CN207079596U - A kind of board-like double-row pile foundation pit support structure of counterfort - Google Patents

A kind of board-like double-row pile foundation pit support structure of counterfort Download PDF

Info

Publication number
CN207079596U
CN207079596U CN201720973499.3U CN201720973499U CN207079596U CN 207079596 U CN207079596 U CN 207079596U CN 201720973499 U CN201720973499 U CN 201720973499U CN 207079596 U CN207079596 U CN 207079596U
Authority
CN
China
Prior art keywords
pile
row
piles
support
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720973499.3U
Other languages
Chinese (zh)
Inventor
何长明
宁平华
熊勇
黎军
杨宏助
曹建新
刘思振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou City Engineering Design Studies Total Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Engineering Design Studies Total Institute filed Critical Guangzhou City Engineering Design Studies Total Institute
Priority to CN201720973499.3U priority Critical patent/CN207079596U/en
Application granted granted Critical
Publication of CN207079596U publication Critical patent/CN207079596U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种扶壁板式双排桩基坑支护结构,包括沿基坑侧壁方向前后间隔设置的前排支护桩和后排支护桩,前排支护桩和后排支护桩的桩顶均具有冠梁,前排支护桩的桩顶标高低于后排支护桩的桩顶标高,前排支护桩与后排支护桩之间通过连续的桩顶支撑板相连接,桩顶支撑板与后排支护桩之间沿基坑侧壁方向间隔设有扶壁板,在后排支护桩后设有止水桩,通过降低前排支护桩的桩顶标高,既充分发挥了后排支护桩的抗弯能力,又可以减少位于基坑顶部的1~2道内支撑,加快基坑施工进度;而且,前排支护桩和后排支护桩之间通过桩顶支撑板和扶壁板相连,可将后排支护桩的水平力传递至前排支护桩,提高整个支护结构的整体性和整体刚度。

The utility model discloses a buttress plate type double-row pile foundation pit support structure, which comprises a front row of support piles and a rear row of support piles arranged at intervals along the direction of the side wall of the foundation pit, and a front row of support piles and a rear row of piles. The pile tops of the supporting piles all have crown beams, the pile top elevation of the front row of supporting piles is lower than that of the rear row of supporting piles, and there is a continuous pile top between the front row of supporting piles and the rear row of supporting piles. The supporting boards are connected, and buttress boards are arranged at intervals along the direction of the side wall of the foundation pit between the pile top supporting board and the rear supporting piles, and water-stop piles are arranged behind the rear supporting piles. By lowering the front supporting piles, The pile top elevation not only gives full play to the bending resistance of the rear support piles, but also reduces the 1-2 internal supports at the top of the foundation pit, speeding up the construction progress of the foundation pit; moreover, the front support piles and the rear support piles The protection piles are connected by the pile top support plate and the buttress plate, which can transmit the horizontal force of the rear support piles to the front support piles, and improve the integrity and overall rigidity of the entire support structure.

Description

一种扶壁板式双排桩基坑支护结构A buttress plate type double-row pile foundation pit support structure

技术领域technical field

本实用新型涉及基坑支护结构技术领域,特别涉及一种双排桩基坑支护结构。The utility model relates to the technical field of foundation pit support structures, in particular to a foundation pit support structure with double rows of piles.

背景技术Background technique

地下空间的利用对改善地面环境起着重要作用。在发展地下交通、降低城市大气污染的同时,还应提倡建设城市地下综合管廊。地下空间可开发为地下铁道和地下车站、地下道路、地下停车库、地下商场、地下民防工程等,地下空间的开挖作业离不开基坑支护结构。基坑支护结构是为保证地下结构施工及基坑周边环境的安全,对基坑侧壁及周边环境采用的支挡、加固与保护措施。The utilization of underground space plays an important role in improving the ground environment. While developing underground transportation and reducing urban air pollution, the construction of urban underground comprehensive utility corridors should also be advocated. Underground space can be developed into underground railways, underground stations, underground roads, underground parking garages, underground shopping malls, underground civil defense projects, etc. The excavation of underground spaces is inseparable from foundation pit support structures. The foundation pit support structure is to ensure the safety of the underground structure construction and the surrounding environment of the foundation pit, and the support, reinforcement and protection measures are adopted for the side wall of the foundation pit and the surrounding environment.

