CN203755678U CN201420049484.4U CN201420049484U CN203755678U CN 203755678 U CN203755678 U CN 203755678U CN 201420049484 U CN201420049484 U CN 201420049484U CN 203755678 U CN203755678 U CN 203755678U
Authority
CN
China
Prior art keywords
pillar
hoisting
hoisting device
steel
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420049484.4U
Other languages
Chinese (zh)
Inventor
王福全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201420049484.4U priority Critical patent/CN203755678U/en
Application granted granted Critical
Publication of CN203755678U publication Critical patent/CN203755678U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an upper suspension hoisting type hoisting device for reinforced concrete floor construction. The hoisting device comprises a pillar, a suspension beam, hoisting screws and a keel. The lower end of the pillar is fixed on a steel structure beam, the upper end of the pillar is connected with the suspension beam, the hoisting screws are arranged in the length direction of the suspension beam, the lower ends of the hoisting screws are connected with the keel, a template is paved on the keel, and the template jacks the steel structure beam. On the basis of a steel beam or a steel truss at the top of a building, the hoisting device is arranged on the steel beam or the steel truss, the template is hoisted through the hoisting device, and cast-in-place concrete construction operation can be facilitated. An all-around scaffold is not required, a press steel plate is not required, and the hoisting device is simple in construction and low in construction cost, and does not require a large amount of labor, so that the hoisting device effectively reduces construction cost and shortens the working period. The hoisting device is mainly used for high-rise buildings with large floor height.

Description

The hanging erecting by overhang of suspention is used in reinforced concrete floor construction
technical field:
The utility model belongs to architectural engineering construction technique field, is specifically related to a kind of reinforced concrete floor construction and uses the hanging erecting by overhang of suspention.
background technology:
Existing building structure adopts " steel truss or girder steel+concrete slab " structural system in a large number, at steel truss or girder steel upper concrete floor, for this architectural structure system, in the time of construction, can adopt the template of profiled sheet as fluid concrete plate, carry out pouring concrete operation; Or the method that adopts full hall scaffold to support concrete blinding is carried out pouring concrete operation.Profiled sheet expense is higher, and profiled sheet mostly is single load bearing plate, can not meet the service condition of profiled sheet in some construction occasion.Adopt full hall scaffold to support concrete blinding expense also higher, especially in the situation that floor floor height is higher, layer as overhead in railway station, reaches the height of 10 meters from the paramount rack-layer of rail layer, need to set up a large amount of scaffolds, construction bothers, long in time limit, labor strength is large.For above-mentioned technical problem, solve the problem of reinforced concrete floor cast-in-site difficulty in a kind of new construction method of the realm of building construction continuation.
utility model content:
In sum, in order to overcome the deficiency of prior art problem, the utility model provides a kind of reinforced concrete floor construction to use the hanging erecting by overhang of suspention, it is taking the girder steel of building structure or steel truss as basis, on girder steel or steel truss, erecting by overhang is set, by erecting by overhang pendent form, thereby facilitate cast-in-place concrete construction operation, do not need to adopt full hall scaffold, also do not need profiled sheet, construction is simple, cost is low, and do not need a large amount of labours, thereby effectively reduce construction cost, reduction of erection time.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
The hanging erecting by overhang of suspention is used in a kind of reinforced concrete floor construction, wherein: comprise pillar, suspention beam, hanging screw mandrel and keel, described pillar lower end is fixed on steel structure girder, the upper end of pillar is connected with suspention beam, length direction along suspention beam is provided with hanging screw mandrel, the lower end of hanging screw mandrel is connected with keel, is equipped with template on keel, and template holds out against steel structure girder.
Further, described pillar upper end arranges adjustable jack, and pillar upper end is connected by adjustable jack with suspention beam.
Further, the end face of described template and the end face of steel structure girder are concordant.
Further, described pillar lower end and steel structure girder are welded and fixed, or are fixed with mandrel on steel structure girder, and pillar is sleeved on outside mandrel.
The beneficial effects of the utility model are:
1, the utility model is taking the girder steel of building structure or steel truss as basis, on girder steel or steel truss, erecting by overhang is set, by erecting by overhang pendent form, thereby facilitate cast-in-place concrete construction operation, do not need to adopt full hall scaffold, do not need profiled sheet yet, construction is simple, and cost is low, and does not need a large amount of labours, thereby effectively reduce construction cost, the reduction of erection time.
2, construction method of the present utility model is novel, utilizes cleverly the steel structure girder of building, taking steel structure girder as support, sets up the template of using for fluid concrete, can effectively solve the problem of reinforced concrete floor cast-in-site difficulty.
3, in the utility model, be that pillar is set on steel structure girder, shore supports suspention beam, suspention beam hung formwork, the utility model mainly uses in the time that building storey height is higher.
brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, the hanging erecting by overhang of suspention is used in a kind of reinforced concrete floor construction, on steel structure girder 1, erecting by overhang is set, erecting by overhang hung formwork 2, then carry out reinforcing bar binding, concrete pouring construction, when concrete strength reaches after strength of mould stripping, remove erecting by overhang and template 2, complete on-the-spot reinforcing bar and change solidifying Tulou plate construction operation.Described erecting by overhang comprises pillar 3, suspention beam 4, hanging screw mandrel 5, main joist and secondary joist, described pillar 3 lower ends are fixed on steel structure girder 1, pillar 3 upper ends arrange adjustable jack 7, pillar 3 upper ends are connected by adjustable jack 7 with suspention beam 4, be provided with hanging screw mandrel 5 along the length direction of suspention beam 4, the lower end of hanging screw mandrel 5 is connected with keel 6, is equipped with template 2 on keel 6, the end face of template 2 is concordant with the end face of steel structure girder 1, and template 2 holds out against steel structure girder 1.Described pillar 3 lower ends and steel structure girder 1 are welded and fixed, and described keel 6 can be made up of shaped steel, also can be made up of the lumps of wood.
When use, after erecting by overhang of the present utility model is set up on steel structure girder 1, by regulating adjustable jack 7 to adjust the height of suspention beam 4, after completing, in template 2, carry out the operation of present fluid concrete floor.
The present embodiment is applicable to the building operations that floor height is higher, the building operations such as railway station, exhibition hall.
Be noted that, the above embodiment is explanation to technical solutions of the utility model and unrestricted, other amendment that is equal to replacement or makes according to prior art of affiliated technical field those of ordinary skill, as long as do not exceed thinking and the scope of technical solutions of the utility model, within all should being included in the desired interest field of the utility model.

Claims (4)

1. the hanging erecting by overhang of suspention is used in a reinforced concrete floor construction, it is characterized in that: comprise pillar (3), suspention beam (4), hanging screw mandrel (5) and keel (6), described pillar (3) lower end is fixed on steel structure girder (1), the upper end of pillar (3) is connected with suspention beam (4), be provided with hanging screw mandrel (5) along the length direction of suspention beam (4), the lower end of hanging screw mandrel (5) is connected with keel (6), on keel (6), be equipped with template (2), template (2) holds out against steel structure girder (1).
2. the hanging erecting by overhang of suspention is used in reinforced concrete floor construction according to claim 1, it is characterized in that: described pillar (3) upper end arranges adjustable jack (7), and pillar (3) upper end is connected by adjustable jack (7) with suspention beam (4).
3. the hanging erecting by overhang of suspention is used in reinforced concrete floor construction according to claim 1, it is characterized in that: the end face of described template (2) is concordant with the end face of steel structure girder (1).
4. the hanging erecting by overhang of suspention is used in reinforced concrete floor construction according to claim 1, it is characterized in that: described pillar (3) lower end and steel structure girder (1) are welded and fixed, or steel structure girder is fixed with mandrel on (1), pillar (3) is sleeved on outside mandrel.
CN201420049484.4U 2014-01-26 2014-01-26 Upper suspension hoisting type hoisting device for reinforced concrete floor construction Expired - Lifetime CN203755678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420049484.4U CN203755678U (en) 2014-01-26 2014-01-26 Upper suspension hoisting type hoisting device for reinforced concrete floor construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420049484.4U CN203755678U (en) 2014-01-26 2014-01-26 Upper suspension hoisting type hoisting device for reinforced concrete floor construction

Publications (1)

Publication Number Publication Date
CN203755678U true CN203755678U (en) 2014-08-06

Family

ID=51250968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420049484.4U Expired - Lifetime CN203755678U (en) 2014-01-26 2014-01-26 Upper suspension hoisting type hoisting device for reinforced concrete floor construction

Country Status (1)

Country Link
CN (1) CN203755678U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758343A (en) * 2014-01-26 2014-04-30 中铁建工集团有限公司 Hanging type construction method and hanging device for reinforced concrete floor
CN105113541A (en) * 2015-09-06 2015-12-02 上海建工二建集团有限公司 Self-supporting bent-frame-free and template-free basement beam-free floor and inverse construction method of same
CN105715063A (en) * 2016-01-27 2016-06-29 北京筑福国际工程技术有限责任公司 Aerated concrete roof panel reinforced through steel beam structure and construction method thereof
CN106884529A (en) * 2017-03-15 2017-06-23 中国水利水电第七工程局有限公司 A kind of high-altitude long-span steel vestibule underplate concrete suspends steel form and construction method in midair

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758343A (en) * 2014-01-26 2014-04-30 中铁建工集团有限公司 Hanging type construction method and hanging device for reinforced concrete floor
CN105113541A (en) * 2015-09-06 2015-12-02 上海建工二建集团有限公司 Self-supporting bent-frame-free and template-free basement beam-free floor and inverse construction method of same
CN105715063A (en) * 2016-01-27 2016-06-29 北京筑福国际工程技术有限责任公司 Aerated concrete roof panel reinforced through steel beam structure and construction method thereof
CN106884529A (en) * 2017-03-15 2017-06-23 中国水利水电第七工程局有限公司 A kind of high-altitude long-span steel vestibule underplate concrete suspends steel form and construction method in midair

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN110331668B (en) Construction method of bidirectional inclined V-shaped bridge tower of cable-stayed bridge without back cables
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN204343459U (en) The parapet node structure of overlaid plate type concrete shear wall system
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN105178603A (en) EPS polyphenyl dismantling-exempt template concrete building cover plate construction technology method
CN202324606U (en) U-shaped force bearing seat
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN207700680U (en) A kind of roof boarding hangs mould
CN103952979A (en) Bracket-free construction device and construction method for steel-concrete superposed beam top plate
CN204418510U (en) Floor support plate steel bar girder structure
CN204280974U (en) A kind of template hoisting device
CN103669872A (en) Walling method and walling device
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN202865996U (en) Room modular structure for nuclear power plant
CN205857697U (en) The anti-form bracing constructing device hanging template
CN204282816U (en) A kind of girder template
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN102287050B (en) Construction method for long-span steel reinforced concrete roof truss

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140806