CN108316314A - A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit - Google Patents

A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit Download PDF

Info

Publication number
CN108316314A
CN108316314A CN201810205304.XA CN201810205304A CN108316314A CN 108316314 A CN108316314 A CN 108316314A CN 201810205304 A CN201810205304 A CN 201810205304A CN 108316314 A CN108316314 A CN 108316314A
Authority
CN
China
Prior art keywords
pit
deep basal
inner support
foundation
basal pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810205304.XA
Other languages
Chinese (zh)
Inventor
张燕
熊大生
于廷新
涂启柱
谢凡
沈峥
陈蒙
王忠华
储团结
黄俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201810205304.XA priority Critical patent/CN108316314A/en
Publication of CN108316314A publication Critical patent/CN108316314A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

The present invention relates to construction engineering technical fields, in particular to a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit.Include the diaphram wall positioned at deep basal pit and shallow foundation pit edge positions and the partition wall positioned at deep basal pit and shallow foundation hole intersection, it is characterised in that:Further include the supporting beam positioned at shallow bottom of foundation ditch and the middle part inner support in deep basal pit;The supporting beam is the reinforced concrete structure being layed in shallow foundation hole below architecture basics, and supporting beam is supported in the horizontal direction between the diaphram wall and partition wall in shallow foundation hole;The middle part inner support is the reinforced concrete structure being supported in the horizontal direction between the diaphram wall of deep basal pit and partition wall, and middle part inner support maintains an equal level with supporting beam and the partition wall both sides that are placed in.The constructing structure of the present invention is simple, construction method efficiently, it is easy, while improving foundation pit construction and being put into stability, reduce the cost of inner supporting structure, there is great promotional value.

Description

A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
Technical field
The present invention relates to construction engineering technical fields, solve to cheat in biasing problem in depth foundation pit in particular to a kind of Support construction.
Background technology
With the development of urbanization, each city is according to features such as Urban Spatial Morphology, travellings according to " zero distance is changed Multiply " requirement, Large Underground comprehensive transportation hub engineering comes into being, state's iron underground go out subway concourse, the mating subsidence observation of municipal administration, Closely linking, the spatially spatially formula interaction of iron subway concourse, builds sequential and there is intersection.
At present majority transit centres spatially underground negative one, two layers go out station hall layer, portion for municipal conveyance system, state's iron Divide F3/B3 for subway station hall layer, the excavation of deep basal pit involved in process of construction, such deep basal pit mostly uses stake (wall)+interior branch Support body system.Under regular situation, to reduce deep pit monitor risk, mostly uses shallow principle after first depth and carry out supporting excavation;Practical mistake Cheng Zhong, because project owner, the completion time of project, use demand difference, the principle of depth or synchronous construction carries out after need to being adjusted to first shallow Pattern foundation pit supporting structure with excavate, be based on this, deep, shallow area's foundation pit enclosure structure in the entire base pit engineering in part caused to bear horizontal force generation Biasing problem.Therefore it in depth foundation pit, needs to solve building enclosure biasing problem in synchronous digging process.
It needs to add in some in foundation pit in most cases using first shallow rear deep foundation ditch excavation method in the prior art Support construction, such as entitled " a kind of foundation pit supporting construction and method for first shallow rear depth " of Patent No. " CN104746520A " Chinese invention patent, the foundation pit supporting construction of the patent introduction in shallow foundation hole by being additionally arranged at the bottom of support bracket, then in ox Horizontal inner supporting structure is added between leg and deep basal pit, by supporting bracket to be solved in depth foundation pit with horizontal inner supporting structure Biasing problem is cheated, this mode can be good at carrying out stress transmission, but need to add extra support ox in shallow foundation hole Leg structure actually increases entire difficulty of construction, improves construction cost, reduces construction efficiency, it is difficult to carry out a wide range of Popularization and application.
Invention content
Present invention aim to the depth internal support of foundation pit knots for the prior art for solving to mention in above-mentioned background technology Structure has that difficulty of construction is big, efficiency is low, of high cost, provides a kind of interior branch for solving to cheat biasing problem in depth foundation pit Support structure.
The technical scheme is that:A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit, including position Cheat in the diaphram wall of deep basal pit and shallow foundation pit edge positions and positioned at deep basal pit and shallow foundation the partition wall of intersection, feature It is:Further include the supporting beam positioned at shallow bottom of foundation ditch and the middle part inner support in deep basal pit;The supporting beam is paving The reinforced concrete structure below interior architecture basics is cheated set on shallow foundation, supporting beam is arranged in the horizontal direction in the underground that shallow foundation is cheated Between diaphragm wall and partition wall;The middle part inner support be supported in the horizontal direction deep basal pit diaphram wall and partition wall it Between reinforced concrete structure, middle part inner support and supporting beam maintain an equal level and the partition wall both sides that are placed in.
The supporting beam includes crossbeam arrange along horizontal cross and along the longitudinally arranged longeron of level;Institute The interspersed connection of crossbeam and longeron stated forms the reticular supporting structure being supported between the diaphram wall and partition wall in shallow foundation hole.
The further crossbeam and longeron junction arranged beneath have sub-merged pier;The sub-merged pier be supported in crossbeam and The Reinforced Concrete Pier Column of longeron junction, sub-merged pier lower end are vertically arranged in shallow Foundation Pit bottom.
The further partition wall upper end has been poured along horizontal longitudinally arranged intermediate beam;The intermediate beam and cross Beam, middle part inner support maintain an equal level;The crossbeam, middle part inner support are fixedly connected with intermediate beam.
It is provided with the waist rail to maintain an equal level with intermediate beam in the further shallow foundation hole;The waist rail is to be fixed on shallow foundation The reinforced concrete structure on diaphram wall inner wall in hole, waist rail are fixedly connected to form cyclic structure with intermediate beam;It is described Crossbeam and longeron be supported between waist rail and intermediate beam.
The further diaphram wall upper end is disposed with Guan Liang;Arrangement in the annulus that the Guan Liang surrounds There is top inner support 0;The top inner support 0 is the reinforced concrete structure being supported in the horizontal direction in cyclic annular Guan Liang, Vertically arranged for interval, top inner support 0 pass through vertical vertical in deep basal pit and shallow foundation hole top inner support 0 with middle part inner support Column is supported in deep basal pit and shallow foundation hole top.
The further supporting beam and 2~10cm of architecture basics interval in shallow foundation hole.
A kind of depth foundation ditch construction method, it is characterised in that:Include the following steps:1), periphery is cheated along deep basal pit and shallow foundation Construction diaphram wall and partition wall, column of constructing among deep basal pit and shallow foundation hole;
2), at excavation of foundation pit region excavation pit to top inner support bottom surface, Guan Liang of constructing at the top of diaphram wall And retaining wall, top inner support is poured in foundation pit, it is made to be fixedly connected with Guan Liang and column;
3), continue to be excavated to downwards at the bottom surface of shallow foundation hole, waist rail of constructing on the diaphram wall inner wall in shallow foundation hole, in shallow Construction Support beam in foundation pit pours intermediate beam in partition wall upper end, in pouring middle part inner support in deep basal pit, it is made to be held with supporting beam It is flat;
4), in construction shallow foundation hole architecture basics and side wall on the crossbeam and longeron in shallow foundation hole, deep basal pit region is continued It is excavated at deep basal pit bottom, bottom inner support of constructing between partition wall and the diaphram wall of deep basal pit, in deep basal pit bottom surface Place's construction deep basal pit architecture basics and side wall;
5) bottom inner support, is removed, the deep basal pit side wall that continues to construct in deep basal pit is removed to middle part inner support in middle part Support at deep basal pit side wall to top inner support of constructing, removes top inner support, carries out deep basal pit and shallow foundation hole top is bound place Reason.
In the further step 3, the method for Construction Support beam is in shallow foundation is cheated:It is excavated at the bottom surface of shallow foundation hole Groove, sub-merged pier of constructing make to prop up in crossbeam and the middle part in deep basal pit in pouring the longitudinal and cross beam being criss-cross arranged on sub-merged pier It props up flat.
In the further step 1, the method for construction column is among deep basal pit and shallow foundation hole:In deep basal pit and Shallow foundation carries out drilling construction column pile foundation in hole, and column is installed on the basis of stand column pile.
Advantages of the present invention has:1, the present invention is propped up by being arranged in middle part positioned opposite between deep basal pit and shallow foundation hole Support and supporting beam, effectively safeguard foundation pit structure, are designed directly against shallow cut area bias resistance to compression deficiency, stress It is clear, keep two foundation pits with good stability;
2, support beam structure of the invention is simple, the arrangement for formula of avoiding the peak hour with foundation beam, neither influences shallow foundation and cheats architecture basics Construction, and can be as the force transferring structure of middle part inner support;
3, deep basal pit of the invention and shallow foundation hole form of construction work are simple, efficient, the support beam body under architecture basics of constructing System need not remove, and can directly be embedded in underground, improve part of the foundation foundation bearing capacity.
The constructing structure of the present invention is simple, and construction method is efficient, easy, while improving base pit stability, reduces Removing temporary supports, optimize construction procedure, have great promotional value.
Description of the drawings
Fig. 1:The present embodiment deep basal pit and shallow foundation cheat construction of diaphragm wall structural schematic diagram;
Fig. 2:The present embodiment deep basal pit and shallow foundation hole top inner support constructing structure schematic diagram;
Fig. 3:The present embodiment deep basal pit and shallow foundation hole supporting beam and middle part inner supporting structure schematic diagram;
Fig. 4:The present embodiment shallow foundation cheats architecture basics constructing structure schematic diagram;
Fig. 5:The present embodiment deep basal pit bottom inner support constructing structure schematic diagram;
Fig. 6:The present embodiment deep basal pit bottom bracing demolition constructing structure schematic diagram;
Fig. 7:Bracing demolition constructing structure schematic diagram in the middle part of the present embodiment deep basal pit;
Fig. 8:The present embodiment deep basal pit and shallow foundation hole supporting beam and middle part inner support vertical view;
Wherein:1-diaphram wall;2-partition walls;3-middle part inner supports;4-crossbeams;5-longerons;6-sub-merged piers;7— Intermediate beam;8-waist rails;9-Guan Liangs;10-top inner supports;11-columns;12-bottom inner supports;13-column pile foundations.
Specific implementation mode
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Such as Fig. 1~8, a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit, the present embodiment passes through in depth Foundation pit and shallow bottom of foundation ditch corresponding position arrangement middle part inner support 3 pass through middle part inner support in deep basal pit and shallow bottom of foundation ditch Supporting beam maintains an equal level, and carries out stress conduction, forms good support construction, has both avoided after adding one of support in the middle part of shallow foundation hole The problem of phase need to remove, and solve the problems, such as depth Foundation Pit bias.
The inner supporting structure of the present embodiment includes positioned at diaphram wall 1 and the position of deep basal pit and shallow foundation pit edge positions The partition wall 2 of intersection is cheated in deep basal pit and shallow foundation, the space that diaphram wall 1 surrounds is divided into two spaces by partition wall 2, is formed Deep basal pit and shallow foundation hole.
The inner supporting structure of the present embodiment include three, as shown in Fig. 2~7, from top to bottom be respectively top inner support 10, Middle part inner support 3 and bottom inner support 12, wherein top inner support 10 is to be supported in deep basal pit and shallow foundation hole top in the horizontal direction Reinforced concrete structure in portion's Guan Liang 9, Guan Liang 9 are to be fixed on the reinforced concrete beam structure of 1 upper end of diaphram wall.This Embodiment is disposed with more root posts 11 in deep basal pit and shallow foundation hole, and the lower end of column 11 is disposed with by way of drilling construction Column pile foundation 13, column 11 are fixed in column pile foundation 13, are used to support top inner support 10.
The present embodiment has been poured in 2 upper end of partition wall along horizontal longitudinally arranged intermediate beam 7, middle part inner support 3 I pour in Reinforced concrete structure between deep basal pit diaphram wall 1 and intermediate beam 7.Wherein intermediate beam 7 cheats diaphram wall 1 with shallow foundation Between poured supporting beam.As shown in figure 8, the supporting beam of the present embodiment includes that (transverse direction of the present embodiment refers to Fig. 8 along horizontal cross Upper and lower directions, longitudinally refer to the left and right directions of Fig. 8, vertical direction refers to the direction of the vertical drawing in Fig. 8) arrangement 4 He of crossbeam Along horizontal longitudinally arranged longeron 5, crossbeam 4 and the interspersed connection of longeron 5 form the diaphram wall 1 and partition wall for being supported in shallow foundation hole Reticular supporting structure between 2.In order to form good support construction, the crossbeam 4 and middle part inner support 3 of the present embodiment maintain an equal level, The two is placed in the both sides of intermediate beam 7, forms horizontal support structure.
It is the steel for being supported in 5 junction of crossbeam 4 and longeron that crossbeam 4 and 5 junction arranged beneath of longeron, which have sub-merged pier 6, sub-merged pier 6, Reinforced concrete pier stud.The waist rail 8 to maintain an equal level with intermediate beam 7 is provided in shallow foundation hole, waist rail 8 is that the underground being fixed in shallow foundation hole connects Reinforced concrete structure on 1 inner wall of continuous wall, waist rail 8 are fixedly connected to form cyclic structure, crossbeam 4 and longeron 5 with intermediate beam 7 It supports between waist rail 8 and intermediate beam 7.
The supporting beam that crossbeam 4 and longeron 5 are formed can both be used as horizontal force transferring structure, can also be used as shallow foundation pit structure base The bearing structure of plinth, the crossbeam 4 of the present embodiment is located at the lower section of shallow foundation hole architecture basics, between the two every 2~10cm.
As shown in figure 5, bottom inner support 12 is located at the lower section of middle part inner support 3, for individually carrying out supporting to deep basal pit, Top inner support 12 is the supporting construction being supported in the horizontal direction between deep basal pit diaphram wall 1 and partition wall 2.
In fact, being not limited to three inner supporting structures, can be arranged between top inner support 10 and middle part inner support 3 Multiple tracks inner supporting structure can also arrange multiple tracks inner supporting structure, as long as energy between bottom inner support 12 and middle part inner support 3 Enough meet supporting requirement.
Specific construction includes the following steps:1, smooth to construction site progress, periphery unwrapping wire is cheated along deep basal pit and shallow foundation, is applied Work diaphram wall 1 and partition wall 2, deep basal pit and shallow foundation hole among construct column 11, as shown in Figure 1, current embodiment require that Deep basal pit and shallow foundation hole periphery form building enclosure, and building enclosure is made of cast-in-situ bored pile, rotary churning pile and diaphram wall 1, Prior to construction column pile foundation 13 in deep basal pit and shallow foundation hole when construction column 11, column of then constructing in column pile foundation 13 11;
2, at excavation of foundation pit region excavation pit to 10 bottom surface of top inner support, in 1 top construction hat of diaphram wall Beam 9 and retaining wall pour top inner support 10, as shown in Fig. 2, it is made to be fixedly connected with Guan Liang 9 and column 11 in foundation pit;
3, continue to be excavated to downwards at the bottom surface of shallow foundation hole, waist rail 8 of constructing on 1 inner wall of diaphram wall in shallow foundation hole, in Construction Support beam in shallow foundation hole, groove is excavated when supporting beam is constructed at the bottom surface of shallow foundation hole, and sub-merged pier 6 of constructing is poured on sub-merged pier 6 The longeron 5 and crossbeam 4 being criss-cross arranged pour intermediate beam 7 in 2 upper end of partition wall, the inner support 3 in the middle part of being poured in deep basal pit, As shown in figure 3, it is made to maintain an equal level with supporting beam;
4, in shallow foundation hole crossbeam 4 and longeron 5 on construction shallow foundation hole architecture basics and side wall, as shown in figure 4, to deep base Hole region continues to be excavated at deep basal pit bottom, bottom inner support of constructing between partition wall 2 and the diaphram wall 1 of deep basal pit 12, as shown in figure 5, construct at deep basal pit bottom surface deep basal pit architecture basics and side wall;
5, bottom inner support 12 is removed, steel pipe stull is installed, as shown in fig. 6, continuing deep basal pit side of constructing in deep basal pit Wall removes middle part inner support 3 to middle part inner support 3, as shown in fig. 7, at construction deep basal pit side wall to top inner support 10, removes Top inner support 10 carries out processing of binding at the top of deep basal pit and shallow foundation hole.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (10)

1. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit, including it is located at deep basal pit and shallow foundation pit edge position The diaphram wall (1) set and the partition wall (2) positioned at deep basal pit and shallow foundation hole intersection, it is characterised in that:Further include being located at The supporting beam of shallow bottom of foundation ditch and the middle part inner support (3) in deep basal pit;The supporting beam is to be layed in shallow foundation hole Reinforced concrete structure below architecture basics, supporting beam be arranged in the horizontal direction the diaphram wall (1) cheated in shallow foundation and Between partition wall (2);The middle part inner support (3) is to be supported in the diaphram wall (1) and partition wall of deep basal pit in the horizontal direction (2) reinforced concrete structure between, middle part inner support (3) maintains an equal level with supporting beam and the partition wall that is placed in (2) both sides.
2. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit as described in claim 1, it is characterised in that: The supporting beam includes the crossbeam (4) arranged along horizontal cross and along horizontal longitudinally arranged longeron (5);The crossbeam (4) and the interspersed connection of longeron (5) forms the mesh-supported knot being supported between the diaphram wall (1) and partition wall (2) in shallow foundation hole Structure.
3. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit as claimed in claim 2, it is characterised in that: The crossbeam (4) and longeron (5) junction arranged beneath has sub-merged pier (6);The sub-merged pier (6) be supported in crossbeam (4) and The Reinforced Concrete Pier Column of longeron (5) junction, sub-merged pier (6) lower end are vertically arranged in shallow Foundation Pit bottom.
4. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit as claimed in claim 2, it is characterised in that: Described partition wall (2) upper end has been poured along horizontal longitudinally arranged intermediate beam (7);The intermediate beam (7) and crossbeam (4), in Portion's inner support (3) maintains an equal level;The crossbeam (4), middle part inner support (3) are fixedly connected with intermediate beam (7).
5. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit as described in claim 1, it is characterised in that: It is provided with the waist rail (8) to maintain an equal level with intermediate beam (7) in the shallow foundation hole;The waist rail (8) is to be fixed in shallow foundation hole Reinforced concrete structure on diaphram wall (1) inner wall, waist rail (8) are fixedly connected to form cyclic structure with intermediate beam (7);Institute The crossbeam (4) stated and longeron (5) are supported between waist rail (8) and intermediate beam (7).
6. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit as described in claim 1, it is characterised in that: Described diaphram wall (1) upper end is disposed with Guan Liang (9);Top is disposed in the annulus that the Guan Liang (9) surrounds Inner support (10);The top inner support (10) is the armored concrete knot being supported in the horizontal direction in cyclic annular Guan Liang (9) Structure, vertically arranged for interval, top inner support (10) pass through deep basal pit and shallow foundation to top inner support (10) with middle part inner support (3) Vertical upright column (11) in hole is supported in deep basal pit and shallow foundation hole top.
7. a kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit as described in claim 1, it is characterised in that: The supporting beam and 2~10cm of architecture basics interval in shallow foundation hole.
8. a kind of depth foundation ditch construction method, it is characterised in that:Include the following steps:1) it, is applied along deep basal pit and shallow foundation hole periphery Work diaphram wall (1) and partition wall (2), the construction column (11) among deep basal pit and shallow foundation hole;
2), at excavation of foundation pit region excavation pit to top inner support (10) bottom surface, the construction hat at the top of diaphram wall (1) Beam (9) and retaining wall pour top inner support (10) in foundation pit, it are made to be fixedly connected with Guan Liang (9) and column (11);
3), continue to be excavated to downwards at the bottom surface of shallow foundation hole, the construction waist rail (8) on diaphram wall (1) inner wall in shallow foundation hole, in Construction Support beam in shallow foundation hole, intermediate beam (7) is poured in partition wall (2) upper end, in pouring middle part inner support (3) in deep basal pit, is made It maintains an equal level with supporting beam;
4), in shallow foundation hole crossbeam (4) and longeron (5) on construction shallow foundation cheat architecture basics and side wall, to deep basal pit region after It is continuous to be excavated at deep basal pit bottom, bottom inner support (12) of constructing between partition wall (2) and the diaphram wall (1) of deep basal pit, Construction deep basal pit architecture basics and side wall at deep basal pit bottom surface;
5) bottom inner support (12), is removed, the deep basal pit side wall that continues to construct in deep basal pit is to middle part inner support (3), in dismounting Portion's inner support (3), construct deep basal pit side wall to top inner support (10) at, remove top inner support (10), carry out deep basal pit and It binds processing at shallow foundation hole top.
9. a kind of depth foundation ditch construction method as claimed in claim 8, it is characterised in that:In the step 3, cheated in shallow foundation The method of interior Construction Support beam is:Groove is excavated at the bottom surface of shallow foundation hole, construction sub-merged pier (6) is handed in length and breadth in being poured on sub-merged pier (6) The longeron (5) and crossbeam (4) of mistake arrangement, make crossbeam (4) maintain an equal level with the middle part inner support (3) in deep basal pit.
10. a kind of depth foundation ditch construction method as claimed in claim 8, it is characterised in that:In the step 1, in deep base The method of construction column (11) is among hole and shallow foundation hole:Drilling construction column pile foundation is carried out in deep basal pit and shallow foundation hole (13), in installation column (11) in column pile foundation (13).
CN201810205304.XA 2018-03-13 2018-03-13 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit Pending CN108316314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810205304.XA CN108316314A (en) 2018-03-13 2018-03-13 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810205304.XA CN108316314A (en) 2018-03-13 2018-03-13 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit

Publications (1)

Publication Number Publication Date
CN108316314A true CN108316314A (en) 2018-07-24

Family

ID=62902473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810205304.XA Pending CN108316314A (en) 2018-03-13 2018-03-13 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit

Country Status (1)

Country Link
CN (1) CN108316314A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610466A (en) * 2019-01-31 2019-04-12 长江勘测规划设计研究有限责任公司 The asynchronous construction method of the built irregular deep basal pit in subway station two sides and structure
CN112813983A (en) * 2020-12-31 2021-05-18 长江勘测规划设计研究有限责任公司 Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN114016513A (en) * 2021-10-26 2022-02-08 南京林业大学 Complex foundation pit group supporting system and time-sequence-sharing excavation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204212177U (en) * 2014-10-17 2015-03-18 中国电建集团华东勘测设计研究院有限公司 A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
CN104746520A (en) * 2015-03-03 2015-07-01 南京市测绘勘察研究院有限公司 Shallow-to-deep foundation pit supporting structure and method
CN106522241A (en) * 2016-12-14 2017-03-22 上海建工建集团有限公司 Deep foundation pit supporting method of ultrahigh floor height type basement structure
CN106836238A (en) * 2017-03-06 2017-06-13 浙江省建建设集团有限公司 A kind of construction method and its structure for falling the vertical floor support replacement of grade formula deep basal pit
CN107700498A (en) * 2017-11-03 2018-02-16 中铁第勘察设计院集团有限公司 Multi-thread crossings on different level abnormal shape deep foundation pit supporting structure and its construction method
CN208088306U (en) * 2018-03-13 2018-11-13 中铁第四勘察设计院集团有限公司 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204212177U (en) * 2014-10-17 2015-03-18 中国电建集团华东勘测设计研究院有限公司 A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
CN104746520A (en) * 2015-03-03 2015-07-01 南京市测绘勘察研究院有限公司 Shallow-to-deep foundation pit supporting structure and method
CN106522241A (en) * 2016-12-14 2017-03-22 上海建工建集团有限公司 Deep foundation pit supporting method of ultrahigh floor height type basement structure
CN106836238A (en) * 2017-03-06 2017-06-13 浙江省建建设集团有限公司 A kind of construction method and its structure for falling the vertical floor support replacement of grade formula deep basal pit
CN107700498A (en) * 2017-11-03 2018-02-16 中铁第勘察设计院集团有限公司 Multi-thread crossings on different level abnormal shape deep foundation pit supporting structure and its construction method
CN208088306U (en) * 2018-03-13 2018-11-13 中铁第四勘察设计院集团有限公司 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张凤龙: "《软弱地层超大深基坑地下车站施工综合技术》", 中国铁道出版社, pages: 20 - 22 *
朱珉: "《跌级式深基坑竖向肋板换撑施工技术》", no. 5, pages 180 - 182 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610466A (en) * 2019-01-31 2019-04-12 长江勘测规划设计研究有限责任公司 The asynchronous construction method of the built irregular deep basal pit in subway station two sides and structure
CN109610466B (en) * 2019-01-31 2023-12-19 长江勘测规划设计研究有限责任公司 Unsynchronized construction method and structure of irregular deep foundation pits on two sides of built subway station
CN112813983A (en) * 2020-12-31 2021-05-18 长江勘测规划设计研究有限责任公司 Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN112813983B (en) * 2020-12-31 2022-07-22 长江勘测规划设计研究有限责任公司 Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN114016513A (en) * 2021-10-26 2022-02-08 南京林业大学 Complex foundation pit group supporting system and time-sequence-sharing excavation method
CN114016513B (en) * 2021-10-26 2023-03-07 南京林业大学 Time-sequence-sharing excavation method of complex foundation pit group supporting system

Similar Documents

Publication Publication Date Title
CN107558494B (en) Underground station structure for rail transit and construction method thereof
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
CN103334439A (en) Long-span reinforced concrete inner support structure of rectangular deep foundation pit and construction method of structure
CN107419731A (en) A kind of board-like double-row pile foundation pit support structure of counterfort and its construction method
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN111236241B (en) Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN108316314A (en) A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
CN112982481B (en) Structure construction method for crossing subway intersection node on pipe gallery
CN111997084A (en) Frame-structure type pile wall structure embedded with retaining plates and construction method thereof
CN110593308A (en) Open excavation back pressure construction method for foundation pit of overhead operation subway underground comprehensive pipe gallery
CN110878562B (en) Method for in-situ excavation of foundation pit and new addition of underground structure under existing reserved building
CN109403338A (en) A kind of assembly lattice configuration steel TRD engineering method diaphram wall and its construction method
CN108149712A (en) Partly inverse for road tunnel makees underground structure and its construction method
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN207452911U (en) A kind of multi-thread crossings on different level abnormal shape deep foundation pit supporting structure
KR101011805B1 (en) Method of constructing underground structure crossing pile bases in a pile-based ground and underground structure constructed using the same
CN208088306U (en) A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
CN110616739B (en) Vertical construction method for underground space of existing building
CN207846471U (en) Partly inverse for road tunnel makees underground structure
CN104074370B (en) A kind of building with brick-concrete structure entirety cross the river shift method and special support changing device thereof
CN207728018U (en) The building structure of skyscraper is built suitable for tier building set
CN111424675A (en) Construction method of ultra-large pile spacing deep foundation pit supporting system
CN105625184A (en) Subway station building method using bridge and station combined building mode

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination