CN204212177U - A kind of double doing in the hole of stand column pile cheats diaphragm wall structure - Google Patents

A kind of double doing in the hole of stand column pile cheats diaphragm wall structure Download PDF

Info

Publication number
CN204212177U
CN204212177U CN201420602998.8U CN201420602998U CN204212177U CN 204212177 U CN204212177 U CN 204212177U CN 201420602998 U CN201420602998 U CN 201420602998U CN 204212177 U CN204212177 U CN 204212177U
Authority
CN
China
Prior art keywords
diaphragm wall
hole
cheats
steel lattice
stand column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420602998.8U
Other languages
Chinese (zh)
Inventor
彭孔曙
臧延伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201420602998.8U priority Critical patent/CN204212177U/en
Application granted granted Critical
Publication of CN204212177U publication Critical patent/CN204212177U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a kind of double doing in the hole of stand column pile and cheats diaphragm wall structure.The purpose of this utility model is to provide simple, lower-cost double the doing in the hole of stand column pile of a kind of structure and cheats diaphragm wall structure, to reduce interim stand column pile quantity, solves the problem that in concrete placings process, diaphragm wall reinforcing cage easily floats.The technical solution of the utility model is: a kind of double doing in the hole of stand column pile cheats diaphragm wall structure, in shallow foundation hole, excavation has deep foundation ditch, the space enclosing structure of this deep foundation ditch adopts diaphragm wall, described diaphragm wall arranges reinforcing cage below deep pit digging scope, it is more than plain concrete wall, it is characterized in that: described plain concrete arranges steel lattice column within the walls, steel lattice column is vertically arranged, this steel lattice column lower end is positioned at below deep pit digging scope, and be fixedly connected with reinforcing cage, steel lattice column upper end rises to ground.The utility model is applicable to municipal administration, industrial and civil architecture.

Description

A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
Technical field
The utility model relates to a kind of double doing in the hole of stand column pile and cheats diaphragm wall structure.Be applicable to municipal administration, industrial and civil architecture.
Background technology
The Deep Foundation Pits such as urban track traffic in recent years and Large Underground space development are progressively toward dark, general orientation development, and in some deep foundation ditchs such as transfer subway station or Large Underground spatial synthesis body etc., often occur that some dig dark comparatively large (>8m), and cheat in the hole of buried depth comparatively dark (cheating base plate buried depth >25m in hole), be limited by the limitation of the water-stop curtain effective lengths such as existing agitation pile, in these holes, pit enclosure structure often needs to adopt diaphragm wall.And consider cost, be convenient to the factors such as the later stage cuts, these diaphragm walls are often designed to half wall, and (namely reinforcing cage is only cheated below excavation scope and is arranged in hole, below be then generally plain concrete wall), so just exist steel concrete conduit be difficult under to diaphragm wall reinforcing cage reserved water smash in hole and due to reinforcing cage do not rise to ground impenetrably the measure such as face ballast prevent from watering smash concrete time the problem such as bottom rising of steel cage.
Summary of the invention
The technical problems to be solved in the utility model is: for above-mentioned Problems existing, simple, lower-cost double the doing in the hole of stand column pile of a kind of structure is provided to cheat diaphragm wall structure, to reduce interim stand column pile quantity, solve the problem that in concrete placings process, diaphragm wall reinforcing cage easily floats.
The technical scheme that the utility model adopts is: a kind of double doing in the hole of stand column pile cheats diaphragm wall structure, in shallow foundation hole, excavation has deep foundation ditch, the space enclosing structure of this deep foundation ditch adopts diaphragm wall, described diaphragm wall arranges reinforcing cage below deep pit digging scope, it is more than plain concrete wall, it is characterized in that: described plain concrete arranges steel lattice column within the walls, steel lattice column is vertically arranged, this steel lattice column lower end is positioned at below deep pit digging scope, and be fixedly connected with reinforcing cage, steel lattice column upper end rises to ground.
Described steel lattice column is cored steel structure, is arranged in reserved the watering of bottom diaphragm wall and smashes hole site.
Two steel lattice columns are symmetrically arranged with, along diaphragm wall axis arranged in every width diaphragm wall.
Between two steel lattice columns, angle steel bridging is set.
Described steel lattice column upper end welding angle steel.
The beneficial effects of the utility model are: the utility model is cheated in diaphragm wall and arranged steel lattice column in hole, make that diaphragm wall is double does stand column pile, greatly save interim stand column pile quantity.Steel lattice column doublely can do and hang muscle when reinforcing cage is transferred, and avoids additional to hang muscle.When the utility model solution diaphragm wall reinforcing cage does not rise to ground, concrete steel conduit is difficult to enter reinforcing cage smoothly and reserves the problem of watering and smashing hole; When solution diaphragm wall reinforcing cage does not rise to ground, the easy On The Floating of diaphragm wall reinforcing cage in concrete placings process.
Accompanying drawing explanation
Fig. 1 is pit enclosure sectional drawing in cheating in the utility model.
Fig. 2 cheats single width diaphragm wall expanded view in hole in the utility model.
Fig. 3 is the enlarged diagram in A portion in Fig. 2.
Detailed description of the invention
In shallow foundation hole 1, excavation has deep foundation ditch 2, and the space enclosing structure of this deep foundation ditch adopts diaphragm wall 3.Diaphragm wall 3 is designed to half wall, namely below deep foundation ditch 2 excavation scope, arranges reinforcing cage 4, is more than plain concrete wall 301.
For cheating Problems existing in diaphragm wall design, construction in hole in the present embodiment, on some subways of summary and municipal engineering practical experience basis, the double form of structure doing stand column pile of a kind of diaphragm wall is proposed, specific as follows:
As shown in Figure 1, steel lattice column 5 is arranged in plain concrete wall 301, makes to cheat in hole that diaphragm wall is double does stand column pile, to save stand column pile quantity.Steel lattice column 5 is vertically arranged, this steel lattice column lower end is positioned at below deep foundation ditch 2 excavation scope, and is fixedly connected with reinforcing cage 4, and steel lattice column upper end rises to ground.
Consider symmetry, every width diaphragm wall 3 arranges two steel lattice columns 5, and according to upper load size, selects steel lattice column model, arrange angle steel bridging 7, to ensure the stability (see Fig. 2) in lifting process between two steel lattice columns 5.Hang muscle when simultaneously two steel lattice columns 5 can be transferred as reinforcing cage 4, and hang muscle without the need to additional, cause waste.
Steel lattice column 5 is cored steel structure, being arranged on reserved the watering of bottom diaphragm wall and smashing hole site, smashing in hole when building concrete by steel lattice column 5 inner space by watering to bottom diaphragm wall under steel conduit.
Steel lattice column 5 top rises to ground, and is welded with angle steel 6 (Fig. 3) in end, so that when building concrete, carries out counterweight, prevent rising of steel cage by end angle steel to diaphragm wall reinforcing cage 4.
The present embodiment be comparatively applicable to along hole in cheat diaphragm wall need to arrange elongated interval stand column pile time, all the other situations can be arranged in conjunction with actual conditions.

Claims (5)

1. double doing in the hole of stand column pile cheats diaphragm wall structure, in shallow foundation hole (1), excavation has deep foundation ditch (2), the space enclosing structure of this deep foundation ditch adopts diaphragm wall (3), described diaphragm wall (3) arranges reinforcing cage (4) below deep foundation ditch (2) excavation scope, it is more than plain concrete wall (301), it is characterized in that: in described plain concrete wall (301), steel lattice column (5) is set, steel lattice column (5) is vertically arranged, this steel lattice column lower end is positioned at below deep foundation ditch (2) excavation scope, and be fixedly connected with reinforcing cage (4), steel lattice column upper end rises to ground.
2. double doing in the hole of stand column pile according to claim 1 cheats diaphragm wall structure, it is characterized in that: described steel lattice column (5) is cored steel structure, is arranged in reserved the watering of bottom diaphragm wall (3) and smashes hole site.
3. double doing in the hole of stand column pile according to claim 1 and 2 cheats diaphragm wall structure, it is characterized in that: in every width diaphragm wall (3), be symmetrically arranged with two steel lattice columns (5), along diaphragm wall (3) axis arranged.
4. double doing in the hole of stand column pile according to claim 3 cheats diaphragm wall structure, it is characterized in that: arrange angle steel bridging (7) between two steel lattice columns (5).
5. double doing in the hole of stand column pile according to claim 1 cheats diaphragm wall structure, it is characterized in that: described steel lattice column (5) upper end welding angle steel (6).
CN201420602998.8U 2014-10-17 2014-10-17 A kind of double doing in the hole of stand column pile cheats diaphragm wall structure Active CN204212177U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420602998.8U CN204212177U (en) 2014-10-17 2014-10-17 A kind of double doing in the hole of stand column pile cheats diaphragm wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420602998.8U CN204212177U (en) 2014-10-17 2014-10-17 A kind of double doing in the hole of stand column pile cheats diaphragm wall structure

Publications (1)

Publication Number Publication Date
CN204212177U true CN204212177U (en) 2015-03-18

Family

ID=52980863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420602998.8U Active CN204212177U (en) 2014-10-17 2014-10-17 A kind of double doing in the hole of stand column pile cheats diaphragm wall structure

Country Status (1)

Country Link
CN (1) CN204212177U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133645A (en) * 2015-08-18 2015-12-09 中铁第一勘察设计院集团有限公司 Vertical shaft body structure internally provided with lattice stand columns and reverse construction method of vertical shaft body structure
CN108316314A (en) * 2018-03-13 2018-07-24 中铁第四勘察设计院集团有限公司 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
CN109706937A (en) * 2018-12-26 2019-05-03 中国水利水电第八工程局有限公司 It is a kind of for intersecting the node supporting construction and construction method of foundation pit synchronous construction
CN109958123A (en) * 2017-12-25 2019-07-02 中国二十冶集团有限公司 Steel sheet pile method for protecting support for completely decomposed sandstone foundation pit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133645A (en) * 2015-08-18 2015-12-09 中铁第一勘察设计院集团有限公司 Vertical shaft body structure internally provided with lattice stand columns and reverse construction method of vertical shaft body structure
CN109958123A (en) * 2017-12-25 2019-07-02 中国二十冶集团有限公司 Steel sheet pile method for protecting support for completely decomposed sandstone foundation pit
CN108316314A (en) * 2018-03-13 2018-07-24 中铁第四勘察设计院集团有限公司 A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
CN109706937A (en) * 2018-12-26 2019-05-03 中国水利水电第八工程局有限公司 It is a kind of for intersecting the node supporting construction and construction method of foundation pit synchronous construction

Similar Documents

Publication Publication Date Title
CN202559361U (en) Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN204212177U (en) A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103104102B (en) Construction method for underground storey-addition reconstruction
CN105240018A (en) Vertical shaft construction device and method
CN203729306U (en) Anti-slide pile and soil retaining plate supporting structure
CN211172000U (en) Foundation pit enclosure system with combination of support piles and concrete main structure
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN204959787U (en) Novel tower crane combination formula basis
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN205259210U (en) Modular retaining wall
CN101608454B (en) Cavity shallow foundation and construction method
CN202830936U (en) Supporting structure of foundation pit
CN102619214B (en) U-shaped interface steel sheet pile and application thereof in enclosure for foundation pit
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN204715364U (en) A kind of foundation pit support device
CN203049588U (en) Pit-in-pit cylindrical mould
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN201874006U (en) Intubating grouting base of transmission line iron tower
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN104328794B (en) A kind of narrow base tower four lower limb associating well foundation
CN203795437U (en) Reinforced steel plate pile foundation pit
CN204199321U (en) A kind of narrow base tower four leg associating open caisson foundation
CN205369301U (en) Supporting structure of subway transfer section lid digs and props against making interval board
CN205296390U (en) In same direction as sloping shear force wall building development platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant