CN203795437U - Reinforced steel plate pile foundation pit - Google Patents
Reinforced steel plate pile foundation pit Download PDFInfo
- Publication number
- CN203795437U CN203795437U CN201420235927.9U CN201420235927U CN203795437U CN 203795437 U CN203795437 U CN 203795437U CN 201420235927 U CN201420235927 U CN 201420235927U CN 203795437 U CN203795437 U CN 203795437U
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- foundation pit
- steel
- sheet piles
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 45
- 239000010959 steel Substances 0.000 title claims abstract description 45
- 210000003205 muscle Anatomy 0.000 claims 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 13
- 238000009412 basement excavation Methods 0.000 abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 239000002689 soil Substances 0.000 description 4
- 101150054854 POU1F1 gene Proteins 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型涉及一种建筑工程结构,尤其是涉及一种加筋钢板桩基坑。加筋钢板桩基坑由打入基坑内的钢板桩围成,基坑两侧设置有钢板桩,钢板桩之间设置有钢管支撑,钢管支撑水平横置在基坑口上,且两端分别连接两个钢板桩,钢管支撑的两端头上分别设置有端头板,基坑底部设置有排水沟,排水沟之间埋设有固定钢块,固定钢块上焊接有斜撑筋,斜撑筋的另一端伸向端头板并固定。本实用新型具有设计较合理,施工成本较低,不易漏水,开挖量较小,地基平衡不易受破坏等特点。
The utility model relates to a construction engineering structure, in particular to a reinforced steel sheet pile foundation pit. The reinforced steel sheet pile foundation pit is surrounded by steel sheet piles driven into the foundation pit. There are steel sheet piles on both sides of the foundation pit, and steel pipe supports are arranged between the steel sheet piles. The steel pipe supports are placed horizontally on the foundation pit mouth, and the two ends are respectively connected There are two steel sheet piles, the two ends of the steel pipe support are respectively provided with end plates, the bottom of the foundation pit is provided with a drainage ditch, and fixed steel blocks are buried between the drainage ditch, and the fixed steel blocks are welded with diagonal bracing bars and diagonal bracing bars. The other end extends to the end plate and is secured. The utility model has the characteristics of more reasonable design, lower construction cost, less water leakage, less excavation volume, less vulnerable foundation balance and the like.
Description
技术领域technical field
本实用新型涉及一种建筑工程结构,尤其是涉及一种加筋钢板桩基坑。The utility model relates to a construction engineering structure, in particular to a reinforced steel sheet pile foundation pit.
背景技术Background technique
当施工区域内地下水丰富,建筑物基础均坐在淤泥质粉质粘土层上,而且很多设备基础埋设深度较大,且部分基础周围环境复杂、均有建筑物,采用大开挖施工完全不可能。拉森钢板桩进行基坑支护,拉森钢板桩施工处理深度大、施工时对相邻建筑物影响小、能克服许多环境困难、施工速度快等优点得到充分显示,钢板桩入土深度除保证本身的稳定性外,还应保证基坑底部在施工期间不会出现隆起和管涌现象。在软土中开挖较深的基坑,当桩背后的土柱重量超过基坑底面以下地基土的承载力时,地基的平衡状态受到破坏,常会发生坑壁土流动,坑顶下陷,坑底隆起的现象。When the groundwater in the construction area is rich, the building foundations are all sitting on the muddy silty clay layer, and many equipment foundations are buried deeply, and the surrounding environment of some foundations is complex and there are buildings, it is completely impossible to use large excavation construction . Larsen steel sheet piles are used for foundation pit support. The advantages of Larsen steel sheet piles are large construction treatment depth, little impact on adjacent buildings during construction, can overcome many environmental difficulties, and fast construction speed. In addition to its own stability, it should also ensure that the bottom of the foundation pit will not bulge and pipe during construction. When excavating a deep foundation pit in soft soil, when the weight of the soil column behind the pile exceeds the bearing capacity of the foundation soil below the bottom of the foundation pit, the balance of the foundation will be destroyed, and the soil on the pit wall will often flow, the pit roof will sink, and the bottom of the pit will sink. uplift phenomenon.
发明内容Contents of the invention
本实用新型主要是针对现有技术所存在的结构复杂,施工成本较高,易漏水,开挖量较大,地基平衡易受破坏等的技术问题,提供一种结构简单,施工成本较低,不易漏水,开挖量较小,地基平衡不易受破坏的加筋钢板桩基坑。The utility model mainly aims at the technical problems existing in the prior art that the structure is complex, the construction cost is high, water leakage is easy, the excavation volume is large, and the foundation balance is easily damaged, etc., and provides a simple structure, low construction cost, The reinforced steel sheet pile foundation pit is not easy to leak, the excavation volume is small, and the foundation balance is not easily damaged.
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:加筋钢板桩基坑由打入基坑内的钢板桩围成,基坑两侧设置有钢板桩,钢板桩之间设置有钢管支撑,钢管支撑水平横置在基坑口上,且两端分别连接两个钢板桩,钢管支撑的两端头上分别设置有端头板,基坑底部设置有排水沟,排水沟之间埋设有固定钢块,固定钢块上焊接有斜撑筋,斜撑筋的另一端伸向端头板并固定。端头板利用螺栓将H型钢连接而成,具有组装方便,现场装配简单,根据不同的基坑按设计要求进行组合和连接,可重复使用,在支撑杆件上能安装各种检测仪器进行施工检测。The above-mentioned technical problems of the utility model are mainly solved by the following technical solutions: the reinforced steel sheet pile foundation pit is surrounded by steel sheet piles driven into the foundation pit, steel sheet piles are arranged on both sides of the foundation pit, and steel sheet piles are arranged between the steel sheet piles. Steel pipe support, the steel pipe support is placed horizontally on the opening of the foundation pit, and two steel sheet piles are connected at both ends, the two ends of the steel pipe support are respectively provided with end plates, and the bottom of the foundation pit is provided with drainage ditches, and the drainage ditches are buried There is a fixed steel block, and a diagonal brace is welded on the fixed steel block, and the other end of the diagonal brace extends to the end plate and is fixed. The end plate is made by connecting H-shaped steel with bolts. It is easy to assemble and assemble on site. It can be combined and connected according to the design requirements of different foundation pits. It can be used repeatedly. Various testing instruments can be installed on the supporting rods for construction. detection.
因此,本实用新型具有设计较合理,施工成本较低,不易漏水,开挖量较小,地基平衡不易受破坏等特点。Therefore, the utility model has the characteristics of more reasonable design, lower construction cost, less water leakage, less excavation volume, less vulnerable foundation balance and the like.
附图说明Description of drawings
附图1是本实用新型的整体结构示意图。Accompanying drawing 1 is the overall structural representation of the utility model.
具体实施方式Detailed ways
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。The technical solutions of the present utility model will be further specifically described below through the embodiments and in conjunction with the accompanying drawings.
实施例1:加筋钢板桩基坑由打入基坑内的钢板桩围成基坑1两侧设置有钢板桩2,钢板桩2之间设置有钢管支撑3,钢管支撑3水平横置在基坑1口上,且两端分别连接两个钢板桩2,钢管支撑3的两端头上分别设置有端头板5,基坑1底部设置有排水沟4,排水沟4之间埋设有固定钢块7,固定钢块7上焊接有斜撑筋6,斜撑筋6的另一端伸向端头板5并固定(如图1所示)。Example 1: The reinforced steel sheet pile foundation pit is surrounded by steel sheet piles driven into the foundation pit. Steel sheet piles 2 are arranged on both sides of the foundation pit, and steel pipe supports 3 are arranged between the steel sheet piles 2. The steel pipe supports 3 are placed horizontally on the foundation pit. On the mouth of the pit 1, two steel sheet piles 2 are connected at both ends, the end plates 5 are respectively arranged on the two ends of the steel pipe support 3, the drainage ditch 4 is arranged at the bottom of the foundation pit 1, and the fixed steel piles are buried between the drainage ditch 4 Block 7, a diagonal brace 6 is welded on the fixed steel block 7, and the other end of the diagonal brace 6 stretches to the end plate 5 and is fixed (as shown in Figure 1).
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420235927.9U CN203795437U (en) | 2014-04-25 | 2014-04-25 | Reinforced steel plate pile foundation pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420235927.9U CN203795437U (en) | 2014-04-25 | 2014-04-25 | Reinforced steel plate pile foundation pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203795437U true CN203795437U (en) | 2014-08-27 |
Family
ID=51377666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420235927.9U Expired - Fee Related CN203795437U (en) | 2014-04-25 | 2014-04-25 | Reinforced steel plate pile foundation pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203795437U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369815A (en) * | 2015-12-07 | 2016-03-02 | 韩文 | Steel sheet pile and foundation pit support construction method |
CN108360897A (en) * | 2018-02-07 | 2018-08-03 | 中国二十冶集团有限公司 | The processing method of mud and drift sand enriching area wash mill |
-
2014
- 2014-04-25 CN CN201420235927.9U patent/CN203795437U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369815A (en) * | 2015-12-07 | 2016-03-02 | 韩文 | Steel sheet pile and foundation pit support construction method |
CN105369815B (en) * | 2015-12-07 | 2017-05-03 | 韩文 | Steel sheet pile and foundation pit support construction method |
CN108360897A (en) * | 2018-02-07 | 2018-08-03 | 中国二十冶集团有限公司 | The processing method of mud and drift sand enriching area wash mill |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN202559361U (en) | Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure | |
CN202881958U (en) | Foundation pit supporting structure with water falling function | |
CN202689031U (en) | Deep foundation pit retaining and protecting retaining wall | |
CN103510528A (en) | Blind trench water discharging structure used for underground structure up-floating prevention | |
CN103290848B (en) | Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof | |
CN201972155U (en) | Topdown-construction-method foundation pit supporting structure of steel plate pile | |
CN203729306U (en) | Anti-slide pile and soil retaining plate supporting structure | |
CN202689009U (en) | Steel sheet pile and tubular pile combined foundation pit supporting structure | |
CN207003421U (en) | A kind of steel plate pilework for being seated hard rock top surface | |
CN203795437U (en) | Reinforced steel plate pile foundation pit | |
CN204212177U (en) | A kind of double doing in the hole of stand column pile cheats diaphragm wall structure | |
CN202559363U (en) | Foundation pit supporting structure for underground diaphragm wall with steel structure | |
CN204715364U (en) | A kind of foundation pit support device | |
CN208934002U (en) | a retaining wall structure | |
CN202323963U (en) | Drainage and anchoring combined device for side slope | |
CN202401461U (en) | Novel foundation pit shoring structure | |
CN102140798A (en) | Steel sheet pile and tubular pile combined base pit supporting structure and supporting method therefor | |
CN102943480B (en) | Loess foundation pit supporting method | |
CN210141128U (en) | Test device for simulating pipe curtain undercut | |
CN211646415U (en) | Prefabricated enclosure structure for narrow deep foundation pit | |
CN203222808U (en) | Foundation processing structure for floating sluice | |
CN203960881U (en) | The inner pressure-bearing dewatering well of foundation ditch steel sleeve flange connecting apparatus | |
CN204163085U (en) | The supporting of bored pile foundation ditch | |
CN105178348A (en) | Method for designing soilless cofferdam structure applied to construction of shallow water region pole and tower foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140827 Termination date: 20180425 |
|
CF01 | Termination of patent right due to non-payment of annual fee |