CN207193884U - A kind of bottom permeable isolated niche for ship lock entrance area at approach channel - Google Patents
A kind of bottom permeable isolated niche for ship lock entrance area at approach channel Download PDFInfo
- Publication number
- CN207193884U CN207193884U CN201720911174.2U CN201720911174U CN207193884U CN 207193884 U CN207193884 U CN 207193884U CN 201720911174 U CN201720911174 U CN 201720911174U CN 207193884 U CN207193884 U CN 207193884U
- Authority
- CN
- China
- Prior art keywords
- pier
- ship lock
- approach channel
- bottom permeable
- embankment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Barrages (AREA)
Abstract
Description
技术领域technical field
本实用新型属于航道建筑物领域,特别涉及一种用于船闸下引航道口门区的底部透水型隔流堤。The utility model belongs to the field of waterway buildings, in particular to a bottom permeable flow barrier embankment used for the gate area of the approach channel under the ship lock.
背景技术Background technique
船闸口门区是连接船闸和河道的纽带,是船闸引航道内静水与枢纽河段引航道外动水的过渡区域,恶劣的口门区水流条件一般表现为水流方向与船舶航线夹角较大、横向流速、纵向流速及回流流速大小不满足通航水流标准以及船舶航行水深不足等问题。口门区的水流条件决定着船舶能否顺利且安全的进出船闸。因此改善引航道口门区水流条件是船闸工程建设中的重要技术问题。The gate area of the ship lock is the link between the ship lock and the river channel. It is the transition area between the still water in the approach channel of the ship lock and the moving water outside the approach channel of the pivotal river section. The flow velocity, longitudinal flow velocity and return flow velocity do not meet the navigable water flow standards and the ship's navigation water depth is insufficient. The water flow conditions in the entrance area determine whether the ship can enter and exit the lock smoothly and safely. Therefore, it is an important technical issue in the construction of ship locks to improve the water flow conditions at the entrance of the approach channel.
口门区水流条件分改善往往需要修建各类辅助导航建筑物,目前研究较多的有导流墩、导航墙和隔水墙。枯水期电站运行方式仅少台机组发电,泄水闸全部关闭,设计流量下位于左汊航槽内的船闸下闸首门槛水深远小于最低的要求;船闸下引航道口门区段航道为弯曲型航道,且随着流量的增大,电站下泄水流分左右两股,进入左汊的分流比例逐渐增大,加上船闸下游导流堤较短,无法阻挡主流斜穿口门区,同时洲头左侧边滩较高的影响,口门区流速逐渐增大,船舶进出引航道口门较为困难。为降低引航道和口门区横流,需要在航道右侧布置导航建筑物。导流墩在靠近航道内侧形成强烈的回流、漩涡等不良流态,对船舶安全航行不利,导航墙在透空段易形成较强的绕柱水流,隔水墙改变了主流方向,不利于船闸下航行要求。The improvement of water flow conditions in the entrance area often requires the construction of various auxiliary navigation structures. At present, there are more researches on diversion piers, navigation walls and water barriers. In the dry season, only a few generating units are used to generate power, and all the sluice gates are closed. The water depth of the lower gate sill of the ship lock located in the left branch navigation channel under the design flow rate is much lower than the minimum requirement; the channel at the gate of the approach channel under the ship lock is curved. And with the increase of the flow rate, the water discharged from the power station is divided into two streams, the left and right streams, and the proportion of the diversion into the left branch gradually increases. In addition, the diversion embankment downstream of the ship lock is short, which cannot prevent the main flow from crossing the entrance area obliquely. Influenced by the higher side beach, the flow velocity in the entrance area gradually increases, and it is more difficult for ships to enter and leave the entrance of the approach channel. In order to reduce the cross flow in the approach channel and the gate area, it is necessary to arrange navigation structures on the right side of the channel. The diversion pier forms strong backflow, vortex and other undesirable flow patterns near the inner side of the channel, which is not conducive to the safe navigation of the ship. The navigation wall is easy to form a strong water flow around the column in the hollow section, and the water barrier changes the mainstream direction, which is not conducive to the ship lock. Next sailing request.
实用新型内容Utility model content
鉴于上述问题,本实用新型的目的在于提供一种改善下引航道口门区水流条件,保证船舶航行的安全,便于现场施工和安装维护的底部透水型隔流堤。In view of the above problems, the purpose of this utility model is to provide a bottom permeable dike that improves the water flow conditions at the entrance of the approach channel, ensures the safety of the ship's navigation, and facilitates on-site construction, installation and maintenance.
为实现上述目的,本实用新型提供的一种用于船闸下引航道口门区的底部透水型隔流堤。其中,包括多个排列的墩台和在相邻墩台间设置的插板;所述底部透水型隔流堤端部和泄水闸间设有船闸下游隔水墙;In order to achieve the above purpose, the utility model provides a bottom permeable barrier embankment for the gate area of the approach channel under the ship lock. Among them, it includes a plurality of arranged pier abutments and inserting plates arranged between adjacent abutments; the end of the bottom permeable dike and the sluice is provided with a bulkhead downstream of the ship lock;
所述墩台包括承台及该承台上设置的墩柱;所述墩柱间相连接的两侧面设置竖槽;所述插板插接于相邻墩柱的侧面竖槽内;The abutment includes a cap and a pier column arranged on the abutment; vertical grooves are arranged on both sides connected between the pier columns; the inserting plate is inserted into the side vertical groove of the adjacent pier column;
所述的墩台顶高程大于洪水期电站尾水位。The elevation of the abutment top is greater than the tailwater level of the hydropower station during the flood period.
进一步的,相邻的所述墩柱间设置有至少一块所述插板;所述墩柱、插板顶高设置成同一数值。Further, at least one inserting plate is arranged between adjacent piers; the top heights of the piers and inserting plates are set to the same value.
作为优选,承台长度12.5m,宽度2.5m,墩柱长度11.5m,宽度2.5m,单段插板长度9m,高2.3m,厚度0.5m,上述的承台和墩柱顶高程随地形的变化而变化。As a preference, the length of the cap is 12.5m, the width is 2.5m, the length of the pier column is 11.5m, the width is 2.5m, the length of a single-section insert is 9m, the height is 2.3m, and the thickness is 0.5m. change with change.
本实用新型的有益效果是改善引航道下口门区水流条件,保证船舶航行的安全,降低部分构件的重量,插板插接于相邻墩柱的侧面竖槽内,给运输和安装带来了便利,提供工程效率,同样便于后续的维护和拆卸。由于底部透空式的隔流堤设计,调节中洪水流量下左汊河道内流量分配,减弱口门区横向流速及水流夹角The beneficial effect of the utility model is to improve the water flow conditions in the entrance area of the approach channel, ensure the safety of the ship's navigation, and reduce the weight of some components. It provides convenience and engineering efficiency, and also facilitates subsequent maintenance and disassembly. Due to the design of the permeable dike at the bottom, the flow distribution in the left branch channel under the medium flood flow is adjusted, and the lateral flow velocity and the included angle of the water flow in the entrance area are weakened.
解决了船闸下引航道口门区横流过大及调节枯水期和洪水期左右汊水流分配的技术问题。具体是通过底部透空式隔流堤,枯水期时原本较为集中的水流被均匀分散,一部分水流穿过导航架进入引航道,一部分水流下行经口门区进入航道内,引航道口门区水流流速较小,横向流速不超过通航水流标准。随着流量的增大,隔流堤插板发挥隔流功能,减少了洪水期的壅水值,通过隔流堤进入引航道口门区流量较工程前大幅度降低,减弱了主流斜穿口门区而产生的过大横向流速,从而达到改善口门区通航水流条件。与现有技术相比,底部透空式隔流堤更适应改善枯水期水深不足,中洪水期口门区横流较大的碍航特点,使主流汇入口门区的流量比得到有效调节,最程度上减弱了泄水闸泄流对口门区水流条件的影响。The technical problems of excessive cross flow at the gate area of the approach channel under the ship lock and adjusting the distribution of left and right branch water in dry season and flood season are solved. Specifically, through the bottom-permeable dike, the originally relatively concentrated water flow is evenly dispersed during the dry season, part of the water flow passes through the navigation frame and enters the approach channel, and part of the water flow descends through the entrance area and enters the channel. Small, the lateral flow velocity does not exceed the standard of navigable water flow. With the increase of the flow rate, the dike plate plays the function of blocking the flow, reducing the backwater value during the flood period, and the flow entering the entrance area of the approach channel through the dike is greatly reduced compared with that before the project, which weakens the oblique crossing of the main flow. The excessive lateral flow velocity generated in the area can improve the navigable water flow conditions in the entrance area. Compared with the existing technology, the permeable dike at the bottom is more suitable for improving the lack of water depth in the dry season and the large cross flow in the entrance area during the middle flood period. In this way, the influence of the discharge of the sluice on the water flow conditions in the entrance area is weakened.
附图说明Description of drawings
图1为本实用新型的结构俯视图;Fig. 1 is the structural top view of the utility model;
图2为本实用新型的结构侧视图;Fig. 2 is a structural side view of the utility model;
图3为实施的结构示意图。Figure 3 is a schematic diagram of the implementation.
具体实施方式包括多个排列的墩台和在相邻墩台间设置的插板;所述底部透水型隔流堤端部和泄水闸间设有船闸下游隔水墙;The specific embodiment includes a plurality of arranged abutments and inserting plates arranged between adjacent abutments; the end of the bottom permeable dike and the sluice is provided with a water barrier downstream of the ship lock;
所述所述的墩台顶高程大于洪水期电站尾水位。The elevation of the abutment top is greater than the tailwater level of the hydropower station during the flood period.
下面结合附图对实用新型作进一步详细的说明。Below in conjunction with accompanying drawing, utility model is described in further detail.
如图1-3所示,一种用于船闸下引航道口门区的底部透水型隔流堤。其中,包括多个排列的墩台01与在相邻墩台01间设置的且和墩台01顶高数值相同的插板02。墩台01包括承台011及该承台011上设置的墩柱012,在墩柱012间相连接的两侧面设置竖槽013,至少有一块插板02竖向叠加式插接于相邻墩柱012的侧面竖槽013内,墩台01顶高程大于洪水期电站尾水位,防止堤顶过流产生不利于船舶航行的横流。墩台01包括承台011及该承台011上设置的墩柱012,墩柱012间相连接的两侧面设置竖槽013,插板02插接于相邻墩柱012的侧面竖槽013内,承台011长度12.5m,宽度2.5m,墩柱012长度11.5m,宽度2.5m,单段插板02长度9m,高2.3m,厚度0.5m。安装简易,大大提高建设工程的效率。As shown in Figure 1-3, a bottom permeable barrier dike used in the gate area of the approach channel under the ship lock. Wherein, it includes a plurality of arranged piers 01 and inserting plates 02 arranged between adjacent piers 01 and having the same top height as the piers 01 . The abutment 01 includes a cap 011 and a pier column 012 provided on the abutment 011, vertical grooves 013 are arranged on both sides connected between the pier columns 012, and at least one inserting plate 02 is vertically superimposed and inserted into the adjacent pier In the side vertical groove 013 of the column 012, the top elevation of the abutment 01 is higher than the tailwater level of the power station during the flood period, so as to prevent the cross flow that is not conducive to the navigation of ships due to the overcurrent at the top of the embankment. The abutment 01 includes the cap 011 and the pier column 012 provided on the abutment 011, the vertical grooves 013 are arranged on the two sides connected between the pier columns 012, and the inserting plate 02 is inserted into the side vertical groove 013 of the adjacent pier column 012 , Cap 011 has a length of 12.5m and a width of 2.5m, a pier column 012 has a length of 11.5m and a width of 2.5m, and a single-section insert plate 02 has a length of 9m, a height of 2.3m and a thickness of 0.5m. It is easy to install and greatly improves the efficiency of construction projects.
相邻的墩柱012间设置有至少一块所述插板02,可以根据实际情况确定插板02的尺寸和数量。墩柱012、插板02顶高设置成同一数值同样是防止堤顶过流产生横流。本申请解决了船闸11下引航道口门区横流过大及调节枯水期和洪水期左右汊水流分配的技术问题。枯水期时,电站下泄水流出尾水渠后,向河道左侧行进,右侧边滩略有过流,水流主要该堤底部透空孔进入左侧河道,原本较为集中的水流在该堤底部透水的调整作用下被均匀分散,一部分水流穿过导航架进入引航道,一部分水流下行经口门区进入航道内,引航道口门区水流流速较小,横向流速不超过通航水流标准。随着流量的增大,插板02发挥隔流作用,通过透水型隔流堤进入引航道口门区流量较工程前大幅度降低,口门区内流速有所减小,口门区水流条件得到较明显改善,水流条件基本满足规范要求。At least one board 02 is arranged between adjacent piers 012, and the size and quantity of boards 02 can be determined according to actual conditions. Setting the top height of the pier column 012 and the inserting plate 02 to the same value is also to prevent cross flow caused by overcurrent at the top of the embankment. This application solves the technical problems of excessive cross flow at the gate area of the approach channel under the ship lock 11 and adjusting the distribution of left and right branch water flow in dry season and flood season. During the dry season, the water discharged from the power station flows out of the tailrace channel and travels to the left side of the river. The right bank has a slight overflow. Under the action of adjustment, it is evenly dispersed, part of the water flow passes through the navigation frame and enters the approach channel, and part of the water flow goes down through the entrance area and enters the channel. With the increase of the flow rate, the plugboard 02 plays the role of blocking the flow, and the flow rate entering the entrance area of the approach channel through the permeable flow separation dike is greatly reduced compared with that before the project, the flow velocity in the entrance area is reduced, and the water flow conditions in the entrance area are improved. Significant improvement, water flow conditions basically meet the specification requirements.
实施时,航运枢纽主要建筑物包括船闸11、电站厂房12、开关站、泄水闸13和拦河坝。设计洪水最大泄流量20300m3/s,校核洪水最大泄流量26300m3/s。船闸采用一级船闸,船闸闸室有效尺寸为130m x 12m x 2.5m(闸室长度x宽度x槛上水深)。船闸11设计流量265m3/s,下闸首水位62.99m;最大通航流量3000m3/s,下闸首水位66.26m;电站最大水头24m,最小水头7m,设计水头7.5m。泄水闸布置于主河床,共设15孔,闸孔净宽9m。During implementation, the main buildings of the shipping hub include ship locks 11, power plant buildings 12, switching stations, sluice gates 13 and barrages. The maximum discharge of designed flood is 20300m3/s, and the maximum discharge of checked flood is 26300m3/s. The ship lock adopts a first-class ship lock, and the effective size of the ship lock chamber is 130m x 12m x 2.5m (lock chamber length x width x water depth above the sill). Ship lock 11 has a design flow rate of 265m3/s and a water level at the head of the lower lock of 62.99m; a maximum navigable flow of 3000m3/s and a water level of the head of the lower lock 66.26m; the maximum water head of the power station is 24m, the minimum water head is 7m, and the design water head is 7.5m. The sluice gate is arranged on the main riverbed, with 15 holes in total, and the net width of the sluice holes is 9m.
以上所述的仅是本实用新型的一些实施方式。对于本领域的一般技术人员来说,在不脱离本实用新型创造构思的前提下,还可以做出若干改进,都属于实用新型的保护范围。What have been described above are only some embodiments of the present utility model. For those skilled in the art, on the premise of not departing from the inventive concept of the utility model, some improvements can be made, which all belong to the protection scope of the utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720911174.2U CN207193884U (en) | 2017-07-26 | 2017-07-26 | A kind of bottom permeable isolated niche for ship lock entrance area at approach channel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720911174.2U CN207193884U (en) | 2017-07-26 | 2017-07-26 | A kind of bottom permeable isolated niche for ship lock entrance area at approach channel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207193884U true CN207193884U (en) | 2018-04-06 |
Family
ID=61798688
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720911174.2U Expired - Fee Related CN207193884U (en) | 2017-07-26 | 2017-07-26 | A kind of bottom permeable isolated niche for ship lock entrance area at approach channel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207193884U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112030886A (en) * | 2020-09-04 | 2020-12-04 | 水利部交通运输部国家能源局南京水利科学研究院 | Approach channel layout method combining water diversion and drainage channel with bottom permeable navigation wall |
| CN114841020A (en) * | 2022-07-01 | 2022-08-02 | 交通运输部天津水运工程科学研究所 | Method for calculating cross-flow extreme value of gate area of downstream approach channel of ship lock with flow guide screen and application |
| CN117057282A (en) * | 2023-10-11 | 2023-11-14 | 交通运输部天津水运工程科学研究所 | Calculation method and application of diversion ratio of hub buildings during ship lock operation period |
-
2017
- 2017-07-26 CN CN201720911174.2U patent/CN207193884U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112030886A (en) * | 2020-09-04 | 2020-12-04 | 水利部交通运输部国家能源局南京水利科学研究院 | Approach channel layout method combining water diversion and drainage channel with bottom permeable navigation wall |
| CN112030886B (en) * | 2020-09-04 | 2021-10-01 | 水利部交通运输部国家能源局南京水利科学研究院 | Approach channel layout method combining water diversion and drainage channel with bottom permeable navigation wall |
| CN114841020A (en) * | 2022-07-01 | 2022-08-02 | 交通运输部天津水运工程科学研究所 | Method for calculating cross-flow extreme value of gate area of downstream approach channel of ship lock with flow guide screen and application |
| CN117057282A (en) * | 2023-10-11 | 2023-11-14 | 交通运输部天津水运工程科学研究所 | Calculation method and application of diversion ratio of hub buildings during ship lock operation period |
| CN117057282B (en) * | 2023-10-11 | 2024-01-23 | 交通运输部天津水运工程科学研究所 | Calculation method and application of diversion ratio of hub buildings during ship lock operation period |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104234174B (en) | A kind of combined type froth breaking siphonic water-collecting well and method | |
| CN206591500U (en) | A kind of laterally-graded rectifier type stiling basin for river course of turning | |
| CN207567714U (en) | A kind of hydraulic engineering flood-discharge energy-dissipating experimental rig | |
| CN107203674B (en) | Tidal reach tributary inlet door water diversion project fluidised form ameliorative way | |
| CN207003391U (en) | A kind of water gate energy-dissipating installation | |
| CN103498452B (en) | The slit structure of high steep Narrow Valleys outlet structure escape works | |
| CN203188185U (en) | United energy dissipation structure under ultralow Froude number | |
| CN104695390B (en) | A combined super-discharging energy-dissipating flood unit and method | |
| CN220789664U (en) | Gravity dam spillway | |
| CN107386220B (en) | Gap split-flow type secondary dam structure | |
| CN212248137U (en) | A continuous diversion energy-dissipating spillway, arc-shaped dissipating pier and energy dissipating unit | |
| CN202214710U (en) | Overflow and water discharge integrated sluice weir | |
| CN210002360U (en) | A damming and flood discharge structure in alpine canyons | |
| CN204982814U (en) | Power that disappears structure in low water head dam low reaches riverbed | |
| CN107975015A (en) | It is provided with the checkdam of surface spillways | |
| CN220927756U (en) | Water conservancy project draws river energy dissipation scour protection facility | |
| CN204919467U (en) | A separate and flow dyke that is used for approach channel on offshore lock | |
| CN202865812U (en) | Flow-isolating structure of ship-lock approach channels | |
| CN205369181U (en) | Ditch water treatment drainage hole structure | |
| CN209114453U (en) | A combined structure for navigable water flow conditions in the entrance area | |
| CN203904946U (en) | Sediment transport device | |
| CN203514275U (en) | Narrow-slit flip bucket structure of release structure in high and steep narrow valley | |
| CN216130077U (en) | Combined type flow-picking energy dissipation device suitable for narrow riverbed | |
| CN118422654A (en) | Structure for improving water flow characteristics at junction of underground cavern and use method thereof | |
| CN206220066U (en) | Passed the flood period the choosing of the breach flow, down stream energy-dissipating structure for gravity dam bank |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180406 Termination date: 20190726 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |