CN207226564U - A kind of high ferro logistics handling system - Google Patents

A kind of high ferro logistics handling system Download PDF

Info

Publication number
CN207226564U
CN207226564U CN201721233660.XU CN201721233660U CN207226564U CN 207226564 U CN207226564 U CN 207226564U CN 201721233660 U CN201721233660 U CN 201721233660U CN 207226564 U CN207226564 U CN 207226564U
Authority
CN
China
Prior art keywords
floor
platform
machine
handling system
high ferro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721233660.XU
Other languages
Chinese (zh)
Inventor
莫骏
张银龙
彭方进
许克亮
张�浩
周明翔
谭学清
刘辉
孙骥
王小岑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201721233660.XU priority Critical patent/CN207226564U/en
Application granted granted Critical
Publication of CN207226564U publication Critical patent/CN207226564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The utility model discloses a kind of high ferro logistics handling system, including transverse movement floor (2), vertical motion floor (3) and Universal floor (5), the transverse movement floor (2) is used for realization the horizontal motion of machine for collecting load (4), the Universal floor (5) is used for realization the divertical motion of the machine for collecting load (4), and the vertical motion floor (3) is used for realization the catenary motion of the machine for collecting load (4);Corresponding often save at compartment of the transverse movement floor (2) is equipped with platform edge connecting component (7).The high ferro logistics handling system of the utility model, using parallel means of transportation, is equipped with a plurality of universal backplane channel, operation while realizing multiple compartment containers is more efficient on platform;The multigroup handling facilities parallel processing of multi-line, more securely and reliably.

Description

A kind of high ferro logistics handling system
Technical field
The utility model belongs to high ferro logistlcs technology field, more particularly, to a kind of high ferro logistics handling system.
Background technology
China is a logistics big country, and year express delivery total amount has breached 30,000,000,000, but also is being continuously increased.With society The development of meeting, requirement of the people to Courier Service is also higher and higher, and the logistics speed that the same day reaches becomes a kind of trend.
Existing general fast railway transportation way, since its cargo handling speed is low, it is difficult to meet the needs of same day reaches;Aviation Then freight volume is smaller for means of transportation, while larger by natural environment influence, it is impossible to meets the needs of large conveying quantity;Road transporting mode is transported Can be low, costly, therefore preferably it is used for short distance transport, cannot equally meet the needs of China's express mail same day reaches.High-velocity stream master If using passenger traffic gap, kinds of goods packing is placed in passenger train gap and is transported, freight volume is few, efficiency is low.
Patent CN104648413A discloses a kind of Features of Railway Logistics handling system and method, including for classified placing cargo Some containers and compartment for transport container, compartment opposite sides be equipped with least one car door, set in compartment Have to be arranged in parallel along car length direction and park the first track groups for driving container to move thereon and as needed for container Second rail assembly of the first rail assembly of part and vertical connection, the first rail assembly are respectively positioned between the second rail assembly, Each car door face one of which rail assembly.In different containers, cargo is put for freight classification handling in the utility model Methodization is put, it is easy-to-look-up, and also transporting container is convenient.
But Features of Railway Logistics handling system disclosed in patent CN104648413A and method Shortcomings:(1) patent provides Features of Railway Logistics handling system be mainly accomplished that handling operation flow of the container in compartment, standing without regard to container Transportation loading and unloading on platform, therefore whole cargo handling operation flow is imperfect, it is impossible to meet the needs of high ferro logistics;(2) pass through Cargo quick despatch, Cascade System operation are realized in the continuous transmission of belt, any one link failure will all cause whole system Paralysis, reliability be not high;(3) due to there is certain stopping accuracy scope during Train Stopping, the technical solution which provides is not It can realize and different stopping accuracies are carried out adaptively, to ensure door position and platform handling facilities Dock With Precision Position.
Utility model content
For the disadvantages described above or Improvement requirement of the prior art, the utility model provides a kind of high ferro logistics handling system, Using parallel means of transportation, a plurality of universal backplane channel is equipped with platform, is made while realizing multiple compartment containers Industry, it is more efficient;The multigroup handling facilities parallel processing of multi-line, more securely and reliably.
To achieve these goals, a kind of high ferro logistics handling system of the utility model offer, including transverse movement floor, Vertical motion floor and Universal floor;
Wherein, the transverse movement floor is arranged along the length direction of platform in multiple rows of multiple row, and in two adjacent sections car Interval is equipped with the car door in railway carriage or compartment junction and each section compartment, the transverse movement floor is used for realization the horizontal direction of machine for collecting load Movement;
The interval is used to install the Universal floor, and the Universal floor is used for realization adjacent two pieces of transverse movement floors Seamless connection and the machine for collecting load divertical motion;
Along the width of the platform, vertical motion floor, the vertical motion are equipped between the Universal floor Floor is used for realization the catenary motion of the machine for collecting load;
The transverse movement floor corresponds to often to save is equipped with platform edge connecting component, the platform edge connecting portion at compartment Part is used for realization the machine for collecting load and loads the compartment or drawn off out of described compartment.
Further, along the width of the platform, walkway is equipped between the transverse movement floor, it is described Walkway is equipped with interval at the correspondence Universal floor, and the interval is used to install the vertical motion floor.
Further, the transverse movement floor is arranged along the length direction of platform in a manner of two rows of multiple rows, is used for Multiple machine for collecting load and non-interference are transported at the same time.
Further, warehouse is kept in one end of the platform equipped with machine for collecting load, waits to ship or stores for temporarily storing The machine for collecting load unloaded from compartment.
Further, the platform edge connecting component includes platform edge connecting plate and hydraulic cylinder, the hydraulic oil Cylinder is used to drive the platform edge connecting plate to stretch out or withdraw.
Further, the one end on the transverse movement floor is equipped with platform edge connecting plate switch button.
In general, by the contemplated above technical scheme of the utility model compared with prior art, can obtain down Row beneficial effect:
(1) the high ferro logistics handling system of the utility model, using parallel means of transportation, is equipped with a plurality of on platform Universal backplane channel, operation while realizing multiple compartment containers are more efficient;The multigroup handling facilities of multi-line are located parallel Reason, more securely and reliably.
(2) the high ferro logistics handling system of the utility model, is designed by Universal floor, it is possible to achieve machine for collecting load is along station The translation in platform direction and vertical platform direction car loading operation, simple in structure, project cost is lower.
(3) the high ferro logistics handling system of the utility model, using Universal floor scheme, machine for collecting load transport channel is continuous , it is ensured that the continuous non-stop run of handling operation, it is more efficient.
(4) the high ferro logistics handling system of the utility model, platform edge connecting plate is in off working state in contraction State, does not influence train operation;After train arrival stops, it is in extended state, can play connection platform and train Effect.Meanwhile the width of the spacious and comfortable gate of width of connecting plate, it is ensured that can be realized in Train Stopping accuracy rating Effective connection between platform vertical motion floor and gate.
Brief description of the drawings
Fig. 1 is a kind of arrangement schematic diagram of high ferro logistics handling system of the utility model embodiment;
Fig. 2 is a kind of high ferro logistics handling system handling operation area partial view of the utility model embodiment;
Fig. 3 is a kind of high ferro logistics handling system platform edge connecting plate schematic diagram of the utility model embodiment;
Fig. 4 is a kind of high ferro logistics handling system platform edge connecting plate top view of the utility model embodiment.
In all attached drawings, the identical structure of same reference numeral expression and part, wherein:1- platforms, 2- transverse movements Floor, 3- vertical motions floor, 4- machine for collecting load, 5- Universal floors, 6- walkways, 7- platform edges connecting component, 8- packagings Device working area, 9- platform edge connecting plates switch button, 10- hydraulic cylinders.
Embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is further elaborated the utility model.It should be appreciated that specific embodiment described herein is only explaining this Utility model, is not used to limit the utility model.It is in addition, involved in each embodiment of the utility model disclosed below As long as and to technical characteristic do not form conflict each other and be mutually combined.
Fig. 1 is a kind of arrangement schematic diagram of high ferro logistics handling system of the utility model embodiment.As shown in Figure 1, the intelligence Energy handling system includes transverse movement floor 2, vertical motion floor 3, machine for collecting load 4, Universal floor 5, walkway 6, platform side Edge connecting component 7, machine for collecting load keep in warehouse 8, platform edge connecting plate switch button 9 and hydraulic cylinder 10.
As shown in Figure 1, in one embodiment of the utility model, two transverse movements are equipped with along the direction of platform 1 Floor 2, Universal floor 5 is equipped with the car door in the junction in two adjacent sections compartment and each section compartment, transverse movement Plate 2 disconnects at the Universal floor 5, and the seamless connection of adjacent transverse athletic floor 2 is realized by the Universal floor 5, is easy to Machine for collecting load 4 realizes divertical motion by the Universal floor 5, and horizontal movement is realized by the transverse movement floor 2.
Fig. 2 is a kind of high ferro logistics handling system handling operation area partial view of the utility model embodiment.Such as Fig. 2 institutes Show, in one embodiment of the utility model, along the direction of platform 1, lead between two transverse movement floors 2 equipped with people's row Road 6, which disconnects in 5 correspondence position of Universal floor, and is equipped with vertical motion floor 3 in the position, easy to machine for collecting load 4 realize catenary motion by the vertical motion floor 3.
The high ferro logistics handling system of the utility model, using parallel means of transportation, is equipped with a plurality of ten thousand on platform To backplane channel, operation while realizing multiple compartment containers is more efficient;The multigroup handling facilities parallel processing of multi-line, It is more safe and reliable.
As shown in Figure 1, in one embodiment of the utility model, the car door on transverse movement floor 2 and each section compartment Corresponding position is equipped with platform edge connecting component 7.Fig. 3 is a kind of high ferro logistics handling system platform edge of the utility model embodiment Connecting plate schematic diagram;Fig. 4 is a kind of high ferro logistics handling system platform edge connecting plate top view of the utility model embodiment.Such as Shown in Fig. 3 and Fig. 4, platform edge connecting component 7 includes platform edge connecting plate and hydraulic cylinder 10, which is used for Drive platform edge connecting plate to stretch out or withdraw, enter easy to machine for collecting load 4 or transport compartment.In the one end on transverse movement floor 2 Equipped with platform edge connecting plate switch button 9.
As shown in Figure 1, warehouse 8 is kept in one end of platform 1 equipped with machine for collecting load, for temporarily storing machine for collecting load 4 to be shipped Or the machine for collecting load 4 that storage is unloaded from compartment.
During work, before train arrival, staff transports the machine for collecting load 4 for partly needing entrucking by Universal floor 5 To the gate position specified, after train arrival stops, platform edge connecting plate switch button 9 is pressed, hydraulic cylinder 10 promotes Platform edge connecting plate struts, and platform 1 is attached with train;The machine for collecting load 4 for needing entrucking is passed through transverse direction by staff Athletic floor 2 transports respective column door position;Machine for collecting load is transported on vertical motion floor 3 by Universal floor 5 again;Most Compartment is transported by vertical motion floor 3 and platform edge connecting plate 7 afterwards, completes car loading operation.
When the corresponding Universal floor region of a certain array carriage is just in operation, if machine for collecting load below is needed to front car Railway carriage or compartment carries out operation, can carry out turning line operation by the vertical motion floor 3 being arranged between two parallel channels, cross Operation Van Railway carriage or compartment, reaches designated position.
Since Universal floor is continuous, after can ensureing that a machine for collecting load vanning finishes, at once to the operation Area is fed, and realization is worked continuously, and improves entrucking efficiency.
Simultaneously as this programme is using the parallel method of a plurality of Universal floor transport channel, it is possible to achieve handling operation is same Shi Jinhang.The machine for collecting load unloaded down from compartment, can be transported directly to container caching operation area, is carried out by parallel channel Deconsolidation service.
As it will be easily appreciated by one skilled in the art that the above is only the preferred embodiment of the utility model only, not For limiting the utility model, any modification for being made where within the spirit and principles of the present invention, equivalent substitution and change Into etc., it should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of high ferro logistics handling system, it is characterised in that including transverse movement floor (2), vertical motion floor (3) and ten thousand To floor (5);
Wherein, the transverse movement floor (2) is arranged along the length direction of platform (1) in multiple rows of multiple row, and in two adjacent sections Interval is equipped with the car door in compartment junction and each section compartment, the transverse movement floor (2) is used for realization machine for collecting load (4) Horizontal motion;
The interval is used to install the Universal floor (5), and the Universal floor (5) is with being used for realization adjacent two pieces of transverse movements The seamless connection of plate (2) and the divertical motion of the machine for collecting load (4);
Along the width of the platform (1), vertical motion floor (3) are equipped between the Universal floor (5), it is described vertical Athletic floor (3) is used for realization the catenary motion of the machine for collecting load (4);
The transverse movement floor (2) corresponding often save is equipped with platform edge connecting component (7) at compartment, the platform edge connection Component (7) is used for realization the machine for collecting load (4) and loads the compartment or drawn off out of described compartment.
2. a kind of high ferro logistics handling system according to claim 1, it is characterised in that along the width of the platform (1) Direction is spent, is equipped with walkway (6) between the transverse movement floor (2), the walkway (6) is described universal in correspondence Plate (5) place is equipped with interval, and the interval is used to install the vertical motion floor (3).
A kind of 3. high ferro logistics handling system according to claim 1 or 2, it is characterised in that the transverse movement floor (2) arranged along the length direction of platform (1) in a manner of two rows of multiple rows, for transport at the same time multiple machine for collecting load (4) and It is non-interference.
4. a kind of high ferro logistics handling system according to claim 1, it is characterised in that one end of the platform (1) is set There is machine for collecting load to keep in warehouse (8), wait to ship or store the machine for collecting load (4) unloaded from compartment for temporarily storing.
A kind of 5. high ferro logistics handling system according to claim 1, it is characterised in that the platform edge connecting component (7) platform edge connecting plate and hydraulic cylinder (10) are included, the hydraulic cylinder (10) is used to drive the platform edge to connect Plate is stretched out or withdrawn.
A kind of 6. high ferro logistics handling system according to claim 1 or 2, it is characterised in that the transverse movement floor (2) one end is equipped with platform edge connecting plate switch button (9).
CN201721233660.XU 2017-09-25 2017-09-25 A kind of high ferro logistics handling system Active CN207226564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721233660.XU CN207226564U (en) 2017-09-25 2017-09-25 A kind of high ferro logistics handling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721233660.XU CN207226564U (en) 2017-09-25 2017-09-25 A kind of high ferro logistics handling system

Publications (1)

Publication Number Publication Date
CN207226564U true CN207226564U (en) 2018-04-13

Family

ID=61863864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721233660.XU Active CN207226564U (en) 2017-09-25 2017-09-25 A kind of high ferro logistics handling system

Country Status (1)

Country Link
CN (1) CN207226564U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109703587A (en) * 2019-01-16 2019-05-03 中铁第四勘察设计院集团有限公司 Baggage container automatic transmission system and method in a kind of city check-in compartment
CN110001694A (en) * 2019-03-29 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of machine for collecting load quick despatch system and method for automobile to high-speed rail
CN110239977A (en) * 2019-05-10 2019-09-17 中铁第四勘察设计院集团有限公司 A kind of circulation loading and unloading type high-speed rail logistics platform and handling method
CN110902420A (en) * 2018-04-18 2020-03-24 芜湖岭上信息科技有限公司 Control method for loading and unloading goods

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110902420A (en) * 2018-04-18 2020-03-24 芜湖岭上信息科技有限公司 Control method for loading and unloading goods
CN110902420B (en) * 2018-04-18 2021-06-22 临沂市宇顺物流有限公司 Control method for loading and unloading goods
CN109703587A (en) * 2019-01-16 2019-05-03 中铁第四勘察设计院集团有限公司 Baggage container automatic transmission system and method in a kind of city check-in compartment
CN110001694A (en) * 2019-03-29 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of machine for collecting load quick despatch system and method for automobile to high-speed rail
CN110001694B (en) * 2019-03-29 2023-08-01 中铁第四勘察设计院集团有限公司 Rapid assembling and disassembling system and method for container from automobile to high-speed rail
CN110239977A (en) * 2019-05-10 2019-09-17 中铁第四勘察设计院集团有限公司 A kind of circulation loading and unloading type high-speed rail logistics platform and handling method

Similar Documents

Publication Publication Date Title
CN107585603A (en) A kind of high ferro logistics handling system and method
CN207226564U (en) A kind of high ferro logistics handling system
CN107601062B (en) High-speed rail logistics intelligent loading and unloading system and method based on AGV trolley
US11447336B2 (en) Robotic cargo handling system and method
JP7288015B2 (en) ROBOT CONTAINER HANDLING APPARATUS AND METHOD
CN204736868U (en) Railway commodity circulation fast loading and unloading system
CN208377726U (en) Track intelligent sorting system
CN107572267A (en) A kind of physical-distribution intelligent handling system and method
CN110271827A (en) Track intelligent sorting system
CN109573429A (en) A kind of double-layer combined double-station RGV trolley and Automated tridimensional warehousing system
CN110589524B (en) Platform loading and unloading carrying system and method for high-speed rail fast motion train set
CN204586616U (en) Mobile shipping railway carriage or compartment
GB1237649A (en) Air-freight handling installation in conjuction with a sorting installation for general cargo
CN220843979U (en) Multilayer shuttle system integrating layer changing and warehouse-in and warehouse-out lifting machine
SK378792A3 (en) Device for transloading unit loads such as containers, swap bodies, semitrailers or the like
CN110116094B (en) High-speed rail logistics double-layer platform cargo transportation system and method
CN211254507U (en) Platform loading and unloading handling system for high-speed rail express train unit
CN108408321B (en) Efficient intensive automatic logistics sorting and storing warehouse system
CN216835928U (en) Baggage transportation system and baggage system
CN207226514U (en) A kind of high ferro physical-distribution intelligent handling system based on AGV trolleies
CN210411565U (en) High-speed railway logistics double-deck platform freight transportation system
CN208813990U (en) Goods yard structure
CN210279860U (en) Underground transfer device of high-speed railway platform
CN111284516B (en) Subway cargo transportation carriage, system and method
CN212221478U (en) Side-by-side loading and unloading operation goods yard for container truck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant