CN206843953U - Sizing auxiliary construction platform in a kind of high-speed railway pier - Google Patents

Sizing auxiliary construction platform in a kind of high-speed railway pier Download PDF

Info

Publication number
CN206843953U
CN206843953U CN201720775182.9U CN201720775182U CN206843953U CN 206843953 U CN206843953 U CN 206843953U CN 201720775182 U CN201720775182 U CN 201720775182U CN 206843953 U CN206843953 U CN 206843953U
Authority
CN
China
Prior art keywords
pier
shaping rack
platform
construction
pier shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720775182.9U
Other languages
Chinese (zh)
Inventor
孙中华
李鹏翱
孙冬梅
王乾坤
刘晓栋
李傲龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201720775182.9U priority Critical patent/CN206843953U/en
Application granted granted Critical
Publication of CN206843953U publication Critical patent/CN206843953U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to high-speed railway pier construction field, to solve the existing limitation that scaffold construction railway pier is set up on the outside of pier shaft and the problems such as efficiency is low, the utility model provides sizing auxiliary construction platform in a kind of high-speed railway pier, it is to be connected in sequence from the bottom to top by some section platforms, the section platform includes shaping rack, shaping rack is connected the multilayer square body frame structure formed by some columns, longitudinally connected bar with transverse connecting rod, and the plane layer that longitudinally connected bar and transverse connecting rod are formed is operating desk;Centring ring is provided with per the outside of layer operation platform, centring ring forms the inner side limiting-position face of railway pier shaft steel bar template.The utility model is by construction platform on the inside of pier shaft, do not limited by execution conditions on the outside of pier shaft, and the outside of the construction platform is provided with centring ring, the pouring construction quality that effect improves pier shaft can be advantageous to using plane that centring ring is formed as the inner side limiting-position face of pier body formwork.

Description

Sizing auxiliary construction platform in a kind of high-speed railway pier
Technical field
The utility model belongs to high-speed railway pier construction field, and sizing auxiliary construction is put down in specially a kind of high-speed railway pier Platform.
Background technology
Railway pier shaft is standing to be calculated as heavy in section bricklaying pier, and to ensure construction safety, pier shaft reinforcing bar colligation generally requires to set Scaffold, presently mainly by setting up common steel tube scaffold, total sub-semigroup etc. on the outside of pier shaft main body, treat scaffold Reinforcing bar colligation can be carried out after construction.The setting up of scaffold, disassembly process are cumbersome, and because scaffold is located at outside pier shaft Side, it need to be set up around whole pier shaft, it is larger to set up area, to ensure working security, needs to carry out ground before setting up big The levelling of scope waits processing, can have a strong impact on construction speed, and scaffold set up that quality can directly affect pier shaft pour effect Fruit.Simultaneously as the geographical environment constraint residing for high-speed railway pier shaft, pier shaft outside, which does not often possess, sets up scaffold construction bar Part, increase the constructional difficulties of pier shaft steel bar template.
The content of the invention
The utility model set up to solve existing on the outside of pier shaft scaffold construction railway pier limitation and efficiency it is low The problems such as, and then provide sizing auxiliary construction platform in a kind of high-speed railway pier.
The utility model adopts the following technical scheme that:
Sizing auxiliary construction platform, is connected in sequence from the bottom to top by some section platforms in a kind of high-speed railway pier, The section platform includes shaping rack, shaping rack connected by some columns, longitudinally connected bar with transverse connecting rod form it is more The plane layer that layer square body frame structure, longitudinally connected bar and transverse connecting rod are formed is operating desk;Per the outside of layer operation platform Provided with centring ring, centring ring forms the inner side limiting-position face of railway pier shaft steel bar template.For convenience of dismounting, centring ring and shaping rack it Between can use colligation connect.
In order to meet the working space of workmen, the upper-lower height of every layer operation platform of the shaping rack is not less than 2 meters; Shaping rack it is total it is high be no more than 6 meters, a formula is advantageous to the lifting of shaping rack, simultaneously because being to pass through bolt between shaping rack single-unit Connection, arm is long between 2 points during excessive height, is had a great influence by wind-force and from load, is unfavorable for security control during construction.
Be bolted between the shaping rack, shaping rack top and bottom be provided with it is some be used for bolted hole, In order to be further ensured that the stability of connection, the connecting rod of upper and lower shaping rack is also subjected to colligation using reinforcing bar etc..
The utility model has the advantages that:
1st, the utility model is not limited by execution conditions on the outside of pier shaft, can used by construction platform on the inside of pier shaft In the construction of all kinds iron tyre pier;
2nd, the outside of the construction platform is provided with centring ring, during pier shaft pouring reinforcement template of constructing, can be formed with centring ring Inner side limiting-position face of the plane as template, is advantageous to the control to stencil plane degree, perpendicularity, can effectively improve pouring for pier shaft Construction quality;
3rd, construction platform by the way of segmentation connects, between shaping rack, between shaping rack and centring ring be removable Formula connects, and convenient disassembly is more time saving and energy saving compared to traditional scaffold lapping, is advantageous to improve integral construction progress.
Brief description of the drawings
Fig. 1 is dimensional structure diagram of the present utility model;
Fig. 2 is the structural representation of shaping rack;
Fig. 3 is the top view of centring ring;
In figure:1- centring rings, 2- shaping racks, 3- columns, the longitudinally connected bars of 4-, 5- transverse connecting rods.
Embodiment
With reference to accompanying drawing, specific embodiment of the present utility model is described further:
To improve speed of application, the utility model carries out steel by way of sizing auxiliary construction platform is set in pier shaft Muscle colligation is constructed, and the interior sizing auxiliary construction platform is connected in sequence from the bottom to top by some section platforms, and section is put down Platform includes shaping rack and centring ring, and shaping rack is welded using angle steel merogenesis, and length and width are to be smoothly put into inside pier shaft It is advisable, can be highly performed according to operation height merogenesis.Shaping rack is hung in pier shaft stage by stage using crane before construction, shaping rack It is a section to be arranged to three layers, and every layer of upper-lower height is 2 meters, is connected by screw bolts between section, after shaping rack installs Spacer bar can be installed on shaping rack, then carry out assembling reinforcement again, shaping rack is hung out into pier shaft after reinforcing bar colligation terminates, Concreting is carried out again.
Each shaping rack is process using angle steel and spiral, and shaping rack column, longitudinally connected bar and termination are horizontal Connecting rod uses angle steel, and other transverse connecting rods use the spiral of diameter 22;Top layer, bottom every rod end of longitudinally connected bar Portion sets 4 bolts hole respectively, and be easy to shaping rack connects high disposal.Often layer operation platform construction scene is set up glued board conduct and applied Work platform.Three layer operation platforms need to set reinforcing bar colligation centring ring above shaping rack, be welded with shaping rack main framing, outside centring ring Shape is identical with pier shaft transverse shape, forms inner side limiting-position structure when pier shaft steel bar template is set up, and is advantageous to raising pier shaft and pours The construction qualities such as the perpendicularity built.
Cable wind rope should be set when pier shaft is higher, ensure that shaping rack is stable.
The utility model carries out reinforcing bar colligation construction by the way of shaping rack is set in pier shaft, will using crane before constructing Shaping rack is hung in pier shaft, and shaping rack is hung out into pier shaft after reinforcing bar colligation terminates, then carries out concreting, and this patent is effective Scaffold building speed is accelerated, while reinforcing bar colligation jig can be set on shaping rack, accelerates reinforcing bar colligation speed of knowing clearly Degree, while ensure that construction safety.

Claims (3)

  1. A kind of 1. sizing auxiliary construction platform in high-speed railway pier, it is characterised in that:By some section platforms from the bottom to top successively It is formed by connecting, the section platform includes shaping rack(2), shaping rack(2)It is by some columns(3), longitudinally connected bar(4)And horizontal stroke To connecting rod(5)Connect the multilayer square body frame structure of composition, longitudinally connected bar(4)And transverse connecting rod(5)What is formed is flat Surface layer is operating desk;Centring ring is provided with per the outside of layer operation platform(1), centring ring(1)Form the interior of railway pier shaft steel bar template Lateral spacing plane.
  2. 2. sizing auxiliary construction platform in high-speed railway pier according to claim 1, it is characterised in that:The shaping rack (2)Every layer operation platform upper-lower height be not less than 2 meters, shaping rack(2)Total high be no more than 6 meters.
  3. 3. sizing auxiliary construction platform in high-speed railway pier according to claim 2, it is characterised in that:The shaping rack (2)Between be bolted, shaping rack(2)Top and bottom, which are provided with, some is used for bolted hole.
CN201720775182.9U 2017-06-29 2017-06-29 Sizing auxiliary construction platform in a kind of high-speed railway pier Expired - Fee Related CN206843953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720775182.9U CN206843953U (en) 2017-06-29 2017-06-29 Sizing auxiliary construction platform in a kind of high-speed railway pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720775182.9U CN206843953U (en) 2017-06-29 2017-06-29 Sizing auxiliary construction platform in a kind of high-speed railway pier

Publications (1)

Publication Number Publication Date
CN206843953U true CN206843953U (en) 2018-01-05

Family

ID=60803177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720775182.9U Expired - Fee Related CN206843953U (en) 2017-06-29 2017-06-29 Sizing auxiliary construction platform in a kind of high-speed railway pier

Country Status (1)

Country Link
CN (1) CN206843953U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789814A (en) * 2021-10-25 2021-12-14 中船黄埔文冲船舶有限公司 Construction platform with multilayer structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789814A (en) * 2021-10-25 2021-12-14 中船黄埔文冲船舶有限公司 Construction platform with multilayer structure

Similar Documents

Publication Publication Date Title
CN102070071B (en) Steel reinforcement cage hoisting method
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN105113716A (en) Construction method of large-diameter multi-rib-plate high-dropping self-compacting steel pipe concrete superposed columns
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN111705747A (en) Sliding template assembly for river retaining wall
CN205400756U (en) Variable section platform truck
CN206843953U (en) Sizing auxiliary construction platform in a kind of high-speed railway pier
CN207160223U (en) A kind of fulcrum-variable pin joint formula steel girder platform
CN202064281U (en) Slip form frame
CN109853945A (en) A kind of new concrete column template device and its construction method
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN102322138A (en) The modular sliding formwork
CN108104124A (en) Large-diameter steel casing three-frame type guide frame and auxiliary positioning platform device
CN109944164B (en) Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN113186830A (en) Construction process of cast-in-place bent cap
CN205348389U (en) Influence of intelligence jacking steel platform truss is steel plate wall segmentation merogenesis structure down
CN204960280U (en) But integral hoisting and used repeatedly's scaffold
CN206034874U (en) Elevartor shaft combination formula integrally lift up operation platform
CN205894640U (en) A safety protection and construction platform for construction of elevator well
CN205955177U (en) Novel construct dedicated aluminum alloy template
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind
CN205296804U (en) Protection cage structure in elevartor shaft