双排桩基坑支护结构越来越广泛的应用,该基坑支护结构是由两排平行的钢筋混凝土桩及桩顶的连梁形成的空间门架式结构体系,由于普通的双排桩基坑支护结构具有整体刚度大、施工简便快速等优点,在基坑开挖深度不大时适合使用。当基坑开挖深度较大或地质条件较差时,或者在一些比较特殊的情况的时候,此时采用一般的双排桩基坑支护结构不能满足设计要求,如何满足保持支护结构的稳定而又施工方便是普通的双排桩支护结构遇到的最大问题。因此双排桩基坑支护结构的设计方案是否科学合理,直接关系到工程的质量、进度、经济效益和安全,因此双排桩基坑支护结构的合理设计具有非常重要的意义。The double-row pile foundation pit support structure is more and more widely used. The foundation pit support structure is a space portal structure system formed by two parallel rows of reinforced concrete piles and the connecting beam on the top of the pile. Due to the common double-row The pile foundation pit support structure has the advantages of high overall rigidity, simple and fast construction, etc., and is suitable for use when the excavation depth of the foundation pit is not large. When the excavation depth of the foundation pit is large or the geological conditions are poor, or in some special cases, the general double-row pile foundation pit support structure cannot meet the design requirements. How to meet the requirements of maintaining the support structure Stability and convenient construction are the biggest problems encountered by ordinary double-row pile support structures. Therefore, whether the design scheme of the double-row pile foundation pit support structure is scientific and reasonable is directly related to the quality, progress, economic benefits and safety of the project, so the rational design of the double-row pile foundation pit support structure is of great significance.

实用新型内容Utility model content

本实用新型所要解决的技术问题是提供一种施工方便、承载力高的扶壁板式双排桩基坑支护结构。The technical problem to be solved by the utility model is to provide a buttress board type double-row pile foundation pit support structure with convenient construction and high bearing capacity.

为解决上述技术问题所采用的技术方案:一种扶壁板式双排桩基坑支护结构,包括沿基坑侧壁方向前后间隔设置的前排支护桩和后排支护桩,所述前排支护桩和后排支护桩的桩顶均具有冠梁,所述前排支护桩的桩顶标高低于后排支护桩的桩顶标高,所述前排支护桩与后排支护桩之间通过连续的桩顶支撑板相连接,所述桩顶支撑板与后排支护桩之间沿基坑侧壁方向间隔设有扶壁板,在所述后排支护桩后设有止水桩。The technical solution adopted to solve the above technical problems: a buttress plate type double-row pile foundation pit support structure, including the front row of support piles and the rear row of support piles arranged at intervals along the direction of the side wall of the foundation pit. The pile tops of the front row of support piles and the rear row of support piles all have crown beams, the pile top elevation of the front row of support piles is lower than the pile top elevation of the rear row of support piles, and the front row of support piles and The rear row of support piles are connected by a continuous pile top support plate, and buttress plates are arranged at intervals along the direction of the side wall of the foundation pit between the pile top support plate and the rear row of support piles. There is a water stop pile behind the pile protection.

进一步地,所述前排支护桩和后排支护桩为地下连续墙,所述地下连续墙的厚度为800~1200mm。Further, the front row of support piles and the rear row of support piles are underground continuous walls, and the thickness of the underground continuous walls is 800-1200mm.

进一步地,所述前排支护桩与后排支护桩之间的桩顶高度差为3.0~6.0m。Further, the pile top height difference between the front row of support piles and the rear row of support piles is 3.0-6.0m.

进一步地,所述前排支护桩与后排支护桩之间的间隔距离为2.5m~5.0m。Further, the distance between the front row of support piles and the rear row of support piles is 2.5m-5.0m.

进一步地,所述前排支护桩和后排支护桩的桩径为0.8m~2.0m。Further, the pile diameters of the front row of support piles and the rear row of support piles are 0.8m-2.0m.

进一步地,所述桩顶支撑板的厚度为0.2m~0.5m。Further, the thickness of the pile top support plate is 0.2m-0.5m.

进一步地,所述扶壁板的厚度为0.3m~0.6m。Further, the buttress board has a thickness of 0.3m-0.6m.

进一步地,所述扶壁板为竖向斜撑,所述竖向斜撑两端分别与前排支护桩和后排支护桩的冠梁相连。Further, the buttress board is a vertical slanting brace, and the two ends of the vertical slanting brace are respectively connected to the crown beams of the front row of support piles and the rear row of support piles.

有益效果:此扶壁板式双排桩基坑支护结构,通过降低前排支护桩的桩顶标高,既充分发挥了后排支护桩的抗弯能力,又可以减少位于基坑顶部的1~2道内支撑,加快基坑施工进度;而且,前排支护桩和后排支护桩之间通过桩顶支撑板和扶壁板相连,可将后排支护桩的水平力传递至前排支护桩,提高整个支护结构的整体性和整体刚度。Beneficial effect: the buttress board type double-row pile foundation pit support structure, by reducing the pile top elevation of the front row of support piles, not only fully exerts the bending resistance of the rear row of support piles, but also reduces the 1 to 2 internal supports to speed up the construction progress of the foundation pit; moreover, the front row of support piles and the rear row of support piles are connected through the pile top support plate and buttress plate, which can transmit the horizontal force of the rear row of support piles to The front row of support piles improves the integrity and overall rigidity of the entire support structure.

附图说明Description of drawings

下面结合附图和实施例对本实用新型做进一步的说明;Below in conjunction with accompanying drawing and embodiment the utility model is described further;

图1为本实用新型双排桩基坑支护结构第一实施例的立面图;Fig. 1 is the elevation view of the first embodiment of the utility model double-row pile foundation pit support structure;

图2为本实用新型双排桩基坑支护结构第二实施例的立面图;Fig. 2 is the elevation view of the second embodiment of the utility model double-row pile foundation pit support structure;

图3为本实用新型双排桩基坑支护结构的平面图。Figure 3 is a plan view of the utility model double-row pile foundation pit support structure.

具体实施方式Detailed ways

参照图1至图3,本实用新型一种扶壁板式双排桩基坑支护结构,包括沿基坑侧壁方向前后间隔设置的前排支护桩1和后排支护桩2,前排支护桩1和后排支护桩2的桩顶均具有冠梁3,前排支护桩1的桩顶标高低于后排支护桩2的桩顶标高,前排支护桩1与后排支护桩2之间通过连续的桩顶支撑板4相连接,桩顶支撑板4与后排支护桩2之间沿基坑侧壁方向间隔设有扶壁板5,在后排支护桩2后设有止水桩6。Referring to Figures 1 to 3, the utility model is a buttress board type double-row pile foundation pit support structure, which includes front row support piles 1 and rear row support piles 2 arranged at intervals along the direction of the side wall of the foundation pit. The pile tops of row support pile 1 and rear row support pile 2 all have crown beams 3, the pile top elevation of front row support pile 1 is lower than the pile top elevation of rear row support pile 2, and front row support pile 1 It is connected with the rear row of support piles 2 through a continuous pile top support plate 4, and the pile top support plate 4 and the rear row of support piles 2 are provided with buttress plates 5 at intervals along the direction of the side wall of the foundation pit. A water stop pile 6 is arranged behind the support pile 2 .

其中,前排支护桩1和后排支护桩2的桩径可以相同,也可以不相同,前排支护桩1和后排支护桩2的桩径设计为0.8m~2.0m,前排支护桩1和后排支护桩2还可以采用地下连续墙结构形式,地下连续墙的厚度则设计为800~1200mm,冠梁3的宽度略大于桩径,冠梁高度略小于桩径。Among them, the pile diameters of the front row of support piles 1 and the rear row of support piles 2 can be the same or different, and the pile diameters of the front row of support piles 1 and the rear row of support piles 2 are designed to be 0.8m-2.0m, The front row of support piles 1 and the rear row of support piles 2 can also adopt an underground diaphragm wall structure, the thickness of the underground diaphragm wall is designed to be 800-1200 mm, the width of the crown beam 3 is slightly larger than the pile diameter, and the height of the crown beam is slightly smaller than the pile diameter. path.

前排支护桩1和后排支护桩2的间隔距离设计为2.5m~5.0m,前排支护桩1与后排支护桩2之间的桩顶高度差根据后排支护桩2的支护能力确定,通常设计为3.0~6.0m,以减少前排支护桩1的桩长,降低工程造价,加宽基坑内土方的开挖进度,同时充分发挥后排支护桩2的抗弯能力。The distance between the front row of support piles 1 and the rear row of support piles 2 is designed to be 2.5m to 5.0m, and the pile top height difference between the front row of support piles 1 and the rear row of support piles 2 is based on the The support capacity of 2 is determined, usually designed as 3.0-6.0m, in order to reduce the pile length of the front row of support piles 1, reduce the project cost, widen the excavation progress of the earthwork in the foundation pit, and give full play to the rear row of support piles 2 of bending resistance.

前排支护桩1与后排支护桩2之间的桩顶支撑板4厚度设计为0.2m~0.5m,桩顶支撑板4作为后排支护桩2的刚性铰,可以将后排支护桩2的水平力传递至前排支护桩1,同时,桩顶支撑板4也是扶壁板5的基础。桩顶支撑板4为现浇钢筋混凝土结构,混凝土强度等级采用C25~C50,可与前排支护桩1的冠梁3一起浇筑。The thickness of the pile top support plate 4 between the front row of support piles 1 and the rear row of support piles 2 is designed to be 0.2m to 0.5m, and the pile top support plate 4 is used as the rigid hinge of the rear row of support piles 2, which can The horizontal force of the support pile 2 is transmitted to the front row of support piles 1, and meanwhile, the pile top support plate 4 is also the foundation of the buttress plate 5. The pile top support plate 4 is a cast-in-place reinforced concrete structure, the concrete strength grade adopts C25-C50, and can be poured together with the crown beam 3 of the front row support pile 1.

扶壁板5的厚度设计为0.3m~0.6m,扶壁板5与桩顶支撑板4及后排支护桩2相连,扶壁板5可以为现浇钢筋混凝土结构,混凝土强度等级采用C25~C50。扶壁板5还可以采用竖向斜撑7,竖向斜撑7两端分别与前排支护桩1和后排支护桩2的冠梁3相连,竖向斜撑7可采用钢筋混凝土结构,也可以采用钢支撑,采用钢支撑时,应在第一道内支撑达到设计强度后施加预加力,以减小后排支护桩2的变形。The thickness of the buttress board 5 is designed to be 0.3m~0.6m. The buttress board 5 is connected with the pile top support board 4 and the rear row of support piles 2. The buttress board 5 can be a cast-in-place reinforced concrete structure, and the concrete strength grade adopts C25 ~C50. Buttress board 5 can also adopt vertical diagonal brace 7, and the two ends of vertical diagonal brace 7 are respectively connected with crown beam 3 of front row support pile 1 and rear row support pile 2, and vertical diagonal brace 7 can adopt reinforced concrete The structure can also be supported by steel. When using steel support, pre-loading should be applied after the first internal support reaches the design strength, so as to reduce the deformation of the rear row of support piles 2.

优选地,在后排支护桩2前设置喷射混凝土层8,喷射混凝土层8的厚度为0.08~0.10m,喷射混凝土强度等级不低于C20,喷射混凝土中配置钢筋网,钢筋网采用HPB300级钢筋,钢筋直径6~10mm,钢筋间距100~250mm。Preferably, a shotcrete layer 8 is set in front of the rear support pile 2, the thickness of the shotcrete layer 8 is 0.08-0.10m, the strength level of the shotcrete is not lower than C20, and the shotcrete is equipped with steel mesh, and the steel mesh adopts HPB300 grade Steel bar, steel bar diameter 6-10mm, steel bar spacing 100-250mm.

上面结合附图对本实用新型的实施方式作了详细说明,但是本实用新型不限于上述实施方式,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The embodiments of the present utility model have been described in detail above in conjunction with the accompanying drawings, but the present utility model is not limited to the above-mentioned embodiments. Various changes are made.

Claims (8)

  1. A kind of 1. board-like double-row pile foundation pit support structure of counterfort, it is characterised in that:Including being set along foundation pit side-wall direction time interval The front-seat support pile and heel row support pile put, the stake top of the front-seat support pile and heel row support pile is respectively provided with Guan Liang, before described The stake top absolute altitude for arranging support pile is less than the stake top absolute altitude of heel row support pile, passes through between the front-seat support pile and heel row support pile Continuous stake top supporting plate is connected, and is interval with and helps along foundation pit side-wall direction between the stake top supporting plate and heel row support pile Wallboard, water-seal pile is provided with after arranging support pile in the rear.
  2. 2. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The front-seat support pile It is diaphram wall with heel row support pile, the thickness of the diaphram wall is 800~1200mm.
  3. 3. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The front-seat support pile Stake top difference in height between heel row support pile is 3.0~6.0m.
  4. 4. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The front-seat support pile Spacing distance between heel row support pile is 2.5m~5.0m.
  5. 5. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The front-seat support pile Stake footpath with heel row support pile is 0.8m~2.0m.
  6. 6. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The stake top supporting plate Thickness be 0.2m~0.5m.
  7. 7. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The thickness of the counterfort plate Spend for 0.3m~0.6m.
  8. 8. the board-like double-row pile foundation pit support structure of counterfort according to claim 1, it is characterised in that:The counterfort plate is perpendicular To diagonal brace, the Guan Liang of the vertical diagonal brace both ends respectively with front-seat support pile and heel row support pile is connected.
CN201720973499.3U 2017-08-04 2017-08-04 A kind of board-like double-row pile foundation pit support structure of counterfort Expired - Fee Related CN207079596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720973499.3U CN207079596U (en) 2017-08-04 2017-08-04 A kind of board-like double-row pile foundation pit support structure of counterfort

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720973499.3U CN207079596U (en) 2017-08-04 2017-08-04 A kind of board-like double-row pile foundation pit support structure of counterfort

Publications (1)

Publication Number Publication Date
CN207079596U true CN207079596U (en) 2018-03-09

Family

ID=61425183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720973499.3U Expired - Fee Related CN207079596U (en) 2017-08-04 2017-08-04 A kind of board-like double-row pile foundation pit support structure of counterfort

Country Status (1)

Country Link
CN (1) CN207079596U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113513032A (en) * 2021-03-23 2021-10-19 深圳市工勘岩土集团有限公司 Three-row pile gravity dam combined retaining structure for filled high slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113513032A (en) * 2021-03-23 2021-10-19 深圳市工勘岩土集团有限公司 Three-row pile gravity dam combined retaining structure for filled high slope

Similar Documents

Publication Publication Date Title
CN107419731A (en) A kind of board-like double-row pile foundation pit support structure of counterfort and its construction method
CN201148620Y (en) Small pile combined anti-skid structure
CN201546227U (en) Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN205295963U (en) Long span steel case back pushes away construction with bearing structure that transversely rectifies
CN102367653A (en) Support structure for large-span continuous beam construction
CN203222738U (en) Steel pipe latticed column temporary buttress supporting device
CN203307817U (en) Double-row pile structure provided with steel tube prestressed concrete for connection between front-row piles and rear-row piles
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN105240018A (en) Vertical shaft construction device and method
CN205806684U (en) A kind of across base pit engineering conduit wiring suspension structure
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN207079596U (en) A kind of board-like double-row pile foundation pit support structure of counterfort
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN210460676U (en) Tunnel structure
CN205369043U (en) Long span steel case back pushes away construction and uses interim bearing structure
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN217500251U (en) Buttress type double-row pile mixed supporting structure
CN208106458U (en) Supporting structure for ultra-shallow soil-covering rectangular large section
CN203795435U (en) Diagonal bracing reinforcing structure
CN202482766U (en) Support structure for large span continuous beam constructions
CN207017169U (en) A kind of high-filled subgrade culvert off-loading structure
CN206503160U (en) A kind of continuous underground wall structure with measure of anti float
CN215829241U (en) Highway frame-type abutment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 510060 No. 348 East Ring Road, Guangzhou, Guangdong

Patentee before: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180309

CF01 Termination of patent right due to non-payment of annual fee