CN205134326U - Prefabricated assembled concrete bearing structure of foundation ditch - Google Patents
Prefabricated assembled concrete bearing structure of foundation ditch Download PDFInfo
- Publication number
- CN205134326U CN205134326U CN201520865356.1U CN201520865356U CN205134326U CN 205134326 U CN205134326 U CN 205134326U CN 201520865356 U CN201520865356 U CN 201520865356U CN 205134326 U CN205134326 U CN 205134326U
- Authority
- CN
- China
- Prior art keywords
- waist rail
- crossbeam
- foundation ditch
- pile
- retaining wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 34
- 239000002689 soil Substances 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- 238000006073 displacement reaction Methods 0.000 claims description 8
- 230000002787 reinforcement Effects 0.000 claims description 7
- 238000012546 transfer Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 25
- 238000013461 design Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 6
- 238000005553 drilling Methods 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000011900 installation process Methods 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 238000009527 percussion Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241001647280 Pareques acuminatus Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000036244 malformation Effects 0.000 description 1
- 230000029052 metamorphosis Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a prefabricated assembled concrete bearing structure of foundation ditch, including vertical insert dado that the soil body and enclose come, space that the dado enclose comes in the stand stake, the guan liang who establishes on the dado top that arrange of law, set up the waist rail on the dado inside wall and be the groined type and set up the crossbeam between the dado, waist rail and crossbeam are at the prefabricated precast beam of interplant. Adopt prefabricated waist rail and crossbeam, make its time limit for a project of having saved the construction in the construction greatly, saved the manual work that cast -in -place construction needs, make the construction more efficient, and the quality is better, still can improve concrete bearing structure's quality, energy saving and consumption reduction.
Description
Technical field
The utility model relates to a kind of concrete inner supporting structure of base pit engineering, particularly a kind of foundation ditch prefabricated assembled concrete braced structures.
Background technology
Along with the develop rapidly of socialism with Chinese characteristics market economy, various places urbanization process is constantly accelerated, dilatation is newly-built to be improved constantly with construction dynamics that is reconstruction of the old city town civilian infrastructure, and the progress and development of Building technology achieves prominent achievement, plays more and more important effect.Along with country progressively accelerates Urbanization Construction, China needs the newly-built or hundreds thousand of kilometer of transformation town road every year, and civilian infrastructure will keep high speed development trend in considerable time from now on.In China's town road is built, the important structure one of of passage (box culvert) as the high-grade town road in building compact district are secretly buried in underground, the proportion of its quantity occupied road all fronts structure is comparatively large, and its construction speed directly affects the duration of whole project.
In conjunction with the concrete condition that each metropolis underground passage (box culvert) is built, foundation pit supporting construction generally adopts soldier pile to add inner support system.Inner support has cast-in-situ steel reinforced concrete support, steel pipe support two kinds of principal modes at present.Cast-in-place reinforced concrete support possesses stronger spatial joins rigidity and makes whole foundation ditch stress deformation present larger space group effect, plane stiffness is large, malformation is little, can available protecting buildings around foundation pit and underground utilities safety, approved widely at engineering circles and used, but, the operation that cast-in-situ steel reinforced concrete Construction of Supporting comprises is more, comprise: bed course, formwork erection, water and smash, maintenance etc., need first to build first concrete support maintenance 7 ?after 28 days, the lower earthwork of support can be excavated, engineering time like this is long, serious restriction construction speed.In addition, cast-in-place operation will rely on manually to be carried out in a large number, and along with the transformation of employment concept, building trade human resources are day by day in short supply, and labour-intensive operation is in the urgent need to changing.Although steel pipe support can accelerating construction progress, but bracing members node is generally hinged, and whole structural stability is poor, foundation ditch easily occurs being out of shape Risks even cave-in accident, even if bracing members generally adopts axle power, self compensating system applies precompression during excavation of foundation pit, but appropriate litigation fees is high.
Engineering construction practice is had higher requirement to ultra-wide excavation of foundation pit support system, must provide a kind of not only economy but also the construction technology of safety, meet rapid construction, ensure duration demand.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of foundation ditch prefabricated assembled concrete braced structures, can improve the quality of concrete support structure, the reduction of erection time, enhance productivity, energy-saving and cost-reducing.
The utility model is by the following technical solutions: a kind of foundation ditch prefabricated assembled concrete braced structures, comprise and vertically insert the soil body and the retaining wall fenced up, the stand column pile of aligned transfer in the space that retaining wall fences up, be located at the Guan Liang on retaining wall top, the crossbeam being erected at the waist rail on retaining wall inside wall and being erected in groined type between retaining wall, and stand column pile is supported in the groined type Nodes of crossbeam, retaining wall comprises soldier pile and the rotary churning pile between soldier pile, described waist rail and crossbeam are precast beam prefabricated in factory, described retaining wall and stand column pile are provided with the support component of support wale and crossbeam.
Crossbeam described in the utility model comprise for bar shaped hollow structure beam member and the tenon of strip structure in vacancy in beam member can be placed in, described tenon upper surface hits exactly has multiple displacement aperture along length of tenon directional spreding.
The waist rail joint that waist rail described in the utility model comprises the cross-sectional sizes waist rail component identical with the cross-sectional sizes of beam member and is connected between two sections of waist rail components, the both ends of the surface of described waist rail joint are all provided with multiple even outwardly directed reinforcement bar, the both ends of the surface of described waist rail component are provided with the jack corresponding with reinforcement bar position, and described waist rail joint stage casing is provided with the groove of two vertical direction that can insert the termination of beam member, that inwardly concave towards the one side inside foundation ditch.
Crossbeam described in the utility model is that two of being close to side by side are together supported between retaining wall and stand column pile, and the termination of these two crossbeams lays respectively at the both sides of stand column pile.
Support component described in the utility model is that the angle steel of multiple horizontal direction and the angle steel under being tilted to are welded leg-of-mutton bracket structure.
Stand column pile described in the utility model is the lattice column structure that Plate Welding becomes.
The length of tenon described in the utility model is 1m ~ 3m, and the diameter in described tenon top offset hole is 10mm, pitch of holes 2.5cm ~ 5cm.
Compared with prior art, the utility model foundation ditch prefabricated assembled concrete braced structures comprises prefabricated concrete beam member, beam joint, and waist rail component, tenon, crossbeam and waist rail can be assembled at the construction field (site), greatly save the duration of construction, save the artificial of cast-in-place construction needs, make construction effectively, and quality is better.
Accompanying drawing explanation
Fig. 1 is beam member structural representation.
Fig. 2 is tenon structure schematic diagram.
Fig. 3 is waist rail element structure schematic diagram.
Fig. 4 is waist rail joint design schematic diagram.
Fig. 5 is tenon connecting cross beam element structure schematic diagram.
Fig. 6 waist rail joint connects waist rail element structure schematic diagram.
The structural representation of Fig. 7 to be stand column pile be lattice column.
Fig. 8 is foundation ditch prefabricated assembled concrete braced structures overall structure schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
As figure 1 ?shown in 7, a kind of foundation ditch prefabricated assembled concrete of the utility model braced structures, comprise and vertically insert the soil body and the retaining wall 1 fenced up by construction space, retaining wall 1 is made up of soldier pile 11 and the rotary churning pile 12 between adjacent soldier pile 11, in the space that retaining wall 1 fences up, aligned transfer stand column pile 2, hat beam 3 is provided with on the top of retaining wall 1, hat beam 3 is reinforced concrete soil structure cast-in-place at the construction field (site), medium position on the inside wall of retaining wall 1 is provided with waist rail 4, between the hat beam 3 fenced up and between the waist rail 4 fenced up, erection has playing in groined type to prevent the crossbeam 5 of retaining wall 1 metamorphosis respectively, according to the degree of depth of foundation ditch, which floor waist rail 4 structure can be set more, stand column pile 2 is supported on crossbeam 5 Nodes, retaining wall 1 is provided with the support component 6 of energy support wale 4, stand column pile 2 is provided with the support component 6 of energy supporting traverse 5 weight, described waist rail 4 and crossbeam 5 are designed to the precast beam of reinforcing bar water-setting soil structure prefabricated in factory.
Concrete, described crossbeam 5 comprise for bar shaped hollow structure beam member 51 (as shown in Figure 1) and the tenon 52 (as shown in Figure 2) of strip structure in vacancy in beam member 51 can be placed in, vacancy in the termination of two sections of beam members 51 is inserted at tenon 52 two ends respectively makes two sections of beam members 51 connect together (as shown in Figure 5), this section of junction is just in time positioned on the support component 6 in stand column pile 2, conveniently make tenon 52 just in time between two sections of beam members 51, multiple displacement aperture 521 (as shown in Figure 2) is distributed with along tenon 52 length direction in described tenon 52 upper surface center, inserted link can be used to insert in displacement aperture 521 between mobile tenon 52 to two sections of beam members 51.
The waist rail joint 42 that described waist rail 4 comprises the cross-sectional sizes waist rail component 41 identical with the cross-sectional sizes of beam member 51 and is connected between two sections of waist rail components 41, the both ends of the surface of described waist rail joint 42 are all provided with multiple even outwardly directed reinforcement bar 422 (as shown in Figure 4), the both ends of the surface of described waist rail component 41 are provided with the jack 411 (as shown in Figure 3) corresponding with reinforcement bar 422 position, described waist rail joint 42 stage casing is provided with towards the one side inside foundation ditch can insert beam member 51 termination, the groove 421 of the vertical direction inwardly concaved, described waist rail joint 42, and waist rail joint 42 and the junction of waist rail component 41 are all positioned on the support component 6 that is connected on retaining wall 1 medial surface.
Described support component 6 is the leg-of-mutton bracket structure that the angle steel of multiple horizontal direction and the angle steel under being tilted to are welded, and support component 6 can adopt prior art to be welded on retaining wall 1 medial surface, and is welded on stand column pile 2 side.The lattice column structure that described stand column pile 2 can become for Plate Welding.
More stable in order to what make crossbeam 5 support, adopt two crossbeams 5 to be side by side supported between retaining wall 1 and stand column pile 2 simultaneously, these two crossbeams 5 side by side lay respectively on the support component 6 on stand column pile 2 both sides, on described waist rail joint 42, be provided with two grooves 421, corresponding with the tip position of the crossbeam of two side by side 5, a termination of beam member 51 is just in time positioned at groove 421.
In order to the construction of the crossbeam 5 and waist rail 4 that coordinate Cast-in-situ Beam structure, the construction method of deep foundation ditch concrete braced structures described in the utility model comprises the following steps:
One, the crossbeam 5 of precast reinforced water-setting soil structure and waist rail 4 in precasting yard.
Crossbeam 5 comprises beam member 51 and tenon 52, and waist rail 4 comprises waist rail component 41 and waist rail joint 42, and beam member 51, tenon 52, waist rail component 41 and waist rail joint 42 are prefabricated according to design length in precasting yard, makes rear maintenance 14 ~ 28 days.
The length of tenon 52 is preferably 1m ~ 3m; The diameter in tenon 52 top offset hole 521 is preferably 10mm, pitch of holes 2.5cm ~ 5cm.
Two, soldier pile 11 and stand column pile 2 are constructed.
The stake footpath of described soldier pile 11 is 1.0m, 1.2m or 1.4m, and pile spacing is 1.3m ~ 1.8m, and soldier pile 11 building-in depth is 6.0 ~ 10.0m, and namely soldier pile 11 gos deep into 6 ~ 10m bottom foundation ditch.Stand column pile 2 footpaths are preferably 1.2m.
1, smooth location, according to working design positioning support fender pile 11 and stand column pile 2 position, then uses rotary drilling rig to adopt revolving of prior art to dig a technique spiral-digging pore, meets the Percussion Piles technique adopting prior art when rockfilling constructional difficulties.
2, in the hole dug, reinforcing cage is placed.
3, to pouring underwater concrete in the hole of putting reinforcing cage well, underwater gliders, to the stake top place 0.5m exceeding mark, to remove laitance, guarantees pile body concrete quality, obtains soldier pile 11 and stand column pile 2.
4, soldier pile 11 and stand column pile 2 maintenance 28 days.
Stand column pile 2 can be substituted by lattice column 21, and in order to adopt prior art, outside the venue, Gang Gou processing factory uses Plate Welding to become processing and fabricating to form to lattice column 21, and the construction method be placed on place as stand column pile 2 by the lattice column 21 made is as follows:
1, according to working design location, use rotary drilling rig employing to revolve and dig a technique spiral-digging pore, meet when rockfilling constructional difficulties and adopt Percussion Piles technique.
2,25t loop wheel machine is adopted vertically to be hung in hole by lattice column 21, by its height of pile top of design con-trol.
3, pouring underwater concrete is to absolute altitude, is fixed in concrete by lattice column 21 bottom.
4, will the concrete curing 28 days of lattice column 21 be fixed, obtain the stand column pile 2 of lattice column structure.
Three, carry out rotary churning pile 12 and construct closing on gap between two soldier piles 11.
Rotary churning pile 12 adopts double or method of high-pressure jet grouting with triple tubes method construction, utilizes water under high pressure to act on nozzle and makes 360 ° of rotation formation high-speed jet cutting soils, layers of sand, also at the uniform velocity promote, form rotary churning pile 12 to projected depth rear nozzle ejection cement paste.
1, the drill bit of rig aims at the center between adjacent two soldier piles 11, keeps drilling rod vertical.
2, open high-pressure injection pump, wait the backward hole inner water-supply that runs well, simultaneously slowly sinking drilling tool creeps into pore-forming after soil, until projected depth.
3, also rise to jet cement slurries in boring after drilling tool pierces projected depth simultaneously, form rotary churning pile 12.
4, rotary churning pile 12 maintenance made 14 ~ 28 days.
Four, be preced with beam 3 to construct.
Described hat beam 3 is site concrete.
1, excavate along retaining wall 1 top, must be preced with beam guide groove, the bottom of wherein relative both sides hat beam guide groove exceeds the height of a crossbeam 5 than the bottom of both sides relative in addition hat beam guide groove.
2, abolish the top concrete of the retaining wall 1 being positioned at hat beam guide groove, make retaining wall top concrete absolute altitude concordant with hat beam elevation of bottom, reinforcing bar exposed after concrete is abolished at reservation retaining wall top is for bar connecting inner with hat beam.
3, along hat beam guide groove direction installation form.
4, colligation in hat beam forms, placement reinforcing bar, and bar connecting exposed after concrete is abolished at retaining wall top.
5, concreting in hat beam forms.
6, maintenance 14 ~ 28 days, obtains relative both sides exceed crossbeam 5 height hat beam 3 than both sides relative in addition.
Five, finishing hat beam 3, stand column pile 2 is installed support component 6.
1, total powerstation is used to measure stand column pile 2 apical axis lines and hat beam 3 point of intersection, and setting hat beam 3 trim locations.
2, usage mining machine also coordinates artificial being excavated to expose hat beam 3 and stand column pile 2 top downwards.
3, at the direction respectively welded and installed support component 6 of stand column pile 2 towards two relatively high hat beams 3, the height of the low crossbeam 5 of end face of the hat beam 3 that the end face of support component 6 is relatively lower than two.
4, finishing relatively low both sides hat beam 3 is towards the side of stand column pile 2, repairs out two hat beam grooves 31 corresponding with support component 6 position in stand column pile 2, the bottom surface of this hat beam groove 31 and support component 6 end face level.
Support component 6 is bracket structure, adopts the angle steel of horizontal direction and the angle steel under being tilted to be welded triangular structure, welded together with stand column pile 2.
Six, lifting cross beam 5
1,50t or 25t pedrail crane is used to sling beam member 51, lay between two sections of beam members 51 side by side to support component 6 end face on low hat beam 3 crown beam groove 31 position and stand column pile 2, these two sections of beam members 51 lay respectively on the support component 6 on stand column pile 2 both sides near the termination of stand column pile 2.
2, two sections of tenons 52 are plugged on respectively in the two sections of beam members 51 placed, reserve the fraction with displacement aperture 521.
3, hang the rear two sections of beam members 51 installed and be connected with front two sections of beam members placed 51, be erected at respectively on the support component 6 on stand column pile 2 both sides.
4, use in the displacement aperture 521 on the tenon 52 in inserted link insertion leading portion beam member 51, mobile tenon 52 in back segment beam member 51, make tenon 52 half in leading portion beam member 51, half is in back segment beam member 51.
5, above-mentioned installation process is repeated, all parallel crossbeams 5 be erected between relatively low both sides hat beam 3 of installation.
6, repeat above-mentioned installation process, the crossbeam 5 vertical with aforementioned crossbeam 5 is installed, the end face that this section of vertical crossbeam 5 is erected at hat beam the groove 31 and aforementioned mounted crossbeam 5 that relatively high both sides hat beam 3 is repaired out is positioned at the both sides of stand column pile 2.
Seven, waist rail 4 is installed.
1, usage mining machine and coordinate manually be excavated to design elevation downwards.
2, adopt the support component 6 on prior art installation retaining wall 1 medial surface at predeterminated position, the support component 6 on wherein relative both sides armlet 1 medial surface exceeds the height of a beam member 51 than the support component 6 on other both sides armlet 1 medial surface relatively.
3, hang installation waist rail component 41, between two sections of waist rail components 41, connect waist rail joint 42, the reinforcement bar 422 by waist rail joint 42 two ends is plugged in the jack 411 on waist rail component 41 termination, both sides, and makes groove 421 inner towards foundation ditch.
4, on the side of stand column pile 2 waist rail 4 relatively high towards both sides, weld support component 6, the end face of the support component 6 in the middle part of stand column pile 2 and the support component 6 end face level on armlet 1 medial surface of relative low both sides in the middle part of stand column pile 2.
Nine, brace summer is lifted.
1,50t or 25t pedrail crane is used to sling beam member 51, lay two sections of beam members 51 side by side to the groove 421 on low waist rail joint 42 with between support component 6 end face in the middle part of stand column pile 2, one end of these two sections of beam members 51 is positioned at the groove 421 on waist rail joint 42 simultaneously, and one end lays respectively on the support component 6 being positioned in the middle part of stand column pile 2 of stand column pile 2 both sides.
2, two sections of tenons 52 are plugged on respectively in the two sections of beam members 51 placed, reserve the fraction with displacement aperture 521.
3, hang the rear two sections of beam members 51 installed and be connected with front two sections of crossbeams placed 51, be erected at respectively on the support component 6 of both sides in the middle part of stand column pile 2.
4, use in the displacement aperture 521 on the tenon 52 in inserted link insertion leading portion beam member 51, mobile tenon 52 in back segment beam member 51, make tenon 52 half in leading portion beam member 51, half is in back segment beam member 51.
5, above-mentioned installation process is repeated, all parallel crossbeams 5 be erected between relatively low both sides waist rail 4 of installation.
6, above-mentioned installation process is repeated, the crossbeam 5 that the crossbeam 5 of Installation And Construction between relatively low both sides waist rail 4 is vertical, this section of vertical crossbeam 5 to be erected on groove 421 on relatively high both sides waist rail joint 42 and the aforementioned mounted end face being erected at crossbeam 5 between relatively low both sides waist rail 4 and to be positioned at the both sides of stand column pile 2.
Ten, continue to be excavated to design elevation downwards, complete whole foundation ditch excacation.
Claims (7)
1. a foundation ditch prefabricated assembled concrete braced structures, comprise and vertically insert the soil body and the retaining wall fenced up (1), the stand column pile (2) of aligned transfer in the space that retaining wall (1) fences up, be located at the Guan Liang (3) on retaining wall (1) top, the crossbeam (5) being erected at the waist rail (4) on retaining wall (1) inside wall and being erected in groined type between retaining wall (1), and stand column pile (2) is supported in the groined type Nodes of crossbeam (5), retaining wall (1) comprises soldier pile (11) and is positioned at the rotary churning pile (12) between soldier pile (11), it is characterized in that: described waist rail (4) and crossbeam (5) are precast beam prefabricated in factory, described retaining wall (1) and stand column pile (2) are provided with the support component (6) of support wale (4) and crossbeam (5).
2. foundation ditch prefabricated assembled concrete braced structures according to claim 1, it is characterized in that: described crossbeam (5) comprise for bar shaped hollow structure beam member (51) and the tenon (52) of strip structure in vacancy in beam member (51) can be placed in, described tenon (52) upper surface hits exactly and is distributed with multiple displacement aperture (521) along tenon (52) length direction.
3. foundation ditch prefabricated assembled concrete braced structures according to claim 2, it is characterized in that: the waist rail joint (42) that described waist rail (4) comprises the cross-sectional sizes waist rail component (41) identical with the cross-sectional sizes of beam member (51) and is connected between two sections of waist rail components (41), the both ends of the surface of described waist rail joint (42) are all provided with multiple even outwardly directed reinforcement bar (422), the both ends of the surface of described waist rail component (41) are provided with the jack (411) corresponding with reinforcement bar (422) position, described waist rail joint (42) stage casing is provided with two towards the one side inside foundation ditch can insert the termination of beam member (51), the groove (421) of the vertical direction inwardly concaved.
4. foundation ditch prefabricated assembled concrete braced structures according to claim 2, it is characterized in that: described crossbeam (5) is that two of being close to side by side are together supported between retaining wall (1) and stand column pile (2), and the termination of these two crossbeams (5) lays respectively at the both sides of stand column pile (2).
5. foundation ditch prefabricated assembled concrete braced structures according to claim 1, is characterized in that: the angle steel that described support component (6) is multiple horizontal direction and the angle steel under being tilted to are welded leg-of-mutton bracket structure.
6. foundation ditch prefabricated assembled concrete braced structures according to claim 1, is characterized in that: lattice column (21) structure that described stand column pile (2) becomes for Plate Welding.
7. foundation ditch prefabricated assembled concrete braced structures according to claim 2, it is characterized in that: the length of described tenon (52) is 1m ~ 3m, the diameter in described tenon (52) top offset hole (521) is 10mm, pitch of holes 2.5cm ~ 5cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520865356.1U CN205134326U (en) | 2015-11-02 | 2015-11-02 | Prefabricated assembled concrete bearing structure of foundation ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520865356.1U CN205134326U (en) | 2015-11-02 | 2015-11-02 | Prefabricated assembled concrete bearing structure of foundation ditch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205134326U true CN205134326U (en) | 2016-04-06 |
Family
ID=55620133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520865356.1U Expired - Fee Related CN205134326U (en) | 2015-11-02 | 2015-11-02 | Prefabricated assembled concrete bearing structure of foundation ditch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205134326U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105256812A (en) * | 2015-11-02 | 2016-01-20 | 深圳市路桥建设集团有限公司 | Prefabricated assembly type concrete supporting structure for foundation pit and construction method of prefabricated assembly type concrete supporting structure |
CN106168029A (en) * | 2016-08-19 | 2016-11-30 | 中铁隧道勘测设计院有限公司 | A kind of foundation ditch recoverable concrete support |
-
2015
- 2015-11-02 CN CN201520865356.1U patent/CN205134326U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105256812A (en) * | 2015-11-02 | 2016-01-20 | 深圳市路桥建设集团有限公司 | Prefabricated assembly type concrete supporting structure for foundation pit and construction method of prefabricated assembly type concrete supporting structure |
CN106168029A (en) * | 2016-08-19 | 2016-11-30 | 中铁隧道勘测设计院有限公司 | A kind of foundation ditch recoverable concrete support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256812B (en) | Foundation ditch prefabricated assembled concrete supporting construction and its construction method | |
CN101440708B (en) | PBA shallow buried underground excavating close range large section three-hole separated island type structure construction method | |
CN110017144B (en) | Loess tunnel three-step construction method considering substrate reinforcement treatment | |
CN105064397A (en) | Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation | |
CN106049505A (en) | Construction method for deep foundation pit supporting and protecting system | |
CN105714831A (en) | Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile | |
CN102691302B (en) | Concrete structure for supporting deep foundation pit | |
CN106930321A (en) | Underground structure novel construction method is built in a kind of pipe-jacking with large diameter combination hole stake | |
CN203334300U (en) | Root pile supporting structure | |
CN105089670A (en) | Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel | |
CN206752667U (en) | A kind of basement barrier wall structure | |
CN108360535A (en) | Foundation pit supporting construction based on campshed and inner support and its construction method | |
CN205134326U (en) | Prefabricated assembled concrete bearing structure of foundation ditch | |
CN205077499U (en) | Double row pile supporting construction with transverse connection component | |
CN211646413U (en) | Modular lattice steel frame shotcrete anchor supporting construction | |
CN104695446A (en) | Basement support construction method | |
CN101725147A (en) | Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space | |
CN216339582U (en) | Combined inclined support for foundation pit support | |
CN103711123B (en) | The construction method of bamboo joint type mortar pile | |
CN113529739B (en) | Coaxial expansion assembled support, shaftless rotary sprayer and corresponding construction method | |
CN114809005A (en) | Construction method for double-wheel milling cement-soil wall composite anchor cable supporting structure | |
CN111911169B (en) | Construction method and structure of shallow buried depth tunnel under existing railway line | |
CN205804366U (en) | A kind of slag runner structure | |
CN110863496B (en) | Method for replacing, supporting, excavating and constructing arch center foundation by concrete supporting in stone-filled island building area | |
CN103711130A (en) | Portal frame type bamboo joint mortar pile enclosure structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160406 |
|
CF01 | Termination of patent right due to non-payment of annual fee |