CN208266915U - Underground pipe gallery overall movement full hall scaffold - Google Patents
Underground pipe gallery overall movement full hall scaffold Download PDFInfo
- Publication number
- CN208266915U CN208266915U CN201820419406.7U CN201820419406U CN208266915U CN 208266915 U CN208266915 U CN 208266915U CN 201820419406 U CN201820419406 U CN 201820419406U CN 208266915 U CN208266915 U CN 208266915U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- underground pipe
- overall movement
- bottom bracket
- full hall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides a kind of underground pipe gallery overall movement full hall scaffold, comprising: bottom plate is arranged on the ground of underground pipe gallery;Rail is fixed on the bottom plate;Bottom bracket, two sides are respectively arranged with multiple idler wheels, and the bottom bracket is slidably connected on the rail by the multiple idler wheel, and the wheel shaft of the multiple idler wheel is connect by variable-speed operation mechanism with driving device;More upright bars, are vertically set on the bottom bracket;And top plate, the top of the more upright bars is set.The utility model is not needed again to remove scaffold, be set up in transfer, template, flitch and the fragmentary supporting member that underground pipe gallery construction is removed are transported by the scaffold of the utility model, greatly reduce the workload of artificial horizontal transport, it is time saving and energy saving, reduce construction cost, also accelerates construction progress.
Description
Technical field
The utility model relates to the technical fields of engineering construction, more specifically, are related to a kind of underground pipe gallery with whole
Body moves full hall scaffold.
Background technique
Underground pipe gallery system not only solves Urban Traffic Jam Based, also greatly facilitates electric power, communication, combustion
The maintenance and maintenance of the urban operating mechanisms such as gas, water supply and sewage.In addition, the system also has certain protection against and mitigation of earthquake disasters effect.Currently, underground
The construction of pipe gallery or traditional type.Due to underground pipe gallery design feature, so it is mainly divergence, it is horizontal
Freight volume is big, and scaffold, the artificial amount of having bad luck of template are big especially in piping lane, time-consuming and laborious, so that construction cost increases.
Utility model content
In view of the above problems, the purpose of the utility model is to provide a kind of underground pipe gallery full hall foot hands of overall movement
Frame reduces the amount of having bad luck of construction personnel and reduces construction cost.
To achieve the goals above, the utility model is realized by technical solution below:
A kind of underground pipe gallery overall movement full hall scaffold, comprising:
Bottom plate is arranged on the ground of underground pipe gallery;
Rail is fixed on the bottom plate;
Bottom bracket, two sides are respectively arranged with multiple idler wheels, and the bottom bracket is slidably connected to by the multiple idler wheel
On the rail, the wheel shaft of the multiple idler wheel is connect by variable-speed operation mechanism with driving device;
More upright bars, are vertically set on the bottom bracket;And
The top of the more upright bars is arranged in top plate.
Preferably, be provided with multiple built-in fittings on the bottom plate, the rail by fastener with it is the multiple pre-buried
Part is fixedly connected.
Preferably, the top of the more upright bars is provided with adjustable screw.
Preferably, supporting block is provided at the top of the adjustable screw, the adjustable screw and the top plate pass through branch
Bracer connection.
It preferably, further include the multiple bridgings being arranged between the bottom bracket and the top plate, the scissors
Support is perpendicular to bottom bracket setting and its bottom is connect with the bottom bracket, the top of the bridging and the top plate
Connection.
Preferably, more horizontal brace rods, the more water are additionally provided with along its short transverse in the more upright bars
Flushconnection bar is parallel to the bottom bracket setting.
Preferably, the bottom bracket is connect with the more upright bars by steel tube plug.
Preferably, the bottom bracket includes more lateral struts and vertically disposed with the more lateral struts
More longitudinal holding poles, the idler wheel are separately positioned in every lateral strut.
Compared with prior art, the utility model at least has the advantages that the utility model is not required in transfer
Scaffold is removed again, is set up, template, flitch and the fragmentary supporting member that underground pipe gallery construction is removed pass through this
The scaffold of utility model transports, and greatly reduces the workload of artificial horizontal transport, time saving and energy saving, reduces construction cost,
Also construction progress is accelerated.The utility model increases variable-speed operation mechanism and auxiliary facility, and the departmental cost is well below weight
New installation is removed, the expense of transport trestle, and turnover frequency has been also speeded up.
Detailed description of the invention
By reference to the description below in conjunction with attached drawing, and with the utility model is more fully understood, this reality
It will be more clearly understood and understood with novel other purposes and result.In the accompanying drawings:
Fig. 1 is the overall construction structural schematic diagram of the utility model embodiment;
Fig. 2 is the horizontal sectional view of Fig. 1;
Fig. 3 is the vertical cross-section diagram of Fig. 1.
Identical label indicates similar or corresponding feature or function in all the appended drawings.
Specific embodiment
Specific embodiment of the utility model is described in detail below with reference to attached drawing.
As shown in Figure 1, Figure 2 and Fig. 3 is jointly shown, and the utility model discloses a kind of underground pipe gallery full halls of overall movement
Scaffold is stood including the bottom plate 1 being arranged on the ground of pipe gallery, the rail being arranged on bottom plate 1, bottom bracket, more
Bar 3 and top plate 4.Rail is accurately positioned by surveying setting-out and determines its installation site, is positioned on bottom plate 1 according to rail in advance
Multiple built-in fittings are arranged in point, and rail is connect by track bolt with the built-in fitting on bottom plate 1.Bottom bracket includes more laterally branch
Bar 20 and with the vertically disposed more longitudinal holding poles of more lateral struts 20, in the present embodiment, more lateral struts 20 are 2
The 20a I-steel of root 10m, equidistantly installs 3 idler wheels 5 on every 20a I-steel, and more longitudinal holding poles are and 20a I-steel
Vertically disposed length is No. 14 I-steel of 3.2m.The spacing between No. 14 adjacent I-steel is 0.9m, Zong Xiangzhi two-by-two
It is bolted between bar and lateral strut 20.Idler wheel 5 on bottom bracket is accordingly slidably connected on rail.Every 20a work
The wheel shaft of 3 idler wheels 5 on word steel passes through variable-speed operation mechanism and connect with a motor 6, and the operating of motor 6 drives variable-speed operation machine
Structure 10 operates and then idler wheel 5 is driven to run on rail.
Multiple steel tube plugs 7 are welded on bottom bracket, more upright bars 3 are vertically plugged on bottom by multiple steel tube plugs 7
On portion's bracket.Being arranged in every row upright bar 3 and each column upright bar 3 on bottom bracket has more water along short transverse spaced set
Flushconnection bar 12, the setting of horizontal brace rod 12 strengthen the structural stability of scaffold.The top of more upright bars 3 is mounted on
Adjustable lead screw 8, in the present embodiment, the outer diameter of upright bar 3 is 48mm, wall thickness 3.2mm, and adjustable screw 8 is 50mm long, and diameter is
32mm.The top of adjustable screw 8 is additionally provided with supporting block 9, is connected between adjustable screw 8 and top plate 4 by supporting block 9.It is adjustable
The setting of lead screw 8 allows to by adjusting the height of adjustable screw rod 8 and then adjustment supporting block 9 institute so that on scaffold
There is the top surface of supporting block 9 to be in same level, the gravity on top plate 4 can be made to be uniformly distributed in this way and give each branch
Bracer 9 improves the uniformity of integrally-built bearing capacity and stress.The setting of supporting block 9 also then increases adjustable screw rod 8
With the contact area of top plate 4, the stability of scaffolding structure is improved.In addition, in order to enable scaffold overall structure is more firm
Gu being additionally provided with multiple bridgings 11 between bottom bracket and top plate 4, bridging 11 is arranged perpendicular to bottom bracket and its bottom
Portion is connect with bottom bracket, and the top of bridging is connect with top plate 4.
When the underground pipe gallery of application the present embodiment is with full hall scaffold is moved integrally, when needing to shift scaffold
When, it does not need to remove scaffold, it is only necessary to open motor 6, the operating of motor 6 is to drive scaffold by variable-speed operation mechanism 10
It is run on rail, and then scaffold is transferred to desired position.And when needing to transport the objects such as template, it is only necessary to by template
Equal objects are placed on the top plate 4 of scaffold, open motor 6, the operating of motor 6 is to drive scaffold by variable-speed operation mechanism 10
It is run on rail, and then template etc. is transported to desired position.In underground pipe gallery template construction, the utility model exists
It does not need again to remove scaffold when transfer, set up, template, flitch and the fragmentary support that underground pipe gallery construction is removed
Component is transported by the scaffold of the utility model, greatly reduces the workload of artificial horizontal transport, time saving and energy saving, is reduced
Construction cost also accelerates construction progress.The utility model increases variable-speed operation mechanism and auxiliary facility, and the departmental cost is remote
Far below reinstalling, removing, the expense of transport trestle, turnover frequency has been also speeded up.
Underground pipe gallery according to the present utility model is described in an illustrative manner above with reference to attached drawing to move integrally completely
Hall scaffold.It will be understood by those skilled in the art, however, that the underground pipe gallery proposed for above-mentioned the utility model is used
Full hall scaffold is moved integrally, various improvement can also be made on the basis of not departing from the content of the present invention.Therefore, this reality
It should be determined by the content of appended claims with novel protection scope.
Claims (8)
1. a kind of underground pipe gallery overall movement full hall scaffold characterized by comprising
Bottom plate is arranged on the ground of underground pipe gallery;
Rail is fixed on the bottom plate;
Bottom bracket, two sides are respectively arranged with multiple idler wheels, and the bottom bracket is slidably connected to described by the multiple idler wheel
On rail, the wheel shaft of the multiple idler wheel is connect by variable-speed operation mechanism with driving device;
More upright bars, are vertically set on the bottom bracket;And
The top of the more upright bars is arranged in top plate.
2. underground pipe gallery as described in claim 1 overall movement full hall scaffold, which is characterized in that on the bottom plate
Multiple built-in fittings are provided with, the rail is fixedly connected by fastener with the multiple built-in fitting.
3. underground pipe gallery as described in claim 1 overall movement full hall scaffold, which is characterized in that described more vertical
The top of bar is provided with adjustable screw.
4. underground pipe gallery as claimed in claim 3 overall movement full hall scaffold, which is characterized in that the adjustable silk
Supporting block is provided at the top of thick stick, the adjustable screw is connect with the top plate by supporting block.
5. underground pipe gallery as described in claim 1 overall movement full hall scaffold, which is characterized in that further include setting
Multiple bridgings between the bottom bracket and the top plate, the bridging is arranged perpendicular to the bottom bracket and it
Bottom is connect with the bottom bracket, and the top of the bridging is connect with the top plate.
6. underground pipe gallery as described in claim 1 overall movement full hall scaffold, which is characterized in that described more vertical
More horizontal brace rods are additionally provided with along its short transverse on bar, the more horizontal brace rods are parallel to the bottom bracket and set
It sets.
7. underground pipe gallery as described in claim 1 overall movement full hall scaffold, which is characterized in that the bottom branch
Frame is connect with the more upright bars by steel tube plug.
8. underground pipe gallery as described in claim 1 overall movement full hall scaffold, which is characterized in that the bottom branch
Frame include more lateral struts and with the vertically disposed more longitudinal holding poles of the more lateral struts, the idler wheel sets respectively
It sets in every lateral strut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820419406.7U CN208266915U (en) | 2018-03-27 | 2018-03-27 | Underground pipe gallery overall movement full hall scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820419406.7U CN208266915U (en) | 2018-03-27 | 2018-03-27 | Underground pipe gallery overall movement full hall scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208266915U true CN208266915U (en) | 2018-12-21 |
Family
ID=64674131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820419406.7U Active CN208266915U (en) | 2018-03-27 | 2018-03-27 | Underground pipe gallery overall movement full hall scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208266915U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080299A (en) * | 2019-05-10 | 2019-08-02 | 成都建工路桥建设有限公司 | A kind of shallow embedding mountain tunnel open-cut engineering method |
CN110761324A (en) * | 2019-10-22 | 2020-02-07 | 中国十七冶集团有限公司 | Pipe gallery main part construction supporting trolley |
-
2018
- 2018-03-27 CN CN201820419406.7U patent/CN208266915U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080299A (en) * | 2019-05-10 | 2019-08-02 | 成都建工路桥建设有限公司 | A kind of shallow embedding mountain tunnel open-cut engineering method |
CN110761324A (en) * | 2019-10-22 | 2020-02-07 | 中国十七冶集团有限公司 | Pipe gallery main part construction supporting trolley |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204457802U (en) | Formed by integrally casting formula formwork jumbo | |
CN104632251A (en) | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage | |
CN205804190U (en) | A kind of travelling bridge for the guardrail construction that builds a bridge | |
CN205171975U (en) | Tuber pipe mounting platform based on BIM technique | |
CN203669884U (en) | Movable all-round steel pipe scaffold for tunnel lining construction | |
CN208266915U (en) | Underground pipe gallery overall movement full hall scaffold | |
CN106930192A (en) | Assembled variable cross-section contracture sliding mode system and its construction method | |
CN205100119U (en) | Steel form device in self -propelled | |
CN214871755U (en) | Portable safe water bores bracket | |
CN201908665U (en) | Movable variable-cross section lining trolley | |
CN207618963U (en) | It is a kind of using fork truck at the top of basement pipe laying device | |
CN106013783A (en) | Formwork support and erecting method thereof | |
CN102777050A (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN203742180U (en) | Truss mounting device and mounting frames thereof | |
CN204174854U (en) | A kind of vertical fragmentation Assembled rotary cat ladder | |
CN107299596B (en) | Concrete support trestle plate lower supporting beam template system and construction method thereof | |
CN201309817Y (en) | Hydraulic lifting mounting carrier vehicle | |
CN210177919U (en) | Civil engineering construction support | |
CN211004170U (en) | A frame-type row of hanging for hoisting of overlength pipe gallery land module | |
CN211201120U (en) | Attached lifting scaffold bottom truss | |
CN210421167U (en) | Installation translation device of large-scale prefabricated piping lane | |
CN217231500U (en) | Pushing equipment for installing guide beam | |
CN112079108A (en) | Municipal works construction is with pressing from both sides formula pipeline handling device | |
CN205476444U (en) | Light -duty support post based on low level jacking die carrier system | |
CN217171924U (en) | Equipment transportation device of taking one's place |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |