channel-section steel and the first vertical rod, it is vertical first A diagonal brace 4 is provided between bar and reinforcement.A diagonal brace 4 is respectively provided between the two ends of rear channel-section steel and the 3rd vertical rod, A diagonal brace 4 is provided between three vertical rods and reinforcement.
Furtherly, bearing 1 is the square frame that the length of side is 1.5m.The length of the first vertical rod is 1.3m, and the 3rd vertical rod 3 is 1.1m.The length of cross bar 5 is more than 6 meters.That is the length of cross bar 5 is longer than the length of bearing 1, by manually pushing down cross bar 5 Tail end, it is ensured that this instrument will not topple in handling roof boarding.
It is indeflectible wheel, as directional wheel positioned at 2 wheels 2 of this front tool.Positioned at the 2 of this instrument rear end Individual wheel 2 is the wheel with turning to.
Referring to Fig. 5, furtherly, in the lower section near wheel 2 guide rail 9 is lined with.The guide rail 9 is channel-section steel or bamboo springboard. Guide rail 9 is straight line or curve.Adopting the one side of guide rail 9 carries out guiding during handling for this instrument, it is ensured that workmen firmly carries out Direction towards correct handling direction.On the other hand, using guide rail 9 this instrument of handling roof boarding can be avoided from not weighing wounded The roof boarding completed, it is ensured that using safety.

Claims (10)

1. the instrument that roof boarding is installed in transport is used for, it is characterised in that including bearing (1), wheel (2), vertical rod (3), diagonal brace (4), cross bar (5) and jack (6);Wherein, it is provided with wheel (2) in the bottom of bearing (1);Vertical rod is provided with the top of bearing (1) (3);Diagonal brace (4) is provided between vertical rod (3) and bearing (1);Cross bar (5) is provided with the top of vertical rod (3);In cross bar (5) One end is provided with jack (6).
2. it is according to claim 1 for transport install roof boarding instrument, it is characterised in that bearing (1) is rectangular; Reinforcement is provided with the bearing (1) of rectangle;A wheel (2) is respectively equipped with the corner of bearing (1);It is provided with bearing (1) Three vertical rods (3);Three vertical rods (3) are along arranged in a straight line.
3. it is according to claim 2 for transport install roof boarding instrument, it is characterised in that the length of three vertical rods (3) Degree successively decreases one by one, and the top of three vertical rods (3) is conllinear.
4. the instrument that roof boarding is installed for transport according to claim 1, it is characterised in that the length of cross bar (5) is More than 2 times of the length of bearing (1);The two ends of cross bar (5) all extend to the outside of bearing (1).
5. the instrument that roof boarding is installed for transport according to claim 1, it is characterised in that near jack (6) Cross bar (5) shaft is provided with knighthead (7) between the vertical rod (3) of jack (6).
6. it is according to claim 1 for transport install roof boarding instrument, it is characterised in that bearing (1) is by 10# channel-section steels It is welded;The material of vertical rod (3) is 10# channel-section steels;Cross bar (5) is coating steel pipe.
7. it is according to claim 1 for transport install roof boarding instrument, it is characterised in that bearing (1) is by 4 grooves " mouth " character form structure part that steel is constituted;Reinforcement is provided between an opposite side of bearing (1);One is respectively arranged at the two ends with reinforcement Root vertical rod (3), is provided with a vertical rod (3) on reinforcement;The vertical rod (3) is perpendicular with bearing (1);
The length of three vertical rods (3) is successively decreased one by one, and the top of three vertical rods (3) is conllinear;According to vertical rod (3) length successively decrease it is suitable Sequence, three vertical rods (3) are referred to as successively the first vertical rod, the second vertical rod, the 3rd vertical rod;Order is this work near the side of the first vertical rod The front end of tool, near the tail end that the side of the 3rd vertical rod is this instrument;The top of three vertical rods (3) jointly with the bar of cross bar (5) Body is connected;The two ends of cross bar (5) all extend to the outside of bearing (1);
Knighthead (7) is provided between cross bar (5) shaft near jack (6) and the first vertical rod.
8. it is according to claim 7 for transport install roof boarding instrument, it is characterised in that the four edges of bearing (1), And reinforcement is 10# channel-section steels;First vertical rod, the second vertical rod, the 3rd vertical rod are 10# channel-section steels;Cross bar (5) is coating steel pipe;
The side of the bearing (1) that note is connected with the first vertical rod is front channel-section steel, and the side of the bearing (1) being connected with the 3rd vertical rod is pit Steel, then:A diagonal brace (4) is respectively provided between the two ends of front channel-section steel and the first vertical rod, is set between the first vertical rod and reinforcement There is a diagonal brace (4);A diagonal brace (4) is respectively provided between the two ends of rear channel-section steel and the 3rd vertical rod, in the 3rd vertical rod and reinforcement A diagonal brace (4) is provided between muscle.
9. the instrument that roof boarding is installed for transport according to claim 7, it is characterised in that bearing (1) is for the length of side The square frame of 1.5m;The length of the first vertical rod is 1.3m, and the 3rd vertical rod (3) is 1.1m;The length of cross bar (5) is more than 6 meters;
2 wheels (2) positioned at this front tool are indeflectible wheel;2 wheels (2) positioned at this instrument rear end are band The wheel of steering.
10. the instrument for installing roof boarding for transport according to claim 1 or 7, it is characterised in that near wheel (2) guide rail (9) is lined with below;The guide rail (9) is channel-section steel or bamboo springboard.
CN201620773711.7U 2016-07-21 2016-07-21 A instrument for transporting installation roof boarding Withdrawn - After Issue CN206128656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620773711.7U CN206128656U (en) 2016-07-21 2016-07-21 A instrument for transporting installation roof boarding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620773711.7U CN206128656U (en) 2016-07-21 2016-07-21 A instrument for transporting installation roof boarding

Publications (1)

Publication Number Publication Date
CN206128656U true CN206128656U (en) 2017-04-26

Family

ID=58562609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620773711.7U Withdrawn - After Issue CN206128656U (en) 2016-07-21 2016-07-21 A instrument for transporting installation roof boarding

Country Status (1)

Country Link
CN (1) CN206128656U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437047A (en) * 2016-07-21 2017-02-22 中铁四局集团建筑工程有限公司 Plant roof panel transporting and mounting equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437047A (en) * 2016-07-21 2017-02-22 中铁四局集团建筑工程有限公司 Plant roof panel transporting and mounting equipment
CN106437047B (en) * 2016-07-21 2018-10-09 中铁四局集团建筑工程有限公司 A kind of equipment transported for factory building roof plate with installing

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN212079327U (en) Hydraulic pressure regulation formula side wall template platform truck
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN206128656U (en) A instrument for transporting installation roof boarding
CN106437047B (en) A kind of equipment transported for factory building roof plate with installing
CN203247031U (en) Hoisting device for curtain board transporting
CN107386119A (en) A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device
CN201908665U (en) Movable variable-cross section lining trolley
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN106351431B (en) The mobile working platform that can continuously construct for rail tunnel
CN210737374U (en) Bridge deck concrete pavement construction platform
CN209889693U (en) Combined steel pipe transportation tool
CN208266915U (en) Underground pipe gallery overall movement full hall scaffold
CN206799012U (en) A kind of concrete batten transport of small space and installation tool group
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN105089294B (en) A kind of H profile steel beam form bracing structure
CN209942078U (en) Large-span even strides factory building roof boarding installation dolly
CN210598156U (en) Steel shotcrete demolishs auxiliary device
CN208023608U (en) A kind of post-cast strip can have enough to meet the need steel channel formwork system
CN202047828U (en) Movable and light-weight trolley formwork base plate system
CN202001022U (en) Movable lining arch center formwork
CN114215339A (en) Tool type ultrahigh-structure hanging basket suspension mechanism installation method
CN206843953U (en) Sizing auxiliary construction platform in a kind of high-speed railway pier
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170426

Effective date of abandoning: 20181009