CN207863507U - A kind of vertical member displacement apparatus for skyscraper floor - Google Patents

A kind of vertical member displacement apparatus for skyscraper floor Download PDF

Info

Publication number
CN207863507U
CN207863507U CN201721918580.8U CN201721918580U CN207863507U CN 207863507 U CN207863507 U CN 207863507U CN 201721918580 U CN201721918580 U CN 201721918580U CN 207863507 U CN207863507 U CN 207863507U
Authority
CN
China
Prior art keywords
column
floor
horizontal
holding
vertical component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721918580.8U
Other languages
Chinese (zh)
Inventor
杨学林
祝文畏
王擎忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Province Institute of Architectural Design and Research
Original Assignee
Zhejiang Province Institute of Architectural Design and Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Province Institute of Architectural Design and Research filed Critical Zhejiang Province Institute of Architectural Design and Research
Priority to CN201721918580.8U priority Critical patent/CN207863507U/en
Application granted granted Critical
Publication of CN207863507U publication Critical patent/CN207863507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型公开了一种用于高层建筑楼层的竖向构件置换装置,旨在提供一种能够在不拆除上部建筑物的情况下,对建筑物的某一楼层的竖向构件进行置换的用于高层建筑楼层的竖向构件置换装置。它包括设置在第N+1层的竖向构件柱上的上抱柱梁、设置在第N‑1层的竖向构件柱上的下抱柱梁、设置在上抱柱梁与下抱柱梁之间的预应力支撑柱及设置在预应力支撑柱与上抱柱梁之间的预置千斤顶,所述预置千斤顶的下端抵在预应力支撑柱的上端面上,预置千斤顶的上端抵在上抱柱梁上。

The utility model discloses a vertical component replacement device for a high-rise building floor, aiming to provide a device capable of replacing a vertical component of a certain floor of a building without dismantling the upper building. Vertical member replacement device on the floors of high-rise buildings. It includes the upper column-holding beam arranged on the vertical member column of the N+1 floor, the lower column-holding beam arranged on the vertical member column of the N‑1st floor, the upper column-holding beam and the lower column-holding beam The prestressed support columns between the beams and the preset jacks arranged between the prestressed support columns and the upper column-holding beams, the lower ends of the preset jacks are against the upper end faces of the prestressed support columns, and the upper ends of the preset jacks Arrest on the upper pillar beam.

Description

一种用于高层建筑楼层的竖向构件置换装置A vertical component replacement device for high-rise building floors

技术领域technical field

本实用新型涉及一种置换装置,具体涉及一种用于高层建筑楼层的竖向构件置换装置。The utility model relates to a replacement device, in particular to a vertical component replacement device for high-rise building floors.

背景技术Background technique

建筑物在建造过程中,某一楼层由于商品混凝土标号过低或者浇筑问题,导致混凝土强度严重不足,引起作为承重构件的竖向构件的承载力不能满足设计和使用要求,必须对竖向构件进行整体置换;而高层建筑的中间楼层强度严重不足时,如采用拆除上部重新进行浇筑的方法,则不仅经济代价巨大,而且耽误工期。During the construction of the building, due to the low grade of commercial concrete or pouring problems on a certain floor, the concrete strength is seriously insufficient, causing the bearing capacity of the vertical components as load-bearing components to fail to meet the design and use requirements, and the vertical components must be repaired. Whole replacement; and when the strength of the middle floor of a high-rise building is seriously insufficient, if the upper part is removed and poured again, it will not only cost a lot of money, but also delay the construction period.

实用新型内容Utility model content

本实用新型的目的是为了克服现有技术中存在的不足,提供一种能够在不拆除上部建筑物的情况下,对建筑物的某一楼层的竖向构件进行置换,并且可有效缩短施工周期,降低施工成本的用于高层建筑楼层的竖向构件置换装置。The purpose of this utility model is to overcome the deficiencies in the prior art, to provide a kind of structure that can replace the vertical components of a certain floor of the building without dismantling the upper building, and can effectively shorten the construction period. , a vertical component replacement device for high-rise building floors that reduces construction costs.

本实用新型的技术方案是:The technical scheme of the utility model is:

一种用于高层建筑楼层的竖向构件置换装置,包括设置在第N+1层的竖向构件柱上的上抱柱梁、设置在第N-1层的竖向构件柱上的下抱柱梁、设置在上抱柱梁与下抱柱梁之间的预应力支撑柱及设置在预应力支撑柱与上抱柱梁之间的预置千斤顶,所述预置千斤顶的下端抵在预应力支撑柱的上端面上,预置千斤顶的上端抵在上抱柱梁上。A vertical component replacement device for the floors of high-rise buildings, comprising an upper embracing column beam arranged on the vertical component column of the N+1th floor, and a lower embracing beam arranged on the vertical component column of the N-1st floor The column beam, the prestressed support column arranged between the upper column-holding beam and the lower column-holding beam, and the preset jack arranged between the prestressed support column and the upper column-holding beam, the lower end of the preset jack rests on the prestressed support column On the upper end face of the stress support column, the upper end of the preset jack is against the upper column-holding beam.

本方案的用于高层建筑楼层的竖向构件置换装置能够在不拆除上部建筑物的情况下,对建筑物的某一楼层的竖向构件进行置换,并且可有效缩短施工周期,降低施工成本。The vertical component replacement device for the floors of high-rise buildings of this proposal can replace the vertical components of a certain floor of the building without demolishing the superstructure, and can effectively shorten the construction period and reduce the construction cost.

作为优选,上抱柱梁通过上水平联系钢梁与第N+1层中的其余的一根或多根竖向构件柱相连接。本方案结构可以有效提高竖向构件置换装置的整体架构稳定性,使竖向构件置换装置能够承载移动的弯矩载荷。Preferably, the upper column-holding beam is connected to the remaining one or more vertical member columns in the N+1th floor through the upper horizontal connecting steel beam. The structure of this scheme can effectively improve the overall structural stability of the vertical component replacement device, so that the vertical component replacement device can bear the moving moment load.

作为优选,下抱柱梁通过下水平联系钢梁与第N-1层中的其余的一根或多根竖向构件柱相连接。本方案结构可以有效提高竖向构件置换装置的整体架构稳定性,使竖向构件置换装置能够承载移动的弯矩载荷。Preferably, the lower column-holding beam is connected to the remaining one or more vertical member columns in the N-1th floor through the lower horizontal connecting steel beam. The structure of this scheme can effectively improve the overall structural stability of the vertical component replacement device, so that the vertical component replacement device can bear the moving moment load.

作为优选,下抱柱梁的上表面上埋设有下锚栓,预应力支撑柱的下端设有水平下连接端板,预应力支撑柱的下端通过水平下连接端板和下锚栓与下抱柱梁相连接,水平下连接端板和下锚栓相连接。As a preference, lower anchor bolts are buried on the upper surface of the lower column-holding beam, the lower end of the prestressed support column is provided with a horizontal lower connection end plate, and the lower end of the prestressed support column is connected to the lower support column through the horizontal lower connection end plate and the lower anchor bolt. The columns and beams are connected, and the horizontal lower connecting end plates are connected with the lower anchor bolts.

作为优选,上抱柱梁的下表面上埋设有上锚栓,上抱柱梁的下表面上还埋设有水平支撑板,所述预应力支撑柱的上端设有水平上连接端板,所述上锚栓依次穿过水平支撑板与水平上连接端板,所述预置千斤顶位于水平支撑板与水平上连接端板之间。As a preference, an upper anchor bolt is buried on the lower surface of the upper column-holding beam, and a horizontal support plate is also embedded on the lower surface of the upper column-holding beam, and the upper end of the prestressed support column is provided with a horizontally connecting end plate. The upper anchor bolts pass through the horizontal support plate and the horizontal upper connection end plate in sequence, and the preset jack is located between the horizontal support plate and the horizontal upper connection end plate.

本实用新型的有益效果是:能够在不拆除上部建筑物的情况下,对建筑物的某一楼层的竖向构件进行置换,并且可有效缩短施工周期,降低施工成本。The beneficial effect of the utility model is that the vertical component of a certain floor of the building can be replaced without dismantling the upper building, and the construction period can be effectively shortened and the construction cost can be reduced.

附图说明Description of drawings

图1是本实用新型的用于高层建筑楼层的竖向构件置换装置的一种结构示意图。Fig. 1 is a kind of structure schematic diagram of the vertical member replacing device for high-rise building floor of the present utility model.

图中:竖向构件柱1,上抱柱梁2,下抱柱梁3,预应力支撑柱4,预置千斤顶5,下锚栓6,水平下连接端板7,水平上连接端板8,水平支撑板9,上锚栓10。In the figure: vertical component column 1, upper column-holding beam 2, lower column-holding beam 3, prestressed support column 4, pre-set jack 5, lower anchor bolt 6, horizontally connecting end plate 7, horizontally connecting end plate 8 , a horizontal support plate 9, and an upper anchor bolt 10.

具体实施方式Detailed ways

下面结合附图与具体实施方式对本实用新型作进一步详细描述:Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail:

如图1所示,一种用于高层建筑楼层的竖向构件置换装置,包括设置在第N+1层的竖向构件柱1上的上抱柱梁2、设置在第N-1层的竖向构件柱上的下抱柱梁3、设置在上抱柱梁与下抱柱梁之间的预应力支撑柱及设置在预应力支撑柱4与上抱柱梁之间的预置千斤顶5。同一竖向构件置换装置中:上抱柱梁与下抱柱梁位于建筑物的同一竖向构件柱上。As shown in Figure 1, a vertical member replacement device for high-rise building floors includes an upper column-holding beam 2 arranged on a vertical member column 1 on the N+1 floor, an upper column beam 2 arranged on the N-1 floor The lower column-holding beam 3 on the vertical member column, the prestressed support column arranged between the upper column-holding beam and the lower column-holding beam, and the preset jack 5 arranged between the prestressed support column 4 and the upper column-holding beam . In the same vertical component replacement device: the upper column-holding beam and the lower column-holding beam are located on the same vertical component column of the building.

预应力支撑柱竖直设置。预应力支撑柱的下端往下穿过第N层的楼底板,预应力支撑柱的下端设有水平下连接端板7。预应力支撑柱的上端往上穿过第N层的楼顶板,预应力支撑柱的上端设有水平上连接端板8。The prestressed supporting columns are vertically arranged. The lower end of the prestressed support column goes down through the floor slab of the Nth floor, and the lower end of the prestressed support column is provided with a horizontal lower connecting end plate 7 . The upper end of the prestressed support column goes upwards through the roof slab of the Nth floor, and the upper end of the prestressed support column is provided with a horizontal connecting end plate 8 .

下抱柱梁的上表面上埋设有下锚栓6。预应力支撑柱的下端与下抱柱梁相连接,具体说是,预应力支撑柱的下端通过水平下连接端板和下锚栓与下抱柱梁相连接,水平下连接端板和下锚栓相连接。A lower anchor bolt 6 is buried on the upper surface of the lower column-holding beam. The lower end of the prestressed support column is connected to the lower column-holding beam, specifically, the lower end of the prestressed support column is connected to the lower column-holding beam through the horizontal lower connection end plate and the lower anchor bolt, and the horizontal lower connection end plate and the lower anchor Bolt connected.

上抱柱梁的下表面上埋设有上锚栓10,上抱柱梁的下表面上还埋设有水平支撑板9。上锚栓依次穿过水平支撑板与水平上连接端板。An upper anchor bolt 10 is embedded on the lower surface of the upper column-holding beam, and a horizontal support plate 9 is also embedded on the lower surface of the upper column-holding beam. The upper anchor bolts pass through the horizontal support plate and the horizontal upper connecting end plate in turn.

上抱柱梁通过上水平联系钢梁与第N+1层中的其余的一根或多根竖向构件柱相连接。下抱柱梁通过下水平联系钢梁与第N-1层中的其余的一根或多根竖向构件柱相连接。The upper column-holding beam is connected to the remaining one or more vertical member columns in the N+1th floor through the upper horizontal connecting steel beam. The lower column-holding beam is connected to the remaining one or more vertical member columns in the N-1th floor through the lower horizontal connecting steel beam.

预置千斤顶的下端抵在预应力支撑柱的上端面的水平上连接端板上,预置千斤顶的上端抵在上抱柱梁的水平支撑板上。The lower end of the pre-set jack abuts against the upper end surface of the prestressed support column and connects the end plate horizontally, and the upper end of the pre-set jack abuts against the horizontal support plate of the upper column-holding beam.

本实施例中的N≥2。N≧2 in this embodiment.

本实施例的用于高层建筑楼层的竖向构件置换装置的使用工作如下:The use work of the vertical component replacement device for the high-rise building floor of the present embodiment is as follows:

通过预置千斤顶加载,将第N+1层的部分竖向荷载通过预应力支撑柱传递到第N-1层的竖向构件柱上;By loading with pre-loaded jacks, part of the vertical load on the N+1th floor is transferred to the vertical member column on the N-1th floor through the prestressed support columns;

接着,将上锚栓与水平上连接端板焊接相连。Next, the upper anchor bolt is connected to the horizontal connecting end plate by welding.

再接着,将第N层中位于上抱柱梁与下抱柱梁之间的竖向构件柱凿除,然后在竖向构件柱的凿除部位重新浇筑新的竖向构件柱,从而实现第N层的竖向构件柱置换。Next, the vertical component column located between the upper column-holding beam and the lower column-holding beam in the Nth floor is chiseled out, and then a new vertical component column is recast at the excised position of the vertical component column, so as to realize the first Replacement of vertical member columns on the N floor.

在重新浇筑新的竖向构件柱的混凝土养护强度达到设计强度的80%后,将竖向构件置换装置拆除。After the concrete curing strength of the newly poured new vertical member column reaches 80% of the design strength, the vertical member replacement device is removed.

本实施例的用于高层建筑楼层的竖向构件置换装置中由于通过预置千斤顶加载,将第N+1层的部分竖向荷载通过预应力支撑柱传递到第N-1层的竖向构件柱上,这样不仅可以完全消除越层托换支撑结构与竖向构件柱之间的连接间隙,而且在凿除第N层中的竖向构件柱之间,提前将第N+1层的部分竖向荷载通过预应力支撑柱传递到第N-1层的竖向构件柱上;从而保证在将第N层中位于上抱柱梁与下抱柱梁之间的竖向构件柱凿除的过程中以及凿除后,能够有效避免第N层以上的建筑物发生沉降,保证建筑物整体结构的整体性与稳定性;从而实现在不拆除上部建筑物的情况下,对建筑物的某一楼层的竖向构件进行置换,并且可有效缩短施工周期,降低施工成本。In the vertical component replacement device for high-rise building floors in this embodiment, due to the loading by the preset jack, part of the vertical load of the N+1th floor is transferred to the vertical component of the N-1th floor through the prestressed support column In this way, not only can the connection gap between the underpinning support structure and the vertical member column be completely eliminated, but also the part of the N+1th floor The vertical load is transmitted to the vertical member column of the N-1th floor through the prestressed support column; thus ensuring that the vertical member column located between the upper column-embracing beam and the lower column-embracing beam in the N-th floor is removed During the process and after the chiseling, it can effectively avoid the settlement of buildings above the Nth floor and ensure the integrity and stability of the overall structure of the building; The vertical components of the floor are replaced, which can effectively shorten the construction period and reduce the construction cost.

Claims (5)

1.一种用于高层建筑楼层的竖向构件置换装置,其特征是,包括设置在第N+1层的竖向构件柱上的上抱柱梁、设置在第N-1层的竖向构件柱上的下抱柱梁、设置在上抱柱梁与下抱柱梁之间的预应力支撑柱及设置在预应力支撑柱与上抱柱梁之间的预置千斤顶,所述预置千斤顶的下端抵在预应力支撑柱的上端面上,预置千斤顶的上端抵在上抱柱梁上。1. A vertical component replacement device for high-rise building floors, characterized in that it comprises an upper column beam arranged on the vertical component column of the N+1 floor, a vertical component column arranged on the N-1 floor The lower column-holding beam on the component column, the prestressed support column arranged between the upper column-holding beam and the lower column-holding beam, and the preset jack arranged between the prestressed support column and the upper column-holding beam, the preset The lower end of the jack abuts against the upper end face of the prestressed supporting column, and the upper end of the preset jack abuts against the upper column-holding beam. 2.根据权利要求1所述的一种用于高层建筑楼层的竖向构件置换装置,其特征是,所述上抱柱梁通过上水平联系钢梁与第N+1层中的其余的一根或多根竖向构件柱相连接。2. A kind of vertical component replacement device for high-rise building floors according to claim 1, characterized in that, the upper column-holding beam connects with the remaining one in the N+1th floor through the upper horizontal connection steel beam. One or more vertical member columns are connected. 3.根据权利要求1所述的一种用于高层建筑楼层的竖向构件置换装置,其特征是,所述下抱柱梁通过下水平联系钢梁与第N-1层中的其余的一根或多根竖向构件柱相连接。3. A kind of vertical component replacement device for high-rise building floors according to claim 1, characterized in that, the lower column-holding beam is connected with the rest of the N-1th floor through the lower horizontal steel beam. One or more vertical member columns are connected. 4.根据权利要求1或2或3所述的一种用于高层建筑楼层的竖向构件置换装置,其特征是,所述下抱柱梁的上表面上埋设有下锚栓,预应力支撑柱的下端设有水平下连接端板,预应力支撑柱的下端通过水平下连接端板和下锚栓与下抱柱梁相连接,水平下连接端板和下锚栓相连接。4. A kind of vertical component replacement device for high-rise building floors according to claim 1, 2 or 3, characterized in that, the upper surface of the lower column-holding beam is embedded with lower anchor bolts, and the prestressed support The lower end of the column is provided with a horizontal lower connecting end plate, and the lower end of the prestressed support column is connected with the lower column-holding beam through the horizontal lower connecting end plate and the lower anchor bolt, and the horizontal lower connecting end plate is connected with the lower anchor bolt. 5.根据权利要求1或2或3所述的一种用于高层建筑楼层的竖向构件置换装置,其特征是,所述上抱柱梁的下表面上埋设有上锚栓,上抱柱梁的下表面上还埋设有水平支撑板,所述预应力支撑柱的上端设有水平上连接端板,所述上锚栓依次穿过水平支撑板与水平上连接端板,所述预置千斤顶位于水平支撑板与水平上连接端板之间。5. according to claim 1 or 2 or 3 described a kind of vertical component replacement device for high-rise building floor, it is characterized in that, on the lower surface of the beam holding the column on the upper anchor bolt is embedded, and the column holding on the upper The lower surface of the beam is also embedded with a horizontal support plate, and the upper end of the prestressed support column is provided with a horizontal upper connection end plate, and the upper anchor bolts pass through the horizontal support plate and the horizontal upper connection end plate in turn, and the preset The jack is located between the horizontal support plate and the horizontally connected end plate.
CN201721918580.8U 2017-12-29 2017-12-29 A kind of vertical member displacement apparatus for skyscraper floor Active CN207863507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721918580.8U CN207863507U (en) 2017-12-29 2017-12-29 A kind of vertical member displacement apparatus for skyscraper floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721918580.8U CN207863507U (en) 2017-12-29 2017-12-29 A kind of vertical member displacement apparatus for skyscraper floor

Publications (1)

Publication Number Publication Date
CN207863507U true CN207863507U (en) 2018-09-14

Family

ID=63464110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721918580.8U Active CN207863507U (en) 2017-12-29 2017-12-29 A kind of vertical member displacement apparatus for skyscraper floor

Country Status (1)

Country Link
CN (1) CN207863507U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101726A (en) * 2018-10-26 2020-05-05 杭州固力建筑工程有限公司 Application method of structure underpinning technology in reinforcement engineering
CN111122040A (en) * 2019-12-30 2020-05-08 浙江瑞邦科特检测有限公司 Dynamic balance monitoring system in support column replacement
CN111561175A (en) * 2020-05-27 2020-08-21 上海标架建筑科技有限公司 Prestress underpinning static force cutting and column pulling construction process
CN112343359A (en) * 2019-08-08 2021-02-09 武汉天蝎建筑装备有限公司 High-rise building demolishs device
CN114908994A (en) * 2022-06-02 2022-08-16 山东大学 A box girder friction base-steel column integral replacement support system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101726A (en) * 2018-10-26 2020-05-05 杭州固力建筑工程有限公司 Application method of structure underpinning technology in reinforcement engineering
CN112343359A (en) * 2019-08-08 2021-02-09 武汉天蝎建筑装备有限公司 High-rise building demolishs device
CN111122040A (en) * 2019-12-30 2020-05-08 浙江瑞邦科特检测有限公司 Dynamic balance monitoring system in support column replacement
CN111561175A (en) * 2020-05-27 2020-08-21 上海标架建筑科技有限公司 Prestress underpinning static force cutting and column pulling construction process
CN114908994A (en) * 2022-06-02 2022-08-16 山东大学 A box girder friction base-steel column integral replacement support system and method

Similar Documents

Publication Publication Date Title
CN207863507U (en) A kind of vertical member displacement apparatus for skyscraper floor
CN102864795B (en) Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN101603372B (en) Method for reinforcing integral replacement concrete for high-rise building steel bar concrete column
CN104005338B (en) A kind of long-span cablestayed bridges tower beam three-dimensional temporary consolidation structure
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
CN105839985A (en) Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN207227968U (en) T beam beams bottom steel plate supertronic device
CN204552141U (en) A kind of braced structures for beam stanchion construction of replacing
CN107571392A (en) A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder
CN109881587B (en) Integral installation method of beam support on main tower in strong wind environment
CN104264706B (en) External elevator steel beam foundation structure and construction method thereof
CN116044204A (en) A Concrete Floor Reinforcement Method with Seriously Corroded Steel Bars
CN110374349A (en) A kind of impaired armored concrete cylinder underpins processing unit and its application method
CN101280550A (en) Method of Jacking and Heightening of Frame Bridge
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN108265998A (en) A kind of skyscraper supporting member flood method of replacing
CN102425115B (en) Control method for actively overcoming dead weight and line shape of vice cable saddle buttress concrete
CN110735387A (en) Transverse connection device for small box girders of bridge and construction method thereof
CN204491412U (en) A kind of hollow sheet hinge crack structure
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN205134192U (en) Cast -in -place roof beam support frame of internal force balanced type is fallen to ground to non -
CN204163104U (en) External elevator steel beam foundation constructs
CN207987777U (en) A kind of high pier girder steel pushing tow support